Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Beyhan-I
[H-F]
TurkeyKalehan Energy Üretim ve Ticaret A.S.HMurat36901/1003/1203/1403/1597361148016610.70(7)0.70(1)  3003009040(M)
Yukari (Upper) KaleköyTurkeyKalehan Energy Üretim ve Ticaret A.S.HMurat59507/1203/14- /1504/17150404222424140.25(7)0.80(1)  3003001300(M)
Asagi (Lower) KaleköyTurkeyKalehan Energy Üretim ve Ticaret A.S.HMurat43203/13- /15- /1704/18103346119213420.25(7)0.80(1)  3003001300(M)
Beyhan-II
[H-F]
TurkeyKalehan Energy Üretim ve Ticaret A.S.HMurat7907/13- /17- /1809/19603631912100.70(7)0.70(1)  3003001300(M)

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Turkey

Owner: Kalehan Energy Üretim ve Ticaret A.S.

Type: Hardfill

Purpose(s): Hydropower

River: Murat

Reservoir capacity: 369 m3x106

Construction Dates

Start of Project: 01/10

Start of RCC: 01/10

End of RCC: 03/14

End of Project: 03/15

Specifications

Height: 97 metres

Length: 361 metres

Volume of RCC: 1480 m3x103

Total volume: 1661 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.70RCC against precast concrete panels
Downstream
SlopeType
0.70Traditional concrete against formwork
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
40Milled sand
  
Beyhan-I completed
Beyhan-I completed

Full Dam Information

Details

Country: Turkey

Owner: Kalehan Energy Üretim ve Ticaret A.S.

Type: Gravity

Purpose(s): Hydropower

River: Murat

Reservoir capacity: 595 m3x106

Construction Dates

Start of Project: 07/12

Start of RCC: 07/12

End of RCC: -/15

End of Project: 04/17

Specifications

Height: 150 metres

Length: 404 metres

Volume of RCC: 2224 m3x103

Total volume: 2414 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.25RCC against precast concrete panels
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
130
Pozzolan (kg/m3)Pozzolan Type
0Milled sand
  
Yukari (Upper) Kaleköy under construction
Yukari (Upper) Kaleköy under construction

Full Dam Information

Details

Country: Turkey

Owner: Kalehan Energy Üretim ve Ticaret A.S.

Type: Gravity

Purpose(s): Hydropower

River: Murat

Reservoir capacity: 432 m3x106

Construction Dates

Start of Project: 03/13

Start of RCC: 03/13

End of RCC: -/17

End of Project: 04/18

Specifications

Height: 103 metres

Length: 346 metres

Volume of RCC: 1192 m3x103

Total volume: 1342 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.25RCC against precast concrete panels
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
130
Pozzolan (kg/m3)Pozzolan Type
0Milled sand
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: Kalehan Energy Üretim ve Ticaret A.S.

Type: Hardfill

Purpose(s): Hydropower

River: Murat

Reservoir capacity: 79 m3x106

Construction Dates

Start of Project: 07/13

Start of RCC: 07/13

End of RCC: -/18

End of Project: 09/19

Specifications

Height: 60 metres

Length: 363 metres

Volume of RCC: 191 m3x103

Total volume: 210 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.70RCC against precast concrete panels
Downstream
SlopeType
0.70Traditional concrete against formwork
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
130
Pozzolan (kg/m3)Pozzolan Type
0Milled sand
  
Photo coming soon

 

Search again