Gross Dam Raise
Download PDF data sheet
Gross Dam Raise under construction

Statistics
Type: Arch-Gravity
Purpose(s): Water Supply
Reservoir capacity: 147 m3x106
Height: 144 metres
Length: 610 metres
Volume of RCC: 568 m3x103
Total volume: unknown
Construction Dates
Start of Project: 04/22 (April 2022)
Start of RCC: 04/24 (April 2024)
End of RCC: 11/25 (November 2025)
End of Project: 12/26 (December 2026)
Country: USA
River: South Boulder Creek
DMS Co-ordinates: 39˚56'53.42"N, 105˚21'29.10"W
DD Co-ordinates: 39.948174, -105.358086
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|