Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Monte ClaroBrazilCERAN (Companhia Energética Rio das Antas)HDas Antas1104/02- /03- /0412/04332323566        75  
Castro AlvesBrazilCERAN (Companhia Energética Rio das Antas)HDas Antas92- /05- /06- /0702/0845350240322V 1.30 1.30   6015(N)
Quatorze (14) de JulhoBrazilCERAN (Companhia Energética Rio das Antas)HDas Antas55- /05- /06- /0710/083728175212V 1.30 1.30   7515(N)
JararacaBrazilVeneto Energética S/AHdas Antas8- /06- /07- /0704/08252203161        7218(N)
Passo de MeioBrazilEnergética Campos de Cima da Serra LtdaHdas Antas27- /07- /08- /09- /1031110             
PezziBrazilPezzi Energética S.A.Hdas Antas24- /11- /12- /12- /1342 4480        7619(N)
Serra dos Cavalinhos IIBrazilSerra dos Cavalinhos II Energética S.A.Hdas Antas24- /11- /12- /12- /1342 3380        7218(N)

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Brazil

Owner: CERAN (Companhia Energética Rio das Antas)

Type: Gravity

Purpose(s): Hydropower

River: Das Antas

Reservoir capacity: 11 m3x106

Construction Dates

Start of Project: 04/02

Start of RCC: 04/02

End of RCC: -/04

End of Project: 12/04

Specifications

Height: 33 metres

Length: 232 metres

Volume of RCC: 35 m3x103

Total volume: 66 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
75
Pozzolan (kg/m3)Pozzolan Type
  
  
Monte Claro completed
Monte Claro completed

Full Dam Information

Details

Country: Brazil

Owner: CERAN (Companhia Energética Rio das Antas)

Type: Gravity

Purpose(s): Hydropower

River: Das Antas

Reservoir capacity: 92 m3x106

Construction Dates

Start of Project: -/05

Start of RCC: -/05

End of RCC: -/07

End of Project: 02/08

Specifications

Height: 45 metres

Length: 350 metres

Volume of RCC: 240 m3x103

Total volume: 322 m3x103

Construction Methods

Facings

Upstream
SlopeType
Vertical 
Downstream
SlopeType
1.30 
Spillway
SlopeType
1.30 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
15Natural pozzolan (ASTM Class N)
  
Castro Alves completed
Castro Alves completed

Full Dam Information

Details

Country: Brazil

Owner: CERAN (Companhia Energética Rio das Antas)

Type: Gravity

Purpose(s): Hydropower

River: Das Antas

Reservoir capacity: 55 m3x106

Construction Dates

Start of Project: -/05

Start of RCC: -/05

End of RCC: -/07

End of Project: 10/08

Specifications

Height: 37 metres

Length: 281 metres

Volume of RCC: 75 m3x103

Total volume: 212 m3x103

Construction Methods

Facings

Upstream
SlopeType
Vertical 
Downstream
SlopeType
1.30 
Spillway
SlopeType
1.30 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
75
Pozzolan (kg/m3)Pozzolan Type
15Natural pozzolan (ASTM Class N)
  
Quatorze (14) de Julho completed
Quatorze (14) de Julho completed

Full Dam Information

Details

Country: Brazil

Owner: Veneto Energética S/A

Type: Gravity

Purpose(s): Hydropower

River: das Antas

Reservoir capacity: 8 m3x106

Construction Dates

Start of Project: -/06

Start of RCC: -/06

End of RCC: -/07

End of Project: 04/08

Specifications

Height: 25 metres

Length: 220 metres

Volume of RCC: 31 m3x103

Total volume: 61 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
72
Pozzolan (kg/m3)Pozzolan Type
18Natural pozzolan (ASTM Class N)
  
Jararaca on Google Earth
Jararaca on Google Earth

Full Dam Information

Details

Country: Brazil

Owner: Energética Campos de Cima da Serra Ltda

Type: Gravity

Purpose(s): Hydropower

River: das Antas

Reservoir capacity: 27 m3x106

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/09

End of Project: -/10

Specifications

Height: 31 metres

Length: 110 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Passo de Meio completed
Passo de Meio completed

Full Dam Information

Details

Country: Brazil

Owner: Pezzi Energética S.A.

Type: Gravity

Purpose(s): Hydropower

River: das Antas

Reservoir capacity: 24 m3x106

Construction Dates

Start of Project: -/11

Start of RCC: -/11

End of RCC: -/12

End of Project: -/13

Specifications

Height: 42 metres

Length: -

Volume of RCC: 44 m3x103

Total volume: 80 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
76
Pozzolan (kg/m3)Pozzolan Type
19Natural pozzolan (ASTM Class N)
  
Pezzi completed
Pezzi completed

Full Dam Information

Details

Country: Brazil

Owner: Serra dos Cavalinhos II Energética S.A.

Type: Gravity

Purpose(s): Hydropower

River: das Antas

Reservoir capacity: 24 m3x106

Construction Dates

Start of Project: -/11

Start of RCC: -/11

End of RCC: -/12

End of Project: -/13

Specifications

Height: 42 metres

Length: -

Volume of RCC: 33 m3x103

Total volume: 80 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
72
Pozzolan (kg/m3)Pozzolan Type
18Natural pozzolan (ASTM Class N)
  
Serra dos Cavalinhos II completed
Serra dos Cavalinhos II completed

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates