Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
BukhtarmaKazakhstanMinistry of EnergyF HIrtysh3105/5509/5710/6112/6390450587988V(10)0.80(3)0.80(3)300120013580(F)
Liangsanping
[A]
ChinaSixian Water Resources BureauHLeishui4- /79- /80- /81- /82353333           
KengkouChinaKengkou Reservoir Management OfficeH WYouxi 2711/8411/8504/8611/86571234362V(9)0.75(10)0.75(13)250 &
500
250 &
500
60
60
120
80
(F)
TamagawaJapanMinistry of ConstructionF H I WTama25408/8009/8307/8612/901004417721150V
0.60
(1)
(1)
0.81(1)0.81(1)150 -
200
750
1000
9139(F)
ManoJapanFukushima PrefectureF H WMano3612/8304/8501/8803/9069239104219V(1)0.80(1)0.80(1)1805009624(F)
Santa EugeniaSpainSociedad Española de Carburos Metálicos S.A.HXallas1701/8706/8706/8810/88842902252540.05(3)0.75
0.35
(3)*
(3)*
0.75(1)25025088
72
152
145
(F)
Asahi OgawaJapanToyama PrefectureF HOgawa503/8305/8606/8806/9084260268361V
0.90
(1)
(1)
0.80(1)0.80(1)1805009624(F)
StagecoachUSAUpper Yampa Water Conservancy District, Steamboat Springs, ColoradoH I R WYampa4208/8706/8807/8811/88461163439V(1)0.80(1)*0.80(1)*3003007171(F)
VadeniRomaniaRomanian Electricity Authority (RENAL) - Tirgu Jiu BranchHJiu503/8605/8810/8810/9225551417 (12) (12)ogee(12)3009001250(-)
GantangpingChinaHydropower Bureau, Lanshan CountyHYonghe9- /84- /86- /88- /9052180 220          (F)
Urugua-iArgentinaElectriciad Misiones S.A.HUrugua-i117510/8504/8804/89- /8977687590626V(6)0.80(17)0.80(1)400400600(-)
Tirgu JiuRomaniaRomanian Electricity Authority (RENAL) - Tirgu Jiu BranchHJiu208/8606/8805/8912/9324611326 (12) (12)ogee(12)3009001250(-)
RongdiChinaDepartment of Water Resources & Hydropower, Guangxi Zhuang Autonomous RegionF H IDulanghe1904/8811/8807/8906/915313661108V(7)0.75(10)0.65(1)30030090
69
140
111
(F)
Longmentan Nº1ChinaDehua County, Fujian ProvinceH I WChanxi5312/8512/8708/8909/89581507193V
0.30
(12)
(12)
0.75(10)0.75(13)30030072
54
82
86
(F)
Tongjiezi (with Niurixigou saddle dam)ChinaGuodian Dadu River Basin Hydropower Development Co.F H I NDadu20001/8510/8812/8910/94881029407855V(1)0.75(10)0.75(1)300 -
500
300 -
500
79
82
79
83
(F)
TashkumyrKyrgyzstanMinistry of Power IndustryH INaryn140- /8203/8712/8912/90753201001300V(1)0.78(1)0.78(1)4004009030(N)
ShangbanChinaHWenchuanxi10- /87- /88- /89- /8947122 74           
PirikaJapanHokkaido Development BureauF H IShirobeshit-oshibetsu1810/82- /88- /8910/9140755163360V
0.80
(1)
(1)
0.80(1)0.80(1)2507508436(F)
Tianshenqiao Nº2ChinaChina Southern Power GridF HNanpan11601/8404/8706/9012/9261471143284V(1)V
0.40
(10)ogee(1)2502507979(F)
RiouFranceElectricité de FranceH I RRiou101/9006/9007/9003/91263084146V(2)0.60(14)*0.60(14)*300300 120(R)
Nickajack Auxillary SpillwayUSATennessee Valley AuthorityHTennessee31108/8907/9002/9104/921742779790.25(3)*0.60(3)*0.60(3)*30060085119(F)
SakaigawaJapanToyama PrefectureF H I WSakai6003/85- /8707/9101/93115298373713V
0.80
(1)
(1)
0.78(1)0.78(1)1807508436(F)
Victoria replacementUSAUpper Peninsula Power Co., MichiganHWest Branch 1304/9108/9110/9106/92371003640V(12)0.80(3)*0.80(3)*3003006767(C)
Sabigawa (lower dam)JapanTokyo Electric Power CompanyHKosabi 1110/8603/9012/9111/921042734005900.10(1)0.80(1)0.80(1)2507509139(F)
MachadoBrazilCOMPESA (Companhia Pernambucana de Saneamento)H WRiacho do Chorão15- /89- /90- /91- /9242360             
YantanChinaDatang Yantan Hydropower Co. Ltd.F H NHongshui335003/8502/8903/9212/95110525626905V(1)V
0.80
(1)
(1)*
ogee(1)30030055104(F)
CapandaAngolaMinistry of Energy and Oil of P. R. AngolaHKwanza479502/8710/8905/9212/0711012037571154V(6)0.70(14)
(10)
0.70(13)40040070100(M)
ShuikouChinaShuikou Hydropower PlantF H NMin261303/8710/9005/9205/951017916001710V(1)0.73(1)ogee(1)200 -
330
200 -
330
60
70
110
90
(F)
Wan’anChinaChina Guodian CorporationF H I NGan221611/8412/9012/9206/946811041561480V(1)0.80(1)ogee(1)30030065105(F)
Guangzhou PSS- Lower damChinaChina Southern Power GridHLiuxihe3012/9410/9112/9210/00611533257V(1)0.70(3)*ogee
0.78
(1)
(1)
30030062108(F)
Guxian (GuhXiahn)ChinaYellow River Conservancy CommissionF H ILuo1175- /78- /89- /92- /93125315             
Petit SautFrench GuyanaElectricité de FranceHSinnamary350007/8907/9202/9305/9448740250410V(11)V
0.80
(7)
(16)
0.80(13)300300 120(R)
JinjiangChinaJinjiang Electric Co.F HJinjianghe18907/9010/9103/9307/9368229182267V(1)0.75(1)0.65(1)
(1)
30030007080(F)
Puding
[A]
ChinaGuizhou Qianyuan Power Co. Ltd.H I WSanchahe37703/8906/9205/9302/9475196103137V(1)0.35(1)ogee
0.35
(1)
(1)
30030085
54
103
99
(F)
TsugawaJapanOkayama PrefectureF H WKamo610/8910/9107/9303/9476228222342V
0.60
(1)
(1)
0.76(1)0.76(1)2507509624(F)
CenzaSpainIberdrola, S.A.HCenza4301/9203/9308/9312/9349609200225V(3)0.122
0.75
(3)*
(3)*
0.75(3)*30030070130(F)
ShuidongChinaFujian Shuikou Power Generation GroupH NYouxi10804/9111/9210/9312/9563197126184V(7)0.75(10)0.75(1)3003005090(F)
DaguangbaChinaHainan Provincial Electric Power Company (HEPCO)H I WChanghua171006/9012/9112/9307/9557719485860V(1)0.75(10)
(3)
0.75(1)3003005596(F)
SuoshaiChinaGuizhou Hongfeng Hydropower PlantHSancha420- /89- /90- /93- /9475196 88           
Pak MunThailandElectricity Generating Authority of Thailand (EGAT)HMun 04/9112/9303/9406/94263234850V
V
(13)
(15)
V
0.80
(13)
(15)
separate 30030058124(F)
ShanziChinaLianjiang Water Conservancy BureauF H I WAojiang17208/9211/9305/9406/9566274180272V(5)0.80(10)0.77(13)30030065
55
125
95
(F)
Wenquanbao
[A]
ChinaWenquanbao Reservoir Management OfficeF H I WTanghe710/9110/9206/94- /95481885563V(4)0.30(3)ogee(13)300300110
69
68
85
(F)
San RafaelMexicoCFE (Comisión Federal de Electricidad)F HSantiago2611/9305/9407/9407/944817681110V(5)0.66
0.80
(3)*separate 30030090130(N)
Lac RobertsonCanadaHydro-QuébecHHa! Ha!58710/9206/9408/9403/95401242835V(1)0.75(1)*separate 3003008585(F)
CatouChinaDongyuan CountyHYinjiang1- /92- /93- /94- /9435115 2230.90 0.90 0.90      
Maojiang
[A]
ChinaLanshan County Hydropower BureauH IXiang2- /92- /93- /94- /9545150 45          (F)
Sishanping
[A]
ChinaHuangcen Reservoir Management OfficeF H ILeishui3- /92- /93- /94- /9556147 18          (F)
MiyagaseJapanMinistry of ConstructionF H WNakatsu19311/8711/9102/9503/01156400153720600.20
0.60
(1)
(1)
0.625(1)0.625(1)150 -
200
7509139(F)
ChiyaJapanOkayama PrefectureF H WTakahashi2803/8909/9204/9503/9898259396670V(1)0.77(1)0.77(1)2507509139(F)
OhmatsugawaJapanAkita PrefectureF H WMatsu1207/9010/9206/9509/9665296141294V
0.70
(1)
(1)
0.76(1)0.76(1)2507509139(F)
Xibingxi
[A-G]
ChinaDepartment of Electric Power, Lonyan City, Fujian ProvinceH WLongshanxi908/9312/9407/9510/9564932533V
0.08
(4)
(4)
0.65(3)ogee
0.65
(13)300 -
350
300 -
350
80
79
120
105
(F)
Guanyinge (Kwan-in-Temple)ChinaGuanyinge Reservoir Management BureauF H I WTaizi216805/9009/9109/9510/9582104012401876V
0.10
(1)
(1)
0.70(1)0.70(1)270 -
280
7509139(F)
SatsunaigawaJapanHokkaido Development BureauF H I WSatsunai5402/8704/9110/9503/991143005367700.40(1)0.80(1)0.80(1)2507507842(S)
UrayamaJapanWater Resources Development Public CorporationF H WUrayama5803/9012/9212/9503/9915637212941750V
0.65
(1)
(1)
0.80(1)0.80(1)250750
1000
9139(F)
ShibanshuiChinaFengdu Water Resources BureauF H RLongxihe10512/9204/94- /95- /9684445335564V(3')0.65(1)0.65(13)3001000126
60
84
90
(F)
Juba IBrazilItamarati Norte S.A. (part of Brennand Energia)HJuba - /93- /94- /95- /962123896113        6015(N)
Juba IIBrazilItamarati Norte S.A. (part of Brennand Energia)HJuba - /93- /94- /95- /9621238105113        6015(N)
JordãoBrazilCOPEL (Companhia Paranense de Energia)HJordão11005/9401/9502/9609/9695550570647V(1)0.74(3)*0.74(12)4004006015(N)
PangueChileEmpresa Electrica Pangue SAHBio-Bio17501/9201/9502/9612/96113410670740V(1)0.80(3)*0.80(12)30030080100(N)
Derivação do Rio JordãoBrazilCopel Geração e Transmissão S.A.HJordão11005/9401/9503/9612/9773560576665           
BailongtanChinaGuangxi-Guiguang Electric Power Development Co. Ltd.H I NHongshuihe34002/9310/9504/9608/97347106280V(1)0.70(10)*0.70(5)*30030073
99
110
60
(F)
HiyoshiJapanWater Resources Development Public CorporationF H WKatsura66- /8310/9407/9603/9870438440670V
0.80
(1)
(1)
0.80(1)0.80(1)250750
1000
84
77
36
33
(F)
Grand Falls spillwayCanadaAbitibi-Price Inc.HExploits 08/9609/9609/9612/9615180711V(1)0.67(1)*0.67(1)*20020013075(F)
MantaichengChinaWangqing County Water Conservancy BureauH IGayahe1008/9201/9312/9608/973733778100V(1)0.75(10)ogee
0.70
(1)
(1)
300100060120(F)
DahekouChinaChongqing Wujiang Power CompanyF HApengjiang115- /93- /94- /96- /9785149 33           
Guilman-AmorinBrazilArcelor Mittal Brasil S.A.HPiracicaba12- /93- /95- /9610/974114385102      3003008020(N)
PlatanovryssiGreecePublic Power Corporation (PPC)H INestos8401/8910/9503/9706/99953054204400.10(14)0.75(14)*0.75(13)30030050225(C)
WanyaoChinaWanyao Reservoir Management BureauF H I WDahexi 22310/9301/9505/9707/9783390320458V
0.20
(1)
(1)
0.70(5)0.75(13)3003006496(F)
TakisatoJapanHokkaido Development BureauF H I WSorachi10810/90- /9307/9706/00504453274550.06(1)0.80(1)0.80(1)2507508436(F)
KazunogawaJapanTokyo Electric Power CompanyHTuchimuro1211/9208/9507/9711/99105264428622V
0.10
(1)
(1)
0.82(1)0.82(1)170100091
84
39
36
(F)
ShuangxiChinaDepartment of Electricity, Dapu County, Guangdong ProvinceF H I WMeixihe9501/9503/9610/9712/9760221113172V(9)0.80(1)0.78(1)30030090
55
110
105
(F)
TaolinkouChinaDepartment of Water Resources, Hebei ProvinceF H I R WQinglonghe85911/9212/9412/97- /98755005851350V
0.15
(1)0.78(1)ogee
0.65
(1)
(1)
300300135
70
70
85
(F)
do PeixeBrazilCPEE (Companhia Paulista de Energia Elétrica)Hdo Peixe202/9612/9612/97- /98323002034V(1)0.80(1)*0.80(1)*300300120
90
0
0
(-)
Fengxiangxia
[A]
ChinaFengdu Hydropower BureauHHuilonghe8- /93- /95- /97- /9890158 7700.10 0.76 0.76      
Contraembalse de Moncion
[H-F]
Dominican RepublicINDRHI (Instiuto Nacional de Recursos Hidráulicos de la República Dominicana)F H IMao807/9502/9603/9806/98282541301550.70(1)0.67(1)*0.80(1)*300300800(-)
HayachineJapanIwate PrefectureF H I WHienuki1703/9310/9506/9803/0074333141333V
0.20
(1)
(1)
0.76(1)0.76(1)2507508436(F)
Gov. José Richa (formerly Salto Caxias)BrazilCOPEL (Companhia Paranense de Energia) Geração E Transmissão S.A.HIguaçu357302/9501/9607/9812/986710839121438V(13)0.75(1)*0.75(12)3003008020(F)
GassanJapanMinistry of ConstructionF H I WBonji6508/8806/9410/9803/011233937311160V(1)0.80(1)0.80(1)250750
1000
9139(F)
Yongxi Nº3ChinaYongxi Hydroelectric Co. Ltd.F H WDazhangxi6805/9610/9710/9809/9987198170255V(3')0.73(10)ogee
0.73
(1)
(1)
2803000115
80
95
90
(F)
HuatanChinaYa’an Electricity CompanyHYinghe801/9606/9612/9805/99851732402900.20(1)0.80(1)0.80(1)300 -
400
300 -
400
78
74
95
90
(F)
ChangshunChinaDepartment of Water Resources, Hubei ProvinceH WYujiang68- /9103/9712/9806/0069279170200V(3')0.74(3)0.80(1)3005000134
72
89
48
(F)
Waijin
[A]
ChinaFushan Power Station Management BureauH INanxi7- /94- /96- /98- /9947235 240           
Kengxiashan
[A]
ChinaWencheng County Kengxiashan Hydropower Development Co. Ltd.HYuquanxi1- /96- /97- /98- /983480             
Fenhe Nº2ChinaDepartment of Water Resources, Shanxi ProvinceF H WFenhe13011/9608/9803/9906/0087350362448V
0.20
(1)
(1)
0.75(5)0.75(1)3003000127
60
84
93
(F)
JiangyaChinaLishui Hydropower Development Co. Ltd.F H I N WLoushui174107/9510/9604/99- /0113136811001310V(3')0.80(3)*ogee
0.80
(13)300300087
64  46
107
96  107
(F)
Songyue (1st Stage)ChinaHelong Electricity CorporationF H I R WHailanhe2109/9701/9804/9909/99292714477V(1)0.73(10)conduit 300200080100(F)
BalambanoIndonesiaP.T. Vale IndonesiaHLarona3303/9504/9806/9909/999435252854V(2)0.80(1)*0.80(12)4204208154(F)
Yangxishui Nº3ChinaShaoguang Electricity Corporation LtdHYangxishui211/9709/9806/9907/0046202100139V(1)V
0.75
(1)
(1)*
0.70(12)300300  (F)
BaishiChinaDepartment of Water Resources, Liaoning ProvinceF H I WDalinghe164509/9604/9709/9912/0049513111603V
0.10
(1)
(1)
0.70(1)0.76(1)3003007258(F)
RosalBrazilRosal Energia S.A.HItabapoana1704/98- /9809/99- /00372124575 (1) (3)* (1)*3003004555(S)
SuçatiTurkeyERE Electricity Co.HGüredin Creek901/9802/9910/9910/99361925560V(7)0.80(7)0.80(12)30030050100(S)
Nam Leuk spillwayLaosEDL Generation Public Co. LtdHNam Leuk185- /98- /98- /99- /001560             
KubusugawaJapanToyama PrefectureF H I WKubusu1003/9304/98- /9910/0295253364469V
0.40
(1)
(1)
0.78(1)0.78(1)2507508436(F)
GaobazhouChinaQingjiang Hydropower Development CorporationF H NQingjiang53605/9711/9804/0001/0157440210940V(9)0.75(1)0.75(1)300300123
86
100
86
(F)
Karkheh (Pie Pol)IranKhuzestan Water & Energy AuthorityF HKarkeh4002/9807/9907/00- /0134350130270 (12) (12)ogee(12)3003009733(-)
Porce IIColombiaEPM (Empresas Públicas de Medellín)HPorce21111/9412/9609/0003/01123425130514450.10(14)0.35
0.75
(14)*0.75(13)300300132
120
88
80
(N)
Tucuruí - 2nd PhaseBrazilEletronorte SAHTocantins4580006/9806/9909/0010/057815412881383 (3) (3)*separate 3003007030(N)
Dona FranciscaBrazilDona Francisca Energértica SAHJacuí33508/9806/9910/0012/0063670485503V(1)0.75(3)*0.75(1)*3003007218(N)
DagangouChinaGe'ermu Hydroelectric Responsibility Corporation Ltd.HGeermu9780- /96- /98- /00- /0140              
Shankou Nº3
[A]
ChinaShixing County Power Development CorporationF HDu’anshui (Chengjiang)4809/9902/0001/0103/015717990119V(3')0.75(3')0.80(1)3303000105
63
86
80
(F)
Longshou Nº1
[A-G]
ChinaDepartment of Electricity, Gansu ProvinceHHeihe1304/9903/0006/0109/0180258187210V
0.20
(1)
(1)
0.75(1)0.75(1)300300096
58
109
113
(F)
Shimenzi
[A]
ChinaShimenzi Reservoir Engineering Management OfficeH I WTaxi8006/9806/9906/0110/011101761882110.142
V
(3')
(3')
V
0.18
(3)
(3)
crest(12)300300093
62
110
110
(F)
ChubetsuJapanMinistry of Land, Infrastructure and TransportF H I WChubetu9303/9409/9708/0103/04862905231007V
0.80
(1)
(1)
0.80(1)0.80(1)250750
1000
8436(F)
DachaoshanChinaDepartment of Electricity, Yunnan ProvinceF HLancang (Mekong)8910/9712/9810/0107/021154817571287V
0.20
(3')0.70(10)*0.70(13)30030094
67
94
101
(N)
Cana BravaBrazilCompanhia Energética Mercosul (of the Tractebel Group)HTocantins230003/9902/0010/0110/0267510527833 (1) (3)*ogee(1)3003004050(S)
MianhuatanChinaMianhuatan Hydroelectric Development CorporationF H N WTing203504/9812/9811/0104/02111302500615V(9)0.75(3)*0.70(13)300300082
59  48
100
88  88
(F)
Lajeado (Luis Eduardo Magalhães)BrazilInvestco (Tractebel)HTocantins498207/9806/0112/0112/02432100188210      3003003040(S)
YanwangbiziChinaChaoyang Water Conservancy BureauF H I WDaling217- /96- /97- /01- /023538387220        64118(F)
UenoJapanTokyo Electric Power CompanyHJinryu1903/97- /98- /0106/05120350269720V
0.30
(1)
(1)
0.84(1)0.84(1)200100077
70
33
30
(F)
FunilBrazilAliança Geração de Energia SAHRio Grande285- /97- /99- /0112/0250              
XiaoxiheChinaDepartment of Electricity, Feng Shun CountyH IXiaoxihe5- /99- /00- /01- /02621034766          (F)
Shuangkengkou
[A]
ChinaHXiaoxihe12- /99- /00- /01- /0268              
Peñas BlancasCosta RicaICE (Instituto Costarricense de Electricidad)HPeñas Blancas204/0007/0101/0207/0248211120170V(1)0.80(1)*0.80(12)3003009035(N)
HelongChinaElectricity Corporation, YanjiH R WHailanhe3011/9808/9901/0212/02302444389V(1)0.75(10)ogee(10)*3002000113113(F)
Shapai
[A]
ChinaSichuan Minjiang Hydropower Co. Ltd.HCaopohe1806/9703/0005/0204/03132230380392V
0.10
(3')0.21(3)crest
0.21
(1)300300108
89
72
89
(F)
Miel IColombiaIsagen S.A. E.S.P. - Hidromiel S.A. E.S.P.HLa Miel56512/9704/0007/0210/0218834516691730V(4')0.75
1.00
(3')*0.75
1.00
(12)30030085 to  1600(-)
Yangxishui Nº1ChinaCorporation of Energy Development, Ruyuan County, Guangdong ProvinceH IYangxi10012/0010/0111/0206/0382244241340V(1)V
0.75
(1)
(1)*
0.70(12)300300  (F)
Nankengyuan
[A]
ChinaJiangning Nankengyuan Hydropower Development Co. Ltd.HXiaoxihe1- /98- /00- /02- /0334114             
São BentoBrazilCASAN (Companhia Catarinense de Águas e Saneamento)HSão Bento58- /99- /00- /02- /0349461  V 0.80 0.80      
HengxiChinaHYangxi100- /99- /00- /02- /0382              
Passo do MeioBrazilEnergética Campos de Cima da Serra LtdaHdas Antas27- /00- /01- /0210/0331110             
Ormeo Junqueira Botelho (formerly Cachoeira da Encoberta)BrazilRio Glória Energética S.A.HGlória3- /99- /01- /0212/0349218             
Pedrinho 1BrazilEnergetica Rio Pedrinho Ltda..HPedrinho1- /99- /01- /02- /0316110             
Itiquira IBrazilItiquira Energética SAHItiquira - /00- /01- /02- /0315 22            
Furquim
[H-F]
BrazilH  - /00- /01- /02- /0318              
GuaporéBrazilTangará Energia S/AHGuaporé18- /00- /01- /02- /0332152 43           
JauruBrazilQueiroz Galvão Energética SA (90%) and Cinco Estrelas Agropecuária e Participações Ltda (10%)HJauru20- /00- /01- /02- /0351              
Junxi II
[A]
ChinaLongquan City Bureau of HydropowerHJunxi5- /00- /01- /02- /0369192             
WanmipoChinaHunan Wuling Hydroelectric Development CorporationH NYoushui37808/0111/0205/0305/0465238141376V(3')0.75(12)ogee(12)300300086
68
103
83
(F)
Linhekou
[A]
ChinaShaanxi Lan River Hydropower Development CorporationH ILanhe147- /9912/0106/03- /04100311229293curve(3')curve(3')ogee(1)300300074
66
111
111
(F)
RalcoChileENDESA, SpainHBio-Bio120008/9901/0209/0304/0415536015961640V(3')0.80(3')*0.80(12)300300133
95  116
57
50  41
(N)
TizidongChinaChongging Electricity Ltd.HApeng2508/0110/0210/0311/035619372161 (12) (12) (12)    (F)
Huilong PSS - Upper damChinaHenan Electric Power CorporationHHuilonggou106/0111/0211/03- /05542087376V(3')0.75(3')none 300300  (F)
BureyskayaRussiaRusHydroF HBureya2100001/7601/85- /03- /091398107093538V(1)0.70(1)0.70(1)300 -
500
300 -
500
95 to  11025 to  30(N)
Maobaguan
[A]
ChinaShaanxi Hanjiang Hydropower Development Co. Ltd.HRenhe2- /00- /02- /03- /046612081106           
WangkengChinaWang Keng Power Station Co. Ltd.HTangkouxi15- /01- /02- /03- /04561593840          (F)
Liubo
[A]
ChinaAnhui Hydropower Development Co. Ltd.,F HXipihe51- /02- /03- /03- /0470258130168          (F)
Ghatghar PPS - Upper damIndiaGoMWRD (Government of Maharashtra Water Resources Department)HPravara612/0105/0301/0406/04155033540V(3')0.78(3')*0.78(3')*30030088132(F)
ZhouningChinaMindong Electromechanical Development CorporationHMuyangxi47- /0204/0303/0406/0473206159199V(3')0.72(3')0.70(12)30030067
50
100
92
(F)
Huilong PSS - Lower damChinaHenan Electric Power CorporationHHuilonggou206/01- /0206/04- /055417588105V(3')0.75(3')*0.75(12)300300  (F)
PedrógãoPortugalEDIA (Empresa de Desenvolvimento e Infra-Estruturas do Alqueva)F H IGuadiana10608/0202/0408/04- /0543448172392V(3')0.80(3')*0.80(12)*30030055165(F)
TongkouChinaBeichuan Bashu Tongkou River Development CorporationHTongkou3610/98- /02- /04- /0472198300352V(1)1.10(1)ogee(1)300300  (F)
PingbanChinaGuangxi-Guiguan Electric Power Co. Ltd.HNanpan27812/01- /02- /0407/0562396150700V(3')0.70(3')ogee(12)300300  (F)
Monte ClaroBrazilCERAN (Companhia Energética Rio das Antas)Hdas Antas2304/02- /03- /0412/04251803566        6015 
Changtan
[A]
ChinaGuangdong Shanneng group Co.HTuwushui17- /03- /03- /04- /0453124 29           
Nam Mang 3LaosEDL (Electricite du Laos)HNam Gnong49- /02- /03- /0401/0528151             
Risoleta Neves (formerly Candonga)BrazilAlianca Geracao de Energia S.A.HDoce5405/01- /03- /0405/0553437236248      3003004050(S)
FundãoBrazilELEJOR - Centrais Elétricas do Rio JordãoHJordao34- /01- /03- /04- /0543445200220      3003006416(N)
YujiankouChinaChongqing Yujiankou Hydropower Co. Ltd.HLong908/01- /03- /04- /0550156118147V(3')0.70(3')0.85(1)    (F)
LetanChinaGuangxi-Guiguan Electric Power Co. Ltd.,H I NXijiang950- /02- /03- /04- /056658650210           
Xiakou
[A]
ChinaHubei Nanzhang Xiakou Electric Co. Ltd.HJuhe99- /02- /03- /04- /0585192 131           
QinglianxiChinaHMeixi20- /00- /02- /04- /0696178             
Santa Clara-PRBrazilElejor Centrais Elétricas do Rio Jordåo S.A.HJordåo43111/0212/03- /0401/0567543530606 (1) (1) (1)*3003004050(S)
Saluda dam remediationUSASouth Carolina Electric and GasHSaluda197008/0207/0304/0507/0565243910041410 (5) (5)*  3003008989(F)
Zhaolaihe
[A]
ChinaChangyang Electric Power BureauH I WDuhu7012/0303/0405/0510/05107206166255curve(3')curve(3') (3')300300084
126
126
103
(F)
XiheChinaHanjiang Hydropower Development Ltd.F H NHan22911/0302/0405/0506/0763346194631          (F)
Çindere
[H-F]
TurkeyDSI - State Hydraulic WorksH I WBuyuk Menderes8204/9407/0205/0511/07107280150016850.70(6)0.70(1)*0.89(12)3003005020(F)
SuofengyingChinaGuizhou-Wujiang Hydropower Development Co. Ltd.F H I N WWu20110/0006/0308/0503/06116165421739V
0.25
(3')
(3')
0.70(3')0.70(1)30030006495(F)
ChalilloBelizeBelize Electric Co. Ltd (BECOL) and A. Fortis Co., CanadaHMacal12007/0303/0410/0512/06684251802100.20(1)0.75(3')*0.75(12)30036001050(N)
Barra GrandeBrazilBAESA (JV of Alcoa, Companhia Paulista de Força e Luz (CPFL), Companhia Brasileira de Alumínio, Camargo Corrêa Cimentos and DME Energética)HPelotas50000- /01- /02- /05- /06856651            
ChangzhouChinaHXun56- /93- /02- /05- /0756              
PicadaBrazilL.D.Q.S.P.E. Geracao de Energia e Participacoes Ltda.Hdo Peixe8- /02- /03- /05- /063297             
Xiaqiao
[A]
ChinaGuangxi Longjiang Electric Power CorporationHLong49- /02- /03- /05- /0668167172226           
Huizhou PSS - Lower damChinaChina Southern Power GridHCaitouhe30- /02- /03- /05- /1161420235242           
Tangkeng
[A]
ChinaQingtian Yongwen Hydropower Co.HGuxi12- /03- /04- /05- /0566    (12) (12) (12)     
Cachoeira GrandeBrazilEMBASA (Empresa Baiana de Aguas e Saneamento S.A.)H ISapucaia5- /04- /04- /05- /051620715            
Peixe AngicalBrazilEnerpeixa S/AHTocantins304/02- /04- /0509/0639400500582      300300700(-)
São BernardoBrazilCJ Energética S/AHBernardo José2- /03- /04- /05- /0621120             
XixiChinaXixi Reservoir Development Co. Ltd.F H I WDaxi85- /03- /04- /05- /0671243231244          (F)
BaiseChinaGuangxi-Youjiang Hydraulic Development Co.Ltd.F H I N WYou566010/0112/0204/0612/0613072019952672V(9)0.80(1)0.80(1)300300080
50
132
110
(F)
Ghatghar PPS - Lower damIndiaGoMWRD (Government of Maharashtra Water Resources Department)HShahi Nallah312/0112/0405/0603/07864476386460.141(3')0.782(3')*0.782(3')*30030075150(F)
NagaiJapanMinistry of Land, Infrastructure and TransportF H N WOkitamano5103/0010/0211/0603/111263817031200V
0.50
(1)
(1)
0.73(1)0.73(1)25010009139(F)
Dahuashui
[A]
ChinaWujaing Qingshuihe Hydropower Development Co. Ltd.F HQingshuihe27612/0304/0511/06- /07135198550670curve(3')curve(3') (1)300300081
94
81
94
(F)
Niuqiao
[A]
ChinaNiu Qiao Reservoir Development Co. Ltd.HQingtonghe26- /03- /0512/06- /0762201 710           
PleikrongVietnamEVN (Electrictie de Vietnam)HPo Ko104811/0502/0512/06- /0765495326450V(1)0.80(1)0.80(1)30030080210(N)
Qilitang
[A]
ChinaHLiuchi71- /03- /04- /06- /0781              
XinjiangshankouChinaHKaidu - /97- /04- /06- /0871              
BaishaChinaChina Huadian CorporationF HWanan199- /04- /05- /06- /0675172211239           
EsmeraldaBrazilEsmeralda S.A.HBernardo José1- /05- /05- /06- /06192121527        6416(N)
LeidatanChinaLeidatan CorporationHYingtaoyuangou9403/03- /05- /0606/0784202240340V(3')0.70(3')0.70(1)     
Santa LauraBrazilSanta Laura S/AHChapecozinho19- /04- /05- /06- /07272452442           
MosquitãoBrazilConcessionária Mosquitão S/AH 19- /04- /05- /06- /07322365776           
XiaoxiChinaHunan Xiangtou Xinshao Youxi Hydropower Development Corporation Ltd.HZishui168- /04- /05- /06- /0747268             
ZhoubaChinaChengdu Haineng Power Co. Ltd.F HMabianhe204- /04- /05- /06- /0773163229405V(1)0.70(1)0.78(1)300300110
66
73
66
(F)
Shaba
[A]
ChinaGuizhou Zhongsui Energy Ltd.HHongdu99- /04- /05- /06- /07871486790           
Wuchuanshaba
[A]
ChinaHWujiang9940- /04- /05- /06- /0787              
DaxiaChinaChina Guodian CorporationH IQuan20- /04- /05- /06- /0788160 205           
ZaoshiChinaLishui Basin Hydraulic and Hydroelectric Development CorporationF H N WDieshui1439- /04- /05- /06- /0788351450930V
0.25
(3')0.80(3')0.75(1)300300053
83
99
102
(F)
JupuduChinaDatang International Power Generation Co. Ltd.HLixian (Black)17411/04- /05- /06- /0795320480800V
0.20
(3)0.80(3)0.80(3)     
TukaheChinaDatang International Power Generation Co. Ltd.H Lixian7804/0412/05- /06- /0759300255570V(3') (3') (3')300300065
93
110
113
(S)
Longqiao
[A]
ChinaLichuan City Yujaing Valley Hudropower Ltd. Hubei ProvinceH RYu2612/0503/0602/0705/0795156135160curve(3')curve(3) (3)     
PinalitoDominican RepublicCorporacion de Empresas de Energia Electrica (CDEEE), Unidad Ejecutora Proyecto Pinalito (UEPP)HTireo409/0411/0503/07- /085221073100V(1)0.80(1)*0.80(12)300300988(N)
Akköy ITurkeyAkköy Energy A.S.HHarsit307/0510/0604/0709/0838144871010.10(1)0.80(1)0.80(12)300300100100(N)
Huizhou PSS - Upper damChinaChina Southern Power GridHXiaojinhe3010/0412/0505/07- /11561688493V(1)0.75(1)0.70(1)30030064125(F)
Longtan (Stage 1)ChinaLongtan Hydropower Development Co. Ltd.F H N WHongshui1621007/0110/0406/0712/0919283246237400V
0.25
(3')0.70(3')0.68(12)30030099
86
121
109
(F)
TaishirMongoliaMinistry of EnergyH I WZabkhan93002/0505/0606/0712/0760200210250V(2)0.72(1)*0.72(12)*333333750(-)
A VuongVietnamEVN (Electrictie de Vietnam)HVugia Thubon 34008/0301/0610/0711/0883240260350V(1)0.80(1)1.00(1)30030090150(N)
Nakai, part of Nam Theun 2 HPPLaosNam Theun Power Corporation (NTPC)/EdF (Electricitie de France)HNam Theun353004/0403/0610/0710/0939436150207V(1)0.35
0.75
(10)0.75(12)300300100100(F)
Dinh BinhVietnamMinistry of Agriculture and Rural Development (MARD)F H I WKon22605/0408/0512/0712/0855571183430V(11)0.75(3')*ogee(12)30090070
126
175
141
(F)
HongkouChinaFujian Hongkou Hydropower Co. Ltd.H WHuotong449- /03- /05- /07- /08130341681830           
Ludesa
[H-F]
BrazilCPFL RenovaveisHChapecó142- /06- /06- /0704/0725300  1.50 1.50 0.75      
Luojiaohe
[A]
ChinaGuizhou Zhongshui Energy Co. Ltd.HLuojiao46- /05- /06- /07- /0781250 110           
Castro AlvesBrazilCERAN (Companhia Energética Rio das Antas)Hdas Antas92- /05- /06- /0702/0848350240322V 0.77 0.77   6015(N)
Da Ilha (Rio da Prata)BrazilDa Ilha Energética S/AHdas Antas16- /04- /06- /0704/0826310          8020 
Quatorze (XIV) de JulhoBrazilCERAN (Companhia Energética Rio das Antas)Hdas Antas55- /05- /06- /0710/083728175212V(1)0.77(1)0.77(1)  7515(N)
Baxiang Nº3ChinaDepartment of Electricity, Feng Shun CountyHBaxianghe8- /05- /06- /07- /08442076383           
TiechengChinaGansu Keyuan Electric Power Group Co. Ltd.HDatong1- /05- /06- /07- /0844143             
YumenChinaDepartment of WaterResources, Henan ProvinceF H NLuohe28- /05- /06- /07- /0862244133234           
YoushuiChinaChongqing Youshui River Hydropower Development Co. Ltd.HYoushui152- /05- /06- /07- /0863194             
Qilinguan
[A]
ChinaNanhe Hydropower Development Ltd.HNanhe14- /05- /06- /07- /08771404555           
Bailianya
[A]
ChinaAnhui Water Resources Development Co. Ltd.F H I WDongpi480- /05- /06- /0704/09105422485600V(1)0.335(1)0.335(1)300300072
56
108
84
(F)
CotiporãBrazilCotiporã Energetica S.A.HCarreiro4- /07- /07- /07- /07161962141           
Plano AltoBrazilSPE Plano Alto Energia S/AHIrani13- /06- /07- /0702/08381734278V 0.75 0.75   7219(N)
JararacaBrazilVeneto Energética S/AHdas Antas8- /06- /07- /0704/08252193161        7218(N)
NanshaChinaRed River Hydropower Development Co. Ltd.HHonghe21202/06- /07- /0707/0885              
Linha EmiliaBrazilLinha Emília Energética S/AHCarreiro12- /06- /07- /07- /08272143554           
SilinChinaGuizhou-Wujiang Hydropower Development CorporationF H I NWujiang159311/0511/0603/08- /091173108251100V(1)0.70(1)0.70(1)  66
89
100
109
(F)
Weihou
[A]
ChinaXilin River Hydropower Development Co. Ltd.HTuoniang13303/05- /0604/08- /0982              
GuangzhaoChinaGuizhou Qianyuan Power Co. Ltd.HBeipan324510/0402/0605/08- /0920141224202800V
0.25
(9)0.75(1)0.75(1)30030061
71
91
87
(F)
GelantanChinaDatang International Hydropower Generation Co. Ltd.HLixian40901/0309/0608/08- /091134669031200V
0.20
(3')0.75(3')0.75(1)  77
93
77
93
(S)
Mangla Emergency Spillway Control WeirPakistanWAPDA (Water and Power Development Authority)H IJhelum650008/0412/0711/0801/09173705479V
0.30
(3')
(3')*
V
0.70
(3')
(3')*
0.70(3')*30030060120(S)
YeywaMyanmarDepartment of Hydroelectric Power - Ministry of Electric PowerHMyitnge260010/0102/0612/0812/1013768024732843V(3')0.80(3')*0.80(12)30030075145(N)
JinghongChinaHuaneng Lancang River Hydropower Co. Ltd.F H RLancang (Mekong)1139- /04- /05- /08- /091087058483068V(3)0.80(3) (1)300 64
93
93
93
(S)
Se San 4VietnamEVN (Electrictie de Vietnam)HPoko5412/0403/05- /08- /09748347531300V(1)0.80(1)0.80(1)30030080160(N)
Santa Rosa IIBrazilSanta Rosa S/AHGrande7- /06- /06- /08- /0831172             
PengshuiChinaDatang International Power Generation Co. Ltd.H IChangxi1465- /05- /06- /08- /091173266081330V(3')0.70(3')0.70(1)  64
81
96
121
(F)
LiujiadongChinaGuangxi Water Conservancy and Electric Power CorporationHGui26- /06- /07- /08- /0861166 127           
Cachoeirão (Henrique Nunes Coutinho)BrazilHidrelétrica Cachoeirão SAHManhuaçu - /07- /07- /08- /082390             
Alto Irani
[H-F]
BrazilCPFL RenovaveisHIrani5- /07- /07- /08- /084524314202.50 2 2      
São SimãoBrazilSão Simão Energia S/AHItapemirim Norte11- /06- /07- /0802/095618792115           
Major Gercino (formerly known as Angelina)BrazilLumbrás Energética S.A.HTijucas6- /07- /07- /0803/0945178             
Binh DienVietnamBinh Dien Electricity Joint Stock CompanyHHuu Trach42401/05- /07- /0804/0954571189423      30030070105(F)
Engenheiro Henrique KotzianBrazilBME Energia SAHIvaí9- /06- /07- /0804/09342285876           
Pedra do GarrafãoBrazilHItabapoana - /07- /07- /0805/0915110             
GoiandiraBrazilGoiás Sul Geração de Energia S.A.HVerissimo7608/07- /07- /0805/0944341  V 0.75 0.75      
Retiro VelhoBrazilRetiro Velho Energetica S/AHda Prata69- /05- /07- /08- /094256             
ShuheChinaDatang Shaanxi Power Generation Co LtdHHanjiang176- /06- /07- /08- /0972              
Qingxi
[A]
ChinaGuizhou Qianyuan Power Co. Ltd.HFurong98- /06- /07- /08- /0982166 154           
NonglingChinaDehong Longjiang Hydropower Development Co. Ltd.HLong233- /06- /07- /08- /0991280 486           
ShankouChinaXinjiang Yili River Basin Development AuthorityHTekes12104/06- /07- /08- /0950496             
Rodeio BonitoBrazilVelcan Energy Development Ltda.HIrani9- /06- /07- /0801/1032223 59V 0.85 0.85      
Engenheiro Ernesto Jorge DreherBrazilBME EnergiaHIvaí4- /07- /08- /0804/09232202935        6817(N)
Las TruchasMexicoDesarrollos Mineros San Luis, S.A. de C.V.HLa Lobor o Las Truchas - /07- /08- /08- /093523024       300300   
Yunlonghe Nº3
[A]
ChinaEngshi Yuefeng Yunlong River Hydropower Development Co. Ltd.HYunlong4403/0604/0704/09- /11139119182207curve(3')curve(3') (3')     
El Platanal (formerly Capillucas)PeruCementos Lima S.A.HCanete501/0710/0804/0910/09346075750.375(3')0.75(3')*  3003006590(N)
KasegawaJapanMinistry of Land, Infrastructure, Transport and TourismF H I WKase7102/0510/0706/0903/1299456830948V
0.60
(1)
(1)
0.75(1)0.75(1)25010008436(F)
Yunkou
[A]
ChinaYujiang Hydropower Co. Ltd.HWuni3506/0704/0806/09- /12119152200205           
VacaBelizeBelize Electric Company Ltd (BECOL) and A. Fortis Company, CanadaHMarcal1202/0702/0810/0912/11702252002200.20(1)0.75(3')*0.75(12)30030009431(F)
Taum Sauk
[H-F]
USAAmerenUEHWater source - East Fork of Black River602/0710/0711/0906/10492060244825000.60(1)0.60(1)*no
spillway
 3003005959(F)
Salto-RSBrazilHCaí - /07- /07- /09- /0942              
WuduChinaSichuan Wudu Water Conservancy and Hydropower Group Ltd.F H I WFu57210/04- /07- /09- /1012063111511580V(3')0.75(3')0.80(3')    (F)
São PedroBrazilSão Pedro Energia S/AHJacu Braço Norte2- /06- /07- /09- /10301402235           
Sông Côn 2VietnamGeruco Song Con Hydro Power Joint Stock CompanyHSong Con30- /06- /07- /09- /1058260             
Huanghuazhai
[A]
ChinaChina Datang CorporationHGetu174807/06- /07- /09- /10110253280292        5296(F)
Tianhuaban
[A]
ChinaYunnan Dianneng Niulanjiang Hydropower Development Co. Ltd.HNiulan6612/06- /07- /09- /10113160182360curve(3')curve(3')ogee(3)     
BaishiyaChinaQuifeng Water Supply Co. of Fangchenggang CityH I WXijiang26- /04- /07- /09- /1274190230240  0.75        
Palomino
[H-F]
Dominican RepublicEGEHID (Empresa de Generación Hidroeléctrica Dominicana)HYaque del Sur and Blanco3- /05- /07- /09- /1365153             
CriúvaBrazilCriúva Energética S/AHLajeado Grange7- /08- /08- /0912/09252468095        7218(N)
Chonghu’erChinaXinjiang-Xinhua-Chonghuer Hydropower Development Co. Ltd.HBurgin8510/06- /08- /09- /0974545 480           
Areia BrancaBrazilHidrelétrica Areia Branca S.A. (Tractebel Energia)HManhuaçu - /08- /08- /09- /0928257             
PalanquinhoBrazilSerrana Energética S/AHdas Antas6- /07- /08- /0901/103213789103        7218(N)
Barra dos CoqueirosBrazilGerdau Aços LongosH WClaro108/07- /08- /0907/10601670172282           
PiedadeBrazilPiedade Usina Geradora de Energia S.AHPiedade18- /06- /08- /0908/1030397             
Serra do FacãoBrazilSerra do Facão Energia S.A. (SEFAC)HSao Marcos519902/07- /08- /0910/1092326610742      3003007218(N)
Maduhe
[A]
ChinaYichang Junwang Group Co.HSiyang33- /06- /08- /09- /10100185             
São Gonçalo (formerly Santa Bárbara)BrazilSPE São Gonçalo Energia S.A.HSanta Bárbara6- /07- /08- /09- /10281481426V 0.75 0.75   6817(N)
CaçuBrazilGerdau SAHClaro - /07- /08- /09- /1040              
Yangjiayuan
[A]
ChinaGuizhou Tongzihe Hydropower Development Co. Ltd.H WTongzhi78- /07- /08- /09- /1068153             
GeliqiaoChinaWujiang Hydropower Development CorporationHQingshuihe7701/0704/08- /09- /10124104 500           
ArvoredoBrazilSPE Arvoredo Energia S.A.HIrani12- /08- /09- /0904/10392595381V 0.75 0.75   8020(N)
Feke IITurkeyAkkur Energy Production Trade and Industry Co. Inc.HGöksu6312/0712/0802/1008/10702561942270.07(6)0.80(3')*separate 30030060
60
60
50
(F)
Adnan Mendres (formerly Çine)TurkeyDSI - State Hydraulic WorksF H I WÇine35012/9511/0404/1010/11137300156016500.10
0.20
(7')0.85(7')0.85(7')30030085
75
105
95
(F)
Kasegawa auxiliary dam
[H-F]
JapanMinistry of Land, Infrastructure, Transport and TourismF H I WKase103/0810/0906/1009/102911652680.80(12)0.80(12)0.80(12)250750800(-)
PirrisCosta RicaICE (Instituto Costarricence de Electricidad)HPirris3612/0603/0906/1007/111132586957550.33(3')*0.50(3')*0.50(12)30030088132(N)
BramhoekSouth AfricaESKOMHBraamhoekspruit2704/0806/0906/1002/11373309098V(3')0.67(3')*0.67(3')*30012007095(F)
Son LaVietnamEVN (Electricté de Vietnam)F HSong Da (Black river)926004/0401/0808/1012/1213896226774800V(3')0.73(3')*separate 30030060160(F)
ŞirnakTurkeyDSI - State Hydraulic WorksHOrtasui18- /0811/0908/1009/10671981572310.10(1)0.80(1)*0.80(12)3006001250(-)
Ban VeVietnamEVN (Electrictie de Vietnam)HCa150008/0402/0710/1012/1113648015201750v
0.30
(3')0.85(3')*0.80(12)30030080120(N)
Çamlica III
[H-F]
TurkeyAkfen EnergyF HZamanti104/0804/1012/1004/11521861601820.70(7)0.70(1)*0.70(12)3003008837(F)
Dong Nai 3VietnamEVN (Electrictie de Vietnam)F HDong Nai169012/0405/0812/1010/1110859411381235V(1)0.75(1)*0.75(1)300300750(-)
Nuoc TrongVietnamMARD (Ministry of Agriculture and Rural Development)H ITra Kluc29010/0707/0912/1005/1169518446607V(3')    300300125
80
218
230
(N)
Santa Clara-BABrazilCompanhia Energetica Santa ClaraHMucuri151- /99- /01- /02- /0359242520600      300300   
Khan KhwarPakistanWAPDA (Water and Power Development Authority) and CTGC (China Three Gorges Corp.)HDuber Khwar 04/03- /06- /1004/1246112             
Jin’anqiaoChinaHanergy, Yunnan Jinsha River Hydropower Co. Ltd. and Yunnan Investment and Development Co. Ltd.H N RJinsha91312/0305/07- /10- /1116064024004430V(3)0.75(3)0.75(1)  72
96
108
117
(F)
Rondon IIBrazilEletrogoes S/A.HComemorqção478- /07- /08- /10- /1119460             
ImboulouRepublic of CongoDélégation Générale des Grands TravauxHLéfini58409/03- /08- /1005/1133310             
Saizhu
[A]
ChinaYunnan Dianneng Group Holding CompanyHXima304/06- /08- /10- /1172160107115curve(3')curve(3') (3)     
QianchangChinaGuodian Yunnan Power Co LtdHPudu22- /07- /08- /10- /1181148             
ShidiChinaChongqing Wujiang Power CompanyHYoushui163- /06- /08- /10- /1230214 260           
Sanliping
[A]
ChinaHubei Energy Group Co. Ltd.F HNanhe499- /0705/08- /10- /11133285 390 (1) (1) (1)     
Água LimpaBrazilÁgua Limpa Energia S/AHPalmeiras10- /08- /09- /1012/10389842            
FigueirópolisBrazilCompanhia Hidroelétrica FigueirópolisHJauru35- /08- /09- /1012/1016170  V 0.43 0.75      
Porto EstrelaBrazilHSanto Antonio8- /08- /09- /10- /1126              
IbiramaBrazilIbirama Energética SAH 1- /09- /09- /10- /1015145             
Ninho da ÁguiaBrazilCPFL RenovaveisHSanto Antônio1- /09- /09- /10- /101594 14V 0.75 0.75      
CajuBrazilEnergisa Geracão Rio Grande S/AHRio Grande10- /09- /09- /1003/11382226682           
PipocaBrazilOmega Engergia Renovávelo S/AHManhuaçu - /07- /09- /1004/1116200            (N)
Naen
[A]
ChinaGuangxi Water Conservancy and Electric Power CorporationHBaidu22- /06- /09- /10- /1175217             
São JoséBrazilIjui Energia S.A.HCarreiro188- /07- /09- /10- /1129790             
Luoboba
[A]
ChinaEnshi Tianfa Electric Ltd.F H RLengshui87- /07- /09- /10- /111141922121          (F)
LavrinhaBrazilBMEHParaiba do Sul 12/07- /09- /10- /1128 85            
São Sebastião do AltoBrazilGeracao Hidroeletrica Rio Grande S/AHGrande44- /08- /09- /10- /11412105175           
LechangxiaChinaDepartment of Water Resources, Guandong ProvinceH I NBei374- /08- /09- /10- /1185256             
Corrente GrandeBrazilCPFL RenovaveisHCorrente Grande12- /10- /10- /10- /1020110  V 0.75 0.75      
Marco BalboBrazilH  - /10- /10- /10- /1030 4273           
Changuinola 1
[A-G]
PanamaAES (Allied Energy Systems Co.) Panama SRLHChanguinola34704/0712/0904/1110/11105595884910V(3')0.50
0.70
(3')*
(3')*
0.50(12)30030070
65
145
150
(F)
Gov. Jayme Canet Junior (formerly Antiga Mauá)BrazilConsorcio Energético Cruzeiro do Sul (Copel and Electrosul Centrais Eléctricas SA)HTibagi2137- /0901/1005/11- /1283726633753V(2)0.80(10)  30024006015(N)
Dong Nai 4VietnamEVN (Electrictie de Vietnam)HDong Nai33712/0403/0906/11- /1212848113051370V(1)0.80(1)*0.80(1)30030085115(N)
GüllübagTurkeySenerji EnerjiHÇoruh2105/0902/1106/1102/127297160175V(1)0.50
0.70
(1)
(1)
0.70(12)3003007070(F)
Dak Mi 4Vietnam(IDICO) Urban and Industrial Development Zone Investment CompanyHVu Gia31304/0701/0808/1104/1290472720800V(3')0.48
0.80
(3')*
(3')*
0.80(1)30030095125(N)
Song Tranh 2VietnamEVN (Electrictie de Vietnam)HSong Tranh73303/0504/0808/1112/129664010321315V(3')0.80(1)0.75(1)30030070110(N)
Gomal Zam
[A-G]
PakistanWAPDA (Water and Power Development Authority)F H IGomal142407/0208/0709/1106/13133231390474V 0.60 0.60 3003000 to
4000
9191(F)
Yubari SyuparoJapanMinistry of Land, Infrastructure and TransportF H I WYubari42711/0310/0909/1103/15111390584940V
0.80
(1)
(1)
0.82(1)0.82(1)250750 &
1000
9139(F)
MengeTurkeyEnerjisa En. Ut. A.S.HGöksu5105/0908/1010/1112/11683043493840.25(1)0.80(3')*0.80(12)3003008040(F)
Nam Gnouang (Theun Hinboun Expansion)LaosTheun Hinboun Power CompanyHNam Gnouang245010/0803/1012/11- /1265480383 V(1)0.80(1)*1.00(12)30030090100(F)
ShiyaziChinaGuizhou Zhongshui Energy Co. Ltd.HHongdu321- /0704/0812/1112/11135              
GongguoqiaoChinaHuaneng Lancang River Hydropower Co. Ltd.HLancang (Mekong)316- /08- /09- /1103/12105356 1067           
Boa SorteBrazilBoa Sorte Energética S/AHTijucas18- /07- /09- /11- /1226              
Huhehaote (Hohhot) PSS - Upstream lower damChinaNei Mongol (Inner Mongolia) Electricity CorporationHHalasxinegou7- /07- /09- /11- /1269242185330           
KamchayCambodiaElectricity of Cambodia (44-year BOT to Sinohydro Corporation)HKamchay718- /07- /09- /11- /121125681100 V
0.30
 0.75        
Qinglong
[A]
ChinaEnshi Mawei Valley Hydropower Development Co. Ltd.HMaweigou2912/08- /09- /11- /12140116 212           
A LuoiVietnamCentral Hydropower Joint Stock CompanyHA Sap 06/0704/09- /11- /1250208138            
SefaköyTurkeyPüre Energy Üretim Tic. A.S.HAras21- /08- /10- /1110/1155148120  (1) (1)       
Anta (with Simplicio)BrazilCentrais Eletricas Brasileiras sa EletrobrasHParaiba do Sul114- /09- /10- /1112/11302704455           
MoínhoBrazilStatkraft (Moinho S.A.)HBernado José1- /09- /10- /11- /1122126925        6817(N)
NabiChinaBaise WaCun Hydropower Development Co.HXiyang57- /09- /10- /11- /1169247 289           
LianhuataiChinaGuodian Shaanxi Hydropower Development Co.HDan9502/09- /10- /11- /1170221 221           
AutódromoBrazilAutódromo Energética S/AHCarreiro4- /10- /10- /11- /11232712147        6717(N)
Boa FéBrazilBoa Fé Energética S.A.HCarreiro5- /10- /10- /11- /11261983258           
SilopiTurkeyDSI - State Hydraulic WorksH WHezil2908/08- /10- /1102/12893567187520.10(7)0.70(3')*0.70(1)3003008139(-)
Santo Antonio-RJBrazilEnergisa Geracão Rio Grande S/AHGrande17- /09- /10- /1102/124428581105           
Santo Antonio-ROBrazilSanto Antônio EnergiaHMadeira2075- /08- /10- /1103/122531005603086           
Dr Victor Baptista Adami (formerly Passos Maia)BrazilPassos Maia Energética S.A. (Statkraft, Adami & Madeiras)HChapecó14- /09- /10- /1109/1234 66         7218(N)
Linxihe
[A]
ChinaHubei Huaqing Power Co. Ltd.HLoushui52- /08- /10- /11- /1274146             
MadushanChinaHonghe Guangyuan Hydropwer and Madushan Development Co. Ltd.H N WHonghe552- /08- /09- /11- /12108353 987           
A’haiChinaYunnan Jinsha River Hydropower Co. Ltd.F H IJinsha885- /08- /10- /11- /12138482 2707           
BalkusanTurkeyKaren EnergyHBalkusan15- /09- /10- /11- /12481896076V(1)0.75(1)*0.75(12)30012007550 
QingyanggouChinaYumen Hongyuan Industrial CompanyHSule - /09- /10- /11- /1264147             
DengkeChinaYunnan Baoshan Electric Co. Ltd.HLongjiang53- /09- /10- /11- /1276239             
RizzaneseFranceElectricité de FranceH IRizzanese1- /0904/1102/12- /12411406472V
1.00
(6)
(10)
V
0.80
 0.80 300300800(-)
KöprüTurkeyEnerjisa En. Ut. A.S.HGöksu9807/0912/1004/12- /131094139751050V
0.60
(1)
(1)
0.80(1)0.80(12)3003008545(F)
Dong Nai 2VietnamTrung Nam Power Jointstock CompanyHDong Nai28104/0912/1005/1203/13804297861025   (3')*  30030080
90
120
110
(N)
BuiGhanaBPA (Bui Power Authority)H IBui1257010/0702/0905/1211/14108493830900V(3')0.75(3')0.75(12)300300045
61
85
91
(F)
GökkayaTurkeyMEM Enerji Elektrik Üretim Sanayi ve Ticaret A.ŞHGöksu1802/1007/1005/1207/1269118961220.067(1)0.80(1)0.80(11)3003005555(F)
Ban ChatVietnamEVN (Electrictie de Vietnam)HNam Mu213801/0608/0908/1212/1313042516002V(3')0.80(3')*separate 30030060160(F)
DevecikonagiTurkeyMCK Elektrik Uretim A.S.H IEmet605/1003/1109/1201/13393131802100.10(2)0.75(1)0.80(12)3003008040(F)
Akköy II (Aladereçam)TurkeyAkköy Energy A.S.HKaraovacik14- /0705/1109/12- /1360260226306V(1)0.80(1)0.80(12)3003008585(N)
Nam Ngum 5
[A]
LaosNam Ngum 5 Power Company Ltd. (15% Électricité du Laos - Generation Company Ltd., 85% Power)HNam Ting31410/0811/1112/1212/12101235298421           
Dak DrinhVietnamPetro VietnamHDak Drinh24901/0909/1112/1212/13100466788  (3') (3')* (12)30030080115(N)
Duber KhwarPakistanWAPDA (Water and Power Development Authority) and CTGC (China Three Gorges Corp.)HDuber Khwar 06/03- /08- /1201/1441202             
LongkaikouChinaYunnan Jinsha River Hydropower Co. Ltd.F H N R WJinsha55808/0709/08- /12- /1311976828403853V(3)0.75(3)  300300096
60
96
90
(F)
Allai KhwarPakistanWAPDA (Water and Power Development Authority) and CTGC (China Three Gorges Corp.)HAllai Khwar 01/05- /09- /1203/135188             
Shankouyan
[A]
ChinaShankouyan Hydro Project Development Co.HYuanhe10511/07- /09- /12- /1399268 272           
OuroBrazilH  - /10- /10- /12- /1216              
Grand PoubaraGabonMinistries of Mining, Energy, Oil and Water ResourcesHOgooué 11/08- /10- /1208/1337300          105
96
70
64
(F)
ShatuoChinaWujiang Hydroelectric Development CorporationF H NWu91005/06- /10- /12- /1310163115101980V
0.15
(3')0.75(3')0.75(3)3003000   
Dayuhyan
[A]
ChinaGuizhou Water-investment Hydropower Development Co., LtdHMasha61- /09- /10- /12- /1381              
GuandiChinaYalong River Hydropower Development Co. Ltd.HYalong760- /09- /10- /12- /1316851629703020V
0.30
   0.70   7288(F)
Nankanghe Nº2
[A]
ChinaXimeng Fubian Hydropower Development Co. Ltd.HNankang31- /10- /11- /12- /1268179             
RetiroBrazilCTG BrasilHSapucai18- /10- /11- /1207/1315482             
GaribaldiBrazilRio Canoas Energia S.A.HCanoas296- /10- /11- /1209/1342517264382           
Çermikler
[H-F]
TurkeyDSI - State Hydraulic WorksHKizilirmak41- /08- /11- /12- /1342251160            
ÇetintepeTurkeyDSI - State Hydraulic WorksHRobozik4409/08- /11- /12- /133917360640.10(1)0.80(1)*0.80(12)30012007763(N)
Toca do TigreBrazilCJ Hydro - Geraçao de Energia S.AHTurvo6- /09- /11- /12- /1322237             
Ivan Botelho I (fomerly Antiga Ponte)BrazilCentrais Hidrelétricas Grapon S/AHPomba17- /10- /11- /12- /1332273             
Huong DienVietnamFPT CorporationHBo821- /10- /11- /12- /1383 260400        90100(N)
PezziBrazilPezzi Energética S.A.Hdas Antas24- /11- /12- /12- /13422384480        7619(N)
Serra dos Cavalinhos IIBrazilSerra dos Cavalinhos II Energética S.A.Hdas Antas8- /11- /12- /12- /13421233380        7218(N)
MurumMalaysiaSEB (Sarawak Energy Bhd)HMurum1204310/0805/1007/13- /1514644015201660V
0.20
(3')
(3')
0.70
0.80
(3)*0.70
0.80
 300300088
65
88
72
(F)
Cannelton
[H-F]
USAAmerican Municipal Partners (AMP)HOhio 05/0906/1208/1309/1635158113 0.80(10)0.80(10)separate 23023011864(F)
Captain Meldahl
[H-F]
USAAmerican Municipal Partners (AMP)HOhio 04/1106/1312/1304/16288456 0.80(10)0.80(10)separate 23023011662(F)
Upper Paung LaungMyanmarDepartment of Hydroelectric Power - Ministry of Electric PowerHPaung Laung128501/0601/1112/13- /141035379361100V(3')0.80(3')*0.80(12)30030090140(N)
KalashukeChinaDepartment of Water Resources, Xinjiang ProvinceF H WE’erqisi2419- /07- /10- /13- /14122148925202890  0.75 0.75 3003000  (F)
Mamaya Nº1ChinaGuizhou Qianyuan Power CompanyHBeipan137- /08- /10- /13- /14109250 591           
Luntan
[A]
ChinaLuntan Hydraulic Engineering Co. Ltd.HYangcunshui18012/08- /10- /13- /1490218             
Rastro de AutoBrazilCERTELHForqueta - /11- /11- /13- /1323190             
AngosturaChileColbún SAHBioBio - /09- /11- /13- /1463125             
Lizhou
[A]
ChinaChina Huadian CorporationH WMuli190- /09- /11- /13- /14132211             
Shannipo
[A]
ChinaGuizhou Qianyuan Power Co. Ltd.HBeipan85- /09- /11- /13- /15119205199267curve(3')curve(3)ogee(3)     
João BorgesBrazilEletrosul Centrais Elétricas SAHCaveiras23- /12- /12- /1311/1329170             
ShaqianChinaHydroChina Co.F HFurong5710/11- /12- /13- /1359              
Barra do Rio ChapéuBrazilEletrosul Centrais Elétricas S/AH WBraço do Norte2- /12- /12- /13- /1325117             
HuanzaPeruEmpresa de Generacion HuanzaHPallca - /10- /12- /13- /1438 85            
ShuangfengsiChinaChengde Shuangfengsi Project BureauHLuanhe137- /11- /12- /13- /1450535 550           
Lower Russei ChrumCambodiaMinistry of Mines and EnergyHRussei Chrum62- /11- /12- /13- /1459325170            
HonglingChinaGuodian Haikong Hongling water construction Co. Ltd.H I WDabian662- /11- /12- /13- /1492              
Huhehaote (Hohhot) PSS - Downstream lower damChinaNei Mongol (Inner Mongolia) Electricity CorporationHHalasxinegou7- /12- /12- /13- /1458308205717           
Bajo FríoPanamaFountain Hydro Power Corp.HChiriqui Viejo - /12- /13- /13- /145640687272           
AslandagTurkeyDSI - State Hydraulic WorksH I WBembo1109/0811/1102/1411/14692101622020.10(1)0.80(1)*0.80(12)300120010080(N)
Beyhan-I
[H-F]
TurkeyKalehan Energy Üretim ve Ticaret A.S.HMurat369- /0903/1203/1403/1597361148016610.70(7)0.70(3')  3003009040(M)
Song Bung 4VietnamEVN (Electrictie de Vietnam)HVu Gia51109/1006/1204/1401/151143459631170V
0.40
 0.80(3')*  300300080
60
120
140
(N) &
(F)
Willow Island
[H-F]
USAAmerican Municipal Partners (AMP)HOhio 12/1111/1304/1402/16206649 0.80(10)0.80(10)separate 23023011662(F)
GuanyinyanChinaDatang Huarui Investment Group Ltd.F H N RJinsha2263- /0809/1105/14- /16159125064739364V
0.10
(3')0.75(3')0.75(1)300 5399(F)
TsugaruJapanMinistry of Land, Infrastructure, Transport and TourismF H IIwaki14110/0805/1008/1403/1697342500717V
1.00
(1)
(1)
0.74(1)0.74(1)25010009139(F)
BonyicPanamaHidroécología Teribe (HET) S.A.HBonyic1- /11- /1308/14- /1537165 88           
Smithland
[H-F]
USAAmerican Municipal Partners (AMP)HOhio 12/1103/1410/1407/1733153120 0.80(10)0.80(10)separate 23023011864(F)
Pembelik
[H-F]
TurkeyDarenhes A.S.HPeriSuyu35811/1003/1310/14- /15885007608380.70(3')*0.70(3')*0.70(12)30012001200(-)
XiangjiabaChinaChina Three Gorges CorporationHJinsha52- /06- /10- /14- /16162909             
TongzilinChinaYalongjiang Valley Hydropower DevelopmentHYalong1- /08- /10- /14- /1671              
LudilaChinaYunnan Huadian Hydropower Co. Ltd.HJingsha171801/07- /11- /14- /15140622 1920V
0.20
 0.75        
YalnızardıçTurkeyAkköy Energy A.S.HGevne109- /09- /11- /14- /15113300490            
RondinhaBrazilHChapecó - /12- /12- /14- /1420              
KayabeyiTurkeyPelin EnergyH IKura14801/10- /12- /1402/15159230637780       300   
Longtanzui
[A]
ChinaHHanshuinanhe10- /10- /12- /14- /1598  205           
ManduriacuEcuadorCELEC (Corporatión Eléctrica del Ecuador)HMauduriacu1012/11- /13- /1403/1561245114 0.25 0.75 0.75     (N)
Gümüsören
[H-F]
TurkeyDSI - State Hydraulic WorksH I WZamanti195- /11- /13- /1406/1537842189019430.70(3')0.76(3')*0.76(12)30012008436(F)
OguzlarTurkeyDSI - State Hydraulic WorksHOrtasu2009/08- /13- /14- /15534313924600.10(1)0.80(1)*0.80(12)3006001000(-)
MusatepeTurkeyDSI - State Hydraulic WorksHRobozik1309/08- /13- /14- /15661651311380.10(1)0.80(3')*0.80(12)30012007763(N)
Lijiahe
[A]
ChinaXian Water Affair GroupHBahe53- /11- /13- /14- /1599352370478           
Songyue (2nd Stage)ChinaHelong Electricity CorporationF H I R WHailanhe21- /12- /13- /14- /1541271  V(1)0.73(10)conduit 300200080100(F)
KarakuzTurkeyDerin Enerji Uretim San. Ve Tic. A.S.HKökün5- /12- /13- /14- /1545162400            
Adigüzel IITurkeyPeker Energy IncHBüyük Menderes 15- /12- /13- /14- /1561145150            
AyvaliTurkeyOzdogan EnerjiHOltu30804/1102/1302/1510/1517740516501900V(3')0.75(3')*0.75(12)30030050
100
110
120
(F)
Göktas 1
[H-F]
TurkeyBereket EnergyHZamanti10904/1103/1303/15- /161332007499000.30
1.00
(1)
(1)
0.60
1.00
(1)
(1)*
0.75(12)3003005050(F)
Kotanli II
[A-G]
TurkeyEBD En. Ür. ve Tic. A.S.HKura2010/1205/1404/1511/15702502482520.15(3)0.70(3')*0.70(12)30030085130(N)
Lai ChauVietnamEVN (Electrictie de Vietnam)HSong Da (Black River)121506/1003/1305/1507/1713162018842500V(3')0.75(3')*0.75(12)30030060160(F)
Teesta low dam (Stage IV)IndiaNHPC Ltd.HTeesta3705/0601/1305/1508/16451961671700.40(3')*0.80(3')*separate 30030085135(F)
Cerro del ÁguilaPeruIC PowerHMantaro3711/1208/1406/15- /16892702504500.10(1)0.75(1)*0.75(12)30060011523 
Xekaman 1LaosXekaman Power Ltd.HXe Kaman312003/1205/1307/1512/161203358701065V(3')* (3')* (12)30030070130(F)
Ulu Jelai/SusuMalaysiaTenaga Nasional Berhad (TNB)HBertam, Telom and Lemoi1803/1103/1409/1507/1690513731747V(4')0.80(3')*0.80(1)*4002400100
95
0
0
(-)
Gibe IIIEthiopiaEthiopian Electric Power (EEP)HOmo1469004/0812/1110/15- /16246630620064000.25(3')1.00(3')*1.00(3')*40040070 to  12045 to  60(S)
TuokouChinaChina Power International DevelopmentHYuan1384- /10- /12- /15- /1682649             
BurçTurkeyAksa Energy Production Trade and Industry Co. Inc.HGöksu6301/0701/12- /15- /17702352322600.07(8)0.80(1)separate 3003006050 to  60(F)
Nam Ou 5LaosEDL (Electricite du Laos)HNam Ou335- /11- /13- /1505/1674445             
Teles PiresBrazilANEEL (Agência Nacional de Energia Elétrica)HTeles Pires107/11- /13- /1509/16673605001020           
GuoduoChinaHuaneng Guoduo Hydropower Co. Ltd.HZha Qu80- /12- /13- /15- /1683236 550           
KasimlarTurkeyDeğirmenüstü EnergyHKöprüçay43- /12- /13- /15- /1690235330            
Mata Velha
[H-F]
BrazilCPFL RenovaveisHPreto38- /14- /14- /1504/163018045651.25 1.25 1.25      
Nam Khan 3LaosEDL (Electricite du Laos)F H WNam Khan24912/12- /14- /1506/1667154125145           
FazendaBrazilENEL Green Power Fazenda S.A.Hdos Apiacás2- /12- /14- /1509/1621503             
Salto ApiacásBrazilENEL Green Power Salto Apiacás S.AHdos Apiacás2- /12- /14- /15- /1617486             
Las Cruces (formerly San Bartolo)PanamaCorporacion de Energia del Istmo Ltd. S.A.HSan Pablo39- /13- /14- /15- /164137177 V(3')0.85(3')*0.85(12)300300900(-)
Shuishimen
[A]
ChinaYunxi Shuishimen Reservoir BureauF H WTianhe37- /13- /14- /15- /1686  150           
Dayakou
[A]
ChinaGuangdong Yuedian Group Co., LtdHNanpeng170- /13- /14- /15- /1699300 210           
Jubinha IBrazilItamarati Norte S.A.HJubinha480- /15- /15- /15- /15211540             
Juba IVBrazilItamarati Norte S.A.HJuba7- /15- /15- /15- /1526570             
Neelum-JhelumPakistanNeelum Jhelum Hydropower CompanyHNeelum8- /08- /1408/1611/1747125 156        15451(S)
Trung SonVietnamEVN (Electrictie de Vietnam)F HMa34911/1204/1408/1602/17884987701140V
0.35
(3')
(3')*
0.65(3')*0.65(12)30030060
70
140
150
(N)
Yukari (Upper) KaleköyTurkeyKalehan Energy Üretim ve Ticaret A.S.HMurat78406/1206/1409/1604/18150516222424140.25(7)0.80(1)  3003009040(M)
KargiTurkeyLimak EnergyHSakarya50- /11- /1512/1606/1795270535            
UludereTurkeyDSI - State Hydraulic WorksHOrtasu17- /08- /12- /16- /18774318008870.10(1)0.80(1)*  3003009545(N)
Dong Nai 5VietnamVinacominHDong Nai - /10- /12- /16- /1872471             
Kirazlı KöprüTurkeyDSI - State Hydraulic WorksH IGökırmak66- /99- /13- /16- /1773280330 0.10(1)0.90(1)  300 7550(F)
BeyyurduTurkeyDSI - State Hydraulic WorksHBembo809/08- /13- /16- /17781761862090.10(1)0.80(1)*0.80(12)300120010080(N)
XiaorongjiangChinaGuilin Dayu Water Conservancy, Infrastructure, Construction and Investment Co. Ltd.HXiaorong163- /10- /13- /16- /1790255             
Belo MonteBrazilNorte Energia S.A.HXingu5- /11- /13- /16- /2074680632208V 1.20 separate      
LianhuaChinaXiamen Water Resources BureauHLianhuaxi33- /10- /14- /16- /1730333             
HechuanChinaHJialingjiang11- /12- /14- /16- /1751              
LushiChinaHNujiang1288- /12- /14- /16- /18165              
ChucasCosta RicaICE (Instituto Costarricense de Electricidad - Costa Rican Institute of Electricity)HTárcoles450- /11- /14- /16- /17481301802000.20 0.75(3')*0.75 30025009596(N)
Zongo IIDR CongoSNELH  05/12- /15- /16- /1720              
Serra dos Cavalinhos IBrazilSerra dos Cavalinhos I Energética S.A.Hdas Antas12- /13- /15- /16- /1730204             
GuanchangChinaH I WQiduxi24- /14- /15- /16- /1754246             
YunheChinaHDangjiahe14- /14- /15- /16- /1768176             
HaokouChinaDatang Investment Group Ltd.HFurong (Pangu)90- /14- /15- /16- /1785211             
Xiangbiling
[A]
ChinaSPIC Guizhou Jinyuan Hydroelectirc PowerplantHNiulan263- /14- /15- /16- /17136459             
Ambarau
[H-F]
DR CongoRandGoldHKibali611/1405/15- /16- /172125533400.75(4')*0.75(1)*0.75(1)3003001000(-)
Köroglu Kotanli 1
[A-G]
TurkeyEBD Enerji Üretim. ve Tic. A.S.HKura7303/1506/1502/1704/17100404640680V(3')0.60(3')*0.60(12)30030085130(N)
Patuca 3HondurasENEE (Empresa Nacional de Energia Eléctrica)HPatuca208- /12- /1602/1712/20541601201600.20(1)0.75(1)*0.75(12)300300010757(N)
LaúcaAngolaMinistry of Energy and Water/GAMEKHKwanza548207/1209/1403/1706/18132107526462766V
0.10
(1)0.85(1)*0.85(12)300300900(-)
OkshtuniAlbaniaDiteko Sh.p.kF HOkshtuni708/1503/1710/1702/1865253141194V
0.15
(12)0.90(12)*0.90(12)*3003001150(-)
Wanjiakouzi
[A]
ChinaChina Datang CorporationHGexiang279- /09- /12- /17- /181684137601020        66100(F)
Dyraaba (part of Uma Oya Project)Sri LankaMinistry of Irrigation and Water Resources ManagementH IMathatilla Oya1- /11- /13- /17- /18501654050V(1) (1)* (12)3003009595(F)
Minas San FranciscoEcuadorCelec Ererjubones CpHJubones14- /12- /14- /1708/1878209        300300   
WunonglongChinaHuaneng Lancang River Hydropower Co. Ltd.HLancang (Mekong)27206/10- /15- /17- /18138247             
SinopBrazilCompanhia Energetica Sinop-CESHTeles Pires - /14- /15- /17- /1917              
IncirTurkeyEnerji S.A.HBuyuk Cay - /13- /16- /17- /18150              
Senhora do PortoBrazilPCH Senhora do Porto S.AHGuanhães5- /14- /16- /17- /1841167             
XimiheChinaH I WXimihe17- /14- /16- /17- /1888147             
Piedra PuntudaNicaraguaHidroelectlea Piedra Puntuda and Energia Tropical Sostearble Cerro Frio S.A.HRío Mico - /15- /16- /17- /1823   0.70
1.00
(5)
(5)
0.70
1.00
(1)*
(1)*
0.70(1)*     
FendouChinaMuling Fendou Reservoir Construction officeF H I WMulenghe191- /15- /16- /17- /1846406             
XiahushanChinaF H I WDashahe196- /15- /16- /17- /1874296             
Wugachong
[A]
ChinaH I WMabie99- /15- /16- /17- /18108182             
HuangdengChinaYunnan Huaneng Lancang River Hydropower Co.,Ltd.H I RLancang (Mekong)161301/1004/1504/1806/1920346427533670 (3') (3') (12)30030082
67
100
100
(F)
Nam Ngiep 1LaosNam Ngiep 1 Power CompanyHNam Ngiep119209/1404/1604/1808/191675402288 V(3') (3')* (12)3002400 -
3600
80
60
120
70
(F)
Muskrat Falls North DamCanadaNALCORHChurchill 08/1507/1709/1807/1939450208243V(1)0.80(1)*0.80(1)3003000 &
1500
80140(F)
Xayaburi (Left bank closure section)LaosXPCL (Xayaburi Power Company Ltd.)HMekong 03/1201/1812/1810/19401098285V(1) (16)  30030060100(F)
DahuaqiaoChinaHuaneng Lancang River Hydropower Co. Ltd.HLancang (Mekong)262- /10- /13- /18- /19107232 112           
Puhulpola (part of Uma Oya Project)Sri LankaMinistry of Irrigation and Water Resources ManagementH IDulgolla Oya1- /11- /13- /18- /19351743040V(1) (1)* (12)3003009595(F)
LidiChinaHuaneng Lancang River Hydropower Co. Ltd.HLancang (Mekong)75- /10- /14- /18- /1975346 1100           
São RoqueBrazilSão Roque Energética S.A.HCanoas - /12- /14- /18- /1968151100583V 0.75 0.75      
BalliTurkeyDSI - State Hydraulic WorksHOrtasu6- /08- /14- /18- /2051188144 0.10(1)0.80(1)0.70(3')3003009545(N)
Maojiahe
[A]
ChinaChina Power Investment CorporationHQingshuihe13- /14- /16- /18- /1975166             
MangshanChinaF H I WChanglehe133- /15- /16- /18- /19101355             
GulpurPakistanWAPDA (Water and Power Development Authority) and MIRA Power Ltd. (a subsidiary of KOSEP)HPoonch2209/14- /16- /1802/2035238             
DatengxiaChinaGuangxi Datengxia Gorge Water Conservancy Development Co. .Ltd.F H N WXijiang3479- /14- /16- /1807/2080  7100           
Don SahongLaosDon Sahong Power Company (Mega First Corporation Berhad and Électricité du Laos)HMekong2410/15- /16- /1812/192668005666090.30(1)0.75(1)0.75(1)300240055103(F)
Quebra DentesBrazilQuevedos Energética S.AHToropi3- /15- /17- /18- /1923206             
JacaréBrazilPCH Jacaré S.A.HGuanhães14- /15- /17- /18- /1933121             
ZhuangliChinaZhuangli reservoir construction and management officeF H I WShizihe133- /15- /17- /18- /194449             
NarliTurkeyAksa Energy Production Trade and Industry Co. Inc.HGöksu27- /16- /17- /18- /19471534968 (14) (14)  3003006550(F)
ItaocaraBrazilCemig Geração e Transmissão SA and Itaocara Energia LtdaHParaiba do Sul170001/16- /17- /18- /1950              
MelenTurkeyDSI - State Hydraulic WorksH I WMelen693- /1306/1503/19- /25124944187120960.15(3')0.70(3')*0.70(3')3003009060(F)
YambaJapanMinistry of Land, Infrastructure, Transport and TourismF H I N WAgatsuma10808/1405/1705/1910/191162915759110.15(1)0.80(1)0.08(1)25010009139(F)
Barra das ÁguasBrazilPCH Águas do Rio Irani Energética SPE Ltda.HIrani11- /1704/1807/19- /2034235             
Saddle Dam D (Xe-Pian Xe-Namnoy)LaosXe-Pian Xe Namnoy Power CompanyHXepian104310/1804/1910/19- /1956430170200V   none 300300  (F)
BiratoriJapanMinistry of Land, Infrastructure, Transport and TourismF H I N WNukapira46- /73- /87- /19- /2157600 180V(1)0.78(1)0.78(1)     
Shah wa ArüsAfghanistanMinistry of Energy and WaterF H I WShakardar10- /12- /13- /1904/2178303270337V
0.20
(1)0.80(1)*0.80(1)30030010545(N)
PingzhaiChinaH I WSanchahe1089- /13- /15- /19- /21163              
Capulin San PabloCosta RicaHidrotárcolesHTárcoles7- /15- /16- /19- /2049              
LuojiuChinaH 346- /15- /17- /19- /2060              
WacunChinaHYoujiang536- /15- /17- /19- /20105365             
Mellègue Amont
[H-F]
TunisiaMinistère de l’AgricultureH IOued Mellègue195- /16- /17- /19- /20684305005600.60 0.60 0.60   900(-)
GaoshengChinaYalong River Hydropower Development Co. Ltd.HHongdu100- /16- /17- /19- /20121              
Wudongde secondary damChinaChina Yangzi River Three Gorges GroupHJinsha (Yangtze)740004/18- /18- /1906/1996163466            
MacacosBrazilPesqueiro Energia S/AHJaguariaiva1- /18- /18- /19- /2016217             
Çetin
[H-F]
TurkeyDSI - State Hydraulic WorksHBotan614- /1209/1801/2003/20165492474148000.70(1)0.70(1)*0.70(1)*  900(-)
Kafue Gorge Lower (KGL)ZambiaKafue Gorge Lower Power Development Co. Ltd.HKafue8301/1606/1804/20- /20131375129013900.20(3')0.75(3')0.75(12)30030060112(F)
ZungeruNigeriaFederal Ministry of Power, NigeriaF HKaduna1140009/1301/1808/2010/21101109019202400V(3')0.75(3')*0.75(12)30030059
69  94
76
69  76
(F)
Arenal I-II
[A-G]
HondurasEnergias Limpias del Yaguala SA de CVHYaguala7201/1804/1911/2001/21932732493050.04(3')0.40
0.67
(3')
(3')
0.40(13)     
Asagi (Lower) KaleköyTurkeyKalehan Energy Üretim ve Ticaret A.S.HMurat55603/13- /15- /2004/21125346119213420.25(7)0.80(3)separate 3003009040(M)
YanagawaJapanIwate PrefectureF H WYana1912/14- /17- /2003/2177243 213           
Tan MyVietnamMinistry of Agriculture and Rural DevelopmentH I WCai219- /16- /18- /20- /2167603510640           
SouapitiGuineaMinistry of Energy and HydraulicsHKonkouré6300- /16- /18- /20- /211161200 3           
3 de Febrero (formerly El Chaparral)
[H-F]
El SalvadorComisión Ejecutiva Hidroeléctrica del Rio Lempa (CEL)HTorola - /09- /18- /2010/23883243754500.20(7')0.80(7')0.80(7')3003009463(N)
Gürsöğüt 1TurkeyLimak EnergyHSakarya77- /19- /19- /20- /2067135105115           
Center Hill Auxiliary Backup DamUSAUS Army Corps of Engineers - Nashville DistrictF H R WCaney Fork940- /17- /19- /20- /214029399122V(1)V
0.83
(1)*0.83(1)*3003009393(F)
Salto Y-YNicaraguaHBambana - /18- /19- /20- /2120   0.70
1.00
(5)
(5)
0.70
1.00
(1)*
(1)*
0.70(1)*     
Bela VistaBrazilBela Vista Geracao de Energia S.A.HChapim7- /00- /00- /00- /0021393             
Meizhou PSS - Upper damChinaChina Southern Power GridH 41- /18- /19- /20- /2160              
Meizhou PSS - Lower damChinaChina Southern Power GridH 45- /18- /19- /20- /2185              
Gürsöğüt 2TurkeyLimak EnergyHSakarya10- /19- /19- /20- /2156275216230           
Nam Kong 3LaosChaleun Sekong Energy Co Ltd (CSE)HNam Kong47111/1703/1902/2111/2165500347400V(3')0.75(3')*0.75(12)300300075113(F)
DaguChinaChina Huadian Group Co. Ltd.HYaluzangbu (Brahmaputra)55- /1603/1904/21- /231183859371442        93
60
93
100
 
Busanga
[A]
DR CongoSicominesHLualaba 11/17- /1907/2111/21142 620770           
Dong MitVietnamHSong An Lao9002/1907/1908/2106/2268378353456           
Hatta PSS-Saddle damUAEDEWAH  12/1903/2109/21- /24381844145 (7) (7) (7)*30030065120(F)
Site CCanadaBC HydroHPeace2644- /1507/1710/2108/25718001740 V(1)0.80(3')0.80(3')*30030080130(F)
Yangjiang PSP - Upper damChinaChina Southern Power Grid Co.HMoyang1801/17- /1911/2106/22101477 652      3006000   
Fengman (new)ChinaNortheast China Electric PowerHSonghua10377- /13- /15- /21- /22951068 2700           
Maling
[A]
ChinaH 219- /16- /18- /21- /2290              
HuangzangsiChinaHHeihe403- /1608/18- /21- /22123              
Cachoeira Cinco VeadosBrazilRincão dos Albinos Energética S.A.HToropi13- /18- /19- /2108/2235206             
La TrongVietnamHSong Gianh 01/9003/9004/9005/9076   V(2)0.80(17)0.80(17)    (-)
KongzhaiChinaHBala3- /17- /19- /21- /2247              
Tuxikou
[A]
ChinaF HQianhe160- /18- /19- /21- /22132              
Rio do PeixeBrazilCPFL Energias Renovavies S.A.Hdo Peixe - /18- /20- /2107/2232300             
Nam Theun 1LaosNam Theun 1 Power CompanyHNam Kading, aka Nam Theun300908/1501/1901/2208/2218777241412134320   (3')*  3003000 &
9000
100
130
130
120
(F)
Grand Ethiopian Renaissance Dam (GERD)EthiopiaEthiopian Electric Power (EEP)HBlue Nile7400012/1005/1305/22- /24160179010100105000.22(3')1.00(3')*1.00(3')*40040067 to  10523 to  35(N)
Tayabasan weir
[H-F]
PhilippinesWawa JV Co. Inc. (Prime Infrastructure Capital Inc and San Lorenzo Ruiz Builders and Developers Group)H I WTayabasan1- /20- /2105/2207/222411430 0.40(4')0.40
0.92
(3')0.92(1)*30030090120(F)
Hatta PSS-Upper damUAEDEWAH  12/1911/2108/22- /2472222170180 (7) (7)none 30030065120(F)
HuanglinxiaChinaH WHanshui22110/18- /2011/2207/2370349             
Julius Nyerere (formerly Rufiji)TanzaniaTANESCO (Tanzania Electric Supply Company Ltd.)HRufiji368012/1810/20- /2212/231341025142019400.20(3')0.75(3')*0.75(12)  9362(F)
FuzikouChinaGuilin Dayu Water Infrastructure Development Investment Co. Ltd.F HLijiang18811/11- /13- /22- /2377239 304           
Chame Shir
[A-G]
IranIran Water & Power Resources Development Company (IWPC)F H I WZohreh2300- /11- /16- /2207/2315168011001200V 0.70   3003001600(-)
KapiçayTurkeyDSI - State Hydraulic WorksH IBasgöz5- /14- /18- /22- /2450136126 V(1)0.80(1)  300 8456 
TuobaChinaHuaneng Lancang River Hydropower Co. Ltd.HLangcang (Mekong)1338- /15- /18- /22- /24158508 3600           
Xiakoutang
[A]
ChinaLichuan City Yujiang Valley Hudropower Ltd. Hubei ProvinceF HYu55- /17- /19- /22- /2270              
LuoyuanhuokouChinaHAo297- /17- /19- /22- /2391              
TingzikouChinaJialing River Tingzikou Water Resources and Hydropower Development Co. Ltd.F H I N WJialing406711/09- /19- /22- /25116995             
Houay LaNgeLaosHouay LaNge Power Co. Ltd. (JV of China-based Hebei Construction and Investment Group Co., Ltd (HCIG) and CS Energy (Laos))HHouaylange1402/18- /20- /2205/2359174  V(3') (3')* (12)     
KızlaryoluTurkeyDSI - State Hydraulic WorksH IDevrez115- /17- /20- /22- /2392261447            
Singrobo-AhouatyIvory CoastIvoirian Hydro EnergyHBandama10510/19- /21- /2203/2324              
Nam Ngum 4LaosEDL (Electricite du Laos)HNam Ngum11002/1803/1901/23- /2474252230    (3')*    82100 
Lom PangarCameroonEDC (Electricity Development Corporation)F HLom6000- /1902/2103/2309/2446185175290V(1)0.85(1)0.85(12)300300100100(F)
Priest Rapids Right EmbankmentUSAGrant County Public Utility DistrictHColumbia 10/2104/2203/2310/2317564386 V(3')V
0.75
(3')
(17)
none 300300 -87137(F)
Nam Sum 3LaosNam Sam 3 Power Co. Ltd. (part of Phongsubthavy Group)HNam Xam43510/1907/2104/2312/23122321907987V(3') (3')*    60140(F)
El TornillitoHondurasHidrovolcanHUlua242- /17- /2105/2310/2483440             
HiraseJapanF H WNishiki30- /10- /16- /23- /2473300 340           
Jalaur afterbay damPhilippinesNational Irrigation Administration (NIA)F H I WJalaur - /19- /21- /2307/2438150             
Jalaur High Dam (JRMP 2)PhilippinesNational Irrigation Administration (NIA)F H I WJalaur229- /19- /21- /2307/24109267             
Sehuencas (formerly Ivirizu)BoliviaENDE Valle Hermoso S.A.HIvirizu30- /18- /21- /23- /24125350             
Manavgat ÇardakTurkeyDSI - State Hydraulic WorksH ISağırın Çayı8- /17- /22- /23- /2444185540            
MaiwanChinaMaiwan Water ConservancyH INandu61504/2003/2205/2407/2579377             
Sidi AbbouMoroccoDirection des Aménagements HydrauliquesF H I WLeben20003/2101/2306/24- /2571149207257V(1)0.90(1)*0.90(1)3003001100 
Naruse
[H-F]
JapanMinistry of Land, Infrastructure, Transport and TourismF H I WNaruse7905/1810/1908/2411/2611575544504850           
Hayghar (formerly Dehroud)
[H-F]
IranFars Water AuthorityF H I WFirooz Abad146- /09- /12- /24- /26882302602850.90(3')1.20(3')*1.20(12)300300   
UchigataniJapanF HKibishima12- /14- /18- /24- /2684270 328           
HuokouChinaDepartment of Water Conservancy, Fujian ProvinceF H WAojiang297- /17- /21- /24- /25913383006630.10 0.76 0.76     (F)
Quanzhou BailaiChinaF H W 54406/2001/22- /2412/25106596             
Song Giang 1VietnamNexif Energy & Song Giang Hydropower Joint Stock CompanyH ISong Cái Nha Trong - /19- /22- /24- /2526              
ArraiasBrazilCELG/ElectronorteHArraias - /21- /23- /24- /2529560             
Batang ToruIndonesiaPT. North Sumatra Hydro EnergyHBatang Toru1810/2107/2303/25- /2679137 500      3002000   
Agios Georgios
[H-F]
GreeceTerna EnergiakiHKapnitsorrema706/2304/2410/2512/2559475765795      400400   
KatendeDR CongoSNEL (Société Nationale d'Électricité)HLulua 08/11- /15- /25- /2716              
El-Janneh
[A-G]
LebanonEBMLH I WIbrahim (Abraham)38- /1502/20- /25- /261623501450       300300   
FengshanChinaH 104- /20- /22- /25- /2590              
NiuluChinaH I WNiulushi66- /18- /22- /25- /2680391             
GujunChinaDazhou Major water works construction and management centerF HZhonhe12812/20- /22- /25- /2677              
ShafaroudIranIran Water & Power Development Company (IWPCo)H I WShafaroud5203/1203/2007/2411/251013007257400.10
0.50
(3')0.80(3')*0.80(12)300300   
Gwayi-ShanganiZimbabweZimbabwe National Water Authority (Zinwa)H I WGwayi63409/04- /22- /26- /2772305 300        60140(F)
Yunxiao PSP - Upper damChinaChina Nuclear (Guodian Zhangzhou) EnergyH 21- /17- /22- /26- /2768              
GuanyinChinaGuizhou Water Conservancy Investment Group Co, LtdH I WGuanyinsi12112/21- /23- /26- /27109              
TBChinaHLancang (Mekong) 10/21- /23- /26- /27158              
JiaoyanChinaHQingshui21012/21- /23- /26- /2796              
Piedra CajónNicaraguaHRío Mico - /00- /00- /00- /0049   0.70
1.00
(5)
(5)
0.70
1.00
(1)*
(1)*
0.70(1)*     
TaghzirtMoroccoDirection des Aménagements HydrauliquesH IDerna85- /22- /24- /26- /2795              
Lower ChatkalUzbekistanJSC UzbekgidroenergoHChatkal5- /23- /25- /26- /2760270             
Koysha (Gibe IV)EthiopiaEthiopian Electric Power (EEP)HOmo690009/1306/2002/2705/282011020735077250.10
0.35
(3')0.70(3')*separate 300150013025(N)
SöylemezTurkeyDSI - State Hydraulic WorksH IAras129504/2204/2411/2709/28113270718750           
Oued LakhdarMoroccoDirection des Aménagements HydrauliquesF H I WLakhdar150- /23- /25- /27- /27110              
Cibeet
[H-F]
IndonesiaPUPR (Public Works and Public Housing Ministry)F H I WCibeet8309/23- /25- /27- /2847960371 0.90 0.90 0.90 2507501060(-)
Upper Yeywa (Kyaukme)MyanmarDepartment of Hydroelectric Power - Ministry of Electric PowerHMyitnge341- /15- /24- /28- /29102266532580V(3')0.80(3')*0.80(12)300300   
QingyukouChinaF H WBahe14104/22- /24- /28- /2971              
Caculo-CabaçaAngolaMinistry of Energy and WaterHKwanza43608/17- /25- /2803/2911653310751450V 0.85(12)*0.85 30024001000 
Shin MaruyamaJapanKansai Electric PowerF HKiso131- /22- /25- /28- /30118341             
KalaChinaYalong River Hydropower Development Co. Ltd.HYalong23401/2407/25- /28- /29128  2560           
TarazIranKhuzestan Province Power & Water AuthorityH I WHarkesh38- /18- /22- /29- /3157350 240           

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Kazakhstan

Owner: Ministry of Energy

Type: Gravity

Purpose(s): Flood Control / Hydropower

River: Irtysh

Reservoir capacity: 31 m3x106

Construction Dates

Start of Project: 05/55

Start of RCC: 05/55

End of RCC: 10/61

End of Project: 12/63

Specifications

Height: 90 metres

Length: 450 metres

Volume of RCC: 587 m3x103

Total volume: 988 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against precast concrete blocks
Downstream
SlopeType
0.80RCC against formwork
Spillway
SlopeType
0.80RCC against formwork

Placement

Layers (mm)Lifts (mm)
3001200

Cementitious material

Cement (kg/m3)
135
Pozzolan (kg/m3)Pozzolan Type
80Low-lime flyash (ASTM Class F)
  
Bukhtarma completed
Bukhtarma completed

Full Dam Information

Details

Country: China

Owner: Sixian Water Resources Bureau

Type: Thin Arch

Purpose(s): Hydropower

River: Leishui

Reservoir capacity: 4 m3x106

Construction Dates

Start of Project: -/79

Start of RCC: -/79

End of RCC: -/81

End of Project: -/82

Specifications

Height: 35 metres

Length: 33 metres

Volume of RCC: 3 m3x103

Total volume: 3 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Liangsanping on Google Earth
Liangsanping on Google Earth

Full Dam Information

Details

Country: China

Owner: Kengkou Reservoir Management Office

Type: Gravity

Purpose(s): Hydropower / Water Supply

River: Youxi

Reservoir capacity: 27 m3x106

Construction Dates

Start of Project: 11/84

Start of RCC: 11/84

End of RCC: 04/86

End of Project: 11/86

Specifications

Height: 57 metres

Length: 123 metres

Volume of RCC: 43 m3x103

Total volume: 62 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against precast concrete panels with hot poured membrane
Downstream
SlopeType
0.75RCC against precast concrete blocks
Spillway
SlopeType
0.75Reinforced concrete cast against precast units or slip-formed facing elements

Placement

Layers (mm)Lifts (mm)
250  &250  &
500500

Cementitious material

Cement (kg/m3)
60
60
Pozzolan (kg/m3)Pozzolan Type
120Low-lime flyash (ASTM Class F)
80 
Kengkou completed
Kengkou completed

Full Dam Information

Details

Country: Japan

Owner: Ministry of Construction

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Tama

Reservoir capacity: 254 m3x106

Construction Dates

Start of Project: 08/80

Start of RCC: 08/80

End of RCC: 07/86

End of Project: 12/90

Specifications

Height: 100 metres

Length: 441 metres

Volume of RCC: 772 m3x103

Total volume: 1150 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.60Traditional concrete against formwork
Downstream
SlopeType
0.81Traditional concrete against formwork
Spillway
SlopeType
0.81Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
150  -750
2001000

Cementitious material

Cement (kg/m3)
91
Pozzolan (kg/m3)Pozzolan Type
39Low-lime flyash (ASTM Class F)
  
Tamagawa completed
Tamagawa completed

Full Dam Information

Details

Country: Japan

Owner: Fukushima Prefecture

Type: Gravity

Purpose(s): Flood Control / Hydropower / Water Supply

River: Mano

Reservoir capacity: 36 m3x106

Construction Dates

Start of Project: 12/83

Start of RCC: 12/83

End of RCC: 01/88

End of Project: 03/90

Specifications

Height: 69 metres

Length: 239 metres

Volume of RCC: 104 m3x103

Total volume: 219 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
180500

Cementitious material

Cement (kg/m3)
96
Pozzolan (kg/m3)Pozzolan Type
24Low-lime flyash (ASTM Class F)
  
Mano completed
Mano completed

Full Dam Information

Details

Country: Spain

Owner: Sociedad Española de Carburos Metálicos S.A.

Type: Gravity

Purpose(s): Hydropower

River: Xallas

Reservoir capacity: 17 m3x106

Construction Dates

Start of Project: 01/87

Start of RCC: 01/87

End of RCC: 06/88

End of Project: 10/88

Specifications

Height: 84 metres

Length: 290 metres

Volume of RCC: 225 m3x103

Total volume: 254 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.05RCC against formwork
Downstream
SlopeType
0.75RCC against formwork  [stepped face]
0.35RCC against formwork  [stepped face]
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
250250

Cementitious material

Cement (kg/m3)
88
72
Pozzolan (kg/m3)Pozzolan Type
152Low-lime flyash (ASTM Class F)
145 
Santa Eugenia completed
Santa Eugenia completed

Full Dam Information

Details

Country: Japan

Owner: Toyama Prefecture

Type: Gravity

Purpose(s): Flood Control / Hydropower

River: Ogawa

Reservoir capacity: 5 m3x106

Construction Dates

Start of Project: 03/83

Start of RCC: 03/83

End of RCC: 06/88

End of Project: 06/90

Specifications

Height: 84 metres

Length: 260 metres

Volume of RCC: 268 m3x103

Total volume: 361 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.90Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
180500

Cementitious material

Cement (kg/m3)
96
Pozzolan (kg/m3)Pozzolan Type
24Low-lime flyash (ASTM Class F)
  
Asahi Ogawa completed
Asahi Ogawa completed

Full Dam Information

Details

Country: USA

Owner: Upper Yampa Water Conservancy District, Steamboat Springs, Colorado

Type: Gravity

Purpose(s): Hydropower / Irrigation / Recreation / Water Supply

River: Yampa

Reservoir capacity: 42 m3x106

Construction Dates

Start of Project: 08/87

Start of RCC: 08/87

End of RCC: 07/88

End of Project: 11/88

Specifications

Height: 46 metres

Length: 116 metres

Volume of RCC: 34 m3x103

Total volume: 39 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
71
Pozzolan (kg/m3)Pozzolan Type
71Low-lime flyash (ASTM Class F)
  
Stagecoach completed
Stagecoach completed

Full Dam Information

Details

Country: Romania

Owner: Romanian Electricity Authority (RENAL) - Tirgu Jiu Branch

Type: Gravity

Purpose(s): Hydropower

River: Jiu

Reservoir capacity: 5 m3x106

Construction Dates

Start of Project: 03/86

Start of RCC: 03/86

End of RCC: 10/88

End of Project: 10/92

Specifications

Height: 25 metres

Length: 55 metres

Volume of RCC: 14 m3x103

Total volume: 17 m3x103

Construction Methods

Facings

Upstream
SlopeType
 Reinforced conventional concrete cast after RCC placement
Downstream
SlopeType
 Reinforced conventional concrete cast after RCC placement
Spillway
SlopeType
ogeeReinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300900

Cementitious material

Cement (kg/m3)
125
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
  
Vadeni completed
Vadeni completed

Full Dam Information

Details

Country: China

Owner: Hydropower Bureau, Lanshan County

Type: Gravity

Purpose(s): Hydropower

River: Yonghe

Reservoir capacity: 9 m3x106

Construction Dates

Start of Project: -/84

Start of RCC: -/84

End of RCC: -/88

End of Project: -/90

Specifications

Height: 52 metres

Length: 180 metres

Volume of RCC: -

Total volume: 220 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: Argentina

Owner: Electriciad Misiones S.A.

Type: Gravity

Purpose(s): Hydropower

River: Urugua-i

Reservoir capacity: 1175 m3x106

Construction Dates

Start of Project: 10/85

Start of RCC: 10/85

End of RCC: 04/89

End of Project: -/89

Specifications

Height: 77 metres

Length: 687 metres

Volume of RCC: 590 m3x103

Total volume: 626 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against precast concrete panels with geomembrane
Downstream
SlopeType
0.80Unformed face of RCC
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
400400

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
  
Urugua-i completed
Urugua-i completed

Full Dam Information

Details

Country: Romania

Owner: Romanian Electricity Authority (RENAL) - Tirgu Jiu Branch

Type: Gravity

Purpose(s): Hydropower

River: Jiu

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: 08/86

Start of RCC: 08/86

End of RCC: 05/89

End of Project: 12/93

Specifications

Height: 24 metres

Length: 61 metres

Volume of RCC: 13 m3x103

Total volume: 26 m3x103

Construction Methods

Facings

Upstream
SlopeType
 Reinforced conventional concrete cast after RCC placement
Downstream
SlopeType
 Reinforced conventional concrete cast after RCC placement
Spillway
SlopeType
ogeeReinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300900

Cementitious material

Cement (kg/m3)
125
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
  
Tirgu Jiu on Google Earth
Tirgu Jiu on Google Earth

Full Dam Information

Details

Country: China

Owner: Department of Water Resources & Hydropower, Guangxi Zhuang Autonomous Region

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation

River: Dulanghe

Reservoir capacity: 19 m3x106

Construction Dates

Start of Project: 04/88

Start of RCC: 04/88

End of RCC: 07/89

End of Project: 06/91

Specifications

Height: 53 metres

Length: 136 metres

Volume of RCC: 61 m3x103

Total volume: 108 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against precast concrete panels
Downstream
SlopeType
0.75RCC against precast concrete blocks
Spillway
SlopeType
0.65Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
90
69
Pozzolan (kg/m3)Pozzolan Type
140Low-lime flyash (ASTM Class F)
111 
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Dehua County, Fujian Province

Type: Gravity

Purpose(s): Hydropower / Irrigation / Water Supply

River: Chanxi

Reservoir capacity: 53 m3x106

Construction Dates

Start of Project: 12/85

Start of RCC: 12/85

End of RCC: 08/89

End of Project: 09/89

Specifications

Height: 58 metres

Length: 150 metres

Volume of RCC: 71 m3x103

Total volume: 93 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalReinforced conventional concrete cast after RCC placement
0.30Reinforced conventional concrete cast after RCC placement
Downstream
SlopeType
0.75RCC against precast concrete blocks
Spillway
SlopeType
0.75Reinforced concrete cast against precast units or slip-formed facing elements

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
72
54
Pozzolan (kg/m3)Pozzolan Type
82Low-lime flyash (ASTM Class F)
86 
Longmentan Nº1 completed
Longmentan Nº1 completed

Full Dam Information

Details

Country: China

Owner: Guodian Dadu River Basin Hydropower Development Co.

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Navigation

River: Dadu

Reservoir capacity: 200 m3x106

Construction Dates

Start of Project: 01/85

Start of RCC: 01/85

End of RCC: 12/89

End of Project: 10/94

Specifications

Height: 88 metres

Length: 1029 metres

Volume of RCC: 407 m3x103

Total volume: 855 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.75RCC against precast concrete blocks
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300  -300  -
500500

Cementitious material

Cement (kg/m3)
79
82
Pozzolan (kg/m3)Pozzolan Type
79Low-lime flyash (ASTM Class F)
83 
Tongjiezi (with Niurixigou saddle dam) completed
Tongjiezi (with Niurixigou saddle dam) completed

Full Dam Information

Details

Country: Kyrgyzstan

Owner: Ministry of Power Industry

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Naryn

Reservoir capacity: 140 m3x106

Construction Dates

Start of Project: -/82

Start of RCC: -/82

End of RCC: 12/89

End of Project: 12/90

Specifications

Height: 75 metres

Length: 320 metres

Volume of RCC: 100 m3x103

Total volume: 1300 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.78Traditional concrete against formwork
Spillway
SlopeType
0.78Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
400400

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
30Natural pozzolan (ASTM Class N)
  
Tashkumyr completed
Tashkumyr completed

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Wenchuanxi

Reservoir capacity: 10 m3x106

Construction Dates

Start of Project: -/87

Start of RCC: -/87

End of RCC: -/89

End of Project: -/89

Specifications

Height: 47 metres

Length: 122 metres

Volume of RCC: -

Total volume: 74 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Japan

Owner: Hokkaido Development Bureau

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation

River: Shirobeshit-oshibetsu

Reservoir capacity: 18 m3x106

Construction Dates

Start of Project: 10/82

Start of RCC: 10/82

End of RCC: -/89

End of Project: 10/91

Specifications

Height: 40 metres

Length: 755 metres

Volume of RCC: 163 m3x103

Total volume: 360 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.80Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
250750

Cementitious material

Cement (kg/m3)
84
Pozzolan (kg/m3)Pozzolan Type
36Low-lime flyash (ASTM Class F)
  
Pirika completed
Pirika completed

Full Dam Information

Details

Country: China

Owner: China Southern Power Grid

Type: Gravity

Purpose(s): Flood Control / Hydropower

River: Nanpan

Reservoir capacity: 116 m3x106

Construction Dates

Start of Project: 01/84

Start of RCC: 01/84

End of RCC: 06/90

End of Project: 12/92

Specifications

Height: 61 metres

Length: 471 metres

Volume of RCC: 143 m3x103

Total volume: 284 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
VerticalRCC against precast concrete blocks
0.40 
Spillway
SlopeType
ogeeTraditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
250250

Cementitious material

Cement (kg/m3)
79
Pozzolan (kg/m3)Pozzolan Type
79Low-lime flyash (ASTM Class F)
  
Tianshenqiao Nº2 completed
Tianshenqiao Nº2 completed

Full Dam Information

Details

Country: France

Owner: Electricité de France

Type: Gravity

Purpose(s): Hydropower / Irrigation / Recreation

River: Riou

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 01/90

Start of RCC: 01/90

End of RCC: 07/90

End of Project: 03/91

Specifications

Height: 26 metres

Length: 308 metres

Volume of RCC: 41 m3x103

Total volume: 46 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork with external geomembrane
Downstream
SlopeType
0.60Slip-formed/extruded facing elements  [stepped face]
Spillway
SlopeType
0.60Slip-formed/extruded facing elements  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
120ROLAC (mixture of flyash and slag with or without limestone fines)
  
Riou completed
Riou completed

Full Dam Information

Details

Country: USA

Owner: Tennessee Valley Authority

Type: Gravity

Purpose(s): Hydropower

River: Tennessee

Reservoir capacity: 311 m3x106

Construction Dates

Start of Project: 08/89

Start of RCC: 08/89

End of RCC: 02/91

End of Project: 04/92

Specifications

Height: 17 metres

Length: 427 metres

Volume of RCC: 79 m3x103

Total volume: 79 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.25RCC against formwork  [stepped face]
Downstream
SlopeType
0.60RCC against formwork  [stepped face]
Spillway
SlopeType
0.60RCC against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300600

Cementitious material

Cement (kg/m3)
85
Pozzolan (kg/m3)Pozzolan Type
119Low-lime flyash (ASTM Class F)
  
Nickajack Auxillary Spillway completed
Nickajack Auxillary Spillway completed

Full Dam Information

Details

Country: Japan

Owner: Toyama Prefecture

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Sakai

Reservoir capacity: 60 m3x106

Construction Dates

Start of Project: 03/85

Start of RCC: 03/85

End of RCC: 07/91

End of Project: 01/93

Specifications

Height: 115 metres

Length: 298 metres

Volume of RCC: 373 m3x103

Total volume: 713 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.80Traditional concrete against formwork
Downstream
SlopeType
0.78Traditional concrete against formwork
Spillway
SlopeType
0.78Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
180750

Cementitious material

Cement (kg/m3)
84
Pozzolan (kg/m3)Pozzolan Type
36Low-lime flyash (ASTM Class F)
  
Sakaigawa completed
Sakaigawa completed

Full Dam Information

Details

Country: USA

Owner: Upper Peninsula Power Co., Michigan

Type: Gravity

Purpose(s): Hydropower

River: West Branch

Reservoir capacity: 13 m3x106

Construction Dates

Start of Project: 04/91

Start of RCC: 04/91

End of RCC: 10/91

End of Project: 06/92

Specifications

Height: 37 metres

Length: 100 metres

Volume of RCC: 36 m3x103

Total volume: 40 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalReinforced conventional concrete cast after RCC placement
Downstream
SlopeType
0.80RCC against formwork  [stepped face]
Spillway
SlopeType
0.80RCC against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
67
Pozzolan (kg/m3)Pozzolan Type
67High-lime flyash (ASTM Class C)
  
Victoria replacement completed
Victoria replacement completed

Full Dam Information

Details

Country: Japan

Owner: Tokyo Electric Power Company

Type: Gravity

Purpose(s): Hydropower

River: Kosabi

Reservoir capacity: 11 m3x106

Construction Dates

Start of Project: 10/86

Start of RCC: 10/86

End of RCC: 12/91

End of Project: 11/92

Specifications

Height: 104 metres

Length: 273 metres

Volume of RCC: 400 m3x103

Total volume: 590 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
250750

Cementitious material

Cement (kg/m3)
91
Pozzolan (kg/m3)Pozzolan Type
39Low-lime flyash (ASTM Class F)
  
Sabigawa (lower dam) completed
Sabigawa (lower dam) completed

Full Dam Information

Details

Country: Brazil

Owner: COMPESA (Companhia Pernambucana de Saneamento)

Type: Gravity

Purpose(s): Hydropower / Water Supply

River: Riacho do Chorão

Reservoir capacity: 15 m3x106

Construction Dates

Start of Project: -/89

Start of RCC: -/89

End of RCC: -/91

End of Project: -/92

Specifications

Height: 42 metres

Length: 360 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Machado completed
Machado completed

Full Dam Information

Details

Country: China

Owner: Datang Yantan Hydropower Co. Ltd.

Type: Gravity

Purpose(s): Flood Control / Hydropower / Navigation

River: Hongshui

Reservoir capacity: 3350 m3x106

Construction Dates

Start of Project: 03/85

Start of RCC: 03/85

End of RCC: 03/92

End of Project: 12/95

Specifications

Height: 110 metres

Length: 525 metres

Volume of RCC: 626 m3x103

Total volume: 905 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
VerticalTraditional concrete against formwork
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
ogeeTraditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
55
Pozzolan (kg/m3)Pozzolan Type
104Low-lime flyash (ASTM Class F)
  
Yantan completed
Yantan completed

Full Dam Information

Details

Country: Angola

Owner: Ministry of Energy and Oil of P. R. Angola

Type: Gravity

Purpose(s): Hydropower

River: Kwanza

Reservoir capacity: 4795 m3x106

Construction Dates

Start of Project: 02/87

Start of RCC: 02/87

End of RCC: 05/92

End of Project: 12/07

Specifications

Height: 110 metres

Length: 1203 metres

Volume of RCC: 757 m3x103

Total volume: 1154 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against precast concrete panels with geomembrane
Downstream
SlopeType
0.70Slip-formed/extruded facing elements
 RCC against precast concrete blocks
Spillway
SlopeType
0.70Reinforced concrete cast against precast units or slip-formed facing elements

Placement

Layers (mm)Lifts (mm)
400400

Cementitious material

Cement (kg/m3)
70
Pozzolan (kg/m3)Pozzolan Type
100Milled sand
  
Capanda completed
Capanda completed

Full Dam Information

Details

Country: China

Owner: Shuikou Hydropower Plant

Type: Gravity

Purpose(s): Flood Control / Hydropower / Navigation

River: Min

Reservoir capacity: 2613 m3x106

Construction Dates

Start of Project: 03/87

Start of RCC: 03/87

End of RCC: 05/92

End of Project: 05/95

Specifications

Height: 101 metres

Length: 791 metres

Volume of RCC: 600 m3x103

Total volume: 1710 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.73Traditional concrete against formwork
Spillway
SlopeType
ogeeTraditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
200  -200  -
330330

Cementitious material

Cement (kg/m3)
60
70
Pozzolan (kg/m3)Pozzolan Type
110Low-lime flyash (ASTM Class F)
90 
Shuikou completed
Shuikou completed

Full Dam Information

Details

Country: China

Owner: China Guodian Corporation

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Navigation

River: Gan

Reservoir capacity: 2216 m3x106

Construction Dates

Start of Project: 11/84

Start of RCC: 11/84

End of RCC: 12/92

End of Project: 06/94

Specifications

Height: 68 metres

Length: 1104 metres

Volume of RCC: 156 m3x103

Total volume: 1480 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
ogeeTraditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
65
Pozzolan (kg/m3)Pozzolan Type
105Low-lime flyash (ASTM Class F)
  
Wan’an completed
Wan’an completed

Full Dam Information

Details

Country: China

Owner: China Southern Power Grid

Type: Gravity

Purpose(s): Hydropower

River: Liuxihe

Reservoir capacity: 30 m3x106

Construction Dates

Start of Project: 12/94

Start of RCC: 12/94

End of RCC: 12/92

End of Project: 10/00

Specifications

Height: 61 metres

Length: 153 metres

Volume of RCC: 32 m3x103

Total volume: 57 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.70RCC against formwork  [stepped face]
Spillway
SlopeType
ogeeTraditional concrete against formwork
0.78Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
62
Pozzolan (kg/m3)Pozzolan Type
108Low-lime flyash (ASTM Class F)
  
Guangzhou PSS- Lower dam on Google Earth
Guangzhou PSS- Lower dam on Google Earth

Full Dam Information

Details

Country: China

Owner: Yellow River Conservancy Commission

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation

River: Luo

Reservoir capacity: 1175 m3x106

Construction Dates

Start of Project: -/78

Start of RCC: -/78

End of RCC: -/92

End of Project: -/93

Specifications

Height: 125 metres

Length: 315 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Guxian (GuhXiahn) on Google Earth
Guxian (GuhXiahn) on Google Earth

Full Dam Information

Details

Country: French Guyana

Owner: Electricité de France

Type: Gravity

Purpose(s): Hydropower

River: Sinnamary

Reservoir capacity: 3500 m3x106

Construction Dates

Start of Project: 07/89

Start of RCC: 07/89

End of RCC: 02/93

End of Project: 05/94

Specifications

Height: 48 metres

Length: 740 metres

Volume of RCC: 250 m3x103

Total volume: 410 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalReinforced conventional concrete cast before RCC placement
Downstream
SlopeType
VerticalRCC against precast concrete panels
0.80Mechanically compacted unformed face of RCC
Spillway
SlopeType
0.80Reinforced concrete cast against precast units or slip-formed facing elements

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
120ROLAC (mixture of flyash and slag with or without limestone fines)
  
Petit Saut completed
Petit Saut completed

Full Dam Information

Details

Country: China

Owner: Jinjiang Electric Co.

Type: Gravity

Purpose(s): Flood Control / Hydropower

River: Jinjianghe

Reservoir capacity: 189 m3x106

Construction Dates

Start of Project: 07/90

Start of RCC: 07/90

End of RCC: 03/93

End of Project: 07/93

Specifications

Height: 68 metres

Length: 229 metres

Volume of RCC: 182 m3x103

Total volume: 267 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.75Traditional concrete against formwork
Spillway
SlopeType
0.65Traditional concrete against formwork
 Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
70
Pozzolan (kg/m3)Pozzolan Type
80Low-lime flyash (ASTM Class F)
  
Jinjiang completed
Jinjiang completed

Full Dam Information

Details

Country: China

Owner: Guizhou Qianyuan Power Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower / Irrigation / Water Supply

River: Sanchahe

Reservoir capacity: 377 m3x106

Construction Dates

Start of Project: 03/89

Start of RCC: 03/89

End of RCC: 05/93

End of Project: 02/94

Specifications

Height: 75 metres

Length: 196 metres

Volume of RCC: 103 m3x103

Total volume: 137 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.35Traditional concrete against formwork
Spillway
SlopeType
ogeeTraditional concrete against formwork
0.35Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
85
54
Pozzolan (kg/m3)Pozzolan Type
103Low-lime flyash (ASTM Class F)
99 
Puding completed
Puding completed

Full Dam Information

Details

Country: Japan

Owner: Okayama Prefecture

Type: Gravity

Purpose(s): Flood Control / Hydropower / Water Supply

River: Kamo

Reservoir capacity: 6 m3x106

Construction Dates

Start of Project: 10/89

Start of RCC: 10/89

End of RCC: 07/93

End of Project: 03/94

Specifications

Height: 76 metres

Length: 228 metres

Volume of RCC: 222 m3x103

Total volume: 342 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.60Traditional concrete against formwork
Downstream
SlopeType
0.76Traditional concrete against formwork
Spillway
SlopeType
0.76Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
250750

Cementitious material

Cement (kg/m3)
96
Pozzolan (kg/m3)Pozzolan Type
24Low-lime flyash (ASTM Class F)
  
Tsugawa completed
Tsugawa completed

Full Dam Information

Details

Country: Spain

Owner: Iberdrola, S.A.

Type: Gravity

Purpose(s): Hydropower

River: Cenza

Reservoir capacity: 43 m3x106

Construction Dates

Start of Project: 01/92

Start of RCC: 01/92

End of RCC: 08/93

End of Project: 12/93

Specifications

Height: 49 metres

Length: 609 metres

Volume of RCC: 200 m3x103

Total volume: 225 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork
Downstream
SlopeType
0.122RCC against formwork  [stepped face]
0.75RCC against formwork  [stepped face]
Spillway
SlopeType
0.75RCC against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
70
Pozzolan (kg/m3)Pozzolan Type
130Low-lime flyash (ASTM Class F)
  
Cenza completed
Cenza completed

Full Dam Information

Details

Country: China

Owner: Fujian Shuikou Power Generation Group

Type: Gravity

Purpose(s): Hydropower / Navigation

River: Youxi

Reservoir capacity: 108 m3x106

Construction Dates

Start of Project: 04/91

Start of RCC: 04/91

End of RCC: 10/93

End of Project: 12/95

Specifications

Height: 63 metres

Length: 197 metres

Volume of RCC: 126 m3x103

Total volume: 184 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against precast concrete panels
Downstream
SlopeType
0.75RCC against precast concrete blocks
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
50
Pozzolan (kg/m3)Pozzolan Type
90Low-lime flyash (ASTM Class F)
  
Shuidong completed
Shuidong completed

Full Dam Information

Details

Country: China

Owner: Hainan Provincial Electric Power Company (HEPCO)

Type: Gravity

Purpose(s): Hydropower / Irrigation / Water Supply

River: Changhua

Reservoir capacity: 1710 m3x106

Construction Dates

Start of Project: 06/90

Start of RCC: 06/90

End of RCC: 12/93

End of Project: 07/95

Specifications

Height: 57 metres

Length: 719 metres

Volume of RCC: 485 m3x103

Total volume: 860 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.75RCC against precast concrete blocks
 RCC against formwork
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
55
Pozzolan (kg/m3)Pozzolan Type
96Low-lime flyash (ASTM Class F)
  
Daguangba completed
Daguangba completed

Full Dam Information

Details

Country: China

Owner: Guizhou Hongfeng Hydropower Plant

Type: Gravity

Purpose(s): Hydropower

River: Sancha

Reservoir capacity: 420 m3x106

Construction Dates

Start of Project: -/89

Start of RCC: -/89

End of RCC: -/93

End of Project: -/94

Specifications

Height: 75 metres

Length: 196 metres

Volume of RCC: -

Total volume: 88 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Thailand

Owner: Electricity Generating Authority of Thailand (EGAT)

Type: Gravity

Purpose(s): Hydropower

River: Mun

Reservoir capacity: -

Construction Dates

Start of Project: 04/91

Start of RCC: 04/91

End of RCC: 03/94

End of Project: 06/94

Specifications

Height: 26 metres

Length: 323 metres

Volume of RCC: 48 m3x103

Total volume: 50 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalReinforced concrete cast against precast units or slip-formed facing elements
VerticalRCC supported by fill shoulders
Downstream
SlopeType
VerticalReinforced concrete cast against precast units or slip-formed facing elements
0.80RCC supported by fill shoulders
Spillway
SlopeType
separate 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
58
Pozzolan (kg/m3)Pozzolan Type
124Low-lime flyash (ASTM Class F)
  
Pak Mun completed
Pak Mun completed

Full Dam Information

Details

Country: China

Owner: Lianjiang Water Conservancy Bureau

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Aojiang

Reservoir capacity: 172 m3x106

Construction Dates

Start of Project: 08/92

Start of RCC: 08/92

End of RCC: 05/94

End of Project: 06/95

Specifications

Height: 66 metres

Length: 274 metres

Volume of RCC: 180 m3x103

Total volume: 272 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against precast concrete panels
Downstream
SlopeType
0.80RCC against precast concrete blocks
Spillway
SlopeType
0.77Reinforced concrete cast against precast units or slip-formed facing elements

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
65
55
Pozzolan (kg/m3)Pozzolan Type
125Low-lime flyash (ASTM Class F)
95 
Shanzi completed
Shanzi completed

Full Dam Information

Details

Country: China

Owner: Wenquanbao Reservoir Management Office

Type: Thin Arch

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Tanghe

Reservoir capacity: 7 m3x106

Construction Dates

Start of Project: 10/91

Start of RCC: 10/91

End of RCC: 06/94

End of Project: -/95

Specifications

Height: 48 metres

Length: 188 metres

Volume of RCC: 55 m3x103

Total volume: 63 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork with external geomembrane
Downstream
SlopeType
0.30RCC against formwork
Spillway
SlopeType
ogeeReinforced concrete cast against precast units or slip-formed facing elements

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
110
69
Pozzolan (kg/m3)Pozzolan Type
68Low-lime flyash (ASTM Class F)
85 
Wenquanbao completed
Wenquanbao completed

Full Dam Information

Details

Country: Mexico

Owner: CFE (Comisión Federal de Electricidad)

Type: Gravity

Purpose(s): Flood Control / Hydropower

River: Santiago

Reservoir capacity: 26 m3x106

Construction Dates

Start of Project: 11/93

Start of RCC: 11/93

End of RCC: 07/94

End of Project: 07/94

Specifications

Height: 48 metres

Length: 176 metres

Volume of RCC: 81 m3x103

Total volume: 110 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against precast concrete panels
Downstream
SlopeType
0.66RCC against formwork  [stepped face]
0.80 
Spillway
SlopeType
separate 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
130Natural pozzolan (ASTM Class N)
  
San Rafael completed
San Rafael completed

Full Dam Information

Details

Country: Canada

Owner: Hydro-Québec

Type: Gravity

Purpose(s): Hydropower

River: Ha! Ha!

Reservoir capacity: 587 m3x106

Construction Dates

Start of Project: 10/92

Start of RCC: 10/92

End of RCC: 08/94

End of Project: 03/95

Specifications

Height: 40 metres

Length: 124 metres

Volume of RCC: 28 m3x103

Total volume: 35 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.75Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
separate 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
85
Pozzolan (kg/m3)Pozzolan Type
85Low-lime flyash (ASTM Class F)
  
Lac Robertson completed
Lac Robertson completed

Full Dam Information

Details

Country: China

Owner: Dongyuan County

Type: Gravity

Purpose(s): Hydropower

River: Yinjiang

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/92

Start of RCC: -/92

End of RCC: -/94

End of Project: -/94

Specifications

Height: 35 metres

Length: 115 metres

Volume of RCC: -

Total volume: 223 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.90 
Downstream
SlopeType
0.90   [stepped face]
Spillway
SlopeType
0.90   [stepped face]

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Lanshan County Hydropower Bureau

Type: Thin Arch

Purpose(s): Hydropower / Irrigation

River: Xiang

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: -/92

Start of RCC: -/92

End of RCC: -/94

End of Project: -/95

Specifications

Height: 45 metres

Length: 150 metres

Volume of RCC: -

Total volume: 45 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Huangcen Reservoir Management Office

Type: Thin Arch

Purpose(s): Flood Control / Hydropower / Irrigation

River: Leishui

Reservoir capacity: 3 m3x106

Construction Dates

Start of Project: -/92

Start of RCC: -/92

End of RCC: -/94

End of Project: -/95

Specifications

Height: 56 metres

Length: 147 metres

Volume of RCC: -

Total volume: 18 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: Japan

Owner: Ministry of Construction

Type: Gravity

Purpose(s): Flood Control / Hydropower / Water Supply

River: Nakatsu

Reservoir capacity: 193 m3x106

Construction Dates

Start of Project: 11/87

Start of RCC: 11/87

End of RCC: 02/95

End of Project: 03/01

Specifications

Height: 156 metres

Length: 400 metres

Volume of RCC: 1537 m3x103

Total volume: 2060 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.20Traditional concrete against formwork
0.60Traditional concrete against formwork
Downstream
SlopeType
0.625Traditional concrete against formwork
Spillway
SlopeType
0.625Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
150  -750
200 

Cementitious material

Cement (kg/m3)
91
Pozzolan (kg/m3)Pozzolan Type
39Low-lime flyash (ASTM Class F)
  
Miyagase completed
Miyagase completed

Full Dam Information

Details

Country: Japan

Owner: Okayama Prefecture

Type: Gravity

Purpose(s): Flood Control / Hydropower / Water Supply

River: Takahashi

Reservoir capacity: 28 m3x106

Construction Dates

Start of Project: 03/89

Start of RCC: 03/89

End of RCC: 04/95

End of Project: 03/98

Specifications

Height: 98 metres

Length: 259 metres

Volume of RCC: 396 m3x103

Total volume: 670 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.77Traditional concrete against formwork
Spillway
SlopeType
0.77Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
250750

Cementitious material

Cement (kg/m3)
91
Pozzolan (kg/m3)Pozzolan Type
39Low-lime flyash (ASTM Class F)
  
Chiya completed
Chiya completed

Full Dam Information

Details

Country: Japan

Owner: Akita Prefecture

Type: Gravity

Purpose(s): Flood Control / Hydropower / Water Supply

River: Matsu

Reservoir capacity: 12 m3x106

Construction Dates

Start of Project: 07/90

Start of RCC: 07/90

End of RCC: 06/95

End of Project: 09/96

Specifications

Height: 65 metres

Length: 296 metres

Volume of RCC: 141 m3x103

Total volume: 294 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.70Traditional concrete against formwork
Downstream
SlopeType
0.76Traditional concrete against formwork
Spillway
SlopeType
0.76Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
250750

Cementitious material

Cement (kg/m3)
91
Pozzolan (kg/m3)Pozzolan Type
39Low-lime flyash (ASTM Class F)
  
Ohmatsugawa completed
Ohmatsugawa completed

Full Dam Information

Details

Country: China

Owner: Department of Electric Power, Lonyan City, Fujian Province

Type: Arch-Gravity

Purpose(s): Hydropower / Water Supply

River: Longshanxi

Reservoir capacity: 9 m3x106

Construction Dates

Start of Project: 08/93

Start of RCC: 08/93

End of RCC: 07/95

End of Project: 10/95

Specifications

Height: 64 metres

Length: 93 metres

Volume of RCC: 25 m3x103

Total volume: 33 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork with external geomembrane
0.08RCC against formwork with external geomembrane
Downstream
SlopeType
0.65RCC against formwork
Spillway
SlopeType
ogeeReinforced concrete cast against precast units or slip-formed facing elements
0.65 

Placement

Layers (mm)Lifts (mm)
300  -300  -
350350

Cementitious material

Cement (kg/m3)
80
79
Pozzolan (kg/m3)Pozzolan Type
120Low-lime flyash (ASTM Class F)
105 
Xibingxi completed
Xibingxi completed

Full Dam Information

Details

Country: China

Owner: Guanyinge Reservoir Management Bureau

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Taizi

Reservoir capacity: 2168 m3x106

Construction Dates

Start of Project: 05/90

Start of RCC: 05/90

End of RCC: 09/95

End of Project: 10/95

Specifications

Height: 82 metres

Length: 1040 metres

Volume of RCC: 1240 m3x103

Total volume: 1876 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.10Traditional concrete against formwork
Downstream
SlopeType
0.70Traditional concrete against formwork
Spillway
SlopeType
0.70Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
270  -750
280 

Cementitious material

Cement (kg/m3)
91
Pozzolan (kg/m3)Pozzolan Type
39Low-lime flyash (ASTM Class F)
  
Guanyinge (Kwan-in-Temple) completed
Guanyinge (Kwan-in-Temple) completed

Full Dam Information

Details

Country: Japan

Owner: Hokkaido Development Bureau

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Satsunai

Reservoir capacity: 54 m3x106

Construction Dates

Start of Project: 02/87

Start of RCC: 02/87

End of RCC: 10/95

End of Project: 03/99

Specifications

Height: 114 metres

Length: 300 metres

Volume of RCC: 536 m3x103

Total volume: 770 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.40Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
250750

Cementitious material

Cement (kg/m3)
78
Pozzolan (kg/m3)Pozzolan Type
42Ground-granulated blast-furnace slag
  
Satsunaigawa completed
Satsunaigawa completed

Full Dam Information

Details

Country: Japan

Owner: Water Resources Development Public Corporation

Type: Gravity

Purpose(s): Flood Control / Hydropower / Water Supply

River: Urayama

Reservoir capacity: 58 m3x106

Construction Dates

Start of Project: 03/90

Start of RCC: 03/90

End of RCC: 12/95

End of Project: 03/99

Specifications

Height: 156 metres

Length: 372 metres

Volume of RCC: 1294 m3x103

Total volume: 1750 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.65Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
250750
 1000

Cementitious material

Cement (kg/m3)
91
Pozzolan (kg/m3)Pozzolan Type
39Low-lime flyash (ASTM Class F)
  
Urayama completed
Urayama completed

Full Dam Information

Details

Country: China

Owner: Fengdu Water Resources Bureau

Type: Gravity

Purpose(s): Flood Control / Hydropower / Recreation

River: Longxihe

Reservoir capacity: 105 m3x106

Construction Dates

Start of Project: 12/92

Start of RCC: 12/92

End of RCC: -/95

End of Project: -/96

Specifications

Height: 84 metres

Length: 445 metres

Volume of RCC: 335 m3x103

Total volume: 564 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.65Traditional concrete against formwork
Spillway
SlopeType
0.65Reinforced concrete cast against precast units or slip-formed facing elements

Placement

Layers (mm)Lifts (mm)
3001000

Cementitious material

Cement (kg/m3)
126
60
Pozzolan (kg/m3)Pozzolan Type
84Low-lime flyash (ASTM Class F)
90 
Shibanshui completed
Shibanshui completed

Full Dam Information

Details

Country: Brazil

Owner: Itamarati Norte S.A. (part of Brennand Energia)

Type: Gravity

Purpose(s): Hydropower

River: Juba

Reservoir capacity: -

Construction Dates

Start of Project: -/93

Start of RCC: -/93

End of RCC: -/95

End of Project: -/96

Specifications

Height: 21 metres

Length: 238 metres

Volume of RCC: 96 m3x103

Total volume: 113 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
15Natural pozzolan (ASTM Class N)
  
Photo coming soon

Full Dam Information

Details

Country: Brazil

Owner: Itamarati Norte S.A. (part of Brennand Energia)

Type: Gravity

Purpose(s): Hydropower

River: Juba

Reservoir capacity: -

Construction Dates

Start of Project: -/93

Start of RCC: -/93

End of RCC: -/95

End of Project: -/96

Specifications

Height: 21 metres

Length: 238 metres

Volume of RCC: 105 m3x103

Total volume: 113 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
15Natural pozzolan (ASTM Class N)
  
Photo coming soon

Full Dam Information

Details

Country: Brazil

Owner: COPEL (Companhia Paranense de Energia)

Type: Gravity

Purpose(s): Hydropower

River: Jordão

Reservoir capacity: 110 m3x106

Construction Dates

Start of Project: 05/94

Start of RCC: 05/94

End of RCC: 02/96

End of Project: 09/96

Specifications

Height: 95 metres

Length: 550 metres

Volume of RCC: 570 m3x103

Total volume: 647 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.74RCC against formwork  [stepped face]
Spillway
SlopeType
0.74Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
400400

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
15Natural pozzolan (ASTM Class N)
  
Jordão completed
Jordão completed

Full Dam Information

Details

Country: Chile

Owner: Empresa Electrica Pangue SA

Type: Gravity

Purpose(s): Hydropower

River: Bio-Bio

Reservoir capacity: 175 m3x106

Construction Dates

Start of Project: 01/92

Start of RCC: 01/92

End of RCC: 02/96

End of Project: 12/96

Specifications

Height: 113 metres

Length: 410 metres

Volume of RCC: 670 m3x103

Total volume: 740 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.80RCC against formwork  [stepped face]
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
100Natural pozzolan (ASTM Class N)
  
Pangue completed
Pangue completed

Full Dam Information

Details

Country: Brazil

Owner: Copel Geração e Transmissão S.A.

Type: Gravity

Purpose(s): Hydropower

River: Jordão

Reservoir capacity: 110 m3x106

Construction Dates

Start of Project: 05/94

Start of RCC: 05/94

End of RCC: 03/96

End of Project: 12/97

Specifications

Height: 73 metres

Length: 560 metres

Volume of RCC: 576 m3x103

Total volume: 665 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Derivação do Rio Jordão completed
Derivação do Rio Jordão completed

Full Dam Information

Details

Country: China

Owner: Guangxi-Guiguang Electric Power Development Co. Ltd.

Type: Gravity

Purpose(s): Hydropower / Irrigation / Navigation

River: Hongshuihe

Reservoir capacity: 340 m3x106

Construction Dates

Start of Project: 02/93

Start of RCC: 02/93

End of RCC: 04/96

End of Project: 08/97

Specifications

Height: 34 metres

Length: 710 metres

Volume of RCC: 62 m3x103

Total volume: 80 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.70RCC against precast concrete blocks  [stepped face]
Spillway
SlopeType
0.70Traditional concrete against precast concrete panels  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
73
99
Pozzolan (kg/m3)Pozzolan Type
110Low-lime flyash (ASTM Class F)
60 
Photo coming soon

Full Dam Information

Details

Country: Japan

Owner: Water Resources Development Public Corporation

Type: Gravity

Purpose(s): Flood Control / Hydropower / Water Supply

River: Katsura

Reservoir capacity: 66 m3x106

Construction Dates

Start of Project: -/83

Start of RCC: -/83

End of RCC: 07/96

End of Project: 03/98

Specifications

Height: 70 metres

Length: 438 metres

Volume of RCC: 440 m3x103

Total volume: 670 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.80Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
250750
 1000

Cementitious material

Cement (kg/m3)
84
77
Pozzolan (kg/m3)Pozzolan Type
36Low-lime flyash (ASTM Class F)
33 
Hiyoshi completed
Hiyoshi completed

Full Dam Information

Details

Country: Canada

Owner: Abitibi-Price Inc.

Type: Gravity

Purpose(s): Hydropower

River: Exploits

Reservoir capacity: -

Construction Dates

Start of Project: 08/96

Start of RCC: 08/96

End of RCC: 09/96

End of Project: 12/96

Specifications

Height: 15 metres

Length: 180 metres

Volume of RCC: 7 m3x103

Total volume: 11 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.67Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.67Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
200200

Cementitious material

Cement (kg/m3)
130
Pozzolan (kg/m3)Pozzolan Type
75Low-lime flyash (ASTM Class F)
  
Grand Falls spillway completed
Grand Falls spillway completed

Full Dam Information

Details

Country: China

Owner: Wangqing County Water Conservancy Bureau

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Gayahe

Reservoir capacity: 10 m3x106

Construction Dates

Start of Project: 08/92

Start of RCC: 08/92

End of RCC: 12/96

End of Project: 08/97

Specifications

Height: 37 metres

Length: 337 metres

Volume of RCC: 78 m3x103

Total volume: 100 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.75RCC against precast concrete blocks
Spillway
SlopeType
ogeeTraditional concrete against formwork
0.70Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
3001000

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
120Low-lime flyash (ASTM Class F)
  
Mantaicheng on Google Earth
Mantaicheng on Google Earth

Full Dam Information

Details

Country: China

Owner: Chongqing Wujiang Power Company

Type: Gravity

Purpose(s): Flood Control / Hydropower

River: Apengjiang

Reservoir capacity: 115 m3x106

Construction Dates

Start of Project: -/93

Start of RCC: -/93

End of RCC: -/96

End of Project: -/97

Specifications

Height: 85 metres

Length: 149 metres

Volume of RCC: -

Total volume: 33 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Dahekou on Google Earth
Dahekou on Google Earth

Full Dam Information

Details

Country: Brazil

Owner: Arcelor Mittal Brasil S.A.

Type: Gravity

Purpose(s): Hydropower

River: Piracicaba

Reservoir capacity: 12 m3x106

Construction Dates

Start of Project: -/93

Start of RCC: -/93

End of RCC: -/96

End of Project: 10/97

Specifications

Height: 41 metres

Length: 143 metres

Volume of RCC: 85 m3x103

Total volume: 102 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
20Natural pozzolan (ASTM Class N)
  
Guilman-Amorin completed
Guilman-Amorin completed

Full Dam Information

Details

Country: Greece

Owner: Public Power Corporation (PPC)

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Nestos

Reservoir capacity: 84 m3x106

Construction Dates

Start of Project: 01/89

Start of RCC: 01/89

End of RCC: 03/97

End of Project: 06/99

Specifications

Height: 95 metres

Length: 305 metres

Volume of RCC: 420 m3x103

Total volume: 440 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Slip-formed/extruded facing elements
Downstream
SlopeType
0.75Slip-formed/extruded facing elements  [stepped face]
Spillway
SlopeType
0.75Reinforced concrete cast against precast units or slip-formed facing elements

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
50
Pozzolan (kg/m3)Pozzolan Type
225High-lime flyash (ASTM Class C)
  
Platanovryssi completed
Platanovryssi completed

Full Dam Information

Details

Country: China

Owner: Wanyao Reservoir Management Bureau

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Dahexi

Reservoir capacity: 223 m3x106

Construction Dates

Start of Project: 10/93

Start of RCC: 10/93

End of RCC: 05/97

End of Project: 07/97

Specifications

Height: 83 metres

Length: 390 metres

Volume of RCC: 320 m3x103

Total volume: 458 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.20Traditional concrete against formwork
Downstream
SlopeType
0.70Traditional concrete against precast concrete panels
Spillway
SlopeType
0.75Reinforced concrete cast against precast units or slip-formed facing elements

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
64
Pozzolan (kg/m3)Pozzolan Type
96Low-lime flyash (ASTM Class F)
  
Wanyao completed
Wanyao completed

Full Dam Information

Details

Country: Japan

Owner: Hokkaido Development Bureau

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Sorachi

Reservoir capacity: 108 m3x106

Construction Dates

Start of Project: 10/90

Start of RCC: 10/90

End of RCC: 07/97

End of Project: 06/00

Specifications

Height: 50 metres

Length: 445 metres

Volume of RCC: 327 m3x103

Total volume: 455 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.06Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
250750

Cementitious material

Cement (kg/m3)
84
Pozzolan (kg/m3)Pozzolan Type
36Low-lime flyash (ASTM Class F)
  
Takisato completed
Takisato completed

Full Dam Information

Details

Country: Japan

Owner: Tokyo Electric Power Company

Type: Gravity

Purpose(s): Hydropower

River: Tuchimuro

Reservoir capacity: 12 m3x106

Construction Dates

Start of Project: 11/92

Start of RCC: 11/92

End of RCC: 07/97

End of Project: 11/99

Specifications

Height: 105 metres

Length: 264 metres

Volume of RCC: 428 m3x103

Total volume: 622 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.10Traditional concrete against formwork
Downstream
SlopeType
0.82Traditional concrete against formwork
Spillway
SlopeType
0.82Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
1701000

Cementitious material

Cement (kg/m3)
91
84
Pozzolan (kg/m3)Pozzolan Type
39Low-lime flyash (ASTM Class F)
36 
Kazunogawa completed
Kazunogawa completed

Full Dam Information

Details

Country: China

Owner: Department of Electricity, Dapu County, Guangdong Province

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Meixihe

Reservoir capacity: 95 m3x106

Construction Dates

Start of Project: 01/95

Start of RCC: 01/95

End of RCC: 10/97

End of Project: 12/97

Specifications

Height: 60 metres

Length: 221 metres

Volume of RCC: 113 m3x103

Total volume: 172 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against precast concrete panels with hot poured membrane
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.78Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
90
55
Pozzolan (kg/m3)Pozzolan Type
110Low-lime flyash (ASTM Class F)
105 
Shuangxi completed
Shuangxi completed

Full Dam Information

Details

Country: China

Owner: Department of Water Resources, Hebei Province

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Recreation / Water Supply

River: Qinglonghe

Reservoir capacity: 859 m3x106

Construction Dates

Start of Project: 11/92

Start of RCC: 11/92

End of RCC: 12/97

End of Project: -/98

Specifications

Height: 75 metres

Length: 500 metres

Volume of RCC: 585 m3x103

Total volume: 1350 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.15 
Downstream
SlopeType
0.78Traditional concrete against formwork
Spillway
SlopeType
ogeeTraditional concrete against formwork
0.65Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
135
70
Pozzolan (kg/m3)Pozzolan Type
70Low-lime flyash (ASTM Class F)
85 
Taolinkou completed
Taolinkou completed

Full Dam Information

Details

Country: Brazil

Owner: CPEE (Companhia Paulista de Energia Elétrica)

Type: Gravity

Purpose(s): Hydropower

River: do Peixe

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: 02/96

Start of RCC: 02/96

End of RCC: 12/97

End of Project: -/98

Specifications

Height: 32 metres

Length: 300 metres

Volume of RCC: 20 m3x103

Total volume: 34 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
120
90
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
0 
do Peixe completed
do Peixe completed

Full Dam Information

Details

Country: China

Owner: Fengdu Hydropower Bureau

Type: Thin Arch

Purpose(s): Hydropower

River: Huilonghe

Reservoir capacity: 8 m3x106

Construction Dates

Start of Project: -/93

Start of RCC: -/93

End of RCC: -/97

End of Project: -/98

Specifications

Height: 90 metres

Length: 158 metres

Volume of RCC: -

Total volume: 770 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10 
Downstream
SlopeType
0.76 
Spillway
SlopeType
0.76 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Dominican Republic

Owner: INDRHI (Instiuto Nacional de Recursos Hidráulicos de la República Dominicana)

Type: Hardfill

Purpose(s): Flood Control / Hydropower / Irrigation

River: Mao

Reservoir capacity: 8 m3x106

Construction Dates

Start of Project: 07/95

Start of RCC: 07/95

End of RCC: 03/98

End of Project: 06/98

Specifications

Height: 28 metres

Length: 254 metres

Volume of RCC: 130 m3x103

Total volume: 155 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.70Traditional concrete against formwork
Downstream
SlopeType
0.67Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
  
Photo coming soon

Full Dam Information

Details

Country: Japan

Owner: Iwate Prefecture

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Hienuki

Reservoir capacity: 17 m3x106

Construction Dates

Start of Project: 03/93

Start of RCC: 03/93

End of RCC: 06/98

End of Project: 03/00

Specifications

Height: 74 metres

Length: 333 metres

Volume of RCC: 141 m3x103

Total volume: 333 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.20Traditional concrete against formwork
Downstream
SlopeType
0.76Traditional concrete against formwork
Spillway
SlopeType
0.76Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
250750

Cementitious material

Cement (kg/m3)
84
Pozzolan (kg/m3)Pozzolan Type
36Low-lime flyash (ASTM Class F)
  
Hayachine completed
Hayachine completed

Full Dam Information

Details

Country: Brazil

Owner: COPEL (Companhia Paranense de Energia) Geração E Transmissão S.A.

Type: Gravity

Purpose(s): Hydropower

River: Iguaçu

Reservoir capacity: 3573 m3x106

Construction Dates

Start of Project: 02/95

Start of RCC: 02/95

End of RCC: 07/98

End of Project: 12/98

Specifications

Height: 67 metres

Length: 1083 metres

Volume of RCC: 912 m3x103

Total volume: 1438 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalReinforced concrete cast against precast units or slip-formed facing elements
Downstream
SlopeType
0.75Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.75Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
20Low-lime flyash (ASTM Class F)
  
Gov. José Richa (formerly Salto Caxias) completed
Gov. José Richa (formerly Salto Caxias) completed

Full Dam Information

Details

Country: Japan

Owner: Ministry of Construction

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Bonji

Reservoir capacity: 65 m3x106

Construction Dates

Start of Project: 08/88

Start of RCC: 08/88

End of RCC: 10/98

End of Project: 03/01

Specifications

Height: 123 metres

Length: 393 metres

Volume of RCC: 731 m3x103

Total volume: 1160 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
250750
 1000

Cementitious material

Cement (kg/m3)
91
Pozzolan (kg/m3)Pozzolan Type
39Low-lime flyash (ASTM Class F)
  
Gassan completed
Gassan completed

Full Dam Information

Details

Country: China

Owner: Yongxi Hydroelectric Co. Ltd.

Type: Gravity

Purpose(s): Flood Control / Hydropower / Water Supply

River: Dazhangxi

Reservoir capacity: 68 m3x106

Construction Dates

Start of Project: 05/96

Start of RCC: 05/96

End of RCC: 10/98

End of Project: 09/99

Specifications

Height: 87 metres

Length: 198 metres

Volume of RCC: 170 m3x103

Total volume: 255 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.73RCC against precast concrete blocks
Spillway
SlopeType
ogeeTraditional concrete against formwork
0.73Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
2803000

Cementitious material

Cement (kg/m3)
115
80
Pozzolan (kg/m3)Pozzolan Type
95Low-lime flyash (ASTM Class F)
90 
Yongxi Nº3 completed
Yongxi Nº3 completed

Full Dam Information

Details

Country: China

Owner: Ya’an Electricity Company

Type: Gravity

Purpose(s): Hydropower

River: Yinghe

Reservoir capacity: 8 m3x106

Construction Dates

Start of Project: 01/96

Start of RCC: 01/96

End of RCC: 12/98

End of Project: 05/99

Specifications

Height: 85 metres

Length: 173 metres

Volume of RCC: 240 m3x103

Total volume: 290 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.20Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300  -300  -
400400

Cementitious material

Cement (kg/m3)
78
74
Pozzolan (kg/m3)Pozzolan Type
95Low-lime flyash (ASTM Class F)
90 
Huatan completed
Huatan completed

Full Dam Information

Details

Country: China

Owner: Department of Water Resources, Hubei Province

Type: Gravity

Purpose(s): Hydropower / Water Supply

River: Yujiang

Reservoir capacity: 68 m3x106

Construction Dates

Start of Project: -/91

Start of RCC: -/91

End of RCC: 12/98

End of Project: 06/00

Specifications

Height: 69 metres

Length: 279 metres

Volume of RCC: 170 m3x103

Total volume: 200 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.74RCC against formwork
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
3005000

Cementitious material

Cement (kg/m3)
134
72
Pozzolan (kg/m3)Pozzolan Type
89Low-lime flyash (ASTM Class F)
48 
Changshun completed
Changshun completed

Full Dam Information

Details

Country: China

Owner: Fushan Power Station Management Bureau

Type: Thin Arch

Purpose(s): Hydropower / Irrigation

River: Nanxi

Reservoir capacity: 7 m3x106

Construction Dates

Start of Project: -/94

Start of RCC: -/94

End of RCC: -/98

End of Project: -/99

Specifications

Height: 47 metres

Length: 235 metres

Volume of RCC: -

Total volume: 240 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Wencheng County Kengxiashan Hydropower Development Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Yuquanxi

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/96

Start of RCC: -/96

End of RCC: -/98

End of Project: -/98

Specifications

Height: 34 metres

Length: 80 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Department of Water Resources, Shanxi Province

Type: Gravity

Purpose(s): Flood Control / Hydropower / Water Supply

River: Fenhe

Reservoir capacity: 130 m3x106

Construction Dates

Start of Project: 11/96

Start of RCC: 11/96

End of RCC: 03/99

End of Project: 06/00

Specifications

Height: 87 metres

Length: 350 metres

Volume of RCC: 362 m3x103

Total volume: 448 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.20Traditional concrete against formwork
Downstream
SlopeType
0.75Traditional concrete against precast concrete panels
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
127
60
Pozzolan (kg/m3)Pozzolan Type
84Low-lime flyash (ASTM Class F)
93 
Fenhe Nº2 completed
Fenhe Nº2 completed

Full Dam Information

Details

Country: China

Owner: Lishui Hydropower Development Co. Ltd.

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Navigation / Water Supply

River: Loushui

Reservoir capacity: 1741 m3x106

Construction Dates

Start of Project: 07/95

Start of RCC: 07/95

End of RCC: 04/99

End of Project: -/01

Specifications

Height: 131 metres

Length: 368 metres

Volume of RCC: 1100 m3x103

Total volume: 1310 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.80RCC against formwork  [stepped face]
Spillway
SlopeType
ogeeReinforced concrete cast against precast units or slip-formed facing elements
0.80 

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
87
64  46
Pozzolan (kg/m3)Pozzolan Type
107Low-lime flyash (ASTM Class F)
96  107 
Jiangya completed
Jiangya completed

Full Dam Information

Details

Country: China

Owner: Helong Electricity Corporation

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Recreation / Water Supply

River: Hailanhe

Reservoir capacity: 21 m3x106

Construction Dates

Start of Project: 09/97

Start of RCC: 09/97

End of RCC: 04/99

End of Project: 09/99

Specifications

Height: 29 metres

Length: 271 metres

Volume of RCC: 44 m3x103

Total volume: 77 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.73RCC against precast concrete blocks
Spillway
SlopeType
conduit 

Placement

Layers (mm)Lifts (mm)
3002000

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
100Low-lime flyash (ASTM Class F)
  
Songyue (1st Stage) on Google Earth
Songyue (1st Stage) on Google Earth

Full Dam Information

Details

Country: Indonesia

Owner: P.T. Vale Indonesia

Type: Gravity

Purpose(s): Hydropower

River: Larona

Reservoir capacity: 33 m3x106

Construction Dates

Start of Project: 03/95

Start of RCC: 03/95

End of RCC: 06/99

End of Project: 09/99

Specifications

Height: 94 metres

Length: 352 metres

Volume of RCC: 528 m3x103

Total volume: 54 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork with external geomembrane
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
420420

Cementitious material

Cement (kg/m3)
81
Pozzolan (kg/m3)Pozzolan Type
54Low-lime flyash (ASTM Class F)
  
Balambano completed
Balambano completed

Full Dam Information

Details

Country: China

Owner: Shaoguang Electricity Corporation Ltd

Type: Gravity

Purpose(s): Hydropower

River: Yangxishui

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: 11/97

Start of RCC: 11/97

End of RCC: 06/99

End of Project: 07/00

Specifications

Height: 46 metres

Length: 202 metres

Volume of RCC: 100 m3x103

Total volume: 139 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
VerticalTraditional concrete against formwork
0.75Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.70Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Yangxishui Nº3 on Google Earth
Yangxishui Nº3 on Google Earth

Full Dam Information

Details

Country: China

Owner: Department of Water Resources, Liaoning Province

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Dalinghe

Reservoir capacity: 1645 m3x106

Construction Dates

Start of Project: 09/96

Start of RCC: 09/96

End of RCC: 09/99

End of Project: 12/00

Specifications

Height: 49 metres

Length: 513 metres

Volume of RCC: 111 m3x103

Total volume: 603 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.10Traditional concrete against formwork
Downstream
SlopeType
0.70Traditional concrete against formwork
Spillway
SlopeType
0.76Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
72
Pozzolan (kg/m3)Pozzolan Type
58Low-lime flyash (ASTM Class F)
  
Baishi completed
Baishi completed

Full Dam Information

Details

Country: Brazil

Owner: Rosal Energia S.A.

Type: Gravity

Purpose(s): Hydropower

River: Itabapoana

Reservoir capacity: 17 m3x106

Construction Dates

Start of Project: 04/98

Start of RCC: 04/98

End of RCC: 09/99

End of Project: -/00

Specifications

Height: 37 metres

Length: 212 metres

Volume of RCC: 45 m3x103

Total volume: 75 m3x103

Construction Methods

Facings

Upstream
SlopeType
 Traditional concrete against formwork
Downstream
SlopeType
 RCC against formwork  [stepped face]
Spillway
SlopeType
 Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
45
Pozzolan (kg/m3)Pozzolan Type
55Ground-granulated blast-furnace slag
  
Rosal completed
Rosal completed

Full Dam Information

Details

Country: Turkey

Owner: ERE Electricity Co.

Type: Gravity

Purpose(s): Hydropower

River: Güredin Creek

Reservoir capacity: 9 m3x106

Construction Dates

Start of Project: 01/98

Start of RCC: 01/98

End of RCC: 10/99

End of Project: 10/99

Specifications

Height: 36 metres

Length: 192 metres

Volume of RCC: 55 m3x103

Total volume: 60 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against precast concrete panels
Downstream
SlopeType
0.80RCC against precast concrete panels
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
50
Pozzolan (kg/m3)Pozzolan Type
100Ground-granulated blast-furnace slag
  
Suçati completed
Suçati completed

Full Dam Information

Details

Country: Laos

Owner: EDL Generation Public Co. Ltd

Type: Gravity

Purpose(s): Hydropower

River: Nam Leuk

Reservoir capacity: 185 m3x106

Construction Dates

Start of Project: -/98

Start of RCC: -/98

End of RCC: -/99

End of Project: -/00

Specifications

Height: 15 metres

Length: 60 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Japan

Owner: Toyama Prefecture

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Kubusu

Reservoir capacity: 10 m3x106

Construction Dates

Start of Project: 03/93

Start of RCC: 03/93

End of RCC: -/99

End of Project: 10/02

Specifications

Height: 95 metres

Length: 253 metres

Volume of RCC: 364 m3x103

Total volume: 469 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.40Traditional concrete against formwork
Downstream
SlopeType
0.78Traditional concrete against formwork
Spillway
SlopeType
0.78Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
250750

Cementitious material

Cement (kg/m3)
84
Pozzolan (kg/m3)Pozzolan Type
36Low-lime flyash (ASTM Class F)
  
Kubusugawa completed
Kubusugawa completed

Full Dam Information

Details

Country: China

Owner: Qingjiang Hydropower Development Corporation

Type: Gravity

Purpose(s): Flood Control / Hydropower / Navigation

River: Qingjiang

Reservoir capacity: 536 m3x106

Construction Dates

Start of Project: 05/97

Start of RCC: 05/97

End of RCC: 04/00

End of Project: 01/01

Specifications

Height: 57 metres

Length: 440 metres

Volume of RCC: 210 m3x103

Total volume: 940 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against precast concrete panels with hot poured membrane
Downstream
SlopeType
0.75Traditional concrete against formwork
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
123
86
Pozzolan (kg/m3)Pozzolan Type
100Low-lime flyash (ASTM Class F)
86 
Gaobazhou completed
Gaobazhou completed

Full Dam Information

Details

Country: Iran

Owner: Khuzestan Water & Energy Authority

Type: Gravity

Purpose(s): Flood Control / Hydropower

River: Karkeh

Reservoir capacity: 40 m3x106

Construction Dates

Start of Project: 02/98

Start of RCC: 02/98

End of RCC: 07/00

End of Project: -/01

Specifications

Height: 34 metres

Length: 350 metres

Volume of RCC: 130 m3x103

Total volume: 270 m3x103

Construction Methods

Facings

Upstream
SlopeType
 Reinforced conventional concrete cast after RCC placement
Downstream
SlopeType
 Reinforced conventional concrete cast after RCC placement
Spillway
SlopeType
ogeeReinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
97
Pozzolan (kg/m3)Pozzolan Type
33No pozzolan used
  
Karkheh (Pie Pol) completed
Karkheh (Pie Pol) completed

Full Dam Information

Details

Country: Colombia

Owner: EPM (Empresas Públicas de Medellín)

Type: Gravity

Purpose(s): Hydropower

River: Porce

Reservoir capacity: 211 m3x106

Construction Dates

Start of Project: 11/94

Start of RCC: 11/94

End of RCC: 09/00

End of Project: 03/01

Specifications

Height: 123 metres

Length: 425 metres

Volume of RCC: 1305 m3x103

Total volume: 1445 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Slip-formed/extruded facing elements
Downstream
SlopeType
0.35Slip-formed/extruded facing elements  [stepped face]
0.75 
Spillway
SlopeType
0.75Reinforced concrete cast against precast units or slip-formed facing elements

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
132
120
Pozzolan (kg/m3)Pozzolan Type
88Natural pozzolan (ASTM Class N)
80 
Porce II completed
Porce II completed

Full Dam Information

Details

Country: Brazil

Owner: Eletronorte SA

Type: Gravity

Purpose(s): Hydropower

River: Tocantins

Reservoir capacity: 45800 m3x106

Construction Dates

Start of Project: 06/98

Start of RCC: 06/98

End of RCC: 09/00

End of Project: 10/05

Specifications

Height: 78 metres

Length: 1541 metres

Volume of RCC: 288 m3x103

Total volume: 1383 m3x103

Construction Methods

Facings

Upstream
SlopeType
 RCC against formwork
Downstream
SlopeType
 RCC against formwork  [stepped face]
Spillway
SlopeType
separate 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
70
Pozzolan (kg/m3)Pozzolan Type
30Natural pozzolan (ASTM Class N)
  
Tucuruí - 2nd Phase completed
Tucuruí - 2nd Phase completed

Full Dam Information

Details

Country: Brazil

Owner: Dona Francisca Energértica SA

Type: Gravity

Purpose(s): Hydropower

River: Jacuí

Reservoir capacity: 335 m3x106

Construction Dates

Start of Project: 08/98

Start of RCC: 08/98

End of RCC: 10/00

End of Project: 12/00

Specifications

Height: 63 metres

Length: 670 metres

Volume of RCC: 485 m3x103

Total volume: 503 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.75RCC against formwork  [stepped face]
Spillway
SlopeType
0.75Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
72
Pozzolan (kg/m3)Pozzolan Type
18Natural pozzolan (ASTM Class N)
  
Dona Francisca completed
Dona Francisca completed

Full Dam Information

Details

Country: China

Owner: Ge'ermu Hydroelectric Responsibility Corporation Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Geermu

Reservoir capacity: 9780 m3x106

Construction Dates

Start of Project: -/96

Start of RCC: -/96

End of RCC: -/00

End of Project: -/01

Specifications

Height: 40 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Dagangou on Google Earth
Dagangou on Google Earth

Full Dam Information

Details

Country: China

Owner: Shixing County Power Development Corporation

Type: Thin Arch

Purpose(s): Flood Control / Hydropower

River: Du’anshui (Chengjiang)

Reservoir capacity: 48 m3x106

Construction Dates

Start of Project: 09/99

Start of RCC: 09/99

End of RCC: 01/01

End of Project: 03/01

Specifications

Height: 57 metres

Length: 179 metres

Volume of RCC: 90 m3x103

Total volume: 119 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
3303000

Cementitious material

Cement (kg/m3)
105
63
Pozzolan (kg/m3)Pozzolan Type
86Low-lime flyash (ASTM Class F)
80 
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Department of Electricity, Gansu Province

Type: Arch-Gravity

Purpose(s): Hydropower

River: Heihe

Reservoir capacity: 13 m3x106

Construction Dates

Start of Project: 04/99

Start of RCC: 04/99

End of RCC: 06/01

End of Project: 09/01

Specifications

Height: 80 metres

Length: 258 metres

Volume of RCC: 187 m3x103

Total volume: 210 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.20Traditional concrete against formwork
Downstream
SlopeType
0.75Traditional concrete against formwork
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
96
58
Pozzolan (kg/m3)Pozzolan Type
109Low-lime flyash (ASTM Class F)
113 
Longshou Nº1 completed
Longshou Nº1 completed

Full Dam Information

Details

Country: China

Owner: Shimenzi Reservoir Engineering Management Office

Type: Thin Arch

Purpose(s): Hydropower / Irrigation / Water Supply

River: Taxi

Reservoir capacity: 80 m3x106

Construction Dates

Start of Project: 06/98

Start of RCC: 06/98

End of RCC: 06/01

End of Project: 10/01

Specifications

Height: 110 metres

Length: 176 metres

Volume of RCC: 188 m3x103

Total volume: 211 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.142RCC against formwork (GEVR/GE-RCC)
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
VerticalRCC against formwork
0.18RCC against formwork
Spillway
SlopeType
crestReinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
93
62
Pozzolan (kg/m3)Pozzolan Type
110Low-lime flyash (ASTM Class F)
110 
Shimenzi completed
Shimenzi completed

Full Dam Information

Details

Country: Japan

Owner: Ministry of Land, Infrastructure and Transport

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Chubetu

Reservoir capacity: 93 m3x106

Construction Dates

Start of Project: 03/94

Start of RCC: 03/94

End of RCC: 08/01

End of Project: 03/04

Specifications

Height: 86 metres

Length: 290 metres

Volume of RCC: 523 m3x103

Total volume: 1007 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.80Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
250750
 1000

Cementitious material

Cement (kg/m3)
84
Pozzolan (kg/m3)Pozzolan Type
36Low-lime flyash (ASTM Class F)
  
Chubetsu completed
Chubetsu completed

Full Dam Information

Details

Country: China

Owner: Department of Electricity, Yunnan Province

Type: Gravity

Purpose(s): Flood Control / Hydropower

River: Lancang (Mekong)

Reservoir capacity: 89 m3x106

Construction Dates

Start of Project: 10/97

Start of RCC: 10/97

End of RCC: 10/01

End of Project: 07/02

Specifications

Height: 115 metres

Length: 481 metres

Volume of RCC: 757 m3x103

Total volume: 1287 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
0.20 
Downstream
SlopeType
0.70RCC against precast concrete blocks  [stepped face]
Spillway
SlopeType
0.70Reinforced concrete cast against precast units or slip-formed facing elements

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
94
67
Pozzolan (kg/m3)Pozzolan Type
94Natural pozzolan (ASTM Class N)
101 
Dachaoshan completed
Dachaoshan completed

Full Dam Information

Details

Country: Brazil

Owner: Companhia Energética Mercosul (of the Tractebel Group)

Type: Gravity

Purpose(s): Hydropower

River: Tocantins

Reservoir capacity: 2300 m3x106

Construction Dates

Start of Project: 03/99

Start of RCC: 03/99

End of RCC: 10/01

End of Project: 10/02

Specifications

Height: 67 metres

Length: 510 metres

Volume of RCC: 527 m3x103

Total volume: 833 m3x103

Construction Methods

Facings

Upstream
SlopeType
 Traditional concrete against formwork
Downstream
SlopeType
 RCC against formwork  [stepped face]
Spillway
SlopeType
ogeeTraditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
40
Pozzolan (kg/m3)Pozzolan Type
50Ground-granulated blast-furnace slag
  
Cana Brava completed
Cana Brava completed

Full Dam Information

Details

Country: China

Owner: Mianhuatan Hydroelectric Development Corporation

Type: Gravity

Purpose(s): Flood Control / Hydropower / Navigation / Water Supply

River: Ting

Reservoir capacity: 2035 m3x106

Construction Dates

Start of Project: 04/98

Start of RCC: 04/98

End of RCC: 11/01

End of Project: 04/02

Specifications

Height: 111 metres

Length: 302 metres

Volume of RCC: 500 m3x103

Total volume: 615 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against precast concrete panels with hot poured membrane
Downstream
SlopeType
0.75RCC against formwork  [stepped face]
Spillway
SlopeType
0.70Reinforced concrete cast against precast units or slip-formed facing elements

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
82
59  48
Pozzolan (kg/m3)Pozzolan Type
100Low-lime flyash (ASTM Class F)
88  88 
Mianhuatan completed
Mianhuatan completed

Full Dam Information

Details

Country: Brazil

Owner: Investco (Tractebel)

Type: Gravity

Purpose(s): Hydropower

River: Tocantins

Reservoir capacity: 4982 m3x106

Construction Dates

Start of Project: 07/98

Start of RCC: 07/98

End of RCC: 12/01

End of Project: 12/02

Specifications

Height: 43 metres

Length: 2100 metres

Volume of RCC: 188 m3x103

Total volume: 210 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
30
Pozzolan (kg/m3)Pozzolan Type
40Ground-granulated blast-furnace slag
  
Lajeado (Luis Eduardo Magalhães) completed
Lajeado (Luis Eduardo Magalhães) completed

Full Dam Information

Details

Country: China

Owner: Chaoyang Water Conservancy Bureau

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Daling

Reservoir capacity: 217 m3x106

Construction Dates

Start of Project: -/96

Start of RCC: -/96

End of RCC: -/01

End of Project: -/02

Specifications

Height: 35 metres

Length: 383 metres

Volume of RCC: 87 m3x103

Total volume: 220 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
64
Pozzolan (kg/m3)Pozzolan Type
118Low-lime flyash (ASTM Class F)
  
Yanwangbizi on Google Earth
Yanwangbizi on Google Earth

Full Dam Information

Details

Country: Japan

Owner: Tokyo Electric Power Company

Type: Gravity

Purpose(s): Hydropower

River: Jinryu

Reservoir capacity: 19 m3x106

Construction Dates

Start of Project: 03/97

Start of RCC: 03/97

End of RCC: -/01

End of Project: 06/05

Specifications

Height: 120 metres

Length: 350 metres

Volume of RCC: 269 m3x103

Total volume: 720 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.30Traditional concrete against formwork
Downstream
SlopeType
0.84Traditional concrete against formwork
Spillway
SlopeType
0.84Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
2001000

Cementitious material

Cement (kg/m3)
77
70
Pozzolan (kg/m3)Pozzolan Type
33Low-lime flyash (ASTM Class F)
30 
Ueno completed
Ueno completed

Full Dam Information

Details

Country: Brazil

Owner: Aliança Geração de Energia SA

Type: Gravity

Purpose(s): Hydropower

River: Rio Grande

Reservoir capacity: 285 m3x106

Construction Dates

Start of Project: -/97

Start of RCC: -/97

End of RCC: -/01

End of Project: 12/02

Specifications

Height: 50 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Funil completed
Funil completed

Full Dam Information

Details

Country: China

Owner: Department of Electricity, Feng Shun County

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Xiaoxihe

Reservoir capacity: 5 m3x106

Construction Dates

Start of Project: -/99

Start of RCC: -/99

End of RCC: -/01

End of Project: -/02

Specifications

Height: 62 metres

Length: 103 metres

Volume of RCC: 47 m3x103

Total volume: 66 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): Hydropower

River: Xiaoxihe

Reservoir capacity: 12 m3x106

Construction Dates

Start of Project: -/99

Start of RCC: -/99

End of RCC: -/01

End of Project: -/02

Specifications

Height: 68 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Costa Rica

Owner: ICE (Instituto Costarricense de Electricidad)

Type: Gravity

Purpose(s): Hydropower

River: Peñas Blancas

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: 04/00

Start of RCC: 04/00

End of RCC: 01/02

End of Project: 07/02

Specifications

Height: 48 metres

Length: 211 metres

Volume of RCC: 120 m3x103

Total volume: 170 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
35Natural pozzolan (ASTM Class N)
  
Peñas Blancas completed
Peñas Blancas completed

Full Dam Information

Details

Country: China

Owner: Electricity Corporation, Yanji

Type: Gravity

Purpose(s): Hydropower / Recreation / Water Supply

River: Hailanhe

Reservoir capacity: 30 m3x106

Construction Dates

Start of Project: 11/98

Start of RCC: 11/98

End of RCC: 01/02

End of Project: 12/02

Specifications

Height: 30 metres

Length: 244 metres

Volume of RCC: 43 m3x103

Total volume: 89 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.75RCC against precast concrete blocks
Spillway
SlopeType
ogeeRCC against precast concrete blocks  [stepped face]

Placement

Layers (mm)Lifts (mm)
3002000

Cementitious material

Cement (kg/m3)
113
Pozzolan (kg/m3)Pozzolan Type
113Low-lime flyash (ASTM Class F)
  
Helong on Google Earth
Helong on Google Earth

Full Dam Information

Details

Country: China

Owner: Sichuan Minjiang Hydropower Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Caopohe

Reservoir capacity: 18 m3x106

Construction Dates

Start of Project: 06/97

Start of RCC: 06/97

End of RCC: 05/02

End of Project: 04/03

Specifications

Height: 132 metres

Length: 230 metres

Volume of RCC: 380 m3x103

Total volume: 392 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
0.10 
Downstream
SlopeType
0.21RCC against formwork
Spillway
SlopeType
crestTraditional concrete against formwork
0.21 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
108
89
Pozzolan (kg/m3)Pozzolan Type
72Low-lime flyash (ASTM Class F)
89 
Shapai completed
Shapai completed

Full Dam Information

Details

Country: Colombia

Owner: Isagen S.A. E.S.P. - Hidromiel S.A. E.S.P.

Type: Gravity

Purpose(s): Hydropower

River: La Miel

Reservoir capacity: 565 m3x106

Construction Dates

Start of Project: 12/97

Start of RCC: 12/97

End of RCC: 07/02

End of Project: 10/02

Specifications

Height: 188 metres

Length: 345 metres

Volume of RCC: 1669 m3x103

Total volume: 1730 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork with external geomembrane (GEVR/GE-RCC)
Downstream
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)  [stepped face]
1.00 
Spillway
SlopeType
0.75Reinforced conventional concrete cast after RCC placement
1.00 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
85  to
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
  
Miel I completed
Miel I completed

Full Dam Information

Details

Country: China

Owner: Corporation of Energy Development, Ruyuan County, Guangdong Province

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Yangxi

Reservoir capacity: 100 m3x106

Construction Dates

Start of Project: 12/00

Start of RCC: 12/00

End of RCC: 11/02

End of Project: 06/03

Specifications

Height: 82 metres

Length: 244 metres

Volume of RCC: 241 m3x103

Total volume: 340 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
VerticalTraditional concrete against formwork
0.75Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.70Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Yangxishui Nº1 on Google Earth
Yangxishui Nº1 on Google Earth

Full Dam Information

Details

Country: China

Owner: Jiangning Nankengyuan Hydropower Development Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Xiaoxihe

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/98

Start of RCC: -/98

End of RCC: -/02

End of Project: -/03

Specifications

Height: 34 metres

Length: 114 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Brazil

Owner: CASAN (Companhia Catarinense de Águas e Saneamento)

Type: Gravity

Purpose(s): Hydropower

River: São Bento

Reservoir capacity: 58 m3x106

Construction Dates

Start of Project: -/99

Start of RCC: -/99

End of RCC: -/02

End of Project: -/03

Specifications

Height: 49 metres

Length: 461 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
Vertical 
Downstream
SlopeType
0.80 
Spillway
SlopeType
0.80 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
São Bento completed
São Bento completed

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Yangxi

Reservoir capacity: 100 m3x106

Construction Dates

Start of Project: -/99

Start of RCC: -/99

End of RCC: -/02

End of Project: -/03

Specifications

Height: 82 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Hengxi on Google Earth
Hengxi on Google Earth

Full Dam Information

Details

Country: Brazil

Owner: Energética Campos de Cima da Serra Ltda

Type: Gravity

Purpose(s): Hydropower

River: das Antas

Reservoir capacity: 27 m3x106

Construction Dates

Start of Project: -/00

Start of RCC: -/00

End of RCC: -/02

End of Project: 10/03

Specifications

Height: 31 metres

Length: 110 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Passo do Meio completed
Passo do Meio completed

Full Dam Information

Details

Country: Brazil

Owner: Rio Glória Energética S.A.

Type: Gravity

Purpose(s): Hydropower

River: Glória

Reservoir capacity: 3 m3x106

Construction Dates

Start of Project: -/99

Start of RCC: -/99

End of RCC: -/02

End of Project: 12/03

Specifications

Height: 49 metres

Length: 218 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Ormeo Junqueira Botelho (formerly Cachoeira da Encoberta) completed
Ormeo Junqueira Botelho (formerly Cachoeira da Encoberta) completed

Full Dam Information

Details

Country: Brazil

Owner: Energetica Rio Pedrinho Ltda..

Type: Gravity

Purpose(s): Hydropower

River: Pedrinho

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/99

Start of RCC: -/99

End of RCC: -/02

End of Project: -/03

Specifications

Height: 16 metres

Length: 110 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Pedrinho 1 completed
Pedrinho 1 completed

Full Dam Information

Details

Country: Brazil

Owner: Itiquira Energética SA

Type: Gravity

Purpose(s): Hydropower

River: Itiquira

Reservoir capacity: -

Construction Dates

Start of Project: -/00

Start of RCC: -/00

End of RCC: -/02

End of Project: -/03

Specifications

Height: 15 metres

Length: -

Volume of RCC: 22 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Itiquira I on Google Earth
Itiquira I on Google Earth

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Hardfill

Purpose(s): Hydropower

River: -

Reservoir capacity: -

Construction Dates

Start of Project: -/00

Start of RCC: -/00

End of RCC: -/02

End of Project: -/03

Specifications

Height: 18 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Furquim completed
Furquim completed

Full Dam Information

Details

Country: Brazil

Owner: Tangará Energia S/A

Type: Gravity

Purpose(s): Hydropower

River: Guaporé

Reservoir capacity: 18 m3x106

Construction Dates

Start of Project: -/00

Start of RCC: -/00

End of RCC: -/02

End of Project: -/03

Specifications

Height: 32 metres

Length: 152 metres

Volume of RCC: -

Total volume: 43 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Guaporé completed
Guaporé completed

Full Dam Information

Details

Country: Brazil

Owner: Queiroz Galvão Energética SA (90%) and Cinco Estrelas Agropecuária e Participações Ltda (10%)

Type: Gravity

Purpose(s): Hydropower

River: Jauru

Reservoir capacity: 20 m3x106

Construction Dates

Start of Project: -/00

Start of RCC: -/00

End of RCC: -/02

End of Project: -/03

Specifications

Height: 51 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Jauru completed
Jauru completed

Full Dam Information

Details

Country: China

Owner: Longquan City Bureau of Hydropower

Type: Thin Arch

Purpose(s): Hydropower

River: Junxi

Reservoir capacity: 5 m3x106

Construction Dates

Start of Project: -/00

Start of RCC: -/00

End of RCC: -/02

End of Project: -/03

Specifications

Height: 69 metres

Length: 192 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Hunan Wuling Hydroelectric Development Corporation

Type: Gravity

Purpose(s): Hydropower / Navigation

River: Youshui

Reservoir capacity: 378 m3x106

Construction Dates

Start of Project: 08/01

Start of RCC: 08/01

End of RCC: 05/03

End of Project: 05/04

Specifications

Height: 65 metres

Length: 238 metres

Volume of RCC: 141 m3x103

Total volume: 376 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.75Reinforced conventional concrete cast after RCC placement
Spillway
SlopeType
ogeeReinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
86
68
Pozzolan (kg/m3)Pozzolan Type
103Low-lime flyash (ASTM Class F)
83 
Wanmipo completed
Wanmipo completed

Full Dam Information

Details

Country: China

Owner: Shaanxi Lan River Hydropower Development Corporation

Type: Thin Arch

Purpose(s): Hydropower / Irrigation

River: Lanhe

Reservoir capacity: 147 m3x106

Construction Dates

Start of Project: -/99

Start of RCC: -/99

End of RCC: 06/03

End of Project: -/04

Specifications

Height: 100 metres

Length: 311 metres

Volume of RCC: 229 m3x103

Total volume: 293 m3x103

Construction Methods

Facings

Upstream
SlopeType
curveRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
curveRCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
ogeeTraditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
74
66
Pozzolan (kg/m3)Pozzolan Type
111Low-lime flyash (ASTM Class F)
111 
Linhekou completed
Linhekou completed

Full Dam Information

Details

Country: Chile

Owner: ENDESA, Spain

Type: Gravity

Purpose(s): Hydropower

River: Bio-Bio

Reservoir capacity: 1200 m3x106

Construction Dates

Start of Project: 08/99

Start of RCC: 08/99

End of RCC: 09/03

End of Project: 04/04

Specifications

Height: 155 metres

Length: 360 metres

Volume of RCC: 1596 m3x103

Total volume: 1640 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
133
95  116
Pozzolan (kg/m3)Pozzolan Type
57Natural pozzolan (ASTM Class N)
50  41 
Ralco completed
Ralco completed

Full Dam Information

Details

Country: China

Owner: Chongging Electricity Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Apeng

Reservoir capacity: 25 m3x106

Construction Dates

Start of Project: 08/01

Start of RCC: 08/01

End of RCC: 10/03

End of Project: 11/03

Specifications

Height: 56 metres

Length: 193 metres

Volume of RCC: 72 m3x103

Total volume: 161 m3x103

Construction Methods

Facings

Upstream
SlopeType
 Reinforced conventional concrete cast after RCC placement
Downstream
SlopeType
 Reinforced conventional concrete cast after RCC placement
Spillway
SlopeType
 Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Tizidong on Google Earth
Tizidong on Google Earth

Full Dam Information

Details

Country: China

Owner: Henan Electric Power Corporation

Type: Gravity

Purpose(s): Hydropower

River: Huilonggou

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 06/01

Start of RCC: 06/01

End of RCC: 11/03

End of Project: -/05

Specifications

Height: 54 metres

Length: 208 metres

Volume of RCC: 73 m3x103

Total volume: 76 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
none 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Huilong PSS - Upper dam completed
Huilong PSS - Upper dam completed

Full Dam Information

Details

Country: Russia

Owner: RusHydro

Type: Gravity

Purpose(s): Flood Control / Hydropower

River: Bureya

Reservoir capacity: 21000 m3x106

Construction Dates

Start of Project: 01/76

Start of RCC: 01/76

End of RCC: -/03

End of Project: -/09

Specifications

Height: 139 metres

Length: 810 metres

Volume of RCC: 709 m3x103

Total volume: 3538 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.70Traditional concrete against formwork
Spillway
SlopeType
0.70Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300  -300  -
500500

Cementitious material

Cement (kg/m3)
95  to
Pozzolan (kg/m3)Pozzolan Type
25  toNatural pozzolan (ASTM Class N)
  
Bureyskaya completed
Bureyskaya completed

Full Dam Information

Details

Country: China

Owner: Shaanxi Hanjiang Hydropower Development Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Renhe

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: -/00

Start of RCC: -/00

End of RCC: -/03

End of Project: -/04

Specifications

Height: 66 metres

Length: 120 metres

Volume of RCC: 81 m3x103

Total volume: 106 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Wang Keng Power Station Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Tangkouxi

Reservoir capacity: 15 m3x106

Construction Dates

Start of Project: -/01

Start of RCC: -/01

End of RCC: -/03

End of Project: -/04

Specifications

Height: 56 metres

Length: 159 metres

Volume of RCC: 38 m3x103

Total volume: 40 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Anhui Hydropower Development Co. Ltd.,

Type: Thin Arch

Purpose(s): Flood Control / Hydropower

River: Xipihe

Reservoir capacity: 51 m3x106

Construction Dates

Start of Project: -/02

Start of RCC: -/02

End of RCC: -/03

End of Project: -/04

Specifications

Height: 70 metres

Length: 258 metres

Volume of RCC: 130 m3x103

Total volume: 168 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: India

Owner: GoMWRD (Government of Maharashtra Water Resources Department)

Type: Gravity

Purpose(s): Hydropower

River: Pravara

Reservoir capacity: 6 m3x106

Construction Dates

Start of Project: 12/01

Start of RCC: 12/01

End of RCC: 01/04

End of Project: 06/04

Specifications

Height: 15 metres

Length: 503 metres

Volume of RCC: 35 m3x103

Total volume: 40 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.78RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.78RCC against formwork (GEVR/GE-RCC)  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
88
Pozzolan (kg/m3)Pozzolan Type
132Low-lime flyash (ASTM Class F)
  
Ghatghar PPS - Upper dam completed
Ghatghar PPS - Upper dam completed

Full Dam Information

Details

Country: China

Owner: Mindong Electromechanical Development Corporation

Type: Gravity

Purpose(s): Hydropower

River: Muyangxi

Reservoir capacity: 47 m3x106

Construction Dates

Start of Project: -/02

Start of RCC: -/02

End of RCC: 03/04

End of Project: 06/04

Specifications

Height: 73 metres

Length: 206 metres

Volume of RCC: 159 m3x103

Total volume: 199 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.72RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
0.70Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
67
50
Pozzolan (kg/m3)Pozzolan Type
100Low-lime flyash (ASTM Class F)
92 
Zhouning completed
Zhouning completed

Full Dam Information

Details

Country: China

Owner: Henan Electric Power Corporation

Type: Gravity

Purpose(s): Hydropower

River: Huilonggou

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: 06/01

Start of RCC: 06/01

End of RCC: 06/04

End of Project: -/05

Specifications

Height: 54 metres

Length: 175 metres

Volume of RCC: 88 m3x103

Total volume: 105 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.75Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: Portugal

Owner: EDIA (Empresa de Desenvolvimento e Infra-Estruturas do Alqueva)

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation

River: Guadiana

Reservoir capacity: 106 m3x106

Construction Dates

Start of Project: 08/02

Start of RCC: 08/02

End of RCC: 08/04

End of Project: -/05

Specifications

Height: 43 metres

Length: 448 metres

Volume of RCC: 172 m3x103

Total volume: 392 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
55
Pozzolan (kg/m3)Pozzolan Type
165Low-lime flyash (ASTM Class F)
  
Pedrógão completed
Pedrógão completed

Full Dam Information

Details

Country: China

Owner: Beichuan Bashu Tongkou River Development Corporation

Type: Gravity

Purpose(s): Hydropower

River: Tongkou

Reservoir capacity: 36 m3x106

Construction Dates

Start of Project: 10/98

Start of RCC: 10/98

End of RCC: -/04

End of Project: -/04

Specifications

Height: 72 metres

Length: 198 metres

Volume of RCC: 300 m3x103

Total volume: 352 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
1.10Traditional concrete against formwork
Spillway
SlopeType
ogeeTraditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Tongkou completed
Tongkou completed

Full Dam Information

Details

Country: China

Owner: Guangxi-Guiguan Electric Power Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Nanpan

Reservoir capacity: 278 m3x106

Construction Dates

Start of Project: 12/01

Start of RCC: 12/01

End of RCC: -/04

End of Project: 07/05

Specifications

Height: 62 metres

Length: 396 metres

Volume of RCC: 150 m3x103

Total volume: 700 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.70RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
ogeeReinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Pingban completed
Pingban completed

Full Dam Information

Details

Country: Brazil

Owner: CERAN (Companhia Energética Rio das Antas)

Type: Gravity

Purpose(s): Hydropower

River: das Antas

Reservoir capacity: 23 m3x106

Construction Dates

Start of Project: 04/02

Start of RCC: 04/02

End of RCC: -/04

End of Project: 12/04

Specifications

Height: 25 metres

Length: 180 metres

Volume of RCC: 35 m3x103

Total volume: 66 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
15 
  
Monte Claro completed
Monte Claro completed

Full Dam Information

Details

Country: China

Owner: Guangdong Shanneng group Co.

Type: Thin Arch

Purpose(s): Hydropower

River: Tuwushui

Reservoir capacity: 17 m3x106

Construction Dates

Start of Project: -/03

Start of RCC: -/03

End of RCC: -/04

End of Project: -/04

Specifications

Height: 53 metres

Length: 124 metres

Volume of RCC: -

Total volume: 29 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Laos

Owner: EDL (Electricite du Laos)

Type: Gravity

Purpose(s): Hydropower

River: Nam Gnong

Reservoir capacity: 49 m3x106

Construction Dates

Start of Project: -/02

Start of RCC: -/02

End of RCC: -/04

End of Project: 01/05

Specifications

Height: 28 metres

Length: 151 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Brazil

Owner: Alianca Geracao de Energia S.A.

Type: Gravity

Purpose(s): Hydropower

River: Doce

Reservoir capacity: 54 m3x106

Construction Dates

Start of Project: 05/01

Start of RCC: 05/01

End of RCC: -/04

End of Project: 05/05

Specifications

Height: 53 metres

Length: 437 metres

Volume of RCC: 236 m3x103

Total volume: 248 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
40
Pozzolan (kg/m3)Pozzolan Type
50Ground-granulated blast-furnace slag
  
Risoleta Neves (formerly Candonga) under construction
Risoleta Neves (formerly Candonga) under construction

Full Dam Information

Details

Country: Brazil

Owner: ELEJOR - Centrais Elétricas do Rio Jordão

Type: Gravity

Purpose(s): Hydropower

River: Jordao

Reservoir capacity: 34 m3x106

Construction Dates

Start of Project: -/01

Start of RCC: -/01

End of RCC: -/04

End of Project: -/05

Specifications

Height: 43 metres

Length: 445 metres

Volume of RCC: 200 m3x103

Total volume: 220 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
64
Pozzolan (kg/m3)Pozzolan Type
16Natural pozzolan (ASTM Class N)
  
Fundão completed
Fundão completed

Full Dam Information

Details

Country: China

Owner: Chongqing Yujiankou Hydropower Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Long

Reservoir capacity: 9 m3x106

Construction Dates

Start of Project: 08/01

Start of RCC: 08/01

End of RCC: -/04

End of Project: -/05

Specifications

Height: 50 metres

Length: 156 metres

Volume of RCC: 118 m3x103

Total volume: 147 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.70RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
0.85Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Yujiankou completed
Yujiankou completed

Full Dam Information

Details

Country: China

Owner: Guangxi-Guiguan Electric Power Co. Ltd.,

Type: Gravity

Purpose(s): Hydropower / Irrigation / Navigation

River: Xijiang

Reservoir capacity: 950 m3x106

Construction Dates

Start of Project: -/02

Start of RCC: -/02

End of RCC: -/04

End of Project: -/05

Specifications

Height: 66 metres

Length: 586 metres

Volume of RCC: 50 m3x103

Total volume: 210 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Letan completed
Letan completed

Full Dam Information

Details

Country: China

Owner: Hubei Nanzhang Xiakou Electric Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Juhe

Reservoir capacity: 99 m3x106

Construction Dates

Start of Project: -/02

Start of RCC: -/02

End of RCC: -/04

End of Project: -/05

Specifications

Height: 85 metres

Length: 192 metres

Volume of RCC: -

Total volume: 131 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Meixi

Reservoir capacity: 20 m3x106

Construction Dates

Start of Project: -/00

Start of RCC: -/00

End of RCC: -/04

End of Project: -/06

Specifications

Height: 96 metres

Length: 178 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Brazil

Owner: Elejor Centrais Elétricas do Rio Jordåo S.A.

Type: Gravity

Purpose(s): Hydropower

River: Jordåo

Reservoir capacity: 431 m3x106

Construction Dates

Start of Project: 11/02

Start of RCC: 11/02

End of RCC: -/04

End of Project: 01/05

Specifications

Height: 67 metres

Length: 543 metres

Volume of RCC: 530 m3x103

Total volume: 606 m3x103

Construction Methods

Facings

Upstream
SlopeType
 Traditional concrete against formwork
Downstream
SlopeType
 Traditional concrete against formwork
Spillway
SlopeType
 Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
40
Pozzolan (kg/m3)Pozzolan Type
50Ground-granulated blast-furnace slag
  
Santa Clara-PR completed
Santa Clara-PR completed

Full Dam Information

Details

Country: USA

Owner: South Carolina Electric and Gas

Type: Gravity

Purpose(s): Hydropower

River: Saluda

Reservoir capacity: 1970 m3x106

Construction Dates

Start of Project: 08/02

Start of RCC: 08/02

End of RCC: 04/05

End of Project: 07/05

Specifications

Height: 65 metres

Length: 2439 metres

Volume of RCC: 1004 m3x103

Total volume: 1410 m3x103

Construction Methods

Facings

Upstream
SlopeType
 Traditional concrete against precast concrete panels
Downstream
SlopeType
 Traditional concrete against precast concrete panels  [stepped face]
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
89
Pozzolan (kg/m3)Pozzolan Type
89Low-lime flyash (ASTM Class F)
  
Saluda dam remediation completed
Saluda dam remediation completed

Full Dam Information

Details

Country: China

Owner: Changyang Electric Power Bureau

Type: Thin Arch

Purpose(s): Hydropower / Irrigation / Water Supply

River: Duhu

Reservoir capacity: 70 m3x106

Construction Dates

Start of Project: 12/03

Start of RCC: 12/03

End of RCC: 05/05

End of Project: 10/05

Specifications

Height: 107 metres

Length: 206 metres

Volume of RCC: 166 m3x103

Total volume: 255 m3x103

Construction Methods

Facings

Upstream
SlopeType
curveRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
curveRCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
 RCC against formwork (GEVR/GE-RCC)

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
84
126
Pozzolan (kg/m3)Pozzolan Type
126Low-lime flyash (ASTM Class F)
103 
Zhaolaihe completed
Zhaolaihe completed

Full Dam Information

Details

Country: China

Owner: Hanjiang Hydropower Development Ltd.

Type: Gravity

Purpose(s): Flood Control / Hydropower / Navigation

River: Han

Reservoir capacity: 229 m3x106

Construction Dates

Start of Project: 11/03

Start of RCC: 11/03

End of RCC: 05/05

End of Project: 06/07

Specifications

Height: 63 metres

Length: 346 metres

Volume of RCC: 194 m3x103

Total volume: 631 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Xihe on Google Earth
Xihe on Google Earth

Full Dam Information

Details

Country: Turkey

Owner: DSI - State Hydraulic Works

Type: Hardfill

Purpose(s): Hydropower / Irrigation / Water Supply

River: Buyuk Menderes

Reservoir capacity: 82 m3x106

Construction Dates

Start of Project: 04/94

Start of RCC: 04/94

End of RCC: 05/05

End of Project: 11/07

Specifications

Height: 107 metres

Length: 280 metres

Volume of RCC: 1500 m3x103

Total volume: 1685 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.70Traditional concrete against precast concrete panels with geomembrane
Downstream
SlopeType
0.70Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.89Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
50
Pozzolan (kg/m3)Pozzolan Type
20Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Guizhou-Wujiang Hydropower Development Co. Ltd.

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Navigation / Water Supply

River: Wu

Reservoir capacity: 201 m3x106

Construction Dates

Start of Project: 10/00

Start of RCC: 10/00

End of RCC: 08/05

End of Project: 03/06

Specifications

Height: 116 metres

Length: 165 metres

Volume of RCC: 421 m3x103

Total volume: 739 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
0.25RCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.70RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
0.70Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
64
Pozzolan (kg/m3)Pozzolan Type
95Low-lime flyash (ASTM Class F)
  
Suofengying completed
Suofengying completed

Full Dam Information

Details

Country: Belize

Owner: Belize Electric Co. Ltd (BECOL) and A. Fortis Co., Canada

Type: Gravity

Purpose(s): Hydropower

River: Macal

Reservoir capacity: 120 m3x106

Construction Dates

Start of Project: 07/03

Start of RCC: 07/03

End of RCC: 10/05

End of Project: 12/06

Specifications

Height: 68 metres

Length: 425 metres

Volume of RCC: 180 m3x103

Total volume: 210 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.20Traditional concrete against formwork
Downstream
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.75Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
3003600

Cementitious material

Cement (kg/m3)
105
Pozzolan (kg/m3)Pozzolan Type
0Natural pozzolan (ASTM Class N)
  
Chalillo completed
Chalillo completed

Full Dam Information

Details

Country: Brazil

Owner: BAESA (JV of Alcoa, Companhia Paulista de Força e Luz (CPFL), Companhia Brasileira de Alumínio, Camargo Corrêa Cimentos and DME Energética)

Type: Gravity

Purpose(s): Hydropower

River: Pelotas

Reservoir capacity: 50000 m3x106

Construction Dates

Start of Project: -/01

Start of RCC: -/01

End of RCC: -/05

End of Project: -/06

Specifications

Height: 85 metres

Length: 665 metres

Volume of RCC: 1 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Barra Grande on Google Earth
Barra Grande on Google Earth

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Xun

Reservoir capacity: 56 m3x106

Construction Dates

Start of Project: -/93

Start of RCC: -/93

End of RCC: -/05

End of Project: -/07

Specifications

Height: 56 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Brazil

Owner: L.D.Q.S.P.E. Geracao de Energia e Participacoes Ltda.

Type: Gravity

Purpose(s): Hydropower

River: do Peixe

Reservoir capacity: 8 m3x106

Construction Dates

Start of Project: -/02

Start of RCC: -/02

End of RCC: -/05

End of Project: -/06

Specifications

Height: 32 metres

Length: 97 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Picada completed
Picada completed

Full Dam Information

Details

Country: China

Owner: Guangxi Longjiang Electric Power Corporation

Type: Thin Arch

Purpose(s): Hydropower

River: Long

Reservoir capacity: 49 m3x106

Construction Dates

Start of Project: -/02

Start of RCC: -/02

End of RCC: -/05

End of Project: -/06

Specifications

Height: 68 metres

Length: 167 metres

Volume of RCC: 172 m3x103

Total volume: 226 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Xiaqiao completed
Xiaqiao completed

Full Dam Information

Details

Country: China

Owner: China Southern Power Grid

Type: Gravity

Purpose(s): Hydropower

River: Caitouhe

Reservoir capacity: 30 m3x106

Construction Dates

Start of Project: -/02

Start of RCC: -/02

End of RCC: -/05

End of Project: -/11

Specifications

Height: 61 metres

Length: 420 metres

Volume of RCC: 235 m3x103

Total volume: 242 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Huizhou PSS - Lower dam on Google Earth
Huizhou PSS - Lower dam on Google Earth

Full Dam Information

Details

Country: China

Owner: Qingtian Yongwen Hydropower Co.

Type: Thin Arch

Purpose(s): Hydropower

River: Guxi

Reservoir capacity: 12 m3x106

Construction Dates

Start of Project: -/03

Start of RCC: -/03

End of RCC: -/05

End of Project: -/05

Specifications

Height: 66 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
 Reinforced conventional concrete cast after RCC placement
Downstream
SlopeType
 Reinforced conventional concrete cast after RCC placement
Spillway
SlopeType
 Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Brazil

Owner: EMBASA (Empresa Baiana de Aguas e Saneamento S.A.)

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Sapucaia

Reservoir capacity: 5 m3x106

Construction Dates

Start of Project: -/04

Start of RCC: -/04

End of RCC: -/05

End of Project: -/05

Specifications

Height: 16 metres

Length: 207 metres

Volume of RCC: 15 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Cachoeira Grande completed
Cachoeira Grande completed

Full Dam Information

Details

Country: Brazil

Owner: Enerpeixa S/A

Type: Gravity

Purpose(s): Hydropower

River: Tocantins

Reservoir capacity: 3 m3x106

Construction Dates

Start of Project: 04/02

Start of RCC: 04/02

End of RCC: -/05

End of Project: 09/06

Specifications

Height: 39 metres

Length: 400 metres

Volume of RCC: 500 m3x103

Total volume: 582 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
70
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
  
Peixe Angical completed
Peixe Angical completed

Full Dam Information

Details

Country: Brazil

Owner: CJ Energética S/A

Type: Gravity

Purpose(s): Hydropower

River: Bernardo José

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: -/03

Start of RCC: -/03

End of RCC: -/05

End of Project: -/06

Specifications

Height: 21 metres

Length: 120 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
São Bernardo completed
São Bernardo completed

Full Dam Information

Details

Country: China

Owner: Xixi Reservoir Development Co. Ltd.

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Daxi

Reservoir capacity: 85 m3x106

Construction Dates

Start of Project: -/03

Start of RCC: -/03

End of RCC: -/05

End of Project: -/06

Specifications

Height: 71 metres

Length: 243 metres

Volume of RCC: 231 m3x103

Total volume: 244 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Xixi completed
Xixi completed

Full Dam Information

Details

Country: China

Owner: Guangxi-Youjiang Hydraulic Development Co.Ltd.

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Navigation / Water Supply

River: You

Reservoir capacity: 5660 m3x106

Construction Dates

Start of Project: 10/01

Start of RCC: 10/01

End of RCC: 04/06

End of Project: 12/06

Specifications

Height: 130 metres

Length: 720 metres

Volume of RCC: 1995 m3x103

Total volume: 2672 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against precast concrete panels with hot poured membrane
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
80
50
Pozzolan (kg/m3)Pozzolan Type
132Low-lime flyash (ASTM Class F)
110 
Baise completed
Baise completed

Full Dam Information

Details

Country: India

Owner: GoMWRD (Government of Maharashtra Water Resources Department)

Type: Gravity

Purpose(s): Hydropower

River: Shahi Nallah

Reservoir capacity: 3 m3x106

Construction Dates

Start of Project: 12/01

Start of RCC: 12/01

End of RCC: 05/06

End of Project: 03/07

Specifications

Height: 86 metres

Length: 447 metres

Volume of RCC: 638 m3x103

Total volume: 646 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.141RCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.782RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.782RCC against formwork (GEVR/GE-RCC)  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
75
Pozzolan (kg/m3)Pozzolan Type
150Low-lime flyash (ASTM Class F)
  
Ghatghar PPS - Lower dam completed
Ghatghar PPS - Lower dam completed

Full Dam Information

Details

Country: Japan

Owner: Ministry of Land, Infrastructure and Transport

Type: Gravity

Purpose(s): Flood Control / Hydropower / Navigation / Water Supply

River: Okitamano

Reservoir capacity: 51 m3x106

Construction Dates

Start of Project: 03/00

Start of RCC: 03/00

End of RCC: 11/06

End of Project: 03/11

Specifications

Height: 126 metres

Length: 381 metres

Volume of RCC: 703 m3x103

Total volume: 1200 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.50Traditional concrete against formwork
Downstream
SlopeType
0.73Traditional concrete against formwork
Spillway
SlopeType
0.73Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
2501000

Cementitious material

Cement (kg/m3)
91
Pozzolan (kg/m3)Pozzolan Type
39Low-lime flyash (ASTM Class F)
  
Nagai completed
Nagai completed

Full Dam Information

Details

Country: China

Owner: Wujaing Qingshuihe Hydropower Development Co. Ltd.

Type: Thin Arch

Purpose(s): Flood Control / Hydropower

River: Qingshuihe

Reservoir capacity: 276 m3x106

Construction Dates

Start of Project: 12/03

Start of RCC: 12/03

End of RCC: 11/06

End of Project: -/07

Specifications

Height: 135 metres

Length: 198 metres

Volume of RCC: 550 m3x103

Total volume: 670 m3x103

Construction Methods

Facings

Upstream
SlopeType
curveRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
curveRCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
 Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
81
94
Pozzolan (kg/m3)Pozzolan Type
81Low-lime flyash (ASTM Class F)
94 
Dahuashui completed
Dahuashui completed

Full Dam Information

Details

Country: China

Owner: Niu Qiao Reservoir Development Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Qingtonghe

Reservoir capacity: 26 m3x106

Construction Dates

Start of Project: -/03

Start of RCC: -/03

End of RCC: 12/06

End of Project: -/07

Specifications

Height: 62 metres

Length: 201 metres

Volume of RCC: -

Total volume: 710 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Vietnam

Owner: EVN (Electrictie de Vietnam)

Type: Gravity

Purpose(s): Hydropower

River: Po Ko

Reservoir capacity: 1048 m3x106

Construction Dates

Start of Project: 11/05

Start of RCC: 11/05

End of RCC: 12/06

End of Project: -/07

Specifications

Height: 65 metres

Length: 495 metres

Volume of RCC: 326 m3x103

Total volume: 450 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
210Natural pozzolan (ASTM Class N)
  
Pleikrong completed
Pleikrong completed

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): Hydropower

River: Liuchi

Reservoir capacity: 71 m3x106

Construction Dates

Start of Project: -/03

Start of RCC: -/03

End of RCC: -/06

End of Project: -/07

Specifications

Height: 81 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Kaidu

Reservoir capacity: -

Construction Dates

Start of Project: -/97

Start of RCC: -/97

End of RCC: -/06

End of Project: -/08

Specifications

Height: 71 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: China Huadian Corporation

Type: Gravity

Purpose(s): Flood Control / Hydropower

River: Wanan

Reservoir capacity: 199 m3x106

Construction Dates

Start of Project: -/04

Start of RCC: -/04

End of RCC: -/06

End of Project: -/06

Specifications

Height: 75 metres

Length: 172 metres

Volume of RCC: 211 m3x103

Total volume: 239 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Baisha completed
Baisha completed

Full Dam Information

Details

Country: Brazil

Owner: Esmeralda S.A.

Type: Gravity

Purpose(s): Hydropower

River: Bernardo José

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/05

Start of RCC: -/05

End of RCC: -/06

End of Project: -/06

Specifications

Height: 19 metres

Length: 212 metres

Volume of RCC: 15 m3x103

Total volume: 27 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
64
Pozzolan (kg/m3)Pozzolan Type
16Natural pozzolan (ASTM Class N)
  
Esmeralda under construction
Esmeralda under construction

Full Dam Information

Details

Country: China

Owner: Leidatan Corporation

Type: Gravity

Purpose(s): Hydropower

River: Yingtaoyuangou

Reservoir capacity: 94 m3x106

Construction Dates

Start of Project: 03/03

Start of RCC: 03/03

End of RCC: -/06

End of Project: 06/07

Specifications

Height: 84 metres

Length: 202 metres

Volume of RCC: 240 m3x103

Total volume: 340 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.70RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
0.70Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Leidatan under construction
Leidatan under construction

Full Dam Information

Details

Country: Brazil

Owner: Santa Laura S/A

Type: Gravity

Purpose(s): Hydropower

River: Chapecozinho

Reservoir capacity: 19 m3x106

Construction Dates

Start of Project: -/04

Start of RCC: -/04

End of RCC: -/06

End of Project: -/07

Specifications

Height: 27 metres

Length: 245 metres

Volume of RCC: 24 m3x103

Total volume: 42 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Santa Laura completed
Santa Laura completed

Full Dam Information

Details

Country: Brazil

Owner: Concessionária Mosquitão S/A

Type: Gravity

Purpose(s): Hydropower

River: -

Reservoir capacity: 19 m3x106

Construction Dates

Start of Project: -/04

Start of RCC: -/04

End of RCC: -/06

End of Project: -/07

Specifications

Height: 32 metres

Length: 236 metres

Volume of RCC: 57 m3x103

Total volume: 76 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Mosquitão completed
Mosquitão completed

Full Dam Information

Details

Country: China

Owner: Hunan Xiangtou Xinshao Youxi Hydropower Development Corporation Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Zishui

Reservoir capacity: 168 m3x106

Construction Dates

Start of Project: -/04

Start of RCC: -/04

End of RCC: -/06

End of Project: -/07

Specifications

Height: 47 metres

Length: 268 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Xiaoxi on Google Earth
Xiaoxi on Google Earth

Full Dam Information

Details

Country: China

Owner: Chengdu Haineng Power Co. Ltd.

Type: Gravity

Purpose(s): Flood Control / Hydropower

River: Mabianhe

Reservoir capacity: 204 m3x106

Construction Dates

Start of Project: -/04

Start of RCC: -/04

End of RCC: -/06

End of Project: -/07

Specifications

Height: 73 metres

Length: 163 metres

Volume of RCC: 229 m3x103

Total volume: 405 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.70Traditional concrete against formwork
Spillway
SlopeType
0.78Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
110
66
Pozzolan (kg/m3)Pozzolan Type
73Low-lime flyash (ASTM Class F)
66 
Zhouba completed
Zhouba completed

Full Dam Information

Details

Country: China

Owner: Guizhou Zhongsui Energy Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Hongdu

Reservoir capacity: 99 m3x106

Construction Dates

Start of Project: -/04

Start of RCC: -/04

End of RCC: -/06

End of Project: -/07

Specifications

Height: 87 metres

Length: 148 metres

Volume of RCC: 67 m3x103

Total volume: 90 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Shaba completed
Shaba completed

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): Hydropower

River: Wujiang

Reservoir capacity: 9940 m3x106

Construction Dates

Start of Project: -/04

Start of RCC: -/04

End of RCC: -/06

End of Project: -/07

Specifications

Height: 87 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: China Guodian Corporation

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Quan

Reservoir capacity: 20 m3x106

Construction Dates

Start of Project: -/04

Start of RCC: -/04

End of RCC: -/06

End of Project: -/07

Specifications

Height: 88 metres

Length: 160 metres

Volume of RCC: -

Total volume: 205 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Lishui Basin Hydraulic and Hydroelectric Development Corporation

Type: Gravity

Purpose(s): Flood Control / Hydropower / Navigation / Water Supply

River: Dieshui

Reservoir capacity: 1439 m3x106

Construction Dates

Start of Project: -/04

Start of RCC: -/04

End of RCC: -/06

End of Project: -/07

Specifications

Height: 88 metres

Length: 351 metres

Volume of RCC: 450 m3x103

Total volume: 930 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
0.25 
Downstream
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
53
83
Pozzolan (kg/m3)Pozzolan Type
99Low-lime flyash (ASTM Class F)
102 
Zaoshi completed
Zaoshi completed

Full Dam Information

Details

Country: China

Owner: Datang International Power Generation Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Lixian (Black)

Reservoir capacity: 174 m3x106

Construction Dates

Start of Project: 11/04

Start of RCC: 11/04

End of RCC: -/06

End of Project: -/07

Specifications

Height: 95 metres

Length: 320 metres

Volume of RCC: 480 m3x103

Total volume: 800 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork
0.20 
Downstream
SlopeType
0.80RCC against formwork
Spillway
SlopeType
0.80RCC against formwork

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Jupudu completed
Jupudu completed

Full Dam Information

Details

Country: China

Owner: Datang International Power Generation Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Lixian

Reservoir capacity: 78 m3x106

Construction Dates

Start of Project: 04/04

Start of RCC: 04/04

End of RCC: -/06

End of Project: -/07

Specifications

Height: 59 metres

Length: 300 metres

Volume of RCC: 255 m3x103

Total volume: 570 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
 RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
 RCC against formwork (GEVR/GE-RCC)

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
65
93
Pozzolan (kg/m3)Pozzolan Type
110Ground-granulated blast-furnace slag
113 
Tukahe completed
Tukahe completed

Full Dam Information

Details

Country: China

Owner: Lichuan City Yujaing Valley Hudropower Ltd. Hubei Province

Type: Thin Arch

Purpose(s): Hydropower / Recreation

River: Yu

Reservoir capacity: 26 m3x106

Construction Dates

Start of Project: 12/05

Start of RCC: 12/05

End of RCC: 02/07

End of Project: 05/07

Specifications

Height: 95 metres

Length: 156 metres

Volume of RCC: 135 m3x103

Total volume: 160 m3x103

Construction Methods

Facings

Upstream
SlopeType
curveRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
curveRCC against formwork
Spillway
SlopeType
 RCC against formwork

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Dominican Republic

Owner: Corporacion de Empresas de Energia Electrica (CDEEE), Unidad Ejecutora Proyecto Pinalito (UEPP)

Type: Gravity

Purpose(s): Hydropower

River: Tireo

Reservoir capacity: 4 m3x106

Construction Dates

Start of Project: 09/04

Start of RCC: 09/04

End of RCC: 03/07

End of Project: -/08

Specifications

Height: 52 metres

Length: 210 metres

Volume of RCC: 73 m3x103

Total volume: 100 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
98
Pozzolan (kg/m3)Pozzolan Type
8Natural pozzolan (ASTM Class N)
  
Pinalito completed
Pinalito completed

Full Dam Information

Details

Country: Turkey

Owner: Akköy Energy A.S.

Type: Gravity

Purpose(s): Hydropower

River: Harsit

Reservoir capacity: 3 m3x106

Construction Dates

Start of Project: 07/05

Start of RCC: 07/05

End of RCC: 04/07

End of Project: 09/08

Specifications

Height: 38 metres

Length: 144 metres

Volume of RCC: 87 m3x103

Total volume: 101 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
100
Pozzolan (kg/m3)Pozzolan Type
100Natural pozzolan (ASTM Class N)
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: China Southern Power Grid

Type: Gravity

Purpose(s): Hydropower

River: Xiaojinhe

Reservoir capacity: 30 m3x106

Construction Dates

Start of Project: 10/04

Start of RCC: 10/04

End of RCC: 05/07

End of Project: -/11

Specifications

Height: 56 metres

Length: 168 metres

Volume of RCC: 84 m3x103

Total volume: 93 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.75Traditional concrete against formwork
Spillway
SlopeType
0.70Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
64
Pozzolan (kg/m3)Pozzolan Type
125Low-lime flyash (ASTM Class F)
  
Huizhou PSS - Upper dam on Google Earth
Huizhou PSS - Upper dam on Google Earth

Full Dam Information

Details

Country: China

Owner: Longtan Hydropower Development Co. Ltd.

Type: Gravity

Purpose(s): Flood Control / Hydropower / Navigation / Water Supply

River: Hongshui

Reservoir capacity: 16210 m3x106

Construction Dates

Start of Project: 07/01

Start of RCC: 07/01

End of RCC: 06/07

End of Project: 12/09

Specifications

Height: 192 metres

Length: 832 metres

Volume of RCC: 4623 m3x103

Total volume: 7400 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
0.25 
Downstream
SlopeType
0.70RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
0.68Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
99
86
Pozzolan (kg/m3)Pozzolan Type
121Low-lime flyash (ASTM Class F)
109 
Longtan (Stage 1) completed
Longtan (Stage 1) completed

Full Dam Information

Details

Country: Mongolia

Owner: Ministry of Energy

Type: Gravity

Purpose(s): Hydropower / Irrigation / Water Supply

River: Zabkhan

Reservoir capacity: 930 m3x106

Construction Dates

Start of Project: 02/05

Start of RCC: 02/05

End of RCC: 06/07

End of Project: 12/07

Specifications

Height: 60 metres

Length: 200 metres

Volume of RCC: 210 m3x103

Total volume: 250 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork with external geomembrane
Downstream
SlopeType
0.72Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.72Reinforced conventional concrete cast after RCC placement  [stepped face]

Placement

Layers (mm)Lifts (mm)
333333

Cementitious material

Cement (kg/m3)
75
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
  
Taishir completed
Taishir completed

Full Dam Information

Details

Country: Vietnam

Owner: EVN (Electrictie de Vietnam)

Type: Gravity

Purpose(s): Hydropower

River: Vugia Thubon

Reservoir capacity: 340 m3x106

Construction Dates

Start of Project: 08/03

Start of RCC: 08/03

End of RCC: 10/07

End of Project: 11/08

Specifications

Height: 83 metres

Length: 240 metres

Volume of RCC: 260 m3x103

Total volume: 350 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
1.00Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
150Natural pozzolan (ASTM Class N)
  
A Vuong under construction
A Vuong under construction

Full Dam Information

Details

Country: Laos

Owner: Nam Theun Power Corporation (NTPC)/EdF (Electricitie de France)

Type: Gravity

Purpose(s): Hydropower

River: Nam Theun

Reservoir capacity: 3530 m3x106

Construction Dates

Start of Project: 04/04

Start of RCC: 04/04

End of RCC: 10/07

End of Project: 10/09

Specifications

Height: 39 metres

Length: 436 metres

Volume of RCC: 150 m3x103

Total volume: 207 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.35RCC against precast concrete blocks
0.75 
Spillway
SlopeType
0.75Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
100
Pozzolan (kg/m3)Pozzolan Type
100Low-lime flyash (ASTM Class F)
  
Nakai, part of Nam Theun 2 HPP completed
Nakai, part of Nam Theun 2 HPP completed

Full Dam Information

Details

Country: Vietnam

Owner: Ministry of Agriculture and Rural Development (MARD)

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Kon

Reservoir capacity: 226 m3x106

Construction Dates

Start of Project: 05/04

Start of RCC: 05/04

End of RCC: 12/07

End of Project: 12/08

Specifications

Height: 55 metres

Length: 571 metres

Volume of RCC: 183 m3x103

Total volume: 430 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalReinforced conventional concrete cast before RCC placement
Downstream
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
ogeeReinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300900

Cementitious material

Cement (kg/m3)
70
126
Pozzolan (kg/m3)Pozzolan Type
175Low-lime flyash (ASTM Class F)
141 
Dinh Binh completed
Dinh Binh completed

Full Dam Information

Details

Country: China

Owner: Fujian Hongkou Hydropower Co. Ltd.

Type: Gravity

Purpose(s): Hydropower / Water Supply

River: Huotong

Reservoir capacity: 449 m3x106

Construction Dates

Start of Project: -/03

Start of RCC: -/03

End of RCC: -/07

End of Project: -/08

Specifications

Height: 130 metres

Length: 341 metres

Volume of RCC: 681 m3x103

Total volume: 830 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Hongkou completed
Hongkou completed

Full Dam Information

Details

Country: Brazil

Owner: CPFL Renovaveis

Type: Hardfill

Purpose(s): Hydropower

River: Chapecó

Reservoir capacity: 142 m3x106

Construction Dates

Start of Project: -/06

Start of RCC: -/06

End of RCC: -/07

End of Project: 04/07

Specifications

Height: 25 metres

Length: 300 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
1.50 
Downstream
SlopeType
1.50 
Spillway
SlopeType
0.75 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Ludesa completed
Ludesa completed

Full Dam Information

Details

Country: China

Owner: Guizhou Zhongshui Energy Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Luojiao

Reservoir capacity: 46 m3x106

Construction Dates

Start of Project: -/05

Start of RCC: -/05

End of RCC: -/07

End of Project: -/07

Specifications

Height: 81 metres

Length: 250 metres

Volume of RCC: -

Total volume: 110 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Luojiaohe on Google Earth
Luojiaohe on Google Earth

Full Dam Information

Details

Country: Brazil

Owner: CERAN (Companhia Energética Rio das Antas)

Type: Gravity

Purpose(s): Hydropower

River: das Antas

Reservoir capacity: 92 m3x106

Construction Dates

Start of Project: -/05

Start of RCC: -/05

End of RCC: -/07

End of Project: 02/08

Specifications

Height: 48 metres

Length: 350 metres

Volume of RCC: 240 m3x103

Total volume: 322 m3x103

Construction Methods

Facings

Upstream
SlopeType
Vertical 
Downstream
SlopeType
0.77 
Spillway
SlopeType
0.77 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
15Natural pozzolan (ASTM Class N)
  
Castro Alves completed
Castro Alves completed

Full Dam Information

Details

Country: Brazil

Owner: Da Ilha Energética S/A

Type: Gravity

Purpose(s): Hydropower

River: das Antas

Reservoir capacity: 16 m3x106

Construction Dates

Start of Project: -/04

Start of RCC: -/04

End of RCC: -/07

End of Project: 04/08

Specifications

Height: 26 metres

Length: 310 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
20 
  
Da Ilha (Rio da Prata) completed
Da Ilha (Rio da Prata) completed

Full Dam Information

Details

Country: Brazil

Owner: CERAN (Companhia Energética Rio das Antas)

Type: Gravity

Purpose(s): Hydropower

River: das Antas

Reservoir capacity: 55 m3x106

Construction Dates

Start of Project: -/05

Start of RCC: -/05

End of RCC: -/07

End of Project: 10/08

Specifications

Height: 37 metres

Length: 281 metres

Volume of RCC: 75 m3x103

Total volume: 212 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.77Traditional concrete against formwork
Spillway
SlopeType
0.77Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
75
Pozzolan (kg/m3)Pozzolan Type
15Natural pozzolan (ASTM Class N)
  
Quatorze (XIV) de Julho completed
Quatorze (XIV) de Julho completed

Full Dam Information

Details

Country: China

Owner: Department of Electricity, Feng Shun County

Type: Gravity

Purpose(s): Hydropower

River: Baxianghe

Reservoir capacity: 8 m3x106

Construction Dates

Start of Project: -/05

Start of RCC: -/05

End of RCC: -/07

End of Project: -/08

Specifications

Height: 44 metres

Length: 207 metres

Volume of RCC: 63 m3x103

Total volume: 83 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Gansu Keyuan Electric Power Group Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Datong

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/05

Start of RCC: -/05

End of RCC: -/07

End of Project: -/08

Specifications

Height: 44 metres

Length: 143 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Tiecheng on Google Earth
Tiecheng on Google Earth

Full Dam Information

Details

Country: China

Owner: Department of WaterResources, Henan Province

Type: Gravity

Purpose(s): Flood Control / Hydropower / Navigation

River: Luohe

Reservoir capacity: 28 m3x106

Construction Dates

Start of Project: -/05

Start of RCC: -/05

End of RCC: -/07

End of Project: -/08

Specifications

Height: 62 metres

Length: 244 metres

Volume of RCC: 133 m3x103

Total volume: 234 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Chongqing Youshui River Hydropower Development Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Youshui

Reservoir capacity: 152 m3x106

Construction Dates

Start of Project: -/05

Start of RCC: -/05

End of RCC: -/07

End of Project: -/08

Specifications

Height: 63 metres

Length: 194 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Youshui completed
Youshui completed

Full Dam Information

Details

Country: China

Owner: Nanhe Hydropower Development Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Nanhe

Reservoir capacity: 14 m3x106

Construction Dates

Start of Project: -/05

Start of RCC: -/05

End of RCC: -/07

End of Project: -/08

Specifications

Height: 77 metres

Length: 140 metres

Volume of RCC: 45 m3x103

Total volume: 55 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Anhui Water Resources Development Co. Ltd.

Type: Thin Arch

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Dongpi

Reservoir capacity: 480 m3x106

Construction Dates

Start of Project: -/05

Start of RCC: -/05

End of RCC: -/07

End of Project: 04/09

Specifications

Height: 105 metres

Length: 422 metres

Volume of RCC: 485 m3x103

Total volume: 600 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.335Traditional concrete against formwork
Spillway
SlopeType
0.335Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
72
56
Pozzolan (kg/m3)Pozzolan Type
108Low-lime flyash (ASTM Class F)
84 
Bailianya completed
Bailianya completed

Full Dam Information

Details

Country: Brazil

Owner: Cotiporã Energetica S.A.

Type: Gravity

Purpose(s): Hydropower

River: Carreiro

Reservoir capacity: 4 m3x106

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/07

End of Project: -/07

Specifications

Height: 16 metres

Length: 196 metres

Volume of RCC: 21 m3x103

Total volume: 41 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Cotiporã on Google Earth
Cotiporã on Google Earth

Full Dam Information

Details

Country: Brazil

Owner: SPE Plano Alto Energia S/A

Type: Gravity

Purpose(s): Hydropower

River: Irani

Reservoir capacity: 13 m3x106

Construction Dates

Start of Project: -/06

Start of RCC: -/06

End of RCC: -/07

End of Project: 02/08

Specifications

Height: 38 metres

Length: 173 metres

Volume of RCC: 42 m3x103

Total volume: 78 m3x103

Construction Methods

Facings

Upstream
SlopeType
Vertical 
Downstream
SlopeType
0.75 
Spillway
SlopeType
0.75 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
72
Pozzolan (kg/m3)Pozzolan Type
19Natural pozzolan (ASTM Class N)
  
Plano Alto on Google Earth
Plano Alto on Google Earth

Full Dam Information

Details

Country: Brazil

Owner: Veneto Energética S/A

Type: Gravity

Purpose(s): Hydropower

River: das Antas

Reservoir capacity: 8 m3x106

Construction Dates

Start of Project: -/06

Start of RCC: -/06

End of RCC: -/07

End of Project: 04/08

Specifications

Height: 25 metres

Length: 219 metres

Volume of RCC: 31 m3x103

Total volume: 61 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
72
Pozzolan (kg/m3)Pozzolan Type
18Natural pozzolan (ASTM Class N)
  
Jararaca on Google Earth
Jararaca on Google Earth

Full Dam Information

Details

Country: China

Owner: Red River Hydropower Development Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Honghe

Reservoir capacity: 212 m3x106

Construction Dates

Start of Project: 02/06

Start of RCC: 02/06

End of RCC: -/07

End of Project: 07/08

Specifications

Height: 85 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Nansha completed
Nansha completed

Full Dam Information

Details

Country: Brazil

Owner: Linha Emília Energética S/A

Type: Gravity

Purpose(s): Hydropower

River: Carreiro

Reservoir capacity: 12 m3x106

Construction Dates

Start of Project: -/06

Start of RCC: -/06

End of RCC: -/07

End of Project: -/08

Specifications

Height: 27 metres

Length: 214 metres

Volume of RCC: 35 m3x103

Total volume: 54 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Linha Emilia completed
Linha Emilia completed

Full Dam Information

Details

Country: China

Owner: Guizhou-Wujiang Hydropower Development Corporation

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Navigation

River: Wujiang

Reservoir capacity: 1593 m3x106

Construction Dates

Start of Project: 11/05

Start of RCC: 11/05

End of RCC: 03/08

End of Project: -/09

Specifications

Height: 117 metres

Length: 310 metres

Volume of RCC: 825 m3x103

Total volume: 1100 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.70Traditional concrete against formwork
Spillway
SlopeType
0.70Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
66
89
Pozzolan (kg/m3)Pozzolan Type
100Low-lime flyash (ASTM Class F)
109 
Silin completed
Silin completed

Full Dam Information

Details

Country: China

Owner: Xilin River Hydropower Development Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Tuoniang

Reservoir capacity: 133 m3x106

Construction Dates

Start of Project: 03/05

Start of RCC: 03/05

End of RCC: 04/08

End of Project: -/09

Specifications

Height: 82 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Guizhou Qianyuan Power Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Beipan

Reservoir capacity: 3245 m3x106

Construction Dates

Start of Project: 10/04

Start of RCC: 10/04

End of RCC: 05/08

End of Project: -/09

Specifications

Height: 201 metres

Length: 412 metres

Volume of RCC: 2420 m3x103

Total volume: 2800 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against precast concrete panels with hot poured membrane
0.25 
Downstream
SlopeType
0.75Traditional concrete against formwork
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
61
71
Pozzolan (kg/m3)Pozzolan Type
91Low-lime flyash (ASTM Class F)
87 
Guangzhao completed
Guangzhao completed

Full Dam Information

Details

Country: China

Owner: Datang International Hydropower Generation Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Lixian

Reservoir capacity: 409 m3x106

Construction Dates

Start of Project: 01/03

Start of RCC: 01/03

End of RCC: 08/08

End of Project: -/09

Specifications

Height: 113 metres

Length: 466 metres

Volume of RCC: 903 m3x103

Total volume: 1200 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
0.20 
Downstream
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
77
93
Pozzolan (kg/m3)Pozzolan Type
77Ground-granulated blast-furnace slag
93 
Gelantan completed
Gelantan completed

Full Dam Information

Details

Country: Pakistan

Owner: WAPDA (Water and Power Development Authority)

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Jhelum

Reservoir capacity: 6500 m3x106

Construction Dates

Start of Project: 08/04

Start of RCC: 08/04

End of RCC: 11/08

End of Project: 01/09

Specifications

Height: 17 metres

Length: 370 metres

Volume of RCC: 54 m3x103

Total volume: 79 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
0.30RCC against formwork (GEVR/GE-RCC)  [stepped face]
Downstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
0.70RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.70RCC against formwork (GEVR/GE-RCC)  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
120Ground-granulated blast-furnace slag
  
Mangla Emergency Spillway Control Weir completed
Mangla Emergency Spillway Control Weir completed

Full Dam Information

Details

Country: Myanmar

Owner: Department of Hydroelectric Power - Ministry of Electric Power

Type: Gravity

Purpose(s): Hydropower

River: Myitnge

Reservoir capacity: 2600 m3x106

Construction Dates

Start of Project: 10/01

Start of RCC: 10/01

End of RCC: 12/08

End of Project: 12/10

Specifications

Height: 137 metres

Length: 680 metres

Volume of RCC: 2473 m3x103

Total volume: 2843 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
75
Pozzolan (kg/m3)Pozzolan Type
145Natural pozzolan (ASTM Class N)
  
Yeywa completed
Yeywa completed

Full Dam Information

Details

Country: China

Owner: Huaneng Lancang River Hydropower Co. Ltd.

Type: Gravity

Purpose(s): Flood Control / Hydropower / Recreation

River: Lancang (Mekong)

Reservoir capacity: 1139 m3x106

Construction Dates

Start of Project: -/04

Start of RCC: -/04

End of RCC: -/08

End of Project: -/09

Specifications

Height: 108 metres

Length: 705 metres

Volume of RCC: 848 m3x103

Total volume: 3068 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork
Downstream
SlopeType
0.80RCC against formwork
Spillway
SlopeType
 Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300 

Cementitious material

Cement (kg/m3)
64
93
Pozzolan (kg/m3)Pozzolan Type
93Ground-granulated blast-furnace slag
93 
Jinghong completed
Jinghong completed

Full Dam Information

Details

Country: Vietnam

Owner: EVN (Electrictie de Vietnam)

Type: Gravity

Purpose(s): Hydropower

River: Poko

Reservoir capacity: 54 m3x106

Construction Dates

Start of Project: 12/04

Start of RCC: 12/04

End of RCC: -/08

End of Project: -/09

Specifications

Height: 74 metres

Length: 834 metres

Volume of RCC: 753 m3x103

Total volume: 1300 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
160Natural pozzolan (ASTM Class N)
  
Se San 4 completed
Se San 4 completed

Full Dam Information

Details

Country: Brazil

Owner: Santa Rosa S/A

Type: Gravity

Purpose(s): Hydropower

River: Grande

Reservoir capacity: 7 m3x106

Construction Dates

Start of Project: -/06

Start of RCC: -/06

End of RCC: -/08

End of Project: -/08

Specifications

Height: 31 metres

Length: 172 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Santa Rosa II completed
Santa Rosa II completed

Full Dam Information

Details

Country: China

Owner: Datang International Power Generation Co. Ltd.

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Changxi

Reservoir capacity: 1465 m3x106

Construction Dates

Start of Project: -/05

Start of RCC: -/05

End of RCC: -/08

End of Project: -/09

Specifications

Height: 117 metres

Length: 326 metres

Volume of RCC: 608 m3x103

Total volume: 1330 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.70RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
0.70Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
64
81
Pozzolan (kg/m3)Pozzolan Type
96Low-lime flyash (ASTM Class F)
121 
Pengshui completed
Pengshui completed

Full Dam Information

Details

Country: China

Owner: Guangxi Water Conservancy and Electric Power Corporation

Type: Gravity

Purpose(s): Hydropower

River: Gui

Reservoir capacity: 26 m3x106

Construction Dates

Start of Project: -/06

Start of RCC: -/06

End of RCC: -/08

End of Project: -/08

Specifications

Height: 61 metres

Length: 166 metres

Volume of RCC: -

Total volume: 127 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Brazil

Owner: Hidrelétrica Cachoeirão SA

Type: Gravity

Purpose(s): Hydropower

River: Manhuaçu

Reservoir capacity: -

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/08

End of Project: -/08

Specifications

Height: 23 metres

Length: 90 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Cachoeirão (Henrique Nunes Coutinho) completed
Cachoeirão (Henrique Nunes Coutinho) completed

Full Dam Information

Details

Country: Brazil

Owner: CPFL Renovaveis

Type: Hardfill

Purpose(s): Hydropower

River: Irani

Reservoir capacity: 5 m3x106

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/08

End of Project: -/08

Specifications

Height: 45 metres

Length: 243 metres

Volume of RCC: 14 m3x103

Total volume: 20 m3x103

Construction Methods

Facings

Upstream
SlopeType
2.50 
Downstream
SlopeType
2 
Spillway
SlopeType
2 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Alto Irani on Google Earth
Alto Irani on Google Earth

Full Dam Information

Details

Country: Brazil

Owner: São Simão Energia S/A

Type: Gravity

Purpose(s): Hydropower

River: Itapemirim Norte

Reservoir capacity: 11 m3x106

Construction Dates

Start of Project: -/06

Start of RCC: -/06

End of RCC: -/08

End of Project: 02/09

Specifications

Height: 56 metres

Length: 187 metres

Volume of RCC: 92 m3x103

Total volume: 115 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
São Simão on Google Earth
São Simão on Google Earth

Full Dam Information

Details

Country: Brazil

Owner: Lumbrás Energética S.A.

Type: Gravity

Purpose(s): Hydropower

River: Tijucas

Reservoir capacity: 6 m3x106

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/08

End of Project: 03/09

Specifications

Height: 45 metres

Length: 178 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Major Gercino (formerly known as Angelina) completed
Major Gercino (formerly known as Angelina) completed

Full Dam Information

Details

Country: Vietnam

Owner: Binh Dien Electricity Joint Stock Company

Type: Gravity

Purpose(s): Hydropower

River: Huu Trach

Reservoir capacity: 424 m3x106

Construction Dates

Start of Project: 01/05

Start of RCC: 01/05

End of RCC: -/08

End of Project: 04/09

Specifications

Height: 54 metres

Length: 571 metres

Volume of RCC: 189 m3x103

Total volume: 423 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
70
Pozzolan (kg/m3)Pozzolan Type
105Low-lime flyash (ASTM Class F)
  
Binh Dien completed
Binh Dien completed

Full Dam Information

Details

Country: Brazil

Owner: BME Energia SA

Type: Gravity

Purpose(s): Hydropower

River: Ivaí

Reservoir capacity: 9 m3x106

Construction Dates

Start of Project: -/06

Start of RCC: -/06

End of RCC: -/08

End of Project: 04/09

Specifications

Height: 34 metres

Length: 228 metres

Volume of RCC: 58 m3x103

Total volume: 76 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Itabapoana

Reservoir capacity: -

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/08

End of Project: 05/09

Specifications

Height: 15 metres

Length: 110 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Pedra do Garrafão completed
Pedra do Garrafão completed

Full Dam Information

Details

Country: Brazil

Owner: Goiás Sul Geração de Energia S.A.

Type: Gravity

Purpose(s): Hydropower

River: Verissimo

Reservoir capacity: 76 m3x106

Construction Dates

Start of Project: 08/07

Start of RCC: 08/07

End of RCC: -/08

End of Project: 05/09

Specifications

Height: 44 metres

Length: 341 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
Vertical 
Downstream
SlopeType
0.75 
Spillway
SlopeType
0.75 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Goiandira completed
Goiandira completed

Full Dam Information

Details

Country: Brazil

Owner: Retiro Velho Energetica S/A

Type: Gravity

Purpose(s): Hydropower

River: da Prata

Reservoir capacity: 69 m3x106

Construction Dates

Start of Project: -/05

Start of RCC: -/05

End of RCC: -/08

End of Project: -/09

Specifications

Height: 42 metres

Length: 56 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Retiro Velho completed
Retiro Velho completed

Full Dam Information

Details

Country: China

Owner: Datang Shaanxi Power Generation Co Ltd

Type: Gravity

Purpose(s): Hydropower

River: Hanjiang

Reservoir capacity: 176 m3x106

Construction Dates

Start of Project: -/06

Start of RCC: -/06

End of RCC: -/08

End of Project: -/09

Specifications

Height: 72 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Shuhe completed
Shuhe completed

Full Dam Information

Details

Country: China

Owner: Guizhou Qianyuan Power Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Furong

Reservoir capacity: 98 m3x106

Construction Dates

Start of Project: -/06

Start of RCC: -/06

End of RCC: -/08

End of Project: -/09

Specifications

Height: 82 metres

Length: 166 metres

Volume of RCC: -

Total volume: 154 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Qingxi completed
Qingxi completed

Full Dam Information

Details

Country: China

Owner: Dehong Longjiang Hydropower Development Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Long

Reservoir capacity: 233 m3x106

Construction Dates

Start of Project: -/06

Start of RCC: -/06

End of RCC: -/08

End of Project: -/09

Specifications

Height: 91 metres

Length: 280 metres

Volume of RCC: -

Total volume: 486 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Nongling completed
Nongling completed

Full Dam Information

Details

Country: China

Owner: Xinjiang Yili River Basin Development Authority

Type: Gravity

Purpose(s): Hydropower

River: Tekes

Reservoir capacity: 121 m3x106

Construction Dates

Start of Project: 04/06

Start of RCC: 04/06

End of RCC: -/08

End of Project: -/09

Specifications

Height: 50 metres

Length: 496 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Shankou on Google Earth
Shankou on Google Earth

Full Dam Information

Details

Country: Brazil

Owner: Velcan Energy Development Ltda.

Type: Gravity

Purpose(s): Hydropower

River: Irani

Reservoir capacity: 9 m3x106

Construction Dates

Start of Project: -/06

Start of RCC: -/06

End of RCC: -/08

End of Project: 01/10

Specifications

Height: 32 metres

Length: 223 metres

Volume of RCC: -

Total volume: 59 m3x103

Construction Methods

Facings

Upstream
SlopeType
Vertical 
Downstream
SlopeType
0.85 
Spillway
SlopeType
0.85 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Rodeio Bonito completed
Rodeio Bonito completed

Full Dam Information

Details

Country: Brazil

Owner: BME Energia

Type: Gravity

Purpose(s): Hydropower

River: Ivaí

Reservoir capacity: 4 m3x106

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/08

End of Project: 04/09

Specifications

Height: 23 metres

Length: 220 metres

Volume of RCC: 29 m3x103

Total volume: 35 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
68
Pozzolan (kg/m3)Pozzolan Type
17Natural pozzolan (ASTM Class N)
  
Engenheiro Ernesto Jorge Dreher completed
Engenheiro Ernesto Jorge Dreher completed

Full Dam Information

Details

Country: Mexico

Owner: Desarrollos Mineros San Luis, S.A. de C.V.

Type: Gravity

Purpose(s): Hydropower

River: La Lobor o Las Truchas

Reservoir capacity: -

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/08

End of Project: -/09

Specifications

Height: 35 metres

Length: 230 metres

Volume of RCC: 24 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Las Truchas completed
Las Truchas completed

Full Dam Information

Details

Country: China

Owner: Engshi Yuefeng Yunlong River Hydropower Development Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Yunlong

Reservoir capacity: 44 m3x106

Construction Dates

Start of Project: 03/06

Start of RCC: 03/06

End of RCC: 04/09

End of Project: -/11

Specifications

Height: 139 metres

Length: 119 metres

Volume of RCC: 182 m3x103

Total volume: 207 m3x103

Construction Methods

Facings

Upstream
SlopeType
curveRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
curveRCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
 RCC against formwork (GEVR/GE-RCC)

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Yunlonghe Nº3 completed
Yunlonghe Nº3 completed

Full Dam Information

Details

Country: Peru

Owner: Cementos Lima S.A.

Type: Gravity

Purpose(s): Hydropower

River: Canete

Reservoir capacity: 5 m3x106

Construction Dates

Start of Project: 01/07

Start of RCC: 01/07

End of RCC: 04/09

End of Project: 10/09

Specifications

Height: 34 metres

Length: 60 metres

Volume of RCC: 75 m3x103

Total volume: 75 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.375RCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
65
Pozzolan (kg/m3)Pozzolan Type
90Natural pozzolan (ASTM Class N)
  
El Platanal (formerly Capillucas) completed
El Platanal (formerly Capillucas) completed

Full Dam Information

Details

Country: Japan

Owner: Ministry of Land, Infrastructure, Transport and Tourism

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Kase

Reservoir capacity: 71 m3x106

Construction Dates

Start of Project: 02/05

Start of RCC: 02/05

End of RCC: 06/09

End of Project: 03/12

Specifications

Height: 99 metres

Length: 456 metres

Volume of RCC: 830 m3x103

Total volume: 948 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.60Traditional concrete against formwork
Downstream
SlopeType
0.75Traditional concrete against formwork
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
2501000

Cementitious material

Cement (kg/m3)
84
Pozzolan (kg/m3)Pozzolan Type
36Low-lime flyash (ASTM Class F)
  
Kasegawa completed
Kasegawa completed

Full Dam Information

Details

Country: China

Owner: Yujiang Hydropower Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Wuni

Reservoir capacity: 35 m3x106

Construction Dates

Start of Project: 06/07

Start of RCC: 06/07

End of RCC: 06/09

End of Project: -/12

Specifications

Height: 119 metres

Length: 152 metres

Volume of RCC: 200 m3x103

Total volume: 205 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Yunkou completed
Yunkou completed

Full Dam Information

Details

Country: Belize

Owner: Belize Electric Company Ltd (BECOL) and A. Fortis Company, Canada

Type: Gravity

Purpose(s): Hydropower

River: Marcal

Reservoir capacity: 12 m3x106

Construction Dates

Start of Project: 02/07

Start of RCC: 02/07

End of RCC: 10/09

End of Project: 12/11

Specifications

Height: 70 metres

Length: 225 metres

Volume of RCC: 200 m3x103

Total volume: 220 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.20Traditional concrete against formwork
Downstream
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.75Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
94
Pozzolan (kg/m3)Pozzolan Type
31Low-lime flyash (ASTM Class F)
  
Vaca completed
Vaca completed

Full Dam Information

Details

Country: USA

Owner: AmerenUE

Type: Hardfill

Purpose(s): Hydropower

River: Water source - East Fork of Black River

Reservoir capacity: 6 m3x106

Construction Dates

Start of Project: 02/07

Start of RCC: 02/07

End of RCC: 11/09

End of Project: 06/10

Specifications

Height: 49 metres

Length: 2060 metres

Volume of RCC: 2448 m3x103

Total volume: 2500 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.60Traditional concrete against formwork
Downstream
SlopeType
0.60Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
no 
spillway 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
59
Pozzolan (kg/m3)Pozzolan Type
59Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Caí

Reservoir capacity: -

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/09

End of Project: -/09

Specifications

Height: 42 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Salto-RS completed
Salto-RS completed

Full Dam Information

Details

Country: China

Owner: Sichuan Wudu Water Conservancy and Hydropower Group Ltd.

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Fu

Reservoir capacity: 572 m3x106

Construction Dates

Start of Project: 10/04

Start of RCC: 10/04

End of RCC: -/09

End of Project: -/10

Specifications

Height: 120 metres

Length: 631 metres

Volume of RCC: 1151 m3x103

Total volume: 1580 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Wudu completed
Wudu completed

Full Dam Information

Details

Country: Brazil

Owner: São Pedro Energia S/A

Type: Gravity

Purpose(s): Hydropower

River: Jacu Braço Norte

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: -/06

Start of RCC: -/06

End of RCC: -/09

End of Project: -/10

Specifications

Height: 30 metres

Length: 140 metres

Volume of RCC: 22 m3x103

Total volume: 35 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
São Pedro completed
São Pedro completed

Full Dam Information

Details

Country: Vietnam

Owner: Geruco Song Con Hydro Power Joint Stock Company

Type: Gravity

Purpose(s): Hydropower

River: Song Con

Reservoir capacity: 30 m3x106

Construction Dates

Start of Project: -/06

Start of RCC: -/06

End of RCC: -/09

End of Project: -/10

Specifications

Height: 58 metres

Length: 260 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Sông Côn 2 completed
Sông Côn 2 completed

Full Dam Information

Details

Country: China

Owner: China Datang Corporation

Type: Thin Arch

Purpose(s): Hydropower

River: Getu

Reservoir capacity: 1748 m3x106

Construction Dates

Start of Project: 07/06

Start of RCC: 07/06

End of RCC: -/09

End of Project: -/10

Specifications

Height: 110 metres

Length: 253 metres

Volume of RCC: 280 m3x103

Total volume: 292 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
52
Pozzolan (kg/m3)Pozzolan Type
96Low-lime flyash (ASTM Class F)
  
Huanghuazhai completed
Huanghuazhai completed

Full Dam Information

Details

Country: China

Owner: Yunnan Dianneng Niulanjiang Hydropower Development Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Niulan

Reservoir capacity: 66 m3x106

Construction Dates

Start of Project: 12/06

Start of RCC: 12/06

End of RCC: -/09

End of Project: -/10

Specifications

Height: 113 metres

Length: 160 metres

Volume of RCC: 182 m3x103

Total volume: 360 m3x103

Construction Methods

Facings

Upstream
SlopeType
curveRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
curveRCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
ogeeRCC against formwork

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Tianhuaban completed
Tianhuaban completed

Full Dam Information

Details

Country: China

Owner: Quifeng Water Supply Co. of Fangchenggang City

Type: Gravity

Purpose(s): Hydropower / Irrigation / Water Supply

River: Xijiang

Reservoir capacity: 26 m3x106

Construction Dates

Start of Project: -/04

Start of RCC: -/04

End of RCC: -/09

End of Project: -/12

Specifications

Height: 74 metres

Length: 190 metres

Volume of RCC: 230 m3x103

Total volume: 240 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
0.75 
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Baishiya completed
Baishiya completed

Full Dam Information

Details

Country: Dominican Republic

Owner: EGEHID (Empresa de Generación Hidroeléctrica Dominicana)

Type: Hardfill

Purpose(s): Hydropower

River: Yaque del Sur and Blanco

Reservoir capacity: 3 m3x106

Construction Dates

Start of Project: -/05

Start of RCC: -/05

End of RCC: -/09

End of Project: -/13

Specifications

Height: 65 metres

Length: 153 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Palomino on Google Earth
Palomino on Google Earth

Full Dam Information

Details

Country: Brazil

Owner: Criúva Energética S/A

Type: Gravity

Purpose(s): Hydropower

River: Lajeado Grange

Reservoir capacity: 7 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/09

End of Project: 12/09

Specifications

Height: 25 metres

Length: 246 metres

Volume of RCC: 80 m3x103

Total volume: 95 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
72
Pozzolan (kg/m3)Pozzolan Type
18Natural pozzolan (ASTM Class N)
  
Criúva completed
Criúva completed

Full Dam Information

Details

Country: China

Owner: Xinjiang-Xinhua-Chonghuer Hydropower Development Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Burgin

Reservoir capacity: 85 m3x106

Construction Dates

Start of Project: 10/06

Start of RCC: 10/06

End of RCC: -/09

End of Project: -/09

Specifications

Height: 74 metres

Length: 545 metres

Volume of RCC: -

Total volume: 480 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Chonghu’er completed
Chonghu’er completed

Full Dam Information

Details

Country: Brazil

Owner: Hidrelétrica Areia Branca S.A. (Tractebel Energia)

Type: Gravity

Purpose(s): Hydropower

River: Manhuaçu

Reservoir capacity: -

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/09

End of Project: -/09

Specifications

Height: 28 metres

Length: 257 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Areia Branca completed
Areia Branca completed

Full Dam Information

Details

Country: Brazil

Owner: Serrana Energética S/A

Type: Gravity

Purpose(s): Hydropower

River: das Antas

Reservoir capacity: 6 m3x106

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/09

End of Project: 01/10

Specifications

Height: 32 metres

Length: 137 metres

Volume of RCC: 89 m3x103

Total volume: 103 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
72
Pozzolan (kg/m3)Pozzolan Type
18Natural pozzolan (ASTM Class N)
  
Palanquinho completed
Palanquinho completed

Full Dam Information

Details

Country: Brazil

Owner: Gerdau Aços Longos

Type: Gravity

Purpose(s): Hydropower / Water Supply

River: Claro

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 08/07

Start of RCC: 08/07

End of RCC: -/09

End of Project: 07/10

Specifications

Height: 60 metres

Length: 1670 metres

Volume of RCC: 172 m3x103

Total volume: 282 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Barra dos Coqueiros completed
Barra dos Coqueiros completed

Full Dam Information

Details

Country: Brazil

Owner: Piedade Usina Geradora de Energia S.A

Type: Gravity

Purpose(s): Hydropower

River: Piedade

Reservoir capacity: 18 m3x106

Construction Dates

Start of Project: -/06

Start of RCC: -/06

End of RCC: -/09

End of Project: 08/10

Specifications

Height: 30 metres

Length: 397 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Piedade completed
Piedade completed

Full Dam Information

Details

Country: Brazil

Owner: Serra do Facão Energia S.A. (SEFAC)

Type: Gravity

Purpose(s): Hydropower

River: Sao Marcos

Reservoir capacity: 5199 m3x106

Construction Dates

Start of Project: 02/07

Start of RCC: 02/07

End of RCC: -/09

End of Project: 10/10

Specifications

Height: 92 metres

Length: 326 metres

Volume of RCC: 610 m3x103

Total volume: 742 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
72
Pozzolan (kg/m3)Pozzolan Type
18Natural pozzolan (ASTM Class N)
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Yichang Junwang Group Co.

Type: Thin Arch

Purpose(s): Hydropower

River: Siyang

Reservoir capacity: 33 m3x106

Construction Dates

Start of Project: -/06

Start of RCC: -/06

End of RCC: -/09

End of Project: -/10

Specifications

Height: 100 metres

Length: 185 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Maduhe completed
Maduhe completed

Full Dam Information

Details

Country: Brazil

Owner: SPE São Gonçalo Energia S.A.

Type: Gravity

Purpose(s): Hydropower

River: Santa Bárbara

Reservoir capacity: 6 m3x106

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/09

End of Project: -/10

Specifications

Height: 28 metres

Length: 148 metres

Volume of RCC: 14 m3x103

Total volume: 26 m3x103

Construction Methods

Facings

Upstream
SlopeType
Vertical 
Downstream
SlopeType
0.75 
Spillway
SlopeType
0.75 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
68
Pozzolan (kg/m3)Pozzolan Type
17Natural pozzolan (ASTM Class N)
  
São Gonçalo (formerly Santa Bárbara) completed
São Gonçalo (formerly Santa Bárbara) completed

Full Dam Information

Details

Country: Brazil

Owner: Gerdau SA

Type: Gravity

Purpose(s): Hydropower

River: Claro

Reservoir capacity: -

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/09

End of Project: -/10

Specifications

Height: 40 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Caçu completed
Caçu completed

Full Dam Information

Details

Country: China

Owner: Guizhou Tongzihe Hydropower Development Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower / Water Supply

River: Tongzhi

Reservoir capacity: 78 m3x106

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/09

End of Project: -/10

Specifications

Height: 68 metres

Length: 153 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Yangjiayuan completed
Yangjiayuan completed

Full Dam Information

Details

Country: China

Owner: Wujiang Hydropower Development Corporation

Type: Gravity

Purpose(s): Hydropower

River: Qingshuihe

Reservoir capacity: 77 m3x106

Construction Dates

Start of Project: 01/07

Start of RCC: 01/07

End of RCC: -/09

End of Project: -/10

Specifications

Height: 124 metres

Length: 104 metres

Volume of RCC: -

Total volume: 500 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Geliqiao completed
Geliqiao completed

Full Dam Information

Details

Country: Brazil

Owner: SPE Arvoredo Energia S.A.

Type: Gravity

Purpose(s): Hydropower

River: Irani

Reservoir capacity: 12 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/09

End of Project: 04/10

Specifications

Height: 39 metres

Length: 259 metres

Volume of RCC: 53 m3x103

Total volume: 81 m3x103

Construction Methods

Facings

Upstream
SlopeType
Vertical 
Downstream
SlopeType
0.75 
Spillway
SlopeType
0.75 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
20Natural pozzolan (ASTM Class N)
  
Arvoredo completed
Arvoredo completed

Full Dam Information

Details

Country: Turkey

Owner: Akkur Energy Production Trade and Industry Co. Inc.

Type: Gravity

Purpose(s): Hydropower

River: Göksu

Reservoir capacity: 63 m3x106

Construction Dates

Start of Project: 12/07

Start of RCC: 12/07

End of RCC: 02/10

End of Project: 08/10

Specifications

Height: 70 metres

Length: 256 metres

Volume of RCC: 194 m3x103

Total volume: 227 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.07Traditional concrete against precast concrete panels with geomembrane
Downstream
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
separate 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
60
60
Pozzolan (kg/m3)Pozzolan Type
60Low-lime flyash (ASTM Class F)
50 
Feke II completed
Feke II completed

Full Dam Information

Details

Country: Turkey

Owner: DSI - State Hydraulic Works

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Çine

Reservoir capacity: 350 m3x106

Construction Dates

Start of Project: 12/95

Start of RCC: 12/95

End of RCC: 04/10

End of Project: 10/11

Specifications

Height: 137 metres

Length: 300 metres

Volume of RCC: 1560 m3x103

Total volume: 1650 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10RCC against precast concrete panels (GEVR/GE-RCC)
0.20 
Downstream
SlopeType
0.85RCC against precast concrete panels (GEVR/GE-RCC)
Spillway
SlopeType
0.85RCC against precast concrete panels (GEVR/GE-RCC)

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
85
75
Pozzolan (kg/m3)Pozzolan Type
105Low-lime flyash (ASTM Class F)
95 
Adnan Mendres (formerly Çine) completed
Adnan Mendres (formerly Çine) completed

Full Dam Information

Details

Country: Japan

Owner: Ministry of Land, Infrastructure, Transport and Tourism

Type: Hardfill

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Kase

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 03/08

Start of RCC: 03/08

End of RCC: 06/10

End of Project: 09/10

Specifications

Height: 29 metres

Length: 116 metres

Volume of RCC: 52 m3x103

Total volume: 68 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.80Reinforced conventional concrete cast after RCC placement
Downstream
SlopeType
0.80Reinforced conventional concrete cast after RCC placement
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
250750

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
  
Kasegawa auxiliary dam on Google Earth
Kasegawa auxiliary dam on Google Earth

Full Dam Information

Details

Country: Costa Rica

Owner: ICE (Instituto Costarricence de Electricidad)

Type: Gravity

Purpose(s): Hydropower

River: Pirris

Reservoir capacity: 36 m3x106

Construction Dates

Start of Project: 12/06

Start of RCC: 12/06

End of RCC: 06/10

End of Project: 07/11

Specifications

Height: 113 metres

Length: 258 metres

Volume of RCC: 695 m3x103

Total volume: 755 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.33RCC against formwork (GEVR/GE-RCC)  [stepped face]
Downstream
SlopeType
0.50RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.50Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
88
Pozzolan (kg/m3)Pozzolan Type
132Natural pozzolan (ASTM Class N)
  
Pirris completed
Pirris completed

Full Dam Information

Details

Country: South Africa

Owner: ESKOM

Type: Gravity

Purpose(s): Hydropower

River: Braamhoekspruit

Reservoir capacity: 27 m3x106

Construction Dates

Start of Project: 04/08

Start of RCC: 04/08

End of RCC: 06/10

End of Project: 02/11

Specifications

Height: 37 metres

Length: 330 metres

Volume of RCC: 90 m3x103

Total volume: 98 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.67RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.67RCC against formwork (GEVR/GE-RCC)  [stepped face]

Placement

Layers (mm)Lifts (mm)
3001200

Cementitious material

Cement (kg/m3)
70
Pozzolan (kg/m3)Pozzolan Type
95Low-lime flyash (ASTM Class F)
  
Bramhoek completed
Bramhoek completed

Full Dam Information

Details

Country: Vietnam

Owner: EVN (Electricté de Vietnam)

Type: Gravity

Purpose(s): Flood Control / Hydropower

River: Song Da (Black river)

Reservoir capacity: 9260 m3x106

Construction Dates

Start of Project: 04/04

Start of RCC: 04/04

End of RCC: 08/10

End of Project: 12/12

Specifications

Height: 138 metres

Length: 962 metres

Volume of RCC: 2677 m3x103

Total volume: 4800 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.73RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
separate 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
160Low-lime flyash (ASTM Class F)
  
Son La completed
Son La completed

Full Dam Information

Details

Country: Turkey

Owner: DSI - State Hydraulic Works

Type: Gravity

Purpose(s): Hydropower

River: Ortasui

Reservoir capacity: 18 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: 08/10

End of Project: 09/10

Specifications

Height: 67 metres

Length: 198 metres

Volume of RCC: 157 m3x103

Total volume: 231 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300600

Cementitious material

Cement (kg/m3)
125
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
  
Şirnak completed
Şirnak completed

Full Dam Information

Details

Country: Vietnam

Owner: EVN (Electrictie de Vietnam)

Type: Gravity

Purpose(s): Hydropower

River: Ca

Reservoir capacity: 1500 m3x106

Construction Dates

Start of Project: 08/04

Start of RCC: 08/04

End of RCC: 10/10

End of Project: 12/11

Specifications

Height: 136 metres

Length: 480 metres

Volume of RCC: 1520 m3x103

Total volume: 1750 m3x103

Construction Methods

Facings

Upstream
SlopeType
vRCC against formwork (GEVR/GE-RCC)
0.30 
Downstream
SlopeType
0.85RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
120Natural pozzolan (ASTM Class N)
  
Ban Ve under construction
Ban Ve under construction

Full Dam Information

Details

Country: Turkey

Owner: Akfen Energy

Type: Hardfill

Purpose(s): Flood Control / Hydropower

River: Zamanti

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 04/08

Start of RCC: 04/08

End of RCC: 12/10

End of Project: 04/11

Specifications

Height: 52 metres

Length: 186 metres

Volume of RCC: 160 m3x103

Total volume: 182 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.70RCC against precast concrete panels
Downstream
SlopeType
0.70Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.70Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
88
Pozzolan (kg/m3)Pozzolan Type
37Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: Vietnam

Owner: EVN (Electrictie de Vietnam)

Type: Gravity

Purpose(s): Flood Control / Hydropower

River: Dong Nai

Reservoir capacity: 1690 m3x106

Construction Dates

Start of Project: 12/04

Start of RCC: 12/04

End of RCC: 12/10

End of Project: 10/11

Specifications

Height: 108 metres

Length: 594 metres

Volume of RCC: 1138 m3x103

Total volume: 1235 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.75Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
75
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
  
Dong Nai 3 completed
Dong Nai 3 completed

Full Dam Information

Details

Country: Vietnam

Owner: MARD (Ministry of Agriculture and Rural Development)

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Tra Kluc

Reservoir capacity: 290 m3x106

Construction Dates

Start of Project: 10/07

Start of RCC: 10/07

End of RCC: 12/10

End of Project: 05/11

Specifications

Height: 69 metres

Length: 518 metres

Volume of RCC: 446 m3x103

Total volume: 607 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
125
80
Pozzolan (kg/m3)Pozzolan Type
218Natural pozzolan (ASTM Class N)
230 
Photo coming soon

Full Dam Information

Details

Country: Brazil

Owner: Companhia Energetica Santa Clara

Type: Gravity

Purpose(s): Hydropower

River: Mucuri

Reservoir capacity: 151 m3x106

Construction Dates

Start of Project: -/99

Start of RCC: -/99

End of RCC: -/02

End of Project: -/03

Specifications

Height: 59 metres

Length: 242 metres

Volume of RCC: 520 m3x103

Total volume: 600 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Santa Clara-BA completed
Santa Clara-BA completed

Full Dam Information

Details

Country: Pakistan

Owner: WAPDA (Water and Power Development Authority) and CTGC (China Three Gorges Corp.)

Type: Gravity

Purpose(s): Hydropower

River: Duber Khwar

Reservoir capacity: -

Construction Dates

Start of Project: 04/03

Start of RCC: 04/03

End of RCC: -/10

End of Project: 04/12

Specifications

Height: 46 metres

Length: 112 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Khan Khwar completed
Khan Khwar completed

Full Dam Information

Details

Country: China

Owner: Hanergy, Yunnan Jinsha River Hydropower Co. Ltd. and Yunnan Investment and Development Co. Ltd.

Type: Gravity

Purpose(s): Hydropower / Navigation / Recreation

River: Jinsha

Reservoir capacity: 913 m3x106

Construction Dates

Start of Project: 12/03

Start of RCC: 12/03

End of RCC: -/10

End of Project: -/11

Specifications

Height: 160 metres

Length: 640 metres

Volume of RCC: 2400 m3x103

Total volume: 4430 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork
Downstream
SlopeType
0.75RCC against formwork
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
72
96
Pozzolan (kg/m3)Pozzolan Type
108Low-lime flyash (ASTM Class F)
117 
Jin’anqiao completed
Jin’anqiao completed

Full Dam Information

Details

Country: Brazil

Owner: Eletrogoes S/A.

Type: Gravity

Purpose(s): Hydropower

River: Comemorqção

Reservoir capacity: 478 m3x106

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/10

End of Project: -/11

Specifications

Height: 19 metres

Length: 460 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Rondon II under construction
Rondon II under construction

Full Dam Information

Details

Country: Republic of Congo

Owner: Délégation Générale des Grands Travaux

Type: Gravity

Purpose(s): Hydropower

River: Léfini

Reservoir capacity: 584 m3x106

Construction Dates

Start of Project: 09/03

Start of RCC: 09/03

End of RCC: -/10

End of Project: 05/11

Specifications

Height: 33 metres

Length: 310 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Imboulou completed
Imboulou completed

Full Dam Information

Details

Country: China

Owner: Yunnan Dianneng Group Holding Company

Type: Thin Arch

Purpose(s): Hydropower

River: Xima

Reservoir capacity: 3 m3x106

Construction Dates

Start of Project: 04/06

Start of RCC: 04/06

End of RCC: -/10

End of Project: -/11

Specifications

Height: 72 metres

Length: 160 metres

Volume of RCC: 107 m3x103

Total volume: 115 m3x103

Construction Methods

Facings

Upstream
SlopeType
curveRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
curveRCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
 RCC against formwork

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Saizhu completed
Saizhu completed

Full Dam Information

Details

Country: China

Owner: Guodian Yunnan Power Co Ltd

Type: Gravity

Purpose(s): Hydropower

River: Pudu

Reservoir capacity: 22 m3x106

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/10

End of Project: -/11

Specifications

Height: 81 metres

Length: 148 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Qianchang on Google Earth
Qianchang on Google Earth

Full Dam Information

Details

Country: China

Owner: Chongqing Wujiang Power Company

Type: Gravity

Purpose(s): Hydropower

River: Youshui

Reservoir capacity: 163 m3x106

Construction Dates

Start of Project: -/06

Start of RCC: -/06

End of RCC: -/10

End of Project: -/12

Specifications

Height: 30 metres

Length: 214 metres

Volume of RCC: -

Total volume: 260 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Shidi on Google Earth
Shidi on Google Earth

Full Dam Information

Details

Country: China

Owner: Hubei Energy Group Co. Ltd.

Type: Thin Arch

Purpose(s): Flood Control / Hydropower

River: Nanhe

Reservoir capacity: 499 m3x106

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/10

End of Project: -/11

Specifications

Height: 133 metres

Length: 285 metres

Volume of RCC: -

Total volume: 390 m3x103

Construction Methods

Facings

Upstream
SlopeType
 Traditional concrete against formwork
Downstream
SlopeType
 Traditional concrete against formwork
Spillway
SlopeType
 Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Sanliping completed
Sanliping completed

Full Dam Information

Details

Country: Brazil

Owner: Água Limpa Energia S/A

Type: Gravity

Purpose(s): Hydropower

River: Palmeiras

Reservoir capacity: 10 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/10

End of Project: 12/10

Specifications

Height: 38 metres

Length: 98 metres

Volume of RCC: 42 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Água Limpa completed
Água Limpa completed

Full Dam Information

Details

Country: Brazil

Owner: Companhia Hidroelétrica Figueirópolis

Type: Gravity

Purpose(s): Hydropower

River: Jauru

Reservoir capacity: 35 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/10

End of Project: 12/10

Specifications

Height: 16 metres

Length: 170 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
Vertical 
Downstream
SlopeType
0.43 
Spillway
SlopeType
0.75 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Figueirópolis completed
Figueirópolis completed

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Santo Antonio

Reservoir capacity: 8 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/10

End of Project: -/11

Specifications

Height: 26 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Porto Estrela completed
Porto Estrela completed

Full Dam Information

Details

Country: Brazil

Owner: Ibirama Energética SA

Type: Gravity

Purpose(s): Hydropower

River: -

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/10

End of Project: -/10

Specifications

Height: 15 metres

Length: 145 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Brazil

Owner: CPFL Renovaveis

Type: Gravity

Purpose(s): Hydropower

River: Santo Antônio

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/10

End of Project: -/10

Specifications

Height: 15 metres

Length: 94 metres

Volume of RCC: -

Total volume: 14 m3x103

Construction Methods

Facings

Upstream
SlopeType
Vertical 
Downstream
SlopeType
0.75 
Spillway
SlopeType
0.75 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Ninho da Águia completed
Ninho da Águia completed

Full Dam Information

Details

Country: Brazil

Owner: Energisa Geracão Rio Grande S/A

Type: Gravity

Purpose(s): Hydropower

River: Rio Grande

Reservoir capacity: 10 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/10

End of Project: 03/11

Specifications

Height: 38 metres

Length: 222 metres

Volume of RCC: 66 m3x103

Total volume: 82 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Caju under construction
Caju under construction

Full Dam Information

Details

Country: Brazil

Owner: Omega Engergia Renovávelo S/A

Type: Gravity

Purpose(s): Hydropower

River: Manhuaçu

Reservoir capacity: -

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/10

End of Project: 04/11

Specifications

Height: 16 metres

Length: 200 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Natural pozzolan (ASTM Class N)
  
Pipoca completed
Pipoca completed

Full Dam Information

Details

Country: China

Owner: Guangxi Water Conservancy and Electric Power Corporation

Type: Thin Arch

Purpose(s): Hydropower

River: Baidu

Reservoir capacity: 22 m3x106

Construction Dates

Start of Project: -/06

Start of RCC: -/06

End of RCC: -/10

End of Project: -/11

Specifications

Height: 75 metres

Length: 217 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Brazil

Owner: Ijui Energia S.A.

Type: Gravity

Purpose(s): Hydropower

River: Carreiro

Reservoir capacity: 188 m3x106

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/10

End of Project: -/11

Specifications

Height: 29 metres

Length: 790 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
São José under construction
São José under construction

Full Dam Information

Details

Country: China

Owner: Enshi Tianfa Electric Ltd.

Type: Thin Arch

Purpose(s): Flood Control / Hydropower / Recreation

River: Lengshui

Reservoir capacity: 87 m3x106

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/10

End of Project: -/11

Specifications

Height: 114 metres

Length: 192 metres

Volume of RCC: 21 m3x103

Total volume: 21 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Luoboba completed
Luoboba completed

Full Dam Information

Details

Country: Brazil

Owner: BME

Type: Gravity

Purpose(s): Hydropower

River: Paraiba do Sul

Reservoir capacity: -

Construction Dates

Start of Project: 12/07

Start of RCC: 12/07

End of RCC: -/10

End of Project: -/11

Specifications

Height: 28 metres

Length: -

Volume of RCC: 85 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Lavrinha completed
Lavrinha completed

Full Dam Information

Details

Country: Brazil

Owner: Geracao Hidroeletrica Rio Grande S/A

Type: Gravity

Purpose(s): Hydropower

River: Grande

Reservoir capacity: 44 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/10

End of Project: -/11

Specifications

Height: 41 metres

Length: 210 metres

Volume of RCC: 51 m3x103

Total volume: 75 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
São Sebastião do Alto completed
São Sebastião do Alto completed

Full Dam Information

Details

Country: China

Owner: Department of Water Resources, Guandong Province

Type: Gravity

Purpose(s): Hydropower / Irrigation / Navigation

River: Bei

Reservoir capacity: 374 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/10

End of Project: -/11

Specifications

Height: 85 metres

Length: 256 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Lechangxia completed
Lechangxia completed

Full Dam Information

Details

Country: Brazil

Owner: CPFL Renovaveis

Type: Gravity

Purpose(s): Hydropower

River: Corrente Grande

Reservoir capacity: 12 m3x106

Construction Dates

Start of Project: -/10

Start of RCC: -/10

End of RCC: -/10

End of Project: -/10

Specifications

Height: 20 metres

Length: 110 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
Vertical 
Downstream
SlopeType
0.75 
Spillway
SlopeType
0.75 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Corrente Grande completed
Corrente Grande completed

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: -

Reservoir capacity: -

Construction Dates

Start of Project: -/10

Start of RCC: -/10

End of RCC: -/10

End of Project: -/10

Specifications

Height: 30 metres

Length: -

Volume of RCC: 42 m3x103

Total volume: 73 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Panama

Owner: AES (Allied Energy Systems Co.) Panama SRL

Type: Arch-Gravity

Purpose(s): Hydropower

River: Changuinola

Reservoir capacity: 347 m3x106

Construction Dates

Start of Project: 04/07

Start of RCC: 04/07

End of RCC: 04/11

End of Project: 10/11

Specifications

Height: 105 metres

Length: 595 metres

Volume of RCC: 884 m3x103

Total volume: 910 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.50RCC against formwork (GEVR/GE-RCC)  [stepped face]
0.70RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.50Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
70
65
Pozzolan (kg/m3)Pozzolan Type
145Low-lime flyash (ASTM Class F)
150 
Changuinola 1 completed
Changuinola 1 completed

Full Dam Information

Details

Country: Brazil

Owner: Consorcio Energético Cruzeiro do Sul (Copel and Electrosul Centrais Eléctricas SA)

Type: Gravity

Purpose(s): Hydropower

River: Tibagi

Reservoir capacity: 2137 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: 05/11

End of Project: -/12

Specifications

Height: 83 metres

Length: 726 metres

Volume of RCC: 633 m3x103

Total volume: 753 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork with external geomembrane
Downstream
SlopeType
0.80RCC against precast concrete blocks
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
3002400

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
15Natural pozzolan (ASTM Class N)
  
Gov. Jayme Canet Junior (formerly Antiga Mauá) completed
Gov. Jayme Canet Junior (formerly Antiga Mauá) completed

Full Dam Information

Details

Country: Vietnam

Owner: EVN (Electrictie de Vietnam)

Type: Gravity

Purpose(s): Hydropower

River: Dong Nai

Reservoir capacity: 337 m3x106

Construction Dates

Start of Project: 12/04

Start of RCC: 12/04

End of RCC: 06/11

End of Project: -/12

Specifications

Height: 128 metres

Length: 481 metres

Volume of RCC: 1305 m3x103

Total volume: 1370 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
85
Pozzolan (kg/m3)Pozzolan Type
115Natural pozzolan (ASTM Class N)
  
Dong Nai 4 completed
Dong Nai 4 completed

Full Dam Information

Details

Country: Turkey

Owner: Senerji Enerji

Type: Gravity

Purpose(s): Hydropower

River: Çoruh

Reservoir capacity: 21 m3x106

Construction Dates

Start of Project: 05/09

Start of RCC: 05/09

End of RCC: 06/11

End of Project: 02/12

Specifications

Height: 72 metres

Length: 97 metres

Volume of RCC: 160 m3x103

Total volume: 175 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.50Traditional concrete against formwork
0.70Traditional concrete against formwork
Spillway
SlopeType
0.70Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
70
Pozzolan (kg/m3)Pozzolan Type
70Low-lime flyash (ASTM Class F)
  
Güllübag completed
Güllübag completed

Full Dam Information

Details

Country: Vietnam

Owner: (IDICO) Urban and Industrial Development Zone Investment Company

Type: Gravity

Purpose(s): Hydropower

River: Vu Gia

Reservoir capacity: 313 m3x106

Construction Dates

Start of Project: 04/07

Start of RCC: 04/07

End of RCC: 08/11

End of Project: 04/12

Specifications

Height: 90 metres

Length: 472 metres

Volume of RCC: 720 m3x103

Total volume: 800 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.48RCC against formwork (GEVR/GE-RCC)  [stepped face]
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
95
Pozzolan (kg/m3)Pozzolan Type
125Natural pozzolan (ASTM Class N)
  
Dak Mi 4 completed
Dak Mi 4 completed

Full Dam Information

Details

Country: Vietnam

Owner: EVN (Electrictie de Vietnam)

Type: Gravity

Purpose(s): Hydropower

River: Song Tranh

Reservoir capacity: 733 m3x106

Construction Dates

Start of Project: 03/05

Start of RCC: 03/05

End of RCC: 08/11

End of Project: 12/12

Specifications

Height: 96 metres

Length: 640 metres

Volume of RCC: 1032 m3x103

Total volume: 1315 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
70
Pozzolan (kg/m3)Pozzolan Type
110Natural pozzolan (ASTM Class N)
  
Song Tranh 2 completed
Song Tranh 2 completed

Full Dam Information

Details

Country: Pakistan

Owner: WAPDA (Water and Power Development Authority)

Type: Arch-Gravity

Purpose(s): Flood Control / Hydropower / Irrigation

River: Gomal

Reservoir capacity: 1424 m3x106

Construction Dates

Start of Project: 07/02

Start of RCC: 07/02

End of RCC: 09/11

End of Project: 06/13

Specifications

Height: 133 metres

Length: 231 metres

Volume of RCC: 390 m3x103

Total volume: 474 m3x103

Construction Methods

Facings

Upstream
SlopeType
Vertical 
Downstream
SlopeType
0.60 
Spillway
SlopeType
0.60 

Placement

Layers (mm)Lifts (mm)
3003000  to
 4000

Cementitious material

Cement (kg/m3)
91
Pozzolan (kg/m3)Pozzolan Type
91Low-lime flyash (ASTM Class F)
  
Gomal Zam completed
Gomal Zam completed

Full Dam Information

Details

Country: Japan

Owner: Ministry of Land, Infrastructure and Transport

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Yubari

Reservoir capacity: 427 m3x106

Construction Dates

Start of Project: 11/03

Start of RCC: 11/03

End of RCC: 09/11

End of Project: 03/15

Specifications

Height: 111 metres

Length: 390 metres

Volume of RCC: 584 m3x103

Total volume: 940 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.80Traditional concrete against formwork
Downstream
SlopeType
0.82Traditional concrete against formwork
Spillway
SlopeType
0.82Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
250750  &
 1000

Cementitious material

Cement (kg/m3)
91
Pozzolan (kg/m3)Pozzolan Type
39Low-lime flyash (ASTM Class F)
  
Yubari Syuparo completed
Yubari Syuparo completed

Full Dam Information

Details

Country: Turkey

Owner: Enerjisa En. Ut. A.S.

Type: Gravity

Purpose(s): Hydropower

River: Göksu

Reservoir capacity: 51 m3x106

Construction Dates

Start of Project: 05/09

Start of RCC: 05/09

End of RCC: 10/11

End of Project: 12/11

Specifications

Height: 68 metres

Length: 304 metres

Volume of RCC: 349 m3x103

Total volume: 384 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.25Traditional concrete against formwork
Downstream
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
40Low-lime flyash (ASTM Class F)
  
Menge completed
Menge completed

Full Dam Information

Details

Country: Laos

Owner: Theun Hinboun Power Company

Type: Gravity

Purpose(s): Hydropower

River: Nam Gnouang

Reservoir capacity: 2450 m3x106

Construction Dates

Start of Project: 10/08

Start of RCC: 10/08

End of RCC: 12/11

End of Project: -/12

Specifications

Height: 65 metres

Length: 480 metres

Volume of RCC: 383 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
1.00Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
100Low-lime flyash (ASTM Class F)
  
Nam Gnouang (Theun Hinboun Expansion) completed
Nam Gnouang (Theun Hinboun Expansion) completed

Full Dam Information

Details

Country: China

Owner: Guizhou Zhongshui Energy Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Hongdu

Reservoir capacity: 321 m3x106

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: 12/11

End of Project: 12/11

Specifications

Height: 135 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Shiyazi completed
Shiyazi completed

Full Dam Information

Details

Country: China

Owner: Huaneng Lancang River Hydropower Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Lancang (Mekong)

Reservoir capacity: 316 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/11

End of Project: 03/12

Specifications

Height: 105 metres

Length: 356 metres

Volume of RCC: -

Total volume: 1067 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Gongguoqiao completed
Gongguoqiao completed

Full Dam Information

Details

Country: Brazil

Owner: Boa Sorte Energética S/A

Type: Gravity

Purpose(s): Hydropower

River: Tijucas

Reservoir capacity: 18 m3x106

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/11

End of Project: -/12

Specifications

Height: 26 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Boa Sorte completed
Boa Sorte completed

Full Dam Information

Details

Country: China

Owner: Nei Mongol (Inner Mongolia) Electricity Corporation

Type: Gravity

Purpose(s): Hydropower

River: Halasxinegou

Reservoir capacity: 7 m3x106

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/11

End of Project: -/12

Specifications

Height: 69 metres

Length: 242 metres

Volume of RCC: 185 m3x103

Total volume: 330 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Huhehaote (Hohhot) PSS - Upstream lower dam on Google Earth
Huhehaote (Hohhot) PSS - Upstream lower dam on Google Earth

Full Dam Information

Details

Country: Cambodia

Owner: Electricity of Cambodia (44-year BOT to Sinohydro Corporation)

Type: Gravity

Purpose(s): Hydropower

River: Kamchay

Reservoir capacity: 718 m3x106

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/11

End of Project: -/12

Specifications

Height: 112 metres

Length: 568 metres

Volume of RCC: 1100 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
Vertical 
0.30 
Downstream
SlopeType
0.75 
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Kamchay completed
Kamchay completed

Full Dam Information

Details

Country: China

Owner: Enshi Mawei Valley Hydropower Development Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Maweigou

Reservoir capacity: 29 m3x106

Construction Dates

Start of Project: 12/08

Start of RCC: 12/08

End of RCC: -/11

End of Project: -/12

Specifications

Height: 140 metres

Length: 116 metres

Volume of RCC: -

Total volume: 212 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Qinglong completed
Qinglong completed

Full Dam Information

Details

Country: Vietnam

Owner: Central Hydropower Joint Stock Company

Type: Gravity

Purpose(s): Hydropower

River: A Sap

Reservoir capacity: -

Construction Dates

Start of Project: 06/07

Start of RCC: 06/07

End of RCC: -/11

End of Project: -/12

Specifications

Height: 50 metres

Length: 208 metres

Volume of RCC: 138 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
A Luoi completed
A Luoi completed

Full Dam Information

Details

Country: Turkey

Owner: Püre Energy Üretim Tic. A.S.

Type: Gravity

Purpose(s): Hydropower

River: Aras

Reservoir capacity: 21 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/11

End of Project: 10/11

Specifications

Height: 55 metres

Length: 148 metres

Volume of RCC: 120 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
 Traditional concrete against formwork
Downstream
SlopeType
 Traditional concrete against formwork
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Sefaköy completed
Sefaköy completed

Full Dam Information

Details

Country: Brazil

Owner: Centrais Eletricas Brasileiras sa Eletrobras

Type: Gravity

Purpose(s): Hydropower

River: Paraiba do Sul

Reservoir capacity: 114 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/11

End of Project: 12/11

Specifications

Height: 30 metres

Length: 270 metres

Volume of RCC: 44 m3x103

Total volume: 55 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Anta (with Simplicio) completed
Anta (with Simplicio) completed

Full Dam Information

Details

Country: Brazil

Owner: Statkraft (Moinho S.A.)

Type: Gravity

Purpose(s): Hydropower

River: Bernado José

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/11

End of Project: -/11

Specifications

Height: 22 metres

Length: 126 metres

Volume of RCC: 9 m3x103

Total volume: 25 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
68
Pozzolan (kg/m3)Pozzolan Type
17Natural pozzolan (ASTM Class N)
  
Moínho completed
Moínho completed

Full Dam Information

Details

Country: China

Owner: Baise WaCun Hydropower Development Co.

Type: Gravity

Purpose(s): Hydropower

River: Xiyang

Reservoir capacity: 57 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/11

End of Project: -/11

Specifications

Height: 69 metres

Length: 247 metres

Volume of RCC: -

Total volume: 289 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Nabi completed
Nabi completed

Full Dam Information

Details

Country: China

Owner: Guodian Shaanxi Hydropower Development Co.

Type: Gravity

Purpose(s): Hydropower

River: Dan

Reservoir capacity: 95 m3x106

Construction Dates

Start of Project: 02/09

Start of RCC: 02/09

End of RCC: -/11

End of Project: -/11

Specifications

Height: 70 metres

Length: 221 metres

Volume of RCC: -

Total volume: 221 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Lianhuatai completed
Lianhuatai completed

Full Dam Information

Details

Country: Brazil

Owner: Autódromo Energética S/A

Type: Gravity

Purpose(s): Hydropower

River: Carreiro

Reservoir capacity: 4 m3x106

Construction Dates

Start of Project: -/10

Start of RCC: -/10

End of RCC: -/11

End of Project: -/11

Specifications

Height: 23 metres

Length: 271 metres

Volume of RCC: 21 m3x103

Total volume: 47 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
67
Pozzolan (kg/m3)Pozzolan Type
17Natural pozzolan (ASTM Class N)
  
Autódromo completed
Autódromo completed

Full Dam Information

Details

Country: Brazil

Owner: Boa Fé Energética S.A.

Type: Gravity

Purpose(s): Hydropower

River: Carreiro

Reservoir capacity: 5 m3x106

Construction Dates

Start of Project: -/10

Start of RCC: -/10

End of RCC: -/11

End of Project: -/11

Specifications

Height: 26 metres

Length: 198 metres

Volume of RCC: 32 m3x103

Total volume: 58 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Boa Fé completed
Boa Fé completed

Full Dam Information

Details

Country: Turkey

Owner: DSI - State Hydraulic Works

Type: Gravity

Purpose(s): Hydropower / Water Supply

River: Hezil

Reservoir capacity: 29 m3x106

Construction Dates

Start of Project: 08/08

Start of RCC: 08/08

End of RCC: -/11

End of Project: 02/12

Specifications

Height: 89 metres

Length: 356 metres

Volume of RCC: 718 m3x103

Total volume: 752 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10RCC against precast concrete panels
Downstream
SlopeType
0.70RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.70Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
81
Pozzolan (kg/m3)Pozzolan Type
39No pozzolan used
  
Silopi on Google Earth
Silopi on Google Earth

Full Dam Information

Details

Country: Brazil

Owner: Energisa Geracão Rio Grande S/A

Type: Gravity

Purpose(s): Hydropower

River: Grande

Reservoir capacity: 17 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/11

End of Project: 02/12

Specifications

Height: 44 metres

Length: 285 metres

Volume of RCC: 81 m3x103

Total volume: 105 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Santo Antonio-RJ completed
Santo Antonio-RJ completed

Full Dam Information

Details

Country: Brazil

Owner: Santo Antônio Energia

Type: Gravity

Purpose(s): Hydropower

River: Madeira

Reservoir capacity: 2075 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/11

End of Project: 03/12

Specifications

Height: 25 metres

Length: 3100 metres

Volume of RCC: 560 m3x103

Total volume: 3086 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Santo Antonio-RO completed
Santo Antonio-RO completed

Full Dam Information

Details

Country: Brazil

Owner: Passos Maia Energética S.A. (Statkraft, Adami & Madeiras)

Type: Gravity

Purpose(s): Hydropower

River: Chapecó

Reservoir capacity: 14 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/11

End of Project: 09/12

Specifications

Height: 34 metres

Length: -

Volume of RCC: 66 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
72
Pozzolan (kg/m3)Pozzolan Type
18Natural pozzolan (ASTM Class N)
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Hubei Huaqing Power Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Loushui

Reservoir capacity: 52 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/11

End of Project: -/12

Specifications

Height: 74 metres

Length: 146 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Honghe Guangyuan Hydropwer and Madushan Development Co. Ltd.

Type: Gravity

Purpose(s): Hydropower / Navigation / Water Supply

River: Honghe

Reservoir capacity: 552 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/11

End of Project: -/12

Specifications

Height: 108 metres

Length: 353 metres

Volume of RCC: -

Total volume: 987 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Madushan completed
Madushan completed

Full Dam Information

Details

Country: China

Owner: Yunnan Jinsha River Hydropower Co. Ltd.

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation

River: Jinsha

Reservoir capacity: 885 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/11

End of Project: -/12

Specifications

Height: 138 metres

Length: 482 metres

Volume of RCC: -

Total volume: 2707 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
A’hai completed
A’hai completed

Full Dam Information

Details

Country: Turkey

Owner: Karen Energy

Type: Gravity

Purpose(s): Hydropower

River: Balkusan

Reservoir capacity: 15 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/11

End of Project: -/12

Specifications

Height: 48 metres

Length: 189 metres

Volume of RCC: 60 m3x103

Total volume: 76 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.75Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.75Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
3001200

Cementitious material

Cement (kg/m3)
75
Pozzolan (kg/m3)Pozzolan Type
50 
  
Balkusan on Google Earth
Balkusan on Google Earth

Full Dam Information

Details

Country: China

Owner: Yumen Hongyuan Industrial Company

Type: Gravity

Purpose(s): Hydropower

River: Sule

Reservoir capacity: -

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/11

End of Project: -/12

Specifications

Height: 64 metres

Length: 147 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Qingyanggou completed
Qingyanggou completed

Full Dam Information

Details

Country: China

Owner: Yunnan Baoshan Electric Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Longjiang

Reservoir capacity: 53 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/11

End of Project: -/12

Specifications

Height: 76 metres

Length: 239 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Dengke completed
Dengke completed

Full Dam Information

Details

Country: France

Owner: Electricité de France

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Rizzanese

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: 02/12

End of Project: -/12

Specifications

Height: 41 metres

Length: 140 metres

Volume of RCC: 64 m3x103

Total volume: 72 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against precast concrete panels with geomembrane
1.00RCC against precast concrete blocks
Downstream
SlopeType
Vertical 
0.80 
Spillway
SlopeType
0.80 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
  
Rizzanese completed
Rizzanese completed

Full Dam Information

Details

Country: Turkey

Owner: Enerjisa En. Ut. A.S.

Type: Gravity

Purpose(s): Hydropower

River: Göksu

Reservoir capacity: 98 m3x106

Construction Dates

Start of Project: 07/09

Start of RCC: 07/09

End of RCC: 04/12

End of Project: -/13

Specifications

Height: 109 metres

Length: 413 metres

Volume of RCC: 975 m3x103

Total volume: 1050 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.60Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
85
Pozzolan (kg/m3)Pozzolan Type
45Low-lime flyash (ASTM Class F)
  
Köprü completed
Köprü completed

Full Dam Information

Details

Country: Vietnam

Owner: Trung Nam Power Jointstock Company

Type: Gravity

Purpose(s): Hydropower

River: Dong Nai

Reservoir capacity: 281 m3x106

Construction Dates

Start of Project: 04/09

Start of RCC: 04/09

End of RCC: 05/12

End of Project: 03/13

Specifications

Height: 80 metres

Length: 429 metres

Volume of RCC: 786 m3x103

Total volume: 1025 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
 RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
80
90
Pozzolan (kg/m3)Pozzolan Type
120Natural pozzolan (ASTM Class N)
110 
Dong Nai 2 on Google Earth
Dong Nai 2 on Google Earth

Full Dam Information

Details

Country: Ghana

Owner: BPA (Bui Power Authority)

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Bui

Reservoir capacity: 12570 m3x106

Construction Dates

Start of Project: 10/07

Start of RCC: 10/07

End of RCC: 05/12

End of Project: 11/14

Specifications

Height: 108 metres

Length: 493 metres

Volume of RCC: 830 m3x103

Total volume: 900 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
0.75Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
45
61
Pozzolan (kg/m3)Pozzolan Type
85Low-lime flyash (ASTM Class F)
91 
Bui completed
Bui completed

Full Dam Information

Details

Country: Turkey

Owner: MEM Enerji Elektrik Üretim Sanayi ve Ticaret A.Ş

Type: Gravity

Purpose(s): Hydropower

River: Göksu

Reservoir capacity: 18 m3x106

Construction Dates

Start of Project: 02/10

Start of RCC: 02/10

End of RCC: 05/12

End of Project: 07/12

Specifications

Height: 69 metres

Length: 118 metres

Volume of RCC: 96 m3x103

Total volume: 122 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.067Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Reinforced conventional concrete cast before RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
55
Pozzolan (kg/m3)Pozzolan Type
55Low-lime flyash (ASTM Class F)
  
Gökkaya completed
Gökkaya completed

Full Dam Information

Details

Country: Vietnam

Owner: EVN (Electrictie de Vietnam)

Type: Gravity

Purpose(s): Hydropower

River: Nam Mu

Reservoir capacity: 2138 m3x106

Construction Dates

Start of Project: 01/06

Start of RCC: 01/06

End of RCC: 08/12

End of Project: 12/13

Specifications

Height: 130 metres

Length: 425 metres

Volume of RCC: 1600 m3x103

Total volume: 2 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
separate 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
160Low-lime flyash (ASTM Class F)
  
Ban Chat completed
Ban Chat completed

Full Dam Information

Details

Country: Turkey

Owner: MCK Elektrik Uretim A.S.

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Emet

Reservoir capacity: 6 m3x106

Construction Dates

Start of Project: 05/10

Start of RCC: 05/10

End of RCC: 09/12

End of Project: 01/13

Specifications

Height: 39 metres

Length: 313 metres

Volume of RCC: 180 m3x103

Total volume: 210 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork with external geomembrane
Downstream
SlopeType
0.75Traditional concrete against formwork
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
40Low-lime flyash (ASTM Class F)
  
Devecikonagi completed
Devecikonagi completed

Full Dam Information

Details

Country: Turkey

Owner: Akköy Energy A.S.

Type: Gravity

Purpose(s): Hydropower

River: Karaovacik

Reservoir capacity: 14 m3x106

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: 09/12

End of Project: -/13

Specifications

Height: 60 metres

Length: 260 metres

Volume of RCC: 226 m3x103

Total volume: 306 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
85
Pozzolan (kg/m3)Pozzolan Type
85Natural pozzolan (ASTM Class N)
  
Akköy II (Aladereçam) completed
Akköy II (Aladereçam) completed

Full Dam Information

Details

Country: Laos

Owner: Nam Ngum 5 Power Company Ltd. (15% Électricité du Laos - Generation Company Ltd., 85% Power)

Type: Thin Arch

Purpose(s): Hydropower

River: Nam Ting

Reservoir capacity: 314 m3x106

Construction Dates

Start of Project: 10/08

Start of RCC: 10/08

End of RCC: 12/12

End of Project: 12/12

Specifications

Height: 101 metres

Length: 235 metres

Volume of RCC: 298 m3x103

Total volume: 421 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Nam Ngum 5 completed
Nam Ngum 5 completed

Full Dam Information

Details

Country: Vietnam

Owner: Petro Vietnam

Type: Gravity

Purpose(s): Hydropower

River: Dak Drinh

Reservoir capacity: 249 m3x106

Construction Dates

Start of Project: 01/09

Start of RCC: 01/09

End of RCC: 12/12

End of Project: 12/13

Specifications

Height: 100 metres

Length: 466 metres

Volume of RCC: 788 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
 RCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
 RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
 Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
115Natural pozzolan (ASTM Class N)
  
Dak Drinh completed
Dak Drinh completed

Full Dam Information

Details

Country: Pakistan

Owner: WAPDA (Water and Power Development Authority) and CTGC (China Three Gorges Corp.)

Type: Gravity

Purpose(s): Hydropower

River: Duber Khwar

Reservoir capacity: -

Construction Dates

Start of Project: 06/03

Start of RCC: 06/03

End of RCC: -/12

End of Project: 01/14

Specifications

Height: 41 metres

Length: 202 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Duber Khwar completed
Duber Khwar completed

Full Dam Information

Details

Country: China

Owner: Yunnan Jinsha River Hydropower Co. Ltd.

Type: Gravity

Purpose(s): Flood Control / Hydropower / Navigation / Recreation / Water Supply

River: Jinsha

Reservoir capacity: 558 m3x106

Construction Dates

Start of Project: 08/07

Start of RCC: 08/07

End of RCC: -/12

End of Project: -/13

Specifications

Height: 119 metres

Length: 768 metres

Volume of RCC: 2840 m3x103

Total volume: 3853 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork
Downstream
SlopeType
0.75RCC against formwork
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
96
60
Pozzolan (kg/m3)Pozzolan Type
96Low-lime flyash (ASTM Class F)
90 
Longkaikou completed
Longkaikou completed

Full Dam Information

Details

Country: Pakistan

Owner: WAPDA (Water and Power Development Authority) and CTGC (China Three Gorges Corp.)

Type: Gravity

Purpose(s): Hydropower

River: Allai Khwar

Reservoir capacity: -

Construction Dates

Start of Project: 01/05

Start of RCC: 01/05

End of RCC: -/12

End of Project: 03/13

Specifications

Height: 51 metres

Length: 88 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Allai Khwar completed
Allai Khwar completed

Full Dam Information

Details

Country: China

Owner: Shankouyan Hydro Project Development Co.

Type: Thin Arch

Purpose(s): Hydropower

River: Yuanhe

Reservoir capacity: 105 m3x106

Construction Dates

Start of Project: 11/07

Start of RCC: 11/07

End of RCC: -/12

End of Project: -/13

Specifications

Height: 99 metres

Length: 268 metres

Volume of RCC: -

Total volume: 272 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Shankouyan completed
Shankouyan completed

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: -

Reservoir capacity: -

Construction Dates

Start of Project: -/10

Start of RCC: -/10

End of RCC: -/12

End of Project: -/12

Specifications

Height: 16 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Gabon

Owner: Ministries of Mining, Energy, Oil and Water Resources

Type: Gravity

Purpose(s): Hydropower

River: Ogooué

Reservoir capacity: -

Construction Dates

Start of Project: 11/08

Start of RCC: 11/08

End of RCC: -/12

End of Project: 08/13

Specifications

Height: 37 metres

Length: 300 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
105
96
Pozzolan (kg/m3)Pozzolan Type
70Low-lime flyash (ASTM Class F)
64 
Grand Poubara completed
Grand Poubara completed

Full Dam Information

Details

Country: China

Owner: Wujiang Hydroelectric Development Corporation

Type: Gravity

Purpose(s): Flood Control / Hydropower / Navigation

River: Wu

Reservoir capacity: 910 m3x106

Construction Dates

Start of Project: 05/06

Start of RCC: 05/06

End of RCC: -/12

End of Project: -/13

Specifications

Height: 101 metres

Length: 631 metres

Volume of RCC: 1510 m3x103

Total volume: 1980 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
0.15 
Downstream
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
0.75RCC against formwork

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Shatuo completed
Shatuo completed

Full Dam Information

Details

Country: China

Owner: Guizhou Water-investment Hydropower Development Co., Ltd

Type: Thin Arch

Purpose(s): Hydropower

River: Masha

Reservoir capacity: 61 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/12

End of Project: -/13

Specifications

Height: 81 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Yalong River Hydropower Development Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Yalong

Reservoir capacity: 760 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/12

End of Project: -/13

Specifications

Height: 168 metres

Length: 516 metres

Volume of RCC: 2970 m3x103

Total volume: 3020 m3x103

Construction Methods

Facings

Upstream
SlopeType
Vertical 
0.30 
Downstream
SlopeType
  
Spillway
SlopeType
0.70 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
72
Pozzolan (kg/m3)Pozzolan Type
88Low-lime flyash (ASTM Class F)
  
Guandi completed
Guandi completed

Full Dam Information

Details

Country: China

Owner: Ximeng Fubian Hydropower Development Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Nankang

Reservoir capacity: 31 m3x106

Construction Dates

Start of Project: -/10

Start of RCC: -/10

End of RCC: -/12

End of Project: -/12

Specifications

Height: 68 metres

Length: 179 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Nankanghe Nº2 on Google Earth
Nankanghe Nº2 on Google Earth

Full Dam Information

Details

Country: Brazil

Owner: CTG Brasil

Type: Gravity

Purpose(s): Hydropower

River: Sapucai

Reservoir capacity: 18 m3x106

Construction Dates

Start of Project: -/10

Start of RCC: -/10

End of RCC: -/12

End of Project: 07/13

Specifications

Height: 15 metres

Length: 482 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Retiro completed
Retiro completed

Full Dam Information

Details

Country: Brazil

Owner: Rio Canoas Energia S.A.

Type: Gravity

Purpose(s): Hydropower

River: Canoas

Reservoir capacity: 296 m3x106

Construction Dates

Start of Project: -/10

Start of RCC: -/10

End of RCC: -/12

End of Project: 09/13

Specifications

Height: 42 metres

Length: 517 metres

Volume of RCC: 264 m3x103

Total volume: 382 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Garibaldi completed
Garibaldi completed

Full Dam Information

Details

Country: Turkey

Owner: DSI - State Hydraulic Works

Type: Hardfill

Purpose(s): Hydropower

River: Kizilirmak

Reservoir capacity: 41 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/12

End of Project: -/13

Specifications

Height: 42 metres

Length: 251 metres

Volume of RCC: 160 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: DSI - State Hydraulic Works

Type: Gravity

Purpose(s): Hydropower

River: Robozik

Reservoir capacity: 44 m3x106

Construction Dates

Start of Project: 09/08

Start of RCC: 09/08

End of RCC: -/12

End of Project: -/13

Specifications

Height: 39 metres

Length: 173 metres

Volume of RCC: 60 m3x103

Total volume: 64 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
3001200

Cementitious material

Cement (kg/m3)
77
Pozzolan (kg/m3)Pozzolan Type
63Natural pozzolan (ASTM Class N)
  
Çetintepe on Google Earth
Çetintepe on Google Earth

Full Dam Information

Details

Country: Brazil

Owner: CJ Hydro - Geraçao de Energia S.A

Type: Gravity

Purpose(s): Hydropower

River: Turvo

Reservoir capacity: 6 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/12

End of Project: -/13

Specifications

Height: 22 metres

Length: 237 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Toca do Tigre completed
Toca do Tigre completed

Full Dam Information

Details

Country: Brazil

Owner: Centrais Hidrelétricas Grapon S/A

Type: Gravity

Purpose(s): Hydropower

River: Pomba

Reservoir capacity: 17 m3x106

Construction Dates

Start of Project: -/10

Start of RCC: -/10

End of RCC: -/12

End of Project: -/13

Specifications

Height: 32 metres

Length: 273 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Ivan Botelho I (fomerly Antiga Ponte) on Google Earth
Ivan Botelho I (fomerly Antiga Ponte) on Google Earth

Full Dam Information

Details

Country: Vietnam

Owner: FPT Corporation

Type: Gravity

Purpose(s): Hydropower

River: Bo

Reservoir capacity: 821 m3x106

Construction Dates

Start of Project: -/10

Start of RCC: -/10

End of RCC: -/12

End of Project: -/13

Specifications

Height: 83 metres

Length: -

Volume of RCC: 260 m3x103

Total volume: 400 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
100Natural pozzolan (ASTM Class N)
  
Huong Dien completed
Huong Dien completed

Full Dam Information

Details

Country: Brazil

Owner: Pezzi Energética S.A.

Type: Gravity

Purpose(s): Hydropower

River: das Antas

Reservoir capacity: 24 m3x106

Construction Dates

Start of Project: -/11

Start of RCC: -/11

End of RCC: -/12

End of Project: -/13

Specifications

Height: 42 metres

Length: 238 metres

Volume of RCC: 44 m3x103

Total volume: 80 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
76
Pozzolan (kg/m3)Pozzolan Type
19Natural pozzolan (ASTM Class N)
  
Pezzi completed
Pezzi completed

Full Dam Information

Details

Country: Brazil

Owner: Serra dos Cavalinhos II Energética S.A.

Type: Gravity

Purpose(s): Hydropower

River: das Antas

Reservoir capacity: 8 m3x106

Construction Dates

Start of Project: -/11

Start of RCC: -/11

End of RCC: -/12

End of Project: -/13

Specifications

Height: 42 metres

Length: 123 metres

Volume of RCC: 33 m3x103

Total volume: 80 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
72
Pozzolan (kg/m3)Pozzolan Type
18Natural pozzolan (ASTM Class N)
  
Serra dos Cavalinhos II completed
Serra dos Cavalinhos II completed

Full Dam Information

Details

Country: Malaysia

Owner: SEB (Sarawak Energy Bhd)

Type: Gravity

Purpose(s): Hydropower

River: Murum

Reservoir capacity: 12043 m3x106

Construction Dates

Start of Project: 10/08

Start of RCC: 10/08

End of RCC: 07/13

End of Project: -/15

Specifications

Height: 146 metres

Length: 440 metres

Volume of RCC: 1520 m3x103

Total volume: 1660 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
0.20RCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.70RCC against formwork  [stepped face]
0.80 
Spillway
SlopeType
0.70 
0.80 

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
88
65
Pozzolan (kg/m3)Pozzolan Type
88Low-lime flyash (ASTM Class F)
72 
Murum completed
Murum completed

Full Dam Information

Details

Country: USA

Owner: American Municipal Partners (AMP)

Type: Hardfill

Purpose(s): Hydropower

River: Ohio

Reservoir capacity: -

Construction Dates

Start of Project: 05/09

Start of RCC: 05/09

End of RCC: 08/13

End of Project: 09/16

Specifications

Height: 35 metres

Length: 158 metres

Volume of RCC: 113 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
0.80RCC against precast concrete blocks
Downstream
SlopeType
0.80RCC against precast concrete blocks
Spillway
SlopeType
separate 

Placement

Layers (mm)Lifts (mm)
230230

Cementitious material

Cement (kg/m3)
118
Pozzolan (kg/m3)Pozzolan Type
64Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: USA

Owner: American Municipal Partners (AMP)

Type: Hardfill

Purpose(s): Hydropower

River: Ohio

Reservoir capacity: -

Construction Dates

Start of Project: 04/11

Start of RCC: 04/11

End of RCC: 12/13

End of Project: 04/16

Specifications

Height: 28 metres

Length: 84 metres

Volume of RCC: 56 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
0.80RCC against precast concrete blocks
Downstream
SlopeType
0.80RCC against precast concrete blocks
Spillway
SlopeType
separate 

Placement

Layers (mm)Lifts (mm)
230230

Cementitious material

Cement (kg/m3)
116
Pozzolan (kg/m3)Pozzolan Type
62Low-lime flyash (ASTM Class F)
  
Captain Meldahl on Google Earth
Captain Meldahl on Google Earth

Full Dam Information

Details

Country: Myanmar

Owner: Department of Hydroelectric Power - Ministry of Electric Power

Type: Gravity

Purpose(s): Hydropower

River: Paung Laung

Reservoir capacity: 1285 m3x106

Construction Dates

Start of Project: 01/06

Start of RCC: 01/06

End of RCC: 12/13

End of Project: -/14

Specifications

Height: 103 metres

Length: 537 metres

Volume of RCC: 936 m3x103

Total volume: 1100 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
140Natural pozzolan (ASTM Class N)
  
Upper Paung Laung completed
Upper Paung Laung completed

Full Dam Information

Details

Country: China

Owner: Department of Water Resources, Xinjiang Province

Type: Gravity

Purpose(s): Flood Control / Hydropower / Water Supply

River: E’erqisi

Reservoir capacity: 2419 m3x106

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/13

End of Project: -/14

Specifications

Height: 122 metres

Length: 1489 metres

Volume of RCC: 2520 m3x103

Total volume: 2890 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
0.75 
Spillway
SlopeType
0.75 

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Kalashuke completed
Kalashuke completed

Full Dam Information

Details

Country: China

Owner: Guizhou Qianyuan Power Company

Type: Gravity

Purpose(s): Hydropower

River: Beipan

Reservoir capacity: 137 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/13

End of Project: -/14

Specifications

Height: 109 metres

Length: 250 metres

Volume of RCC: -

Total volume: 591 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Mamaya Nº1 completed
Mamaya Nº1 completed

Full Dam Information

Details

Country: China

Owner: Luntan Hydraulic Engineering Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Yangcunshui

Reservoir capacity: 180 m3x106

Construction Dates

Start of Project: 12/08

Start of RCC: 12/08

End of RCC: -/13

End of Project: -/14

Specifications

Height: 90 metres

Length: 218 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Brazil

Owner: CERTEL

Type: Gravity

Purpose(s): Hydropower

River: Forqueta

Reservoir capacity: -

Construction Dates

Start of Project: -/11

Start of RCC: -/11

End of RCC: -/13

End of Project: -/13

Specifications

Height: 23 metres

Length: 190 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Chile

Owner: Colbún SA

Type: Gravity

Purpose(s): Hydropower

River: BioBio

Reservoir capacity: -

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/13

End of Project: -/14

Specifications

Height: 63 metres

Length: 125 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Angostura completed
Angostura completed

Full Dam Information

Details

Country: China

Owner: China Huadian Corporation

Type: Thin Arch

Purpose(s): Hydropower / Water Supply

River: Muli

Reservoir capacity: 190 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/13

End of Project: -/14

Specifications

Height: 132 metres

Length: 211 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Lizhou completed
Lizhou completed

Full Dam Information

Details

Country: China

Owner: Guizhou Qianyuan Power Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Beipan

Reservoir capacity: 85 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/13

End of Project: -/15

Specifications

Height: 119 metres

Length: 205 metres

Volume of RCC: 199 m3x103

Total volume: 267 m3x103

Construction Methods

Facings

Upstream
SlopeType
curveRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
curveRCC against formwork
Spillway
SlopeType
ogeeRCC against formwork

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Shannipo completed
Shannipo completed

Full Dam Information

Details

Country: Brazil

Owner: Eletrosul Centrais Elétricas SA

Type: Gravity

Purpose(s): Hydropower

River: Caveiras

Reservoir capacity: 23 m3x106

Construction Dates

Start of Project: -/12

Start of RCC: -/12

End of RCC: -/13

End of Project: 11/13

Specifications

Height: 29 metres

Length: 170 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
João Borges completed
João Borges completed

Full Dam Information

Details

Country: China

Owner: HydroChina Co.

Type: Gravity

Purpose(s): Flood Control / Hydropower

River: Furong

Reservoir capacity: 57 m3x106

Construction Dates

Start of Project: 10/11

Start of RCC: 10/11

End of RCC: -/13

End of Project: -/13

Specifications

Height: 59 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Shaqian completed
Shaqian completed

Full Dam Information

Details

Country: Brazil

Owner: Eletrosul Centrais Elétricas S/A

Type: Gravity

Purpose(s): Hydropower / Water Supply

River: Braço do Norte

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: -/12

Start of RCC: -/12

End of RCC: -/13

End of Project: -/13

Specifications

Height: 25 metres

Length: 117 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Barra do Rio Chapéu completed
Barra do Rio Chapéu completed

Full Dam Information

Details

Country: Peru

Owner: Empresa de Generacion Huanza

Type: Gravity

Purpose(s): Hydropower

River: Pallca

Reservoir capacity: -

Construction Dates

Start of Project: -/10

Start of RCC: -/10

End of RCC: -/13

End of Project: -/14

Specifications

Height: 38 metres

Length: -

Volume of RCC: 85 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Huanza completed
Huanza completed

Full Dam Information

Details

Country: China

Owner: Chengde Shuangfengsi Project Bureau

Type: Gravity

Purpose(s): Hydropower

River: Luanhe

Reservoir capacity: 137 m3x106

Construction Dates

Start of Project: -/11

Start of RCC: -/11

End of RCC: -/13

End of Project: -/14

Specifications

Height: 50 metres

Length: 535 metres

Volume of RCC: -

Total volume: 550 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Cambodia

Owner: Ministry of Mines and Energy

Type: Gravity

Purpose(s): Hydropower

River: Russei Chrum

Reservoir capacity: 62 m3x106

Construction Dates

Start of Project: -/11

Start of RCC: -/11

End of RCC: -/13

End of Project: -/14

Specifications

Height: 59 metres

Length: 325 metres

Volume of RCC: 170 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Lower Russei Chrum completed
Lower Russei Chrum completed

Full Dam Information

Details

Country: China

Owner: Guodian Haikong Hongling water construction Co. Ltd.

Type: Gravity

Purpose(s): Hydropower / Irrigation / Water Supply

River: Dabian

Reservoir capacity: 662 m3x106

Construction Dates

Start of Project: -/11

Start of RCC: -/11

End of RCC: -/13

End of Project: -/14

Specifications

Height: 92 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Nei Mongol (Inner Mongolia) Electricity Corporation

Type: Gravity

Purpose(s): Hydropower

River: Halasxinegou

Reservoir capacity: 7 m3x106

Construction Dates

Start of Project: -/12

Start of RCC: -/12

End of RCC: -/13

End of Project: -/14

Specifications

Height: 58 metres

Length: 308 metres

Volume of RCC: 205 m3x103

Total volume: 717 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Huhehaote (Hohhot) PSS - Downstream lower dam under construction
Huhehaote (Hohhot) PSS - Downstream lower dam under construction

Full Dam Information

Details

Country: Panama

Owner: Fountain Hydro Power Corp.

Type: Gravity

Purpose(s): Hydropower

River: Chiriqui Viejo

Reservoir capacity: -

Construction Dates

Start of Project: -/12

Start of RCC: -/12

End of RCC: -/13

End of Project: -/14

Specifications

Height: 56 metres

Length: 406 metres

Volume of RCC: 87 m3x103

Total volume: 272 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: DSI - State Hydraulic Works

Type: Gravity

Purpose(s): Hydropower / Irrigation / Water Supply

River: Bembo

Reservoir capacity: 11 m3x106

Construction Dates

Start of Project: 09/08

Start of RCC: 09/08

End of RCC: 02/14

End of Project: 11/14

Specifications

Height: 69 metres

Length: 210 metres

Volume of RCC: 162 m3x103

Total volume: 202 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
3001200

Cementitious material

Cement (kg/m3)
100
Pozzolan (kg/m3)Pozzolan Type
80Natural pozzolan (ASTM Class N)
  
Aslandag completed
Aslandag completed

Full Dam Information

Details

Country: Turkey

Owner: Kalehan Energy Üretim ve Ticaret A.S.

Type: Hardfill

Purpose(s): Hydropower

River: Murat

Reservoir capacity: 369 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: 03/14

End of Project: 03/15

Specifications

Height: 97 metres

Length: 361 metres

Volume of RCC: 1480 m3x103

Total volume: 1661 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.70RCC against precast concrete panels
Downstream
SlopeType
0.70RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
40Milled sand
  
Photo coming soon

Full Dam Information

Details

Country: Vietnam

Owner: EVN (Electrictie de Vietnam)

Type: Gravity

Purpose(s): Hydropower

River: Vu Gia

Reservoir capacity: 511 m3x106

Construction Dates

Start of Project: 09/10

Start of RCC: 09/10

End of RCC: 04/14

End of Project: 01/15

Specifications

Height: 114 metres

Length: 345 metres

Volume of RCC: 963 m3x103

Total volume: 1170 m3x103

Construction Methods

Facings

Upstream
SlopeType
Vertical 
0.40 
Downstream
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
80
60
Pozzolan (kg/m3)Pozzolan Type
120Natural pozzolan (ASTM Class N)  &
140Low-lime flyash (ASTM Class F)
Song Bung 4 completed
Song Bung 4 completed

Full Dam Information

Details

Country: USA

Owner: American Municipal Partners (AMP)

Type: Hardfill

Purpose(s): Hydropower

River: Ohio

Reservoir capacity: -

Construction Dates

Start of Project: 12/11

Start of RCC: 12/11

End of RCC: 04/14

End of Project: 02/16

Specifications

Height: 20 metres

Length: 66 metres

Volume of RCC: 49 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
0.80RCC against precast concrete blocks
Downstream
SlopeType
0.80RCC against precast concrete blocks
Spillway
SlopeType
separate 

Placement

Layers (mm)Lifts (mm)
230230

Cementitious material

Cement (kg/m3)
116
Pozzolan (kg/m3)Pozzolan Type
62Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Datang Huarui Investment Group Ltd.

Type: Gravity

Purpose(s): Flood Control / Hydropower / Navigation / Recreation

River: Jinsha

Reservoir capacity: 2263 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: 05/14

End of Project: -/16

Specifications

Height: 159 metres

Length: 1250 metres

Volume of RCC: 6473 m3x103

Total volume: 9364 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
0.10 
Downstream
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300 

Cementitious material

Cement (kg/m3)
53
Pozzolan (kg/m3)Pozzolan Type
99Low-lime flyash (ASTM Class F)
  
Guanyinyan completed
Guanyinyan completed

Full Dam Information

Details

Country: Japan

Owner: Ministry of Land, Infrastructure, Transport and Tourism

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation

River: Iwaki

Reservoir capacity: 141 m3x106

Construction Dates

Start of Project: 10/08

Start of RCC: 10/08

End of RCC: 08/14

End of Project: 03/16

Specifications

Height: 97 metres

Length: 342 metres

Volume of RCC: 500 m3x103

Total volume: 717 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
1.00Traditional concrete against formwork
Downstream
SlopeType
0.74Traditional concrete against formwork
Spillway
SlopeType
0.74Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
2501000

Cementitious material

Cement (kg/m3)
91
Pozzolan (kg/m3)Pozzolan Type
39Low-lime flyash (ASTM Class F)
  
Tsugaru completed
Tsugaru completed

Full Dam Information

Details

Country: Panama

Owner: Hidroécología Teribe (HET) S.A.

Type: Gravity

Purpose(s): Hydropower

River: Bonyic

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/11

Start of RCC: -/11

End of RCC: 08/14

End of Project: -/15

Specifications

Height: 37 metres

Length: 165 metres

Volume of RCC: -

Total volume: 88 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Bonyic completed
Bonyic completed

Full Dam Information

Details

Country: USA

Owner: American Municipal Partners (AMP)

Type: Hardfill

Purpose(s): Hydropower

River: Ohio

Reservoir capacity: -

Construction Dates

Start of Project: 12/11

Start of RCC: 12/11

End of RCC: 10/14

End of Project: 07/17

Specifications

Height: 33 metres

Length: 153 metres

Volume of RCC: 120 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
0.80RCC against precast concrete blocks
Downstream
SlopeType
0.80RCC against precast concrete blocks
Spillway
SlopeType
separate 

Placement

Layers (mm)Lifts (mm)
230230

Cementitious material

Cement (kg/m3)
118
Pozzolan (kg/m3)Pozzolan Type
64Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: Darenhes A.S.

Type: Hardfill

Purpose(s): Hydropower

River: PeriSuyu

Reservoir capacity: 358 m3x106

Construction Dates

Start of Project: 11/10

Start of RCC: 11/10

End of RCC: 10/14

End of Project: -/15

Specifications

Height: 88 metres

Length: 500 metres

Volume of RCC: 760 m3x103

Total volume: 838 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.70RCC against formwork (GEVR/GE-RCC)  [stepped face]
Downstream
SlopeType
0.70RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.70Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
3001200

Cementitious material

Cement (kg/m3)
120
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: China Three Gorges Corporation

Type: Gravity

Purpose(s): Hydropower

River: Jinsha

Reservoir capacity: 52 m3x106

Construction Dates

Start of Project: -/06

Start of RCC: -/06

End of RCC: -/14

End of Project: -/16

Specifications

Height: 162 metres

Length: 909 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Xiangjiaba completed
Xiangjiaba completed

Full Dam Information

Details

Country: China

Owner: Yalongjiang Valley Hydropower Development

Type: Gravity

Purpose(s): Hydropower

River: Yalong

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/14

End of Project: -/16

Specifications

Height: 71 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Tongzilin completed
Tongzilin completed

Full Dam Information

Details

Country: China

Owner: Yunnan Huadian Hydropower Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Jingsha

Reservoir capacity: 1718 m3x106

Construction Dates

Start of Project: 01/07

Start of RCC: 01/07

End of RCC: -/14

End of Project: -/15

Specifications

Height: 140 metres

Length: 622 metres

Volume of RCC: -

Total volume: 1920 m3x103

Construction Methods

Facings

Upstream
SlopeType
Vertical 
0.20 
Downstream
SlopeType
0.75 
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Ludila completed
Ludila completed

Full Dam Information

Details

Country: Turkey

Owner: Akköy Energy A.S.

Type: Gravity

Purpose(s): Hydropower

River: Gevne

Reservoir capacity: 109 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/14

End of Project: -/15

Specifications

Height: 113 metres

Length: 300 metres

Volume of RCC: 490 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Chapecó

Reservoir capacity: -

Construction Dates

Start of Project: -/12

Start of RCC: -/12

End of RCC: -/14

End of Project: -/14

Specifications

Height: 20 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Rondinha completed
Rondinha completed

Full Dam Information

Details

Country: Turkey

Owner: Pelin Energy

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Kura

Reservoir capacity: 148 m3x106

Construction Dates

Start of Project: 01/10

Start of RCC: 01/10

End of RCC: -/14

End of Project: 02/15

Specifications

Height: 159 metres

Length: 230 metres

Volume of RCC: 637 m3x103

Total volume: 780 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
 300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): Hydropower

River: Hanshuinanhe

Reservoir capacity: 10 m3x106

Construction Dates

Start of Project: -/10

Start of RCC: -/10

End of RCC: -/14

End of Project: -/15

Specifications

Height: 98 metres

Length: -

Volume of RCC: -

Total volume: 205 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Ecuador

Owner: CELEC (Corporatión Eléctrica del Ecuador)

Type: Gravity

Purpose(s): Hydropower

River: Mauduriacu

Reservoir capacity: 10 m3x106

Construction Dates

Start of Project: 12/11

Start of RCC: 12/11

End of RCC: -/14

End of Project: 03/15

Specifications

Height: 61 metres

Length: 245 metres

Volume of RCC: 114 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
0.25 
Downstream
SlopeType
0.75 
Spillway
SlopeType
0.75 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Natural pozzolan (ASTM Class N)
  
Manduriacu completed
Manduriacu completed

Full Dam Information

Details

Country: Turkey

Owner: DSI - State Hydraulic Works

Type: Hardfill

Purpose(s): Hydropower / Irrigation / Water Supply

River: Zamanti

Reservoir capacity: 195 m3x106

Construction Dates

Start of Project: -/11

Start of RCC: -/11

End of RCC: -/14

End of Project: 06/15

Specifications

Height: 37 metres

Length: 842 metres

Volume of RCC: 1890 m3x103

Total volume: 1943 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.70RCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.76RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.76Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
3001200

Cementitious material

Cement (kg/m3)
84
Pozzolan (kg/m3)Pozzolan Type
36Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: DSI - State Hydraulic Works

Type: Gravity

Purpose(s): Hydropower

River: Ortasu

Reservoir capacity: 20 m3x106

Construction Dates

Start of Project: 09/08

Start of RCC: 09/08

End of RCC: -/14

End of Project: -/15

Specifications

Height: 53 metres

Length: 431 metres

Volume of RCC: 392 m3x103

Total volume: 460 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300600

Cementitious material

Cement (kg/m3)
100
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
  
Oguzlar on Google Earth
Oguzlar on Google Earth

Full Dam Information

Details

Country: Turkey

Owner: DSI - State Hydraulic Works

Type: Gravity

Purpose(s): Hydropower

River: Robozik

Reservoir capacity: 13 m3x106

Construction Dates

Start of Project: 09/08

Start of RCC: 09/08

End of RCC: -/14

End of Project: -/15

Specifications

Height: 66 metres

Length: 165 metres

Volume of RCC: 131 m3x103

Total volume: 138 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
3001200

Cementitious material

Cement (kg/m3)
77
Pozzolan (kg/m3)Pozzolan Type
63Natural pozzolan (ASTM Class N)
  
Musatepe on Google Earth
Musatepe on Google Earth

Full Dam Information

Details

Country: China

Owner: Xian Water Affair Group

Type: Thin Arch

Purpose(s): Hydropower

River: Bahe

Reservoir capacity: 53 m3x106

Construction Dates

Start of Project: -/11

Start of RCC: -/11

End of RCC: -/14

End of Project: -/15

Specifications

Height: 99 metres

Length: 352 metres

Volume of RCC: 370 m3x103

Total volume: 478 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Helong Electricity Corporation

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Recreation / Water Supply

River: Hailanhe

Reservoir capacity: 21 m3x106

Construction Dates

Start of Project: -/12

Start of RCC: -/12

End of RCC: -/14

End of Project: -/15

Specifications

Height: 41 metres

Length: 271 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.73RCC against precast concrete blocks
Spillway
SlopeType
conduit 

Placement

Layers (mm)Lifts (mm)
3002000

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
100Low-lime flyash (ASTM Class F)
  
Songyue (2nd Stage) on Google Earth
Songyue (2nd Stage) on Google Earth

Full Dam Information

Details

Country: Turkey

Owner: Derin Enerji Uretim San. Ve Tic. A.S.

Type: Gravity

Purpose(s): Hydropower

River: Kökün

Reservoir capacity: 5 m3x106

Construction Dates

Start of Project: -/12

Start of RCC: -/12

End of RCC: -/14

End of Project: -/15

Specifications

Height: 45 metres

Length: 162 metres

Volume of RCC: 400 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Karakuz completed
Karakuz completed

Full Dam Information

Details

Country: Turkey

Owner: Peker Energy Inc

Type: Gravity

Purpose(s): Hydropower

River: Büyük Menderes

Reservoir capacity: 15 m3x106

Construction Dates

Start of Project: -/12

Start of RCC: -/12

End of RCC: -/14

End of Project: -/15

Specifications

Height: 61 metres

Length: 145 metres

Volume of RCC: 150 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: Ozdogan Enerji

Type: Gravity

Purpose(s): Hydropower

River: Oltu

Reservoir capacity: 308 m3x106

Construction Dates

Start of Project: 04/11

Start of RCC: 04/11

End of RCC: 02/15

End of Project: 10/15

Specifications

Height: 177 metres

Length: 405 metres

Volume of RCC: 1650 m3x103

Total volume: 1900 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.75Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
50
100
Pozzolan (kg/m3)Pozzolan Type
110Low-lime flyash (ASTM Class F)
120 
Ayvali completed
Ayvali completed

Full Dam Information

Details

Country: Turkey

Owner: Bereket Energy

Type: Hardfill

Purpose(s): Hydropower

River: Zamanti

Reservoir capacity: 109 m3x106

Construction Dates

Start of Project: 04/11

Start of RCC: 04/11

End of RCC: 03/15

End of Project: -/16

Specifications

Height: 133 metres

Length: 200 metres

Volume of RCC: 749 m3x103

Total volume: 900 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.30Traditional concrete against formwork
1.00Traditional concrete against formwork
Downstream
SlopeType
0.60Traditional concrete against formwork
1.00Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.75Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
50
Pozzolan (kg/m3)Pozzolan Type
50Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: EBD En. Ür. ve Tic. A.S.

Type: Arch-Gravity

Purpose(s): Hydropower

River: Kura

Reservoir capacity: 20 m3x106

Construction Dates

Start of Project: 10/12

Start of RCC: 10/12

End of RCC: 04/15

End of Project: 11/15

Specifications

Height: 70 metres

Length: 250 metres

Volume of RCC: 248 m3x103

Total volume: 252 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.15RCC against formwork
Downstream
SlopeType
0.70RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.70Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
85
Pozzolan (kg/m3)Pozzolan Type
130Natural pozzolan (ASTM Class N)
  
Kotanli II completed
Kotanli II completed

Full Dam Information

Details

Country: Vietnam

Owner: EVN (Electrictie de Vietnam)

Type: Gravity

Purpose(s): Hydropower

River: Song Da (Black River)

Reservoir capacity: 1215 m3x106

Construction Dates

Start of Project: 06/10

Start of RCC: 06/10

End of RCC: 05/15

End of Project: 07/17

Specifications

Height: 131 metres

Length: 620 metres

Volume of RCC: 1884 m3x103

Total volume: 2500 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.75Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
160Low-lime flyash (ASTM Class F)
  
Lai Chau completed
Lai Chau completed

Full Dam Information

Details

Country: India

Owner: NHPC Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Teesta

Reservoir capacity: 37 m3x106

Construction Dates

Start of Project: 05/06

Start of RCC: 05/06

End of RCC: 05/15

End of Project: 08/16

Specifications

Height: 45 metres

Length: 196 metres

Volume of RCC: 167 m3x103

Total volume: 170 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.40RCC against formwork (GEVR/GE-RCC)  [stepped face]
Downstream
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
separate 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
85
Pozzolan (kg/m3)Pozzolan Type
135Low-lime flyash (ASTM Class F)
  
Teesta low dam (Stage IV) completed
Teesta low dam (Stage IV) completed

Full Dam Information

Details

Country: Peru

Owner: IC Power

Type: Gravity

Purpose(s): Hydropower

River: Mantaro

Reservoir capacity: 37 m3x106

Construction Dates

Start of Project: 11/12

Start of RCC: 11/12

End of RCC: 06/15

End of Project: -/16

Specifications

Height: 89 metres

Length: 270 metres

Volume of RCC: 250 m3x103

Total volume: 450 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.75Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.75Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300600

Cementitious material

Cement (kg/m3)
115
Pozzolan (kg/m3)Pozzolan Type
23 
  
Cerro del Águila completed
Cerro del Águila completed

Full Dam Information

Details

Country: Laos

Owner: Xekaman Power Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Xe Kaman

Reservoir capacity: 3120 m3x106

Construction Dates

Start of Project: 03/12

Start of RCC: 03/12

End of RCC: 07/15

End of Project: 12/16

Specifications

Height: 120 metres

Length: 335 metres

Volume of RCC: 870 m3x103

Total volume: 1065 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)  [stepped face]
Downstream
SlopeType
 RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
 Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
70
Pozzolan (kg/m3)Pozzolan Type
130Low-lime flyash (ASTM Class F)
  
Xekaman 1 completed
Xekaman 1 completed

Full Dam Information

Details

Country: Malaysia

Owner: Tenaga Nasional Berhad (TNB)

Type: Gravity

Purpose(s): Hydropower

River: Bertam, Telom and Lemoi

Reservoir capacity: 18 m3x106

Construction Dates

Start of Project: 03/11

Start of RCC: 03/11

End of RCC: 09/15

End of Project: 07/16

Specifications

Height: 90 metres

Length: 513 metres

Volume of RCC: 731 m3x103

Total volume: 747 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork with external geomembrane (GEVR/GE-RCC)
Downstream
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.80Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
4002400

Cementitious material

Cement (kg/m3)
100
95
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
0 
Ulu Jelai/Susu completed
Ulu Jelai/Susu completed

Full Dam Information

Details

Country: Ethiopia

Owner: Ethiopian Electric Power (EEP)

Type: Gravity

Purpose(s): Hydropower

River: Omo

Reservoir capacity: 14690 m3x106

Construction Dates

Start of Project: 04/08

Start of RCC: 04/08

End of RCC: 10/15

End of Project: -/16

Specifications

Height: 246 metres

Length: 630 metres

Volume of RCC: 6200 m3x103

Total volume: 6400 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.25RCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
1.00RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
1.00RCC against formwork (GEVR/GE-RCC)  [stepped face]

Placement

Layers (mm)Lifts (mm)
400400

Cementitious material

Cement (kg/m3)
70  to
Pozzolan (kg/m3)Pozzolan Type
45  toGround-granulated blast-furnace slag
  
Gibe III completed
Gibe III completed

Full Dam Information

Details

Country: China

Owner: China Power International Development

Type: Gravity

Purpose(s): Hydropower

River: Yuan

Reservoir capacity: 1384 m3x106

Construction Dates

Start of Project: -/10

Start of RCC: -/10

End of RCC: -/15

End of Project: -/16

Specifications

Height: 82 metres

Length: 649 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: Aksa Energy Production Trade and Industry Co. Inc.

Type: Gravity

Purpose(s): Hydropower

River: Göksu

Reservoir capacity: 63 m3x106

Construction Dates

Start of Project: 01/07

Start of RCC: 01/07

End of RCC: -/15

End of Project: -/17

Specifications

Height: 70 metres

Length: 235 metres

Volume of RCC: 232 m3x103

Total volume: 260 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.07RCC against precast concrete panels with geomembrane
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
separate 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
50  toLow-lime flyash (ASTM Class F)
  
Burç on Google Earth
Burç on Google Earth

Full Dam Information

Details

Country: Laos

Owner: EDL (Electricite du Laos)

Type: Gravity

Purpose(s): Hydropower

River: Nam Ou

Reservoir capacity: 335 m3x106

Construction Dates

Start of Project: -/11

Start of RCC: -/11

End of RCC: -/15

End of Project: 05/16

Specifications

Height: 74 metres

Length: 445 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Nam Ou 5 completed
Nam Ou 5 completed

Full Dam Information

Details

Country: Brazil

Owner: ANEEL (Agência Nacional de Energia Elétrica)

Type: Gravity

Purpose(s): Hydropower

River: Teles Pires

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 07/11

Start of RCC: 07/11

End of RCC: -/15

End of Project: 09/16

Specifications

Height: 67 metres

Length: 360 metres

Volume of RCC: 500 m3x103

Total volume: 1020 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Teles Pires under construction
Teles Pires under construction

Full Dam Information

Details

Country: China

Owner: Huaneng Guoduo Hydropower Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Zha Qu

Reservoir capacity: 80 m3x106

Construction Dates

Start of Project: -/12

Start of RCC: -/12

End of RCC: -/15

End of Project: -/16

Specifications

Height: 83 metres

Length: 236 metres

Volume of RCC: -

Total volume: 550 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Guoduo completed
Guoduo completed

Full Dam Information

Details

Country: Turkey

Owner: Değirmenüstü Energy

Type: Gravity

Purpose(s): Hydropower

River: Köprüçay

Reservoir capacity: 43 m3x106

Construction Dates

Start of Project: -/12

Start of RCC: -/12

End of RCC: -/15

End of Project: -/16

Specifications

Height: 90 metres

Length: 235 metres

Volume of RCC: 330 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Brazil

Owner: CPFL Renovaveis

Type: Hardfill

Purpose(s): Hydropower

River: Preto

Reservoir capacity: 38 m3x106

Construction Dates

Start of Project: -/14

Start of RCC: -/14

End of RCC: -/15

End of Project: 04/16

Specifications

Height: 30 metres

Length: 180 metres

Volume of RCC: 45 m3x103

Total volume: 65 m3x103

Construction Methods

Facings

Upstream
SlopeType
1.25 
Downstream
SlopeType
1.25 
Spillway
SlopeType
1.25 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Mata Velha under construction
Mata Velha under construction

Full Dam Information

Details

Country: Laos

Owner: EDL (Electricite du Laos)

Type: Gravity

Purpose(s): Flood Control / Hydropower / Water Supply

River: Nam Khan

Reservoir capacity: 249 m3x106

Construction Dates

Start of Project: 12/12

Start of RCC: 12/12

End of RCC: -/15

End of Project: 06/16

Specifications

Height: 67 metres

Length: 154 metres

Volume of RCC: 125 m3x103

Total volume: 145 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Brazil

Owner: ENEL Green Power Fazenda S.A.

Type: Gravity

Purpose(s): Hydropower

River: dos Apiacás

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: -/12

Start of RCC: -/12

End of RCC: -/15

End of Project: 09/16

Specifications

Height: 21 metres

Length: 503 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Fazenda completed
Fazenda completed

Full Dam Information

Details

Country: Brazil

Owner: ENEL Green Power Salto Apiacás S.A

Type: Gravity

Purpose(s): Hydropower

River: dos Apiacás

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: -/12

Start of RCC: -/12

End of RCC: -/15

End of Project: -/16

Specifications

Height: 17 metres

Length: 486 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Salto Apiacás completed
Salto Apiacás completed

Full Dam Information

Details

Country: Panama

Owner: Corporacion de Energia del Istmo Ltd. S.A.

Type: Gravity

Purpose(s): Hydropower

River: San Pablo

Reservoir capacity: 39 m3x106

Construction Dates

Start of Project: -/13

Start of RCC: -/13

End of RCC: -/15

End of Project: -/16

Specifications

Height: 41 metres

Length: 371 metres

Volume of RCC: 77 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.85RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.85Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
  
Las Cruces (formerly San Bartolo) completed
Las Cruces (formerly San Bartolo) completed

Full Dam Information

Details

Country: China

Owner: Yunxi Shuishimen Reservoir Bureau

Type: Thin Arch

Purpose(s): Flood Control / Hydropower / Water Supply

River: Tianhe

Reservoir capacity: 37 m3x106

Construction Dates

Start of Project: -/13

Start of RCC: -/13

End of RCC: -/15

End of Project: -/16

Specifications

Height: 86 metres

Length: -

Volume of RCC: -

Total volume: 150 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Guangdong Yuedian Group Co., Ltd

Type: Thin Arch

Purpose(s): Hydropower

River: Nanpeng

Reservoir capacity: 170 m3x106

Construction Dates

Start of Project: -/13

Start of RCC: -/13

End of RCC: -/15

End of Project: -/16

Specifications

Height: 99 metres

Length: 300 metres

Volume of RCC: -

Total volume: 210 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Dayakou on Google Earth
Dayakou on Google Earth

Full Dam Information

Details

Country: Brazil

Owner: Itamarati Norte S.A.

Type: Gravity

Purpose(s): Hydropower

River: Jubinha

Reservoir capacity: 480 m3x106

Construction Dates

Start of Project: -/15

Start of RCC: -/15

End of RCC: -/15

End of Project: -/15

Specifications

Height: 21 metres

Length: 1540 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Brazil

Owner: Itamarati Norte S.A.

Type: Gravity

Purpose(s): Hydropower

River: Juba

Reservoir capacity: 7 m3x106

Construction Dates

Start of Project: -/15

Start of RCC: -/15

End of RCC: -/15

End of Project: -/15

Specifications

Height: 26 metres

Length: 570 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Pakistan

Owner: Neelum Jhelum Hydropower Company

Type: Gravity

Purpose(s): Hydropower

River: Neelum

Reservoir capacity: 8 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: 08/16

End of Project: 11/17

Specifications

Height: 47 metres

Length: 125 metres

Volume of RCC: -

Total volume: 156 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
154
Pozzolan (kg/m3)Pozzolan Type
51Ground-granulated blast-furnace slag
  
Neelum-Jhelum under construction
Neelum-Jhelum under construction

Full Dam Information

Details

Country: Vietnam

Owner: EVN (Electrictie de Vietnam)

Type: Gravity

Purpose(s): Flood Control / Hydropower

River: Ma

Reservoir capacity: 349 m3x106

Construction Dates

Start of Project: 11/12

Start of RCC: 11/12

End of RCC: 08/16

End of Project: 02/17

Specifications

Height: 88 metres

Length: 498 metres

Volume of RCC: 770 m3x103

Total volume: 1140 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
0.35RCC against formwork (GEVR/GE-RCC)  [stepped face]
Downstream
SlopeType
0.65RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.65Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
60
70
Pozzolan (kg/m3)Pozzolan Type
140Natural pozzolan (ASTM Class N)
150 
Trung Son under construction
Trung Son under construction

Full Dam Information

Details

Country: Turkey

Owner: Kalehan Energy Üretim ve Ticaret A.S.

Type: Gravity

Purpose(s): Hydropower

River: Murat

Reservoir capacity: 784 m3x106

Construction Dates

Start of Project: 06/12

Start of RCC: 06/12

End of RCC: 09/16

End of Project: 04/18

Specifications

Height: 150 metres

Length: 516 metres

Volume of RCC: 2224 m3x103

Total volume: 2414 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.25RCC against precast concrete panels
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
40Milled sand
  
Yukari (Upper) Kaleköy under construction
Yukari (Upper) Kaleköy under construction

Full Dam Information

Details

Country: Turkey

Owner: Limak Energy

Type: Gravity

Purpose(s): Hydropower

River: Sakarya

Reservoir capacity: 50 m3x106

Construction Dates

Start of Project: -/11

Start of RCC: -/11

End of RCC: 12/16

End of Project: 06/17

Specifications

Height: 95 metres

Length: 270 metres

Volume of RCC: 535 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: DSI - State Hydraulic Works

Type: Gravity

Purpose(s): Hydropower

River: Ortasu

Reservoir capacity: 17 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/16

End of Project: -/18

Specifications

Height: 77 metres

Length: 431 metres

Volume of RCC: 800 m3x103

Total volume: 887 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
95
Pozzolan (kg/m3)Pozzolan Type
45Natural pozzolan (ASTM Class N)
  
Photo coming soon

Full Dam Information

Details

Country: Vietnam

Owner: Vinacomin

Type: Gravity

Purpose(s): Hydropower

River: Dong Nai

Reservoir capacity: -

Construction Dates

Start of Project: -/10

Start of RCC: -/10

End of RCC: -/16

End of Project: -/18

Specifications

Height: 72 metres

Length: 471 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Dong Nai 5 completed
Dong Nai 5 completed

Full Dam Information

Details

Country: Turkey

Owner: DSI - State Hydraulic Works

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Gökırmak

Reservoir capacity: 66 m3x106

Construction Dates

Start of Project: -/99

Start of RCC: -/99

End of RCC: -/16

End of Project: -/17

Specifications

Height: 73 metres

Length: 280 metres

Volume of RCC: 330 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.90Traditional concrete against formwork
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300 

Cementitious material

Cement (kg/m3)
75
Pozzolan (kg/m3)Pozzolan Type
50Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: DSI - State Hydraulic Works

Type: Gravity

Purpose(s): Hydropower

River: Bembo

Reservoir capacity: 8 m3x106

Construction Dates

Start of Project: 09/08

Start of RCC: 09/08

End of RCC: -/16

End of Project: -/17

Specifications

Height: 78 metres

Length: 176 metres

Volume of RCC: 186 m3x103

Total volume: 209 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
3001200

Cementitious material

Cement (kg/m3)
100
Pozzolan (kg/m3)Pozzolan Type
80Natural pozzolan (ASTM Class N)
  
Beyyurdu under construction
Beyyurdu under construction

Full Dam Information

Details

Country: China

Owner: Guilin Dayu Water Conservancy, Infrastructure, Construction and Investment Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Xiaorong

Reservoir capacity: 163 m3x106

Construction Dates

Start of Project: -/10

Start of RCC: -/10

End of RCC: -/16

End of Project: -/17

Specifications

Height: 90 metres

Length: 255 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Xiaorongjiang completed
Xiaorongjiang completed

Full Dam Information

Details

Country: Brazil

Owner: Norte Energia S.A.

Type: Gravity

Purpose(s): Hydropower

River: Xingu

Reservoir capacity: 5 m3x106

Construction Dates

Start of Project: -/11

Start of RCC: -/11

End of RCC: -/16

End of Project: -/20

Specifications

Height: 74 metres

Length: 680 metres

Volume of RCC: 63 m3x103

Total volume: 2208 m3x103

Construction Methods

Facings

Upstream
SlopeType
Vertical 
Downstream
SlopeType
1.20 
Spillway
SlopeType
separate 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Belo Monte completed
Belo Monte completed

Full Dam Information

Details

Country: China

Owner: Xiamen Water Resources Bureau

Type: Gravity

Purpose(s): Hydropower

River: Lianhuaxi

Reservoir capacity: 33 m3x106

Construction Dates

Start of Project: -/10

Start of RCC: -/10

End of RCC: -/16

End of Project: -/17

Specifications

Height: 30 metres

Length: 333 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Lianhua on Google Earth
Lianhua on Google Earth

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Jialingjiang

Reservoir capacity: 11 m3x106

Construction Dates

Start of Project: -/12

Start of RCC: -/12

End of RCC: -/16

End of Project: -/17

Specifications

Height: 51 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Nujiang

Reservoir capacity: 1288 m3x106

Construction Dates

Start of Project: -/12

Start of RCC: -/12

End of RCC: -/16

End of Project: -/18

Specifications

Height: 165 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Costa Rica

Owner: ICE (Instituto Costarricense de Electricidad - Costa Rican Institute of Electricity)

Type: Gravity

Purpose(s): Hydropower

River: Tárcoles

Reservoir capacity: 450 m3x106

Construction Dates

Start of Project: -/11

Start of RCC: -/11

End of RCC: -/16

End of Project: -/17

Specifications

Height: 48 metres

Length: 130 metres

Volume of RCC: 180 m3x103

Total volume: 200 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.20 
Downstream
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.75 

Placement

Layers (mm)Lifts (mm)
3002500

Cementitious material

Cement (kg/m3)
95
Pozzolan (kg/m3)Pozzolan Type
96Natural pozzolan (ASTM Class N)
  
Photo coming soon

Full Dam Information

Details

Country: DR Congo

Owner: SNEL

Type: Gravity

Purpose(s): Hydropower

River: -

Reservoir capacity: -

Construction Dates

Start of Project: 05/12

Start of RCC: 05/12

End of RCC: -/16

End of Project: -/17

Specifications

Height: 20 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Zongo II under construction
Zongo II under construction

Full Dam Information

Details

Country: Brazil

Owner: Serra dos Cavalinhos I Energética S.A.

Type: -

Purpose(s): Hydropower

River: das Antas

Reservoir capacity: 12 m3x106

Construction Dates

Start of Project: -/13

Start of RCC: -/13

End of RCC: -/16

End of Project: -/17

Specifications

Height: 30 metres

Length: 204 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower / Irrigation / Water Supply

River: Qiduxi

Reservoir capacity: 24 m3x106

Construction Dates

Start of Project: -/14

Start of RCC: -/14

End of RCC: -/16

End of Project: -/17

Specifications

Height: 54 metres

Length: 246 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Dangjiahe

Reservoir capacity: 14 m3x106

Construction Dates

Start of Project: -/14

Start of RCC: -/14

End of RCC: -/16

End of Project: -/17

Specifications

Height: 68 metres

Length: 176 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Datang Investment Group Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Furong (Pangu)

Reservoir capacity: 90 m3x106

Construction Dates

Start of Project: -/14

Start of RCC: -/14

End of RCC: -/16

End of Project: -/17

Specifications

Height: 85 metres

Length: 211 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Haokou on Google Earth
Haokou on Google Earth

Full Dam Information

Details

Country: China

Owner: SPIC Guizhou Jinyuan Hydroelectirc Powerplant

Type: Thin Arch

Purpose(s): Hydropower

River: Niulan

Reservoir capacity: 263 m3x106

Construction Dates

Start of Project: -/14

Start of RCC: -/14

End of RCC: -/16

End of Project: -/17

Specifications

Height: 136 metres

Length: 459 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Xiangbiling on Google Earth
Xiangbiling on Google Earth

Full Dam Information

Details

Country: DR Congo

Owner: RandGold

Type: Hardfill

Purpose(s): Hydropower

River: Kibali

Reservoir capacity: 6 m3x106

Construction Dates

Start of Project: 11/14

Start of RCC: 11/14

End of RCC: -/16

End of Project: -/17

Specifications

Height: 21 metres

Length: 255 metres

Volume of RCC: 33 m3x103

Total volume: 40 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.75RCC against formwork with external geomembrane (GEVR/GE-RCC)  [stepped face]
Downstream
SlopeType
0.75Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
100
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: EBD Enerji Üretim. ve Tic. A.S.

Type: Arch-Gravity

Purpose(s): Hydropower

River: Kura

Reservoir capacity: 73 m3x106

Construction Dates

Start of Project: 03/15

Start of RCC: 03/15

End of RCC: 02/17

End of Project: 04/17

Specifications

Height: 100 metres

Length: 404 metres

Volume of RCC: 640 m3x103

Total volume: 680 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.60RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.60Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
85
Pozzolan (kg/m3)Pozzolan Type
130Natural pozzolan (ASTM Class N)
  
Köroglu Kotanli 1 under construction
Köroglu Kotanli 1 under construction

Full Dam Information

Details

Country: Honduras

Owner: ENEE (Empresa Nacional de Energia Eléctrica)

Type: Gravity

Purpose(s): Hydropower

River: Patuca

Reservoir capacity: 208 m3x106

Construction Dates

Start of Project: -/12

Start of RCC: -/12

End of RCC: 02/17

End of Project: 12/20

Specifications

Height: 54 metres

Length: 160 metres

Volume of RCC: 120 m3x103

Total volume: 160 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.20Traditional concrete against formwork
Downstream
SlopeType
0.75Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.75Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
107
Pozzolan (kg/m3)Pozzolan Type
57Natural pozzolan (ASTM Class N)
  
Patuca 3 completed
Patuca 3 completed

Full Dam Information

Details

Country: Angola

Owner: Ministry of Energy and Water/GAMEK

Type: Gravity

Purpose(s): Hydropower

River: Kwanza

Reservoir capacity: 5482 m3x106

Construction Dates

Start of Project: 07/12

Start of RCC: 07/12

End of RCC: 03/17

End of Project: 06/18

Specifications

Height: 132 metres

Length: 1075 metres

Volume of RCC: 2646 m3x103

Total volume: 2766 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.10 
Downstream
SlopeType
0.85Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.85Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
  
Laúca completed
Laúca completed

Full Dam Information

Details

Country: Albania

Owner: Diteko Sh.p.k

Type: Gravity

Purpose(s): Flood Control / Hydropower

River: Okshtuni

Reservoir capacity: 7 m3x106

Construction Dates

Start of Project: 08/15

Start of RCC: 08/15

End of RCC: 10/17

End of Project: 02/18

Specifications

Height: 65 metres

Length: 253 metres

Volume of RCC: 141 m3x103

Total volume: 194 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalReinforced conventional concrete cast after RCC placement
0.15 
Downstream
SlopeType
0.90Reinforced conventional concrete cast after RCC placement  [stepped face]
Spillway
SlopeType
0.90Reinforced conventional concrete cast after RCC placement  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
115
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
  
Okshtuni under construction
Okshtuni under construction

Full Dam Information

Details

Country: China

Owner: China Datang Corporation

Type: Thin Arch

Purpose(s): Hydropower

River: Gexiang

Reservoir capacity: 279 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/17

End of Project: -/18

Specifications

Height: 168 metres

Length: 413 metres

Volume of RCC: 760 m3x103

Total volume: 1020 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
66
Pozzolan (kg/m3)Pozzolan Type
100Low-lime flyash (ASTM Class F)
  
Wanjiakouzi completed
Wanjiakouzi completed

Full Dam Information

Details

Country: Sri Lanka

Owner: Ministry of Irrigation and Water Resources Management

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Mathatilla Oya

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/11

Start of RCC: -/11

End of RCC: -/17

End of Project: -/18

Specifications

Height: 50 metres

Length: 165 metres

Volume of RCC: 40 m3x103

Total volume: 50 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
 Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
 Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
95
Pozzolan (kg/m3)Pozzolan Type
95Low-lime flyash (ASTM Class F)
  
Dyraaba (part of Uma Oya Project) completed
Dyraaba (part of Uma Oya Project) completed

Full Dam Information

Details

Country: Ecuador

Owner: Celec Ererjubones Cp

Type: Gravity

Purpose(s): Hydropower

River: Jubones

Reservoir capacity: 14 m3x106

Construction Dates

Start of Project: -/12

Start of RCC: -/12

End of RCC: -/17

End of Project: 08/18

Specifications

Height: 78 metres

Length: 209 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Minas San Francisco completed
Minas San Francisco completed

Full Dam Information

Details

Country: China

Owner: Huaneng Lancang River Hydropower Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Lancang (Mekong)

Reservoir capacity: 272 m3x106

Construction Dates

Start of Project: 06/10

Start of RCC: 06/10

End of RCC: -/17

End of Project: -/18

Specifications

Height: 138 metres

Length: 247 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Wunonglong completed
Wunonglong completed

Full Dam Information

Details

Country: Brazil

Owner: Companhia Energetica Sinop-CES

Type: Gravity

Purpose(s): Hydropower

River: Teles Pires

Reservoir capacity: -

Construction Dates

Start of Project: -/14

Start of RCC: -/14

End of RCC: -/17

End of Project: -/19

Specifications

Height: 17 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: Enerji S.A.

Type: Gravity

Purpose(s): Hydropower

River: Buyuk Cay

Reservoir capacity: -

Construction Dates

Start of Project: -/13

Start of RCC: -/13

End of RCC: -/17

End of Project: -/18

Specifications

Height: 150 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Brazil

Owner: PCH Senhora do Porto S.A

Type: Gravity

Purpose(s): Hydropower

River: Guanhães

Reservoir capacity: 5 m3x106

Construction Dates

Start of Project: -/14

Start of RCC: -/14

End of RCC: -/17

End of Project: -/18

Specifications

Height: 41 metres

Length: 167 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Senhora do Porto completed
Senhora do Porto completed

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower / Irrigation / Water Supply

River: Ximihe

Reservoir capacity: 17 m3x106

Construction Dates

Start of Project: -/14

Start of RCC: -/14

End of RCC: -/17

End of Project: -/18

Specifications

Height: 88 metres

Length: 147 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Ximihe on Google Earth
Ximihe on Google Earth

Full Dam Information

Details

Country: Nicaragua

Owner: Hidroelectlea Piedra Puntuda and Energia Tropical Sostearble Cerro Frio S.A.

Type: Gravity

Purpose(s): Hydropower

River: Río Mico

Reservoir capacity: -

Construction Dates

Start of Project: -/15

Start of RCC: -/15

End of RCC: -/17

End of Project: -/18

Specifications

Height: 23 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
0.70Traditional concrete against precast concrete panels
1.00Traditional concrete against precast concrete panels
Downstream
SlopeType
0.70Traditional concrete against formwork  [stepped face]
1.00Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.70Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Muling Fendou Reservoir Construction office

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Mulenghe

Reservoir capacity: 191 m3x106

Construction Dates

Start of Project: -/15

Start of RCC: -/15

End of RCC: -/17

End of Project: -/18

Specifications

Height: 46 metres

Length: 406 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Dashahe

Reservoir capacity: 196 m3x106

Construction Dates

Start of Project: -/15

Start of RCC: -/15

End of RCC: -/17

End of Project: -/18

Specifications

Height: 74 metres

Length: 296 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): Hydropower / Irrigation / Water Supply

River: Mabie

Reservoir capacity: 99 m3x106

Construction Dates

Start of Project: -/15

Start of RCC: -/15

End of RCC: -/17

End of Project: -/18

Specifications

Height: 108 metres

Length: 182 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Yunnan Huaneng Lancang River Hydropower Co.,Ltd.

Type: Gravity

Purpose(s): Hydropower / Irrigation / Recreation

River: Lancang (Mekong)

Reservoir capacity: 1613 m3x106

Construction Dates

Start of Project: 01/10

Start of RCC: 01/10

End of RCC: 04/18

End of Project: 06/19

Specifications

Height: 203 metres

Length: 464 metres

Volume of RCC: 2753 m3x103

Total volume: 3670 m3x103

Construction Methods

Facings

Upstream
SlopeType
 RCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
 RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
 Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
82
67
Pozzolan (kg/m3)Pozzolan Type
100Low-lime flyash (ASTM Class F)
100 
Huangdeng completed
Huangdeng completed

Full Dam Information

Details

Country: Laos

Owner: Nam Ngiep 1 Power Company

Type: Gravity

Purpose(s): Hydropower

River: Nam Ngiep

Reservoir capacity: 1192 m3x106

Construction Dates

Start of Project: 09/14

Start of RCC: 09/14

End of RCC: 04/18

End of Project: 08/19

Specifications

Height: 167 metres

Length: 540 metres

Volume of RCC: 2288 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
 RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
 Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
3002400  -
 3600

Cementitious material

Cement (kg/m3)
80
60
Pozzolan (kg/m3)Pozzolan Type
120Low-lime flyash (ASTM Class F)
70 
Nam Ngiep 1 completed
Nam Ngiep 1 completed

Full Dam Information

Details

Country: Canada

Owner: NALCOR

Type: Gravity

Purpose(s): Hydropower

River: Churchill

Reservoir capacity: -

Construction Dates

Start of Project: 08/15

Start of RCC: 08/15

End of RCC: 09/18

End of Project: 07/19

Specifications

Height: 39 metres

Length: 450 metres

Volume of RCC: 208 m3x103

Total volume: 243 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
3003000  &
 1500

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
140Low-lime flyash (ASTM Class F)
  
Muskrat Falls North Dam completed
Muskrat Falls North Dam completed

Full Dam Information

Details

Country: Laos

Owner: XPCL (Xayaburi Power Company Ltd.)

Type: Gravity

Purpose(s): Hydropower

River: Mekong

Reservoir capacity: -

Construction Dates

Start of Project: 03/12

Start of RCC: 03/12

End of RCC: 12/18

End of Project: 10/19

Specifications

Height: 40 metres

Length: 109 metres

Volume of RCC: 82 m3x103

Total volume: 85 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
 Mechanically compacted unformed face of RCC
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
100Low-lime flyash (ASTM Class F)
  
Xayaburi (Left bank closure section) under construction
Xayaburi (Left bank closure section) under construction

Full Dam Information

Details

Country: China

Owner: Huaneng Lancang River Hydropower Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Lancang (Mekong)

Reservoir capacity: 262 m3x106

Construction Dates

Start of Project: -/10

Start of RCC: -/10

End of RCC: -/18

End of Project: -/19

Specifications

Height: 107 metres

Length: 232 metres

Volume of RCC: -

Total volume: 112 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Dahuaqiao completed
Dahuaqiao completed

Full Dam Information

Details

Country: Sri Lanka

Owner: Ministry of Irrigation and Water Resources Management

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Dulgolla Oya

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/11

Start of RCC: -/11

End of RCC: -/18

End of Project: -/19

Specifications

Height: 35 metres

Length: 174 metres

Volume of RCC: 30 m3x103

Total volume: 40 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
 Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
 Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
95
Pozzolan (kg/m3)Pozzolan Type
95Low-lime flyash (ASTM Class F)
  
Puhulpola (part of Uma Oya Project) under construction
Puhulpola (part of Uma Oya Project) under construction

Full Dam Information

Details

Country: China

Owner: Huaneng Lancang River Hydropower Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Lancang (Mekong)

Reservoir capacity: 75 m3x106

Construction Dates

Start of Project: -/10

Start of RCC: -/10

End of RCC: -/18

End of Project: -/19

Specifications

Height: 75 metres

Length: 346 metres

Volume of RCC: -

Total volume: 1100 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Lidi completed
Lidi completed

Full Dam Information

Details

Country: Brazil

Owner: São Roque Energética S.A.

Type: Gravity

Purpose(s): Hydropower

River: Canoas

Reservoir capacity: -

Construction Dates

Start of Project: -/12

Start of RCC: -/12

End of RCC: -/18

End of Project: -/19

Specifications

Height: 68 metres

Length: 151 metres

Volume of RCC: 100 m3x103

Total volume: 583 m3x103

Construction Methods

Facings

Upstream
SlopeType
Vertical 
Downstream
SlopeType
0.75 
Spillway
SlopeType
0.75   [stepped face]

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
São Roque on Google Earth
São Roque on Google Earth

Full Dam Information

Details

Country: Turkey

Owner: DSI - State Hydraulic Works

Type: Gravity

Purpose(s): Hydropower

River: Ortasu

Reservoir capacity: 6 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/18

End of Project: -/20

Specifications

Height: 51 metres

Length: 188 metres

Volume of RCC: 144 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.70RCC against formwork (GEVR/GE-RCC)

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
95
Pozzolan (kg/m3)Pozzolan Type
45Natural pozzolan (ASTM Class N)
  
Balli completed
Balli completed

Full Dam Information

Details

Country: China

Owner: China Power Investment Corporation

Type: Thin Arch

Purpose(s): Hydropower

River: Qingshuihe

Reservoir capacity: 13 m3x106

Construction Dates

Start of Project: -/14

Start of RCC: -/14

End of RCC: -/18

End of Project: -/19

Specifications

Height: 75 metres

Length: 166 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Maojiahe completed
Maojiahe completed

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Changlehe

Reservoir capacity: 133 m3x106

Construction Dates

Start of Project: -/15

Start of RCC: -/15

End of RCC: -/18

End of Project: -/19

Specifications

Height: 101 metres

Length: 355 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Pakistan

Owner: WAPDA (Water and Power Development Authority) and MIRA Power Ltd. (a subsidiary of KOSEP)

Type: Gravity

Purpose(s): Hydropower

River: Poonch

Reservoir capacity: 22 m3x106

Construction Dates

Start of Project: 09/14

Start of RCC: 09/14

End of RCC: -/18

End of Project: 02/20

Specifications

Height: 35 metres

Length: 238 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Guangxi Datengxia Gorge Water Conservancy Development Co. .Ltd.

Type: Gravity

Purpose(s): Flood Control / Hydropower / Navigation / Water Supply

River: Xijiang

Reservoir capacity: 3479 m3x106

Construction Dates

Start of Project: -/14

Start of RCC: -/14

End of RCC: -/18

End of Project: 07/20

Specifications

Height: 80 metres

Length: -

Volume of RCC: -

Total volume: 7100 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Datengxia completed
Datengxia completed

Full Dam Information

Details

Country: Laos

Owner: Don Sahong Power Company (Mega First Corporation Berhad and Électricité du Laos)

Type: Gravity

Purpose(s): Hydropower

River: Mekong

Reservoir capacity: 24 m3x106

Construction Dates

Start of Project: 10/15

Start of RCC: 10/15

End of RCC: -/18

End of Project: 12/19

Specifications

Height: 26 metres

Length: 6800 metres

Volume of RCC: 566 m3x103

Total volume: 609 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.30Traditional concrete against formwork
Downstream
SlopeType
0.75Traditional concrete against formwork
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
3002400

Cementitious material

Cement (kg/m3)
55
Pozzolan (kg/m3)Pozzolan Type
103Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: Brazil

Owner: Quevedos Energética S.A

Type: Gravity

Purpose(s): Hydropower

River: Toropi

Reservoir capacity: 3 m3x106

Construction Dates

Start of Project: -/15

Start of RCC: -/15

End of RCC: -/18

End of Project: -/19

Specifications

Height: 23 metres

Length: 206 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Quebra Dentes completed
Quebra Dentes completed

Full Dam Information

Details

Country: Brazil

Owner: PCH Jacaré S.A.

Type: Gravity

Purpose(s): Hydropower

River: Guanhães

Reservoir capacity: 14 m3x106

Construction Dates

Start of Project: -/15

Start of RCC: -/15

End of RCC: -/18

End of Project: -/19

Specifications

Height: 33 metres

Length: 121 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Jacaré completed
Jacaré completed

Full Dam Information

Details

Country: China

Owner: Zhuangli reservoir construction and management office

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Shizihe

Reservoir capacity: 133 m3x106

Construction Dates

Start of Project: -/15

Start of RCC: -/15

End of RCC: -/18

End of Project: -/19

Specifications

Height: 44 metres

Length: 49 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: Aksa Energy Production Trade and Industry Co. Inc.

Type: Gravity

Purpose(s): Hydropower

River: Göksu

Reservoir capacity: 27 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/18

End of Project: -/19

Specifications

Height: 47 metres

Length: 153 metres

Volume of RCC: 49 m3x103

Total volume: 68 m3x103

Construction Methods

Facings

Upstream
SlopeType
 Slip-formed/extruded facing elements
Downstream
SlopeType
 Slip-formed/extruded facing elements
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
65
Pozzolan (kg/m3)Pozzolan Type
50Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: Brazil

Owner: Cemig Geração e Transmissão SA and Itaocara Energia Ltda

Type: Gravity

Purpose(s): Hydropower

River: Paraiba do Sul

Reservoir capacity: 1700 m3x106

Construction Dates

Start of Project: 01/16

Start of RCC: 01/16

End of RCC: -/18

End of Project: -/19

Specifications

Height: 50 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: DSI - State Hydraulic Works

Type: Gravity

Purpose(s): Hydropower / Irrigation / Water Supply

River: Melen

Reservoir capacity: 693 m3x106

Construction Dates

Start of Project: -/13

Start of RCC: -/13

End of RCC: 03/19

End of Project: -/25

Specifications

Height: 124 metres

Length: 944 metres

Volume of RCC: 1871 m3x103

Total volume: 2096 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.15RCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.70RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.70RCC against formwork (GEVR/GE-RCC)

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
60Low-lime flyash (ASTM Class F)
  
Melen under construction
Melen under construction

Full Dam Information

Details

Country: Japan

Owner: Ministry of Land, Infrastructure, Transport and Tourism

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Navigation / Water Supply

River: Agatsuma

Reservoir capacity: 108 m3x106

Construction Dates

Start of Project: 08/14

Start of RCC: 08/14

End of RCC: 05/19

End of Project: 10/19

Specifications

Height: 116 metres

Length: 291 metres

Volume of RCC: 575 m3x103

Total volume: 911 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.15Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.08Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
2501000

Cementitious material

Cement (kg/m3)
91
Pozzolan (kg/m3)Pozzolan Type
39Low-lime flyash (ASTM Class F)
  
Yamba under construction
Yamba under construction

Full Dam Information

Details

Country: Brazil

Owner: PCH Águas do Rio Irani Energética SPE Ltda.

Type: Gravity

Purpose(s): Hydropower

River: Irani

Reservoir capacity: 11 m3x106

Construction Dates

Start of Project: -/17

Start of RCC: -/17

End of RCC: 07/19

End of Project: -/20

Specifications

Height: 34 metres

Length: 235 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Barra das Águas completed
Barra das Águas completed

Full Dam Information

Details

Country: Laos

Owner: Xe-Pian Xe Namnoy Power Company

Type: Gravity

Purpose(s): Hydropower

River: Xepian

Reservoir capacity: 1043 m3x106

Construction Dates

Start of Project: 10/18

Start of RCC: 10/18

End of RCC: 10/19

End of Project: -/19

Specifications

Height: 56 metres

Length: 430 metres

Volume of RCC: 170 m3x103

Total volume: 200 m3x103

Construction Methods

Facings

Upstream
SlopeType
Vertical 
Downstream
SlopeType
    [stepped face]
Spillway
SlopeType
none 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: Japan

Owner: Ministry of Land, Infrastructure, Transport and Tourism

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Navigation / Water Supply

River: Nukapira

Reservoir capacity: 46 m3x106

Construction Dates

Start of Project: -/73

Start of RCC: -/73

End of RCC: -/19

End of Project: -/21

Specifications

Height: 57 metres

Length: 600 metres

Volume of RCC: -

Total volume: 180 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.78Traditional concrete against formwork
Spillway
SlopeType
0.78Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Biratori on Google Earth
Biratori on Google Earth

Full Dam Information

Details

Country: Afghanistan

Owner: Ministry of Energy and Water

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Shakardar

Reservoir capacity: 10 m3x106

Construction Dates

Start of Project: -/12

Start of RCC: -/12

End of RCC: -/19

End of Project: 04/21

Specifications

Height: 78 metres

Length: 303 metres

Volume of RCC: 270 m3x103

Total volume: 337 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.20 
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
105
Pozzolan (kg/m3)Pozzolan Type
45Natural pozzolan (ASTM Class N)
  
Shah wa Arüs on Google Earth
Shah wa Arüs on Google Earth

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower / Irrigation / Water Supply

River: Sanchahe

Reservoir capacity: 1089 m3x106

Construction Dates

Start of Project: -/13

Start of RCC: -/13

End of RCC: -/19

End of Project: -/21

Specifications

Height: 163 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Pingzhai on Google Earth
Pingzhai on Google Earth

Full Dam Information

Details

Country: Costa Rica

Owner: Hidrotárcoles

Type: Gravity

Purpose(s): Hydropower

River: Tárcoles

Reservoir capacity: 7 m3x106

Construction Dates

Start of Project: -/15

Start of RCC: -/15

End of RCC: -/19

End of Project: -/20

Specifications

Height: 49 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Capulin San Pablo under construction
Capulin San Pablo under construction

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: -

Reservoir capacity: 346 m3x106

Construction Dates

Start of Project: -/15

Start of RCC: -/15

End of RCC: -/19

End of Project: -/20

Specifications

Height: 60 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Youjiang

Reservoir capacity: 536 m3x106

Construction Dates

Start of Project: -/15

Start of RCC: -/15

End of RCC: -/19

End of Project: -/20

Specifications

Height: 105 metres

Length: 365 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Wacun completed
Wacun completed

Full Dam Information

Details

Country: Tunisia

Owner: Ministère de l’Agriculture

Type: Hardfill

Purpose(s): Hydropower / Irrigation

River: Oued Mellègue

Reservoir capacity: 195 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/19

End of Project: -/20

Specifications

Height: 68 metres

Length: 430 metres

Volume of RCC: 500 m3x103

Total volume: 560 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.60 
Downstream
SlopeType
0.60 
Spillway
SlopeType
0.60 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Yalong River Hydropower Development Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Hongdu

Reservoir capacity: 100 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/19

End of Project: -/20

Specifications

Height: 121 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Gaosheng on Google Earth
Gaosheng on Google Earth

Full Dam Information

Details

Country: China

Owner: China Yangzi River Three Gorges Group

Type: Gravity

Purpose(s): Hydropower

River: Jinsha (Yangtze)

Reservoir capacity: 7400 m3x106

Construction Dates

Start of Project: 04/18

Start of RCC: 04/18

End of RCC: -/19

End of Project: 06/19

Specifications

Height: 96 metres

Length: 163 metres

Volume of RCC: 466 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Wudongde secondary dam on Google Earth
Wudongde secondary dam on Google Earth

Full Dam Information

Details

Country: Brazil

Owner: Pesqueiro Energia S/A

Type: Gravity

Purpose(s): Hydropower

River: Jaguariaiva

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/18

Start of RCC: -/18

End of RCC: -/19

End of Project: -/20

Specifications

Height: 16 metres

Length: 217 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Macacos completed
Macacos completed

Full Dam Information

Details

Country: Turkey

Owner: DSI - State Hydraulic Works

Type: Hardfill

Purpose(s): Hydropower

River: Botan

Reservoir capacity: 614 m3x106

Construction Dates

Start of Project: -/12

Start of RCC: -/12

End of RCC: 01/20

End of Project: 03/20

Specifications

Height: 165 metres

Length: 492 metres

Volume of RCC: 4741 m3x103

Total volume: 4800 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.70Traditional concrete against formwork
Downstream
SlopeType
0.70Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.70Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
  
Photo coming soon

Full Dam Information

Details

Country: Zambia

Owner: Kafue Gorge Lower Power Development Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Kafue

Reservoir capacity: 83 m3x106

Construction Dates

Start of Project: 01/16

Start of RCC: 01/16

End of RCC: 04/20

End of Project: -/20

Specifications

Height: 131 metres

Length: 375 metres

Volume of RCC: 1290 m3x103

Total volume: 1390 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.20RCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
0.75Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
112Low-lime flyash (ASTM Class F)
  
Kafue Gorge Lower (KGL) completed
Kafue Gorge Lower (KGL) completed

Full Dam Information

Details

Country: Nigeria

Owner: Federal Ministry of Power, Nigeria

Type: Gravity

Purpose(s): Flood Control / Hydropower

River: Kaduna

Reservoir capacity: 11400 m3x106

Construction Dates

Start of Project: 09/13

Start of RCC: 09/13

End of RCC: 08/20

End of Project: 10/21

Specifications

Height: 101 metres

Length: 1090 metres

Volume of RCC: 1920 m3x103

Total volume: 2400 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.75Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
59
69  94
Pozzolan (kg/m3)Pozzolan Type
76Low-lime flyash (ASTM Class F)
69  76 
Zungeru on Google Earth
Zungeru on Google Earth

Full Dam Information

Details

Country: Honduras

Owner: Energias Limpias del Yaguala SA de CV

Type: Arch-Gravity

Purpose(s): Hydropower

River: Yaguala

Reservoir capacity: 72 m3x106

Construction Dates

Start of Project: 01/18

Start of RCC: 01/18

End of RCC: 11/20

End of Project: 01/21

Specifications

Height: 93 metres

Length: 273 metres

Volume of RCC: 249 m3x103

Total volume: 305 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.04RCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.40RCC against formwork (GEVR/GE-RCC)
0.67RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
0.40Reinforced concrete cast against precast units or slip-formed facing elements

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Arenal I-II on Google Earth
Arenal I-II on Google Earth

Full Dam Information

Details

Country: Turkey

Owner: Kalehan Energy Üretim ve Ticaret A.S.

Type: Gravity

Purpose(s): Hydropower

River: Murat

Reservoir capacity: 556 m3x106

Construction Dates

Start of Project: 03/13

Start of RCC: 03/13

End of RCC: -/20

End of Project: 04/21

Specifications

Height: 125 metres

Length: 346 metres

Volume of RCC: 1192 m3x103

Total volume: 1342 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.25RCC against precast concrete panels
Downstream
SlopeType
0.80RCC against formwork
Spillway
SlopeType
separate 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
40Milled sand
  
Photo coming soon

Full Dam Information

Details

Country: Japan

Owner: Iwate Prefecture

Type: Gravity

Purpose(s): Flood Control / Hydropower / Water Supply

River: Yana

Reservoir capacity: 19 m3x106

Construction Dates

Start of Project: 12/14

Start of RCC: 12/14

End of RCC: -/20

End of Project: 03/21

Specifications

Height: 77 metres

Length: 243 metres

Volume of RCC: -

Total volume: 213 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Yanagawa completed
Yanagawa completed

Full Dam Information

Details

Country: Vietnam

Owner: Ministry of Agriculture and Rural Development

Type: Gravity

Purpose(s): Hydropower / Irrigation / Water Supply

River: Cai

Reservoir capacity: 219 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/20

End of Project: -/21

Specifications

Height: 67 metres

Length: 603 metres

Volume of RCC: 510 m3x103

Total volume: 640 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Guinea

Owner: Ministry of Energy and Hydraulics

Type: Gravity

Purpose(s): Hydropower

River: Konkouré

Reservoir capacity: 6300 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/20

End of Project: -/21

Specifications

Height: 116 metres

Length: 1200 metres

Volume of RCC: -

Total volume: 3 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Souapiti on Google Earth
Souapiti on Google Earth

Full Dam Information

Details

Country: El Salvador

Owner: Comisión Ejecutiva Hidroeléctrica del Rio Lempa (CEL)

Type: Hardfill

Purpose(s): Hydropower

River: Torola

Reservoir capacity: -

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/20

End of Project: 10/23

Specifications

Height: 88 metres

Length: 324 metres

Volume of RCC: 375 m3x103

Total volume: 450 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.20RCC against precast concrete panels (GEVR/GE-RCC)
Downstream
SlopeType
0.80RCC against precast concrete panels (GEVR/GE-RCC)
Spillway
SlopeType
0.80RCC against precast concrete panels (GEVR/GE-RCC)

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
94
Pozzolan (kg/m3)Pozzolan Type
63Natural pozzolan (ASTM Class N)
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: Limak Energy

Type: Gravity

Purpose(s): Hydropower

River: Sakarya

Reservoir capacity: 77 m3x106

Construction Dates

Start of Project: -/19

Start of RCC: -/19

End of RCC: -/20

End of Project: -/20

Specifications

Height: 67 metres

Length: 135 metres

Volume of RCC: 105 m3x103

Total volume: 115 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: USA

Owner: US Army Corps of Engineers - Nashville District

Type: Gravity

Purpose(s): Flood Control / Hydropower / Recreation / Water Supply

River: Caney Fork

Reservoir capacity: 940 m3x106

Construction Dates

Start of Project: -/17

Start of RCC: -/17

End of RCC: -/20

End of Project: -/21

Specifications

Height: 40 metres

Length: 293 metres

Volume of RCC: 99 m3x103

Total volume: 122 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
VerticalTraditional concrete against formwork  [stepped face]
0.83 
Spillway
SlopeType
0.83Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
93
Pozzolan (kg/m3)Pozzolan Type
93Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: Nicaragua

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Bambana

Reservoir capacity: -

Construction Dates

Start of Project: -/18

Start of RCC: -/18

End of RCC: -/20

End of Project: -/21

Specifications

Height: 20 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
0.70Traditional concrete against precast concrete panels
1.00Traditional concrete against precast concrete panels
Downstream
SlopeType
0.70Traditional concrete against formwork  [stepped face]
1.00Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.70Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Brazil

Owner: Bela Vista Geracao de Energia S.A.

Type: Gravity

Purpose(s): Hydropower

River: Chapim

Reservoir capacity: 7 m3x106

Construction Dates

Start of Project: -/00

Start of RCC: -/00

End of RCC: -/00

End of Project: -/00

Specifications

Height: 21 metres

Length: 393 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Bela Vista completed
Bela Vista completed

Full Dam Information

Details

Country: China

Owner: China Southern Power Grid

Type: Gravity

Purpose(s): Hydropower

River: -

Reservoir capacity: 41 m3x106

Construction Dates

Start of Project: -/18

Start of RCC: -/18

End of RCC: -/20

End of Project: -/21

Specifications

Height: 60 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: China Southern Power Grid

Type: Gravity

Purpose(s): Hydropower

River: -

Reservoir capacity: 45 m3x106

Construction Dates

Start of Project: -/18

Start of RCC: -/18

End of RCC: -/20

End of Project: -/21

Specifications

Height: 85 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: Limak Energy

Type: Gravity

Purpose(s): Hydropower

River: Sakarya

Reservoir capacity: 10 m3x106

Construction Dates

Start of Project: -/19

Start of RCC: -/19

End of RCC: -/20

End of Project: -/21

Specifications

Height: 56 metres

Length: 275 metres

Volume of RCC: 216 m3x103

Total volume: 230 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Laos

Owner: Chaleun Sekong Energy Co Ltd (CSE)

Type: Gravity

Purpose(s): Hydropower

River: Nam Kong

Reservoir capacity: 471 m3x106

Construction Dates

Start of Project: 11/17

Start of RCC: 11/17

End of RCC: 02/21

End of Project: 11/21

Specifications

Height: 65 metres

Length: 500 metres

Volume of RCC: 347 m3x103

Total volume: 400 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.75Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
75
Pozzolan (kg/m3)Pozzolan Type
113Low-lime flyash (ASTM Class F)
  
Nam Kong 3 on Google Earth
Nam Kong 3 on Google Earth

Full Dam Information

Details

Country: China

Owner: China Huadian Group Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Yaluzangbu (Brahmaputra)

Reservoir capacity: 55 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: 04/21

End of Project: -/23

Specifications

Height: 118 metres

Length: 385 metres

Volume of RCC: 937 m3x103

Total volume: 1442 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
93
60
Pozzolan (kg/m3)Pozzolan Type
93 
100 
Dagu completed
Dagu completed

Full Dam Information

Details

Country: DR Congo

Owner: Sicomines

Type: Thin Arch

Purpose(s): Hydropower

River: Lualaba

Reservoir capacity: -

Construction Dates

Start of Project: 11/17

Start of RCC: 11/17

End of RCC: 07/21

End of Project: 11/21

Specifications

Height: 142 metres

Length: -

Volume of RCC: 620 m3x103

Total volume: 770 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Busanga on Google Earth
Busanga on Google Earth

Full Dam Information

Details

Country: Vietnam

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Song An Lao

Reservoir capacity: 90 m3x106

Construction Dates

Start of Project: 02/19

Start of RCC: 02/19

End of RCC: 08/21

End of Project: 06/22

Specifications

Height: 68 metres

Length: 378 metres

Volume of RCC: 353 m3x103

Total volume: 456 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: UAE

Owner: DEWA

Type: Gravity

Purpose(s): Hydropower

River: -

Reservoir capacity: -

Construction Dates

Start of Project: 12/19

Start of RCC: 12/19

End of RCC: 09/21

End of Project: -/24

Specifications

Height: 38 metres

Length: 184 metres

Volume of RCC: 41 m3x103

Total volume: 45 m3x103

Construction Methods

Facings

Upstream
SlopeType
 RCC against precast concrete panels
Downstream
SlopeType
 RCC against precast concrete panels
Spillway
SlopeType
 RCC against precast concrete panels  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
65
Pozzolan (kg/m3)Pozzolan Type
120Low-lime flyash (ASTM Class F)
  
Hatta PSS-Saddle dam completed
Hatta PSS-Saddle dam completed

Full Dam Information

Details

Country: Canada

Owner: BC Hydro

Type: Gravity

Purpose(s): Hydropower

River: Peace

Reservoir capacity: 2644 m3x106

Construction Dates

Start of Project: -/15

Start of RCC: -/15

End of RCC: 10/21

End of Project: 08/25

Specifications

Height: 71 metres

Length: 800 metres

Volume of RCC: 1740 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
130Low-lime flyash (ASTM Class F)
  
Site C completed
Site C completed

Full Dam Information

Details

Country: China

Owner: China Southern Power Grid Co.

Type: Gravity

Purpose(s): Hydropower

River: Moyang

Reservoir capacity: 18 m3x106

Construction Dates

Start of Project: 01/17

Start of RCC: 01/17

End of RCC: 11/21

End of Project: 06/22

Specifications

Height: 101 metres

Length: 477 metres

Volume of RCC: -

Total volume: 652 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
3006000

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Northeast China Electric Power

Type: Gravity

Purpose(s): Hydropower

River: Songhua

Reservoir capacity: 10377 m3x106

Construction Dates

Start of Project: -/13

Start of RCC: -/13

End of RCC: -/21

End of Project: -/22

Specifications

Height: 95 metres

Length: 1068 metres

Volume of RCC: -

Total volume: 2700 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Fengman (new) completed
Fengman (new) completed

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): Hydropower

River: -

Reservoir capacity: 219 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/21

End of Project: -/22

Specifications

Height: 90 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Heihe

Reservoir capacity: 403 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/21

End of Project: -/22

Specifications

Height: 123 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Brazil

Owner: Rincão dos Albinos Energética S.A.

Type: Gravity

Purpose(s): Hydropower

River: Toropi

Reservoir capacity: 13 m3x106

Construction Dates

Start of Project: -/18

Start of RCC: -/18

End of RCC: -/21

End of Project: 08/22

Specifications

Height: 35 metres

Length: 206 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Cachoeira Cinco Veados completed
Cachoeira Cinco Veados completed

Full Dam Information

Details

Country: Vietnam

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Song Gianh

Reservoir capacity: -

Construction Dates

Start of Project: 01/90

Start of RCC: 01/90

End of RCC: 04/90

End of Project: 05/90

Specifications

Height: 76 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork with external geomembrane
Downstream
SlopeType
0.80Unformed face of RCC
Spillway
SlopeType
0.80Unformed face of RCC

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 No pozzolan used
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Bala

Reservoir capacity: 3 m3x106

Construction Dates

Start of Project: -/17

Start of RCC: -/17

End of RCC: -/21

End of Project: -/22

Specifications

Height: 47 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): Flood Control / Hydropower

River: Qianhe

Reservoir capacity: 160 m3x106

Construction Dates

Start of Project: -/18

Start of RCC: -/18

End of RCC: -/21

End of Project: -/22

Specifications

Height: 132 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Brazil

Owner: CPFL Energias Renovavies S.A.

Type: Gravity

Purpose(s): Hydropower

River: do Peixe

Reservoir capacity: -

Construction Dates

Start of Project: -/18

Start of RCC: -/18

End of RCC: -/21

End of Project: 07/22

Specifications

Height: 32 metres

Length: 300 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Laos

Owner: Nam Theun 1 Power Company

Type: Gravity

Purpose(s): Hydropower

River: Nam Kading, aka Nam Theun

Reservoir capacity: 3009 m3x106

Construction Dates

Start of Project: 08/15

Start of RCC: 08/15

End of RCC: 01/22

End of Project: 08/22

Specifications

Height: 187 metres

Length: 772 metres

Volume of RCC: 4141213 m3x103

Total volume: 4320 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
 RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
3003000  &
 9000

Cementitious material

Cement (kg/m3)
100
130
Pozzolan (kg/m3)Pozzolan Type
130Low-lime flyash (ASTM Class F)
120 
Nam Theun 1 under construction
Nam Theun 1 under construction

Full Dam Information

Details

Country: Ethiopia

Owner: Ethiopian Electric Power (EEP)

Type: Gravity

Purpose(s): Hydropower

River: Blue Nile

Reservoir capacity: 74000 m3x106

Construction Dates

Start of Project: 12/10

Start of RCC: 12/10

End of RCC: 05/22

End of Project: -/24

Specifications

Height: 160 metres

Length: 1790 metres

Volume of RCC: 10100 m3x103

Total volume: 10500 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.22RCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
1.00RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
1.00RCC against formwork (GEVR/GE-RCC)  [stepped face]

Placement

Layers (mm)Lifts (mm)
400400

Cementitious material

Cement (kg/m3)
67  to
Pozzolan (kg/m3)Pozzolan Type
23  toNatural pozzolan (ASTM Class N)
  
Grand Ethiopian Renaissance Dam (GERD) completed
Grand Ethiopian Renaissance Dam (GERD) completed

Full Dam Information

Details

Country: Philippines

Owner: Wawa JV Co. Inc. (Prime Infrastructure Capital Inc and San Lorenzo Ruiz Builders and Developers Group)

Type: Hardfill

Purpose(s): Hydropower / Irrigation / Water Supply

River: Tayabasan

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/20

Start of RCC: -/20

End of RCC: 05/22

End of Project: 07/22

Specifications

Height: 24 metres

Length: 114 metres

Volume of RCC: 30 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
0.40RCC against formwork with external geomembrane (GEVR/GE-RCC)
Downstream
SlopeType
0.40RCC against formwork (GEVR/GE-RCC)
0.92 
Spillway
SlopeType
0.92Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
120Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: UAE

Owner: DEWA

Type: Gravity

Purpose(s): Hydropower

River: -

Reservoir capacity: -

Construction Dates

Start of Project: 12/19

Start of RCC: 12/19

End of RCC: 08/22

End of Project: -/24

Specifications

Height: 72 metres

Length: 222 metres

Volume of RCC: 170 m3x103

Total volume: 180 m3x103

Construction Methods

Facings

Upstream
SlopeType
 RCC against precast concrete panels
Downstream
SlopeType
 RCC against precast concrete panels
Spillway
SlopeType
none 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
65
Pozzolan (kg/m3)Pozzolan Type
120Low-lime flyash (ASTM Class F)
  
Hatta PSS-Upper dam completed
Hatta PSS-Upper dam completed

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower / Water Supply

River: Hanshui

Reservoir capacity: 221 m3x106

Construction Dates

Start of Project: 10/18

Start of RCC: 10/18

End of RCC: 11/22

End of Project: 07/23

Specifications

Height: 70 metres

Length: 349 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Tanzania

Owner: TANESCO (Tanzania Electric Supply Company Ltd.)

Type: Gravity

Purpose(s): Hydropower

River: Rufiji

Reservoir capacity: 3680 m3x106

Construction Dates

Start of Project: 12/18

Start of RCC: 12/18

End of RCC: -/22

End of Project: 12/23

Specifications

Height: 134 metres

Length: 1025 metres

Volume of RCC: 1420 m3x103

Total volume: 1940 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.20RCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.75Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
93
Pozzolan (kg/m3)Pozzolan Type
62Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Guilin Dayu Water Infrastructure Development Investment Co. Ltd.

Type: Gravity

Purpose(s): Flood Control / Hydropower

River: Lijiang

Reservoir capacity: 188 m3x106

Construction Dates

Start of Project: 11/11

Start of RCC: 11/11

End of RCC: -/22

End of Project: -/23

Specifications

Height: 77 metres

Length: 239 metres

Volume of RCC: -

Total volume: 304 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Fuzikou under construction
Fuzikou under construction

Full Dam Information

Details

Country: Iran

Owner: Iran Water & Power Resources Development Company (IWPC)

Type: Arch-Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Zohreh

Reservoir capacity: 2300 m3x106

Construction Dates

Start of Project: -/11

Start of RCC: -/11

End of RCC: -/22

End of Project: 07/23

Specifications

Height: 151 metres

Length: 680 metres

Volume of RCC: 1100 m3x103

Total volume: 1200 m3x103

Construction Methods

Facings

Upstream
SlopeType
Vertical 
Downstream
SlopeType
0.70 
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
160
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
  
Chame Shir under construction
Chame Shir under construction

Full Dam Information

Details

Country: Turkey

Owner: DSI - State Hydraulic Works

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Basgöz

Reservoir capacity: 5 m3x106

Construction Dates

Start of Project: -/14

Start of RCC: -/14

End of RCC: -/22

End of Project: -/24

Specifications

Height: 50 metres

Length: 136 metres

Volume of RCC: 126 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300 

Cementitious material

Cement (kg/m3)
84
Pozzolan (kg/m3)Pozzolan Type
56 
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Huaneng Lancang River Hydropower Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Langcang (Mekong)

Reservoir capacity: 1338 m3x106

Construction Dates

Start of Project: -/15

Start of RCC: -/15

End of RCC: -/22

End of Project: -/24

Specifications

Height: 158 metres

Length: 508 metres

Volume of RCC: -

Total volume: 3600 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Tuoba completed
Tuoba completed

Full Dam Information

Details

Country: China

Owner: Lichuan City Yujiang Valley Hudropower Ltd. Hubei Province

Type: Thin Arch

Purpose(s): Flood Control / Hydropower

River: Yu

Reservoir capacity: 55 m3x106

Construction Dates

Start of Project: -/17

Start of RCC: -/17

End of RCC: -/22

End of Project: -/22

Specifications

Height: 70 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Ao

Reservoir capacity: 297 m3x106

Construction Dates

Start of Project: -/17

Start of RCC: -/17

End of RCC: -/22

End of Project: -/23

Specifications

Height: 91 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Jialing River Tingzikou Water Resources and Hydropower Development Co. Ltd.

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Navigation / Water Supply

River: Jialing

Reservoir capacity: 4067 m3x106

Construction Dates

Start of Project: 11/09

Start of RCC: 11/09

End of RCC: -/22

End of Project: -/25

Specifications

Height: 116 metres

Length: 995 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Tingzikou completed
Tingzikou completed

Full Dam Information

Details

Country: Laos

Owner: Houay LaNge Power Co. Ltd. (JV of China-based Hebei Construction and Investment Group Co., Ltd (HCIG) and CS Energy (Laos))

Type: Gravity

Purpose(s): Hydropower

River: Houaylange

Reservoir capacity: 14 m3x106

Construction Dates

Start of Project: 02/18

Start of RCC: 02/18

End of RCC: -/22

End of Project: 05/23

Specifications

Height: 59 metres

Length: 174 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
 RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
 Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Houay LaNge completed
Houay LaNge completed

Full Dam Information

Details

Country: Turkey

Owner: DSI - State Hydraulic Works

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Devrez

Reservoir capacity: 115 m3x106

Construction Dates

Start of Project: -/17

Start of RCC: -/17

End of RCC: -/22

End of Project: -/23

Specifications

Height: 92 metres

Length: 261 metres

Volume of RCC: 447 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Kızlaryolu on Google Earth
Kızlaryolu on Google Earth

Full Dam Information

Details

Country: Ivory Coast

Owner: Ivoirian Hydro Energy

Type: Gravity

Purpose(s): Hydropower

River: Bandama

Reservoir capacity: 105 m3x106

Construction Dates

Start of Project: 10/19

Start of RCC: 10/19

End of RCC: -/22

End of Project: 03/23

Specifications

Height: 24 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Singrobo-Ahouaty completed
Singrobo-Ahouaty completed

Full Dam Information

Details

Country: Laos

Owner: EDL (Electricite du Laos)

Type: Gravity

Purpose(s): Hydropower

River: Nam Ngum

Reservoir capacity: 110 m3x106

Construction Dates

Start of Project: 02/18

Start of RCC: 02/18

End of RCC: 01/23

End of Project: -/24

Specifications

Height: 74 metres

Length: 252 metres

Volume of RCC: 230 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
 RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
82
Pozzolan (kg/m3)Pozzolan Type
100 
  
Nam Ngum 4 completed
Nam Ngum 4 completed

Full Dam Information

Details

Country: Cameroon

Owner: EDC (Electricity Development Corporation)

Type: Gravity

Purpose(s): Flood Control / Hydropower

River: Lom

Reservoir capacity: 6000 m3x106

Construction Dates

Start of Project: -/19

Start of RCC: -/19

End of RCC: 03/23

End of Project: 09/24

Specifications

Height: 46 metres

Length: 185 metres

Volume of RCC: 175 m3x103

Total volume: 290 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.85Traditional concrete against formwork
Spillway
SlopeType
0.85Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
100
Pozzolan (kg/m3)Pozzolan Type
100Low-lime flyash (ASTM Class F)
  
Lom Pangar completed
Lom Pangar completed

Full Dam Information

Details

Country: USA

Owner: Grant County Public Utility District

Type: Gravity

Purpose(s): Hydropower

River: Columbia

Reservoir capacity: -

Construction Dates

Start of Project: 10/21

Start of RCC: 10/21

End of RCC: 03/23

End of Project: 10/23

Specifications

Height: 17 metres

Length: 564 metres

Volume of RCC: 386 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
0.75Unformed face of RCC
Spillway
SlopeType
none 

Placement

Layers (mm)Lifts (mm)
300300  -

Cementitious material

Cement (kg/m3)
87
Pozzolan (kg/m3)Pozzolan Type
137Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: Laos

Owner: Nam Sam 3 Power Co. Ltd. (part of Phongsubthavy Group)

Type: Gravity

Purpose(s): Hydropower

River: Nam Xam

Reservoir capacity: 435 m3x106

Construction Dates

Start of Project: 10/19

Start of RCC: 10/19

End of RCC: 04/23

End of Project: 12/23

Specifications

Height: 122 metres

Length: 321 metres

Volume of RCC: 907 m3x103

Total volume: 987 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
 RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
140Low-lime flyash (ASTM Class F)
  
Nam Sum 3 completed
Nam Sum 3 completed

Full Dam Information

Details

Country: Honduras

Owner: Hidrovolcan

Type: Gravity

Purpose(s): Hydropower

River: Ulua

Reservoir capacity: 242 m3x106

Construction Dates

Start of Project: -/17

Start of RCC: -/17

End of RCC: 05/23

End of Project: 10/24

Specifications

Height: 83 metres

Length: 440 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Japan

Owner: -

Type: Gravity

Purpose(s): Flood Control / Hydropower / Water Supply

River: Nishiki

Reservoir capacity: 30 m3x106

Construction Dates

Start of Project: -/10

Start of RCC: -/10

End of RCC: -/23

End of Project: -/24

Specifications

Height: 73 metres

Length: 300 metres

Volume of RCC: -

Total volume: 340 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Hirase completed
Hirase completed

Full Dam Information

Details

Country: Philippines

Owner: National Irrigation Administration (NIA)

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Jalaur

Reservoir capacity: -

Construction Dates

Start of Project: -/19

Start of RCC: -/19

End of RCC: -/23

End of Project: 07/24

Specifications

Height: 38 metres

Length: 150 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Jalaur afterbay dam on Google Earth
Jalaur afterbay dam on Google Earth

Full Dam Information

Details

Country: Philippines

Owner: National Irrigation Administration (NIA)

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Jalaur

Reservoir capacity: 229 m3x106

Construction Dates

Start of Project: -/19

Start of RCC: -/19

End of RCC: -/23

End of Project: 07/24

Specifications

Height: 109 metres

Length: 267 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Jalaur High Dam (JRMP 2) completed
Jalaur High Dam (JRMP 2) completed

Full Dam Information

Details

Country: Bolivia

Owner: ENDE Valle Hermoso S.A.

Type: Gravity

Purpose(s): Hydropower

River: Ivirizu

Reservoir capacity: 30 m3x106

Construction Dates

Start of Project: -/18

Start of RCC: -/18

End of RCC: -/23

End of Project: -/24

Specifications

Height: 125 metres

Length: 350 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Sehuencas (formerly Ivirizu) under construction
Sehuencas (formerly Ivirizu) under construction

Full Dam Information

Details

Country: Turkey

Owner: DSI - State Hydraulic Works

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Sağırın Çayı

Reservoir capacity: 8 m3x106

Construction Dates

Start of Project: -/17

Start of RCC: -/17

End of RCC: -/23

End of Project: -/24

Specifications

Height: 44 metres

Length: 185 metres

Volume of RCC: 540 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Maiwan Water Conservancy

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Nandu

Reservoir capacity: 615 m3x106

Construction Dates

Start of Project: 04/20

Start of RCC: 04/20

End of RCC: 05/24

End of Project: 07/25

Specifications

Height: 79 metres

Length: 377 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Morocco

Owner: Direction des Aménagements Hydrauliques

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Leben

Reservoir capacity: 200 m3x106

Construction Dates

Start of Project: 03/21

Start of RCC: 03/21

End of RCC: 06/24

End of Project: -/25

Specifications

Height: 71 metres

Length: 149 metres

Volume of RCC: 207 m3x103

Total volume: 257 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.90Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.90Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
110
Pozzolan (kg/m3)Pozzolan Type
0 
  
Sidi Abbou on Google Earth
Sidi Abbou on Google Earth

Full Dam Information

Details

Country: Japan

Owner: Ministry of Land, Infrastructure, Transport and Tourism

Type: Hardfill

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Naruse

Reservoir capacity: 79 m3x106

Construction Dates

Start of Project: 05/18

Start of RCC: 05/18

End of RCC: 08/24

End of Project: 11/26

Specifications

Height: 115 metres

Length: 755 metres

Volume of RCC: 4450 m3x103

Total volume: 4850 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Naruse under construction
Naruse under construction

Full Dam Information

Details

Country: Iran

Owner: Fars Water Authority

Type: Hardfill

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Firooz Abad

Reservoir capacity: 146 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/24

End of Project: -/26

Specifications

Height: 88 metres

Length: 230 metres

Volume of RCC: 260 m3x103

Total volume: 285 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.90RCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
1.20RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
1.20Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Hayghar (formerly Dehroud) on Google Earth
Hayghar (formerly Dehroud) on Google Earth

Full Dam Information

Details

Country: Japan

Owner: -

Type: Gravity

Purpose(s): Flood Control / Hydropower

River: Kibishima

Reservoir capacity: 12 m3x106

Construction Dates

Start of Project: -/14

Start of RCC: -/14

End of RCC: -/24

End of Project: -/26

Specifications

Height: 84 metres

Length: 270 metres

Volume of RCC: -

Total volume: 328 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Uchigatani on Google Earth
Uchigatani on Google Earth

Full Dam Information

Details

Country: China

Owner: Department of Water Conservancy, Fujian Province

Type: Gravity

Purpose(s): Flood Control / Hydropower / Water Supply

River: Aojiang

Reservoir capacity: 297 m3x106

Construction Dates

Start of Project: -/17

Start of RCC: -/17

End of RCC: -/24

End of Project: -/25

Specifications

Height: 91 metres

Length: 338 metres

Volume of RCC: 300 m3x103

Total volume: 663 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10 
Downstream
SlopeType
0.76 
Spillway
SlopeType
0.76 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Flood Control / Hydropower / Water Supply

River: -

Reservoir capacity: 544 m3x106

Construction Dates

Start of Project: 06/20

Start of RCC: 06/20

End of RCC: -/24

End of Project: 12/25

Specifications

Height: 106 metres

Length: 596 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Vietnam

Owner: Nexif Energy & Song Giang Hydropower Joint Stock Company

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Song Cái Nha Trong

Reservoir capacity: -

Construction Dates

Start of Project: -/19

Start of RCC: -/19

End of RCC: -/24

End of Project: -/25

Specifications

Height: 26 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Song Giang 1 under construction
Song Giang 1 under construction

Full Dam Information

Details

Country: Brazil

Owner: CELG/Electronorte

Type: Gravity

Purpose(s): Hydropower

River: Arraias

Reservoir capacity: -

Construction Dates

Start of Project: -/21

Start of RCC: -/21

End of RCC: -/24

End of Project: -/25

Specifications

Height: 29 metres

Length: 560 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Arraias on Google Earth
Arraias on Google Earth

Full Dam Information

Details

Country: Indonesia

Owner: PT. North Sumatra Hydro Energy

Type: Gravity

Purpose(s): Hydropower

River: Batang Toru

Reservoir capacity: 18 m3x106

Construction Dates

Start of Project: 10/21

Start of RCC: 10/21

End of RCC: 03/25

End of Project: -/26

Specifications

Height: 79 metres

Length: 137 metres

Volume of RCC: -

Total volume: 500 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
3002000

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Batang Toru under construction
Batang Toru under construction

Full Dam Information

Details

Country: Greece

Owner: Terna Energiaki

Type: Hardfill

Purpose(s): Hydropower

River: Kapnitsorrema

Reservoir capacity: 7 m3x106

Construction Dates

Start of Project: 06/23

Start of RCC: 06/23

End of RCC: 10/25

End of Project: 12/25

Specifications

Height: 59 metres

Length: 475 metres

Volume of RCC: 765 m3x103

Total volume: 795 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
400400

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Agios Georgios under construction
Agios Georgios under construction

Full Dam Information

Details

Country: DR Congo

Owner: SNEL (Société Nationale d'Électricité)

Type: Gravity

Purpose(s): Hydropower

River: Lulua

Reservoir capacity: -

Construction Dates

Start of Project: 08/11

Start of RCC: 08/11

End of RCC: -/25

End of Project: -/27

Specifications

Height: 16 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Katende on Google Earth
Katende on Google Earth

Full Dam Information

Details

Country: Lebanon

Owner: EBML

Type: Arch-Gravity

Purpose(s): Hydropower / Irrigation / Water Supply

River: Ibrahim (Abraham)

Reservoir capacity: 38 m3x106

Construction Dates

Start of Project: -/15

Start of RCC: -/15

End of RCC: -/25

End of Project: -/26

Specifications

Height: 162 metres

Length: 350 metres

Volume of RCC: 1450 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
El-Janneh under construction
El-Janneh under construction

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: -

Reservoir capacity: 104 m3x106

Construction Dates

Start of Project: -/20

Start of RCC: -/20

End of RCC: -/25

End of Project: -/25

Specifications

Height: 90 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower / Irrigation / Water Supply

River: Niulushi

Reservoir capacity: 66 m3x106

Construction Dates

Start of Project: -/18

Start of RCC: -/18

End of RCC: -/25

End of Project: -/26

Specifications

Height: 80 metres

Length: 391 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Dazhou Major water works construction and management center

Type: Gravity

Purpose(s): Flood Control / Hydropower

River: Zhonhe

Reservoir capacity: 128 m3x106

Construction Dates

Start of Project: 12/20

Start of RCC: 12/20

End of RCC: -/25

End of Project: -/26

Specifications

Height: 77 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Iran

Owner: Iran Water & Power Development Company (IWPCo)

Type: Gravity

Purpose(s): Hydropower / Irrigation / Water Supply

River: Shafaroud

Reservoir capacity: 52 m3x106

Construction Dates

Start of Project: 03/12

Start of RCC: 03/12

End of RCC: 07/24

End of Project: 11/25

Specifications

Height: 101 metres

Length: 300 metres

Volume of RCC: 725 m3x103

Total volume: 740 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10RCC against formwork (GEVR/GE-RCC)
0.50 
Downstream
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Zimbabwe

Owner: Zimbabwe National Water Authority (Zinwa)

Type: Gravity

Purpose(s): Hydropower / Irrigation / Water Supply

River: Gwayi

Reservoir capacity: 634 m3x106

Construction Dates

Start of Project: 09/04

Start of RCC: 09/04

End of RCC: -/26

End of Project: -/27

Specifications

Height: 72 metres

Length: 305 metres

Volume of RCC: -

Total volume: 300 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
140Low-lime flyash (ASTM Class F)
  
Gwayi-Shangani completed
Gwayi-Shangani completed

Full Dam Information

Details

Country: China

Owner: China Nuclear (Guodian Zhangzhou) Energy

Type: Gravity

Purpose(s): Hydropower

River: -

Reservoir capacity: 21 m3x106

Construction Dates

Start of Project: -/17

Start of RCC: -/17

End of RCC: -/26

End of Project: -/27

Specifications

Height: 68 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Guizhou Water Conservancy Investment Group Co, Ltd

Type: Gravity

Purpose(s): Hydropower / Irrigation / Water Supply

River: Guanyinsi

Reservoir capacity: 121 m3x106

Construction Dates

Start of Project: 12/21

Start of RCC: 12/21

End of RCC: -/26

End of Project: -/27

Specifications

Height: 109 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Lancang (Mekong)

Reservoir capacity: -

Construction Dates

Start of Project: 10/21

Start of RCC: 10/21

End of RCC: -/26

End of Project: -/27

Specifications

Height: 158 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Qingshui

Reservoir capacity: 210 m3x106

Construction Dates

Start of Project: 12/21

Start of RCC: 12/21

End of RCC: -/26

End of Project: -/27

Specifications

Height: 96 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Nicaragua

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Río Mico

Reservoir capacity: -

Construction Dates

Start of Project: -/00

Start of RCC: -/00

End of RCC: -/00

End of Project: -/00

Specifications

Height: 49 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
0.70Traditional concrete against precast concrete panels
1.00Traditional concrete against precast concrete panels
Downstream
SlopeType
0.70Traditional concrete against formwork  [stepped face]
1.00Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.70Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Morocco

Owner: Direction des Aménagements Hydrauliques

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Derna

Reservoir capacity: 85 m3x106

Construction Dates

Start of Project: -/22

Start of RCC: -/22

End of RCC: -/26

End of Project: -/27

Specifications

Height: 95 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Uzbekistan

Owner: JSC Uzbekgidroenergo

Type: Gravity

Purpose(s): Hydropower

River: Chatkal

Reservoir capacity: 5 m3x106

Construction Dates

Start of Project: -/23

Start of RCC: -/23

End of RCC: -/26

End of Project: -/27

Specifications

Height: 60 metres

Length: 270 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Lower Chatkal under construction
Lower Chatkal under construction

Full Dam Information

Details

Country: Ethiopia

Owner: Ethiopian Electric Power (EEP)

Type: Gravity

Purpose(s): Hydropower

River: Omo

Reservoir capacity: 6900 m3x106

Construction Dates

Start of Project: 09/13

Start of RCC: 09/13

End of RCC: 02/27

End of Project: 05/28

Specifications

Height: 201 metres

Length: 1020 metres

Volume of RCC: 7350 m3x103

Total volume: 7725 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10RCC against formwork (GEVR/GE-RCC)
0.35 
Downstream
SlopeType
0.70RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
separate 

Placement

Layers (mm)Lifts (mm)
3001500

Cementitious material

Cement (kg/m3)
130
Pozzolan (kg/m3)Pozzolan Type
25Natural pozzolan (ASTM Class N)
  
Koysha (Gibe IV) on Google Earth
Koysha (Gibe IV) on Google Earth

Full Dam Information

Details

Country: Turkey

Owner: DSI - State Hydraulic Works

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Aras

Reservoir capacity: 1295 m3x106

Construction Dates

Start of Project: 04/22

Start of RCC: 04/22

End of RCC: 11/27

End of Project: 09/28

Specifications

Height: 113 metres

Length: 270 metres

Volume of RCC: 718 m3x103

Total volume: 750 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Morocco

Owner: Direction des Aménagements Hydrauliques

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Lakhdar

Reservoir capacity: 150 m3x106

Construction Dates

Start of Project: -/23

Start of RCC: -/23

End of RCC: -/27

End of Project: -/27

Specifications

Height: 110 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Indonesia

Owner: PUPR (Public Works and Public Housing Ministry)

Type: Hardfill

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Cibeet

Reservoir capacity: 83 m3x106

Construction Dates

Start of Project: 09/23

Start of RCC: 09/23

End of RCC: -/27

End of Project: -/28

Specifications

Height: 47 metres

Length: 960 metres

Volume of RCC: 371 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
0.90 
Downstream
SlopeType
0.90 
Spillway
SlopeType
0.90 

Placement

Layers (mm)Lifts (mm)
250750

Cementitious material

Cement (kg/m3)
106
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
  
Photo coming soon

Full Dam Information

Details

Country: Myanmar

Owner: Department of Hydroelectric Power - Ministry of Electric Power

Type: Gravity

Purpose(s): Hydropower

River: Myitnge

Reservoir capacity: 341 m3x106

Construction Dates

Start of Project: -/15

Start of RCC: -/15

End of RCC: -/28

End of Project: -/29

Specifications

Height: 102 metres

Length: 266 metres

Volume of RCC: 532 m3x103

Total volume: 580 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Upper Yeywa (Kyaukme) under construction
Upper Yeywa (Kyaukme) under construction

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Flood Control / Hydropower / Water Supply

River: Bahe

Reservoir capacity: 141 m3x106

Construction Dates

Start of Project: 04/22

Start of RCC: 04/22

End of RCC: -/28

End of Project: -/29

Specifications

Height: 71 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Angola

Owner: Ministry of Energy and Water

Type: Gravity

Purpose(s): Hydropower

River: Kwanza

Reservoir capacity: 436 m3x106

Construction Dates

Start of Project: 08/17

Start of RCC: 08/17

End of RCC: -/28

End of Project: 03/29

Specifications

Height: 116 metres

Length: 533 metres

Volume of RCC: 1075 m3x103

Total volume: 1450 m3x103

Construction Methods

Facings

Upstream
SlopeType
Vertical 
Downstream
SlopeType
0.85Reinforced conventional concrete cast after RCC placement  [stepped face]
Spillway
SlopeType
0.85 

Placement

Layers (mm)Lifts (mm)
3002400

Cementitious material

Cement (kg/m3)
100
Pozzolan (kg/m3)Pozzolan Type
0 
  
Caculo-Cabaça on Google Earth
Caculo-Cabaça on Google Earth

Full Dam Information

Details

Country: Japan

Owner: Kansai Electric Power

Type: Gravity

Purpose(s): Flood Control / Hydropower

River: Kiso

Reservoir capacity: 131 m3x106

Construction Dates

Start of Project: -/22

Start of RCC: -/22

End of RCC: -/28

End of Project: -/30

Specifications

Height: 118 metres

Length: 341 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Yalong River Hydropower Development Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Yalong

Reservoir capacity: 234 m3x106

Construction Dates

Start of Project: 01/24

Start of RCC: 01/24

End of RCC: -/28

End of Project: -/29

Specifications

Height: 128 metres

Length: -

Volume of RCC: -

Total volume: 2560 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Iran

Owner: Khuzestan Province Power & Water Authority

Type: Gravity

Purpose(s): Hydropower / Irrigation / Water Supply

River: Harkesh

Reservoir capacity: 38 m3x106

Construction Dates

Start of Project: -/18

Start of RCC: -/18

End of RCC: -/29

End of Project: -/31

Specifications

Height: 57 metres

Length: 350 metres

Volume of RCC: -

Total volume: 240 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates