Click here to return to the front page

Dam DatabaseProjectsNewsAboutContact

Projects

New Victoria Dam

<:: Return to list

New Victoria Dam  (click to enlarge)Owner: Water Authority of Western Australia
Designer: Water Authority of Western Australia
Contractor: Baulderstone Hornibrook Engineering Pty. Ltd.
Consultant to Contractor: Kinhill/Halcrow/MD&A J.V.
Location: 25 km SE of Perth, Western Australia
River: Mundy Brook
Height: 52 m
Length: 285 m
Volume of RCC: 121 000 m3
Volume of dam: 135 000 m3
Reservoir capacity: 10M m3
Design flood: 700 m3/sec
Start of Project: 23.08.1990
Start of RCC: 11.03.1991
Completion of RCC: 18.08.1991
Completion of Project: 16.11.1991
Forming of upstream face: Horizontally-slipformed facing elements in a vertical face
Forming of downstream face: Horizontally-slipformed facing elements in a stepped face at slopes of 0.325 and 0.80:1 (H:V)
Forming of spillway: Horizontally-slipformed facing elements in a stepped face at slopes of 0.325 and 0.80:1 (H:V)
Mixture proportions:
ASTM Type-I cement 79 kg/m3
ASTM Class F flyash 160 kg/m3
Water 105 kg/m3
Coarse aggregate 1430 kg/m3
Fine aggregate 730 kg/m3
Workability:
Loaded VeBe time 15 - 20 sec±

Original Victoria Dam completed in 1891  (click to enlarge)
Original Victoria Dam completed in 1891
(click on image to enlarge)
Section of original dam being blown up in 1990  (click to enlarge)
Section of original dam being blown up in 1990
(click on image to enlarge)
March 1991 - concrete plant and conveyor to dam  (click to enlarge)
March 1991 - concrete plant and conveyor to dam
(click on image to enlarge)
March 1991 - conveyor to dam and excavation  (click to enlarge)
March 1991 - conveyor to dam and excavation
(click on image to enlarge)
March 1991 - General view of placement at base of dam  (click to enlarge)
March 1991 - General view of placement at base of dam
(click on image to enlarge)
May 1991 - New Victoria dam under construction from partially-demolished Victoria dam  (click to enlarge)
May 1991 - New Victoria dam under construction from
partially-demolished Victoria dam
(click on image to enlarge)
May 1991 - Placement of precast concrete slabs as soffit of main gallery  (click to enlarge)
May 1991 - Placement of precast concrete slabs as soffit of main gallery (NB walls of gallery formed of slipformed elements)
(click on image to enlarge)
May 1991 - Large vibratory roller compacting RCC directly against a downstream facing element  (click to enlarge)
May 1991 - Large vibratory roller compacting RCC directly against a downstream facing element
(click on image to enlarge)
June 1991 - Inserting 'crack inducer' into RCC after roller compaction  (click to enlarge)
June 1991 - Inserting 'crack inducer' into RCC after roller compaction (NB shaft on joint in background)
(click on image to enlarge)
August 1991 - Downstream face of almost completed dam  (click to enlarge)
August 1991 - Downstream face of almost completed dam (NB construction of spillway crest and training walls)
(click on image to enlarge)
August 1991 - upstream face prior to impounding   (click to enlarge)
August 1991 - Upstream face prior to impounding
(NB external upstream joint seals on contraction joints)
(click on image to enlarge)
August 1991 - Completed external upstream joint seal  (click to enlarge)
August 1991 - Completed external upstream joint seal
(click on image to enlarge)
October 1991 - Downstream face of dam after impounding  (click to enlarge)
October 1991 - Downstream face of dam after impounding
(click on image to enlarge)
Impounded reservoir in October 1991 27 months   (click to enlarge)
Impounded reservoir in October 1991 27 months
after the initiation of the Project
(click on image to enlarge)

^ top of page ^

dam database | projects | news | about us | contact

© 2003-2010 Malcolm Dunstan & Associates - All rights reserved