SEARCHING
... please wait

Batu Hampar

Download PDF data sheet
Photo coming soon

Particulars

Owner: Jabatan Bekalan Air Negeri Sembilan

Designer: Sepakat Setia Perunding Sdn Bhd

Contractor: Dekon Sdn. Bhd. - CM Indah JV

Statistics

Type: Gravity

Purpose(s): Water Supply

Reservoir capacity: 3 m3x106

Height: 75 metres

Length: 236 metres

Volume of RCC: 200 m3x103

Total volume: 203 m3x103

Construction Dates

Start of Project: 11/07 (November 2007)

Start of RCC: 10/09 (October 2009)

End of RCC: 04/10 (April 2010)

End of Project: 05/10 (May 2010)

Country: Malaysia

River: Batu Hampar

DMS Co-ordinates: unknown

DD Co-ordinates: unknown

Facings

Upstream

SlopeType
 RCC against formwork (GEVR/GE-RCC)

Downstream

SlopeType
 RCC against precast concrete blocks

Spillway

SlopeType
 RCC against precast concrete blocks

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
65
Pozzolan (kg/m3)Pozzolan Type
120Low-lime flyash (ASTM Class F)