Goktas

Download PDF data sheet
Photo coming soon

Particulars

Owner: Bereket Energy

Designer: unknown

Contractor: unknown

Statistics

Type: Hardfill

Purpose(s): Hydropower

Reservoir capacity: 110 m3x106

Height: 135 metres

Length: 200 metres

Volume of RCC: 750 m3x103

Total volume: 900 m3x103

Construction Dates

Start of Project: 04/11 (April 2011)

Start of RCC: 03/13 (March 2013)

End of RCC: 03/15 (March 2015)

End of Project: 12/15 (December 2015)

Country: Turkey

River: Zamanti

DMS Co-ordinates: unknown

DD Co-ordinates: unknown

Facings

Upstream

SlopeType
0.30RCC against formwork
1.00RCC against formwork

Downstream

SlopeType
0.60RCC against formwork
1.00RCC against formwork

Spillway

SlopeType
0.75Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
50
Pozzolan (kg/m3)Pozzolan Type
50Low-lime flyash (ASTM Class F)