SEARCHING
... please wait

Divresh

Download PDF data sheet
Photo coming soon

Particulars

Owner: Gilan Province Water Authority

Designer: Rey-Ab

Contractor: unknown

Statistics

Type: Gravity

Purpose(s): Irrigation / Water Supply

Reservoir capacity: 3 m3x106

Height: 45 metres

Length: 195 metres

Volume of RCC: unknown

Total volume: 137 m3x103

Construction Dates

Start of Project: /13 ( 2013)

Start of RCC: /15 ( 2015)

End of RCC: /17 ( 2017)

End of Project: /18 ( 2018)

Country: Iran

River: Kharshak

DMS Co-ordinates: 36˚52'18"N, 49˚32'28"E

DD Co-ordinates: 36.871666, 49.541111

Facings

Upstream

SlopeType
  

Downstream

SlopeType
  

Spillway

SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type