Yukari (Upper) Kaleköy

Download PDF data sheet
Yukari (Upper) Kaleköy under construction
Yukari (Upper) Kaleköy under construction

Particulars

Owner: Kalehan Energy Üretim ve Ticaret A.S.

Designer: unknown

Contractor: unknown

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: 595 m3x106

Height: 150 metres

Length: 404 metres

Volume of RCC: 2224 m3x103

Total volume: 2414 m3x103

Construction Dates

Start of Project: 07/12 (July 2012)

Start of RCC: 03/14 (March 2014)

End of RCC: /15 ( 2015)

End of Project: 04/17 (April 2017)

Country: Turkey

River: Murat

DMS Co-ordinates: 38˚48'50"N, 41˚2'33"E

DD Co-ordinates: 38.813889, 41.042778

Facings

Upstream

SlopeType
0.25RCC against precast concrete panels

Downstream

SlopeType
0.80Traditional concrete against formwork

Spillway

SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
130
Pozzolan (kg/m3)Pozzolan Type
0Milled sand