Owner:
Water Authority of Western Australia
Designer: Water Authority of Western Australia
Contractor: Baulderstone Hornibrook Engineering Pty.
Ltd.
Consultant to Contractor: Kinhill/Halcrow/MD&A J.V.
Location: 25 km SE of Perth, Western Australia
River: Mundy Brook
Height: 52 m
Length: 285 m
Volume of RCC: 121 000 m3
Volume of dam: 135 000 m3
Reservoir capacity: 10M m3
Design flood: 700 m3/sec
Start of Project: 23.08.1990
Start of RCC: 11.03.1991
Completion of RCC: 18.08.1991
Completion of Project: 16.11.1991
Forming of upstream face: Horizontally-slipformed facing
elements in a vertical face
Forming of downstream face: Horizontally-slipformed facing
elements in a stepped face at slopes of 0.325 and 0.80:1 (H:V)
Forming of spillway: Horizontally-slipformed facing elements
in a stepped face at slopes of 0.325 and 0.80:1 (H:V)
Mixture proportions:
ASTM Type-I cement
79 kg/m3
ASTM Class F
flyash 160 kg/m3
Water 105 kg/m3
Coarse aggregate
1430 kg/m3
Fine aggregate
730 kg/m3
Workability:
Loaded VeBe time
15 - 20 sec±

Original Victoria Dam completed in 1891
(click on image to enlarge) |

Section of original dam being blown up in
1990
(click on image to enlarge) |

March 1991 - concrete plant and conveyor
to dam
(click on image to enlarge) |

March 1991 - conveyor to dam and excavation
(click on image to enlarge) |

March 1991 - General view of placement at
base of dam
(click on image to enlarge) |

May 1991 - New Victoria dam under construction
from
partially-demolished Victoria dam
(click on image to enlarge) |

May 1991 - Placement of precast concrete
slabs as soffit of main gallery (NB walls of gallery formed of slipformed
elements)
(click on image to enlarge) |

May 1991 - Large vibratory roller compacting
RCC directly against a downstream facing element
(click on image to enlarge) |

June 1991 - Inserting 'crack inducer' into
RCC after roller compaction (NB shaft on joint in background)
(click on image to enlarge) |

August 1991 - Downstream face of almost
completed dam (NB construction of spillway crest and training walls)
(click on image to enlarge) |

August 1991 - Upstream face prior to impounding
(NB external upstream joint seals on contraction joints)
(click on image to enlarge) |

August 1991 - Completed external upstream
joint seal
(click on image to enlarge) |

October 1991 - Downstream face of dam after
impounding
(click on image to enlarge) |

Impounded reservoir in October 1991 27 months
after the initiation of the Project
(click on image to enlarge) |
^ top of page ^
dam database | projects
| news | about us