Dam Search Results

Owner: Akkur Energy Production Trade and Industry Co. Inc.

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Feke IITurkeyAkkur Energy Production Trade and Industry Co. Inc.HGöksu6312/0712/0802/1008/10702561942270.07(6)0.80(3')*separate 30030060
60
60
50
(F)
BurçTurkeyAkkur Energy Production Trade and Industry Co. Inc.HGöksu6301/0701/08- /10- /11702352322600.07(8)0.80(3)separate 3003006050 to  60(F)
NarliTurkeyAkkur Energy Production Trade and Industry Co. Inc.HGöksu27- /16- /17- /18- /19471534968 (14) (14)  3003006550(F)

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Turkey

Owner: Akkur Energy Production Trade and Industry Co. Inc.

Type: Gravity

Purpose(s): Hydropower

River: Göksu

Reservoir capacity: 63 m3x106

Construction Dates

Start of Project: 12/07

Start of RCC: 12/07

End of RCC: 02/10

End of Project: 08/10

Specifications

Height: 70 metres

Length: 256 metres

Volume of RCC: 194 m3x103

Total volume: 227 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.07Traditional concrete against precast concrete panels with geomembrane
Downstream
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
separate 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
60
60
Pozzolan (kg/m3)Pozzolan Type
60Low-lime flyash (ASTM Class F)
50 
Feke II completed
Feke II completed

Full Dam Information

Details

Country: Turkey

Owner: Akkur Energy Production Trade and Industry Co. Inc.

Type: Gravity

Purpose(s): Hydropower

River: Göksu

Reservoir capacity: 63 m3x106

Construction Dates

Start of Project: 01/07

Start of RCC: 01/07

End of RCC: -/10

End of Project: -/11

Specifications

Height: 70 metres

Length: 235 metres

Volume of RCC: 232 m3x103

Total volume: 260 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.07RCC against precast concrete panels with geomembrane
Downstream
SlopeType
0.80RCC against formwork
Spillway
SlopeType
separate 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
50  toLow-lime flyash (ASTM Class F)
  
Burç on Google Earth
Burç on Google Earth

Full Dam Information

Details

Country: Turkey

Owner: Akkur Energy Production Trade and Industry Co. Inc.

Type: Gravity

Purpose(s): Hydropower

River: Göksu

Reservoir capacity: 27 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/18

End of Project: -/19

Specifications

Height: 47 metres

Length: 153 metres

Volume of RCC: 49 m3x103

Total volume: 68 m3x103

Construction Methods

Facings

Upstream
SlopeType
 Slip-formed/extruded facing elements
Downstream
SlopeType
 Slip-formed/extruded facing elements
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
65
Pozzolan (kg/m3)Pozzolan Type
50Low-lime flyash (ASTM Class F)
  
Photo coming soon

 

Search again