SEARCHING
... please wait

Kavsak Bendi

Download PDF data sheet
Photo coming soon

Particulars

Owner: Enerjisa En.Ür. A.S.

Designer: Hidro Dizayn Engineering Consultancy Co. Inc.

Contractor: unknown

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: unknown

Height: 88 metres

Length: unknown

Volume of RCC: unknown

Total volume: unknown

Construction Dates

Start of Project: /09 ( 2009)

Start of RCC: /10 ( 2010)

End of RCC: /12 ( 2012)

End of Project: /13 ( 2013)

Country: Turkey

River: Seyhan

DMS Co-ordinates: 37˚33'45"N, 35˚31'46"E

DD Co-ordinates: 37.562500, 35.529446

Facings

Upstream

SlopeType
0.20Traditional concrete against formwork

Downstream

SlopeType
0.80Traditional concrete against formwork

Spillway

SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type