Los Pilares

Download PDF data sheet
Los Pilares under construction
Los Pilares under construction

Particulars

Owner: CNA (Comisión Nacional del Agua)

Designer: unknown

Contractor: Canoras-Construplan

Statistics

Type: Gravity

Purpose(s): Flood Control / Irrigation / Water Supply

Reservoir capacity: 478 m3x106

Height: 65 metres

Length: 230 metres

Volume of RCC: unknown

Total volume: unknown

Construction Dates

Start of Project: 02/14 (February 2014)

Start of RCC: /15 ( 2015)

End of RCC: /17 ( 2017)

End of Project: /18 ( 2018)

Country: Mexico

River: Mayo

DMS Co-ordinates: 27˚25'25"N, 108˚51'35"W

DD Co-ordinates: 27.423611, -108.859718