Mont Nieddu

Download PDF data sheet
Mont Nieddu under construction
Mont Nieddu under construction

Particulars

Owner: Consorzio di Bonifica della Sardegna Meridionale

Designer: Studio di Ingegneria C.P.C.

Contractor: Astaldi

Statistics

Type: Gravity

Purpose(s): Irrigation / Water Supply

Reservoir capacity: 34 m3x106

Height: 84 metres

Length: 345 metres

Volume of RCC: 262 m3x103

Total volume: 444 m3x103

Construction Dates

Start of Project: 01/98 (January 1998)

Start of RCC: /18 ( 2018)

End of RCC: /19 ( 2019)

End of Project: /20 ( 2020)

Country: Italy

River: Monti Nieddu

DMS Co-ordinates: unknown

DD Co-ordinates: unknown

Facings

Upstream

SlopeType
0.05Traditional concrete against formwork

Downstream

SlopeType
0.75Traditional concrete against formwork  [stepped face]

Spillway

SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type