SEARCHING
... please wait

Copalar Bajo

Download PDF data sheet
Photo coming soon

Particulars

Owner: unknown

Designer: unknown

Contractor: unknown

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: unknown

Height: 70 metres

Length: unknown

Volume of RCC: unknown

Total volume: unknown

Construction Dates

Start of Project: /15 ( 2015)

Start of RCC: /17 ( 2017)

End of RCC: /19 ( 2019)

End of Project: /20 ( 2020)

Country: Nicaragua

River: Grande de Matagalpa

DMS Co-ordinates: unknown

DD Co-ordinates: unknown

Facings

Upstream

SlopeType
0.70Traditional concrete against precast concrete panels
1.00Traditional concrete against precast concrete panels

Downstream

SlopeType
0.70Traditional concrete against formwork  [stepped face]
1.00Traditional concrete against formwork  [stepped face]

Spillway

SlopeType
0.70Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type