Astandag

Download PDF data sheet
Astandag completed
Astandag completed

Particulars

Owner: DSI - State Hydraulic Works

Designer: Su Yapi Engineering and Consulting Inc.

Contractor: unknown

Statistics

Type: Gravity

Purpose(s): Hydropower / Irrigation / Water Supply

Reservoir capacity: 11 m3x106

Height: 69 metres

Length: 210 metres

Volume of RCC: 162 m3x103

Total volume: 202 m3x103

Construction Dates

Start of Project: 09/08 (September 2008)

Start of RCC: 11/11 (November 2011)

End of RCC: 02/14 (February 2014)

End of Project: 11/14 (November 2014)

Country: Turkey

River: Bembo

DMS Co-ordinates: 37˚19'35"N, 44˚26'12"E

DD Co-ordinates: 37.326389, 44.436668

Facings

Upstream

SlopeType
VerticalTraditional concrete against formwork

Downstream

SlopeType
0.80Traditional concrete against formwork  [stepped face]

Spillway

SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
3001200

Cementitious material

Cement (kg/m3)
95
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -