| Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
| Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
| Bukhtarma | Kazakhstan | Ministry of Energy | F H | Irtysh | 31 | 05/55 | 09/57 | 10/61 | 12/63 | 90 | 450 | 587 | 988 | V | (10) | 0.80 | (3) | 0.80 | (3) | 300 | 1200 | 135 | 80 | (F) |
| Nangankou | China | Dongqiao County | I | Zaoshui | 4 | - /69 | - /70 | - /71 | - /72 | 32 | 85 | |||||||||||||
| Langshan [A] | China | Dinggeniu | 33 | - /74 | - /76 | - /78 | - /79 | 41 | 173 | 36 | ||||||||||||||
| Shimajigawa | Japan | Ministry of Construction | F I W | Shimaji | 21 | 09/76 | 10/78 | 04/80 | 03/81 | 89 | 240 | 165 | 317 | V 0.30 | (1) (1) | 0.80 | (1) | 0.80 | (1) | 150 to 200 | 500 700 | 84 | 36 | (F) |
| Liangsanping [A] | China | Sixian Water Resources Bureau | H | Leishui | 4 | - /79 | - /80 | - /81 | - /82 | 35 | 33 | 3 | 3 | |||||||||||
| Willow Creek | USA | US Army Corps of Engineers | F R | Willow Creek | 17 | 11/81 | 04/82 | 09/82 | 04/83 | 52 | 543 | 331 | 331 | V | (7) | 0.80 | (17) | 0.80 | (17) | 300 | 300 | 47 | 19 | (F) |
| Copperfield | Australia | Kidston Gold Mines Ltd. | W | Copperfield | 20 | 12/83 | 05/84 | 09/84 | 09/84 | 40 | 340 | 140 | 156 | V | (3) | V 0.90 | (3) (17) | 0.80 | (1) | 300 | 300 | 80 | 30 | (F) |
| Middle Fork | USA | Exxon Company, Houston, Texas | F W | Middle Fork | 1 | 05/84 | 07/84 | 09/84 | 11/84 | 38 | 125 | 42 | 43 | V | (1) | 0.80 | (1)* | conduit | 300 | 300 | 66 | 0 | (-) | |
| Carroll E. Ecton (formerly Winchester) | USA | Winchester Municipal Utility | W | Upper Howard Creek | 2 | 06/84 | 08/84 | 11/84 | 01/85 | 23 | 363 | 24 | 27 | V | (6) | V 1.00 | (5) (17) | 1.00 | (1) | 300 | 300 | 104 | 0 | (-) |
| Galesville | USA | Douglas County | F I R W | Cow Creek | 52 | 07/84 | 05/85 | 08/85 | 10/85 | 50 | 290 | 161 | 171 | V | (1) | 0.80 | (17) | 0.80 | (17) | 300 | 300 | 53 | 51 | (F) |
| Castilblanco de los Arroyos | Spain | Junta de Andalucia | W | Cala | 1 | 07/84 | 05/85 | 10/85 | 12/85 | 25 | 124 | 14 | 20 | V | (1) | V 0.75 | (1) (1) | 0.75 | (1) | 450 | 450 | 72 61 | 116 120 | (F) |
| Kengkou | China | Kengkou Reservoir Management Office | H W | Youxi | 27 | 11/84 | 11/85 | 04/86 | 11/86 | 57 | 123 | 43 | 62 | V | (9) | 0.75 | (10) | 0.75 | (13) | 250 & 500 | 250 & 500 | 60 60 | 120 80 | (F) |
| Craigbourne | Australia | Rivers and Water Supply Commission of Tasmania | I W | Coal | 13 | 01/86 | 04/86 | 06/86 | 08/86 | 25 | 247 | 22 | 24 | V | (7) | 1.00 | (17) | separate | 300 | 300 | 70 | 60 | (F) | |
| Tamagawa | Japan | Ministry of Construction | F H I W | Tama | 254 | 08/80 | 09/83 | 07/86 | 12/90 | 100 | 441 | 772 | 1150 | V 0.60 | (1) (1) | 0.81 | (1) | 0.81 | (1) | 150 - 200 | 750 1000 | 91 | 39 | (F) |
| Grindstone Canyon | USA | Village of Ruidoso | W | Grindstone | 2 | 09/85 | 05/86 | 07/86 | 10/86 | 42 | 432 | 88 | 96 | V | (1) | 0.75 | (1)* | 0.75 | (1) | 300 | 300 | 76 | 0 | (-) |
| Monksville | USA | North Jersey District Water Supply Commission and Hackensack Water Company | W | Wanaque | 27 | 05/85 | 03/86 | 08/86 | 11/86 | 48 | 670 | 219 | 232 | V | (1) | V 0.78 | (1) (17) | 0.78 | (1)* | 300 | 300 | 64 | 0 | (-) |
| De Mist Kraal | South Africa | Department of Water & Sanitation | I W | Little Fish | 4 | 09/84 | 05/86 | 08/86 | 10/87 | 30 | 300 | 35 | 65 | V | (1) | 0.60 | (1)* | 0.60 | (1)* | 250 | 250 | 58 | 58 | (F) |
| Saco de Nova Olinda | Brazil | SRH (Secretaria de RecursosHidricos) | F I W | Gravata | 97 | 07/85 | 07/86 | 10/86 | 06/87 | 56 | 230 | 132 | 143 | V | (1) | 0.80 | (3)* | separate | 400 | 400 | 55 | 15 | (N) | |
| Flag Boshielo (formerly Arabie) | South Africa | Department of Water & Sanitation | I W | Olifants | 104 | 09/85 | 03/86 | 11/86 | 07/87 | 36 | 455 | 101 | 142 | V | (1) | 0.50 0.75 | (1)* (1)* | 0.75 | (1) | 300 | 300 | 36 | 74 | (S) |
| Zaaihoek | South Africa | Department of Water & Sanitation | W | Slang | 190 | 05/85 | 11/85 | 03/87 | 09/88 | 47 | 527 | 97 | 134 | V | (1) | V 0.62 | (1)* | 0.62 | (1)* | 250 | 250 | 36 | 84 | (S) |
| La Manzanilla | Mexico | CNA (Comisión Nacional del Agua) | F | Ibarrilla | 1 | 11/86 | 01/87 | 05/87 | 07/87 | 36 | 150 | 20 | 30 | V 0.15 | (5) (5) | V 0.80 | (5) (17) | 0.80 | (12) | 300 | 300 | 135 | 135 | (F) |
| Lower Chase Creek | USA | Phelps Dodge Morenci Inc & Sumitomo Metal Mining | F | Lower Chase Creek | 1 | 03/87 | 05/87 | 06/87 | 07/87 | 27 | 122 | 14 | 22 | V | (1) | 0.70 | (1)* | 0.70 | (1)* | 300 | 300 | 64 | 40 | (F) |
| Upper Stillwater | USA | Central Utah Water Conservancy District | I W | Rock Creek | 37 | 12/83 | 09/85 | 08/87 | 12/87 | 91 | 815 | 1125 | 1281 | V | (14) | 0.32 0.60 | (14) (14) | 0.32 0.60 | (14)* (14)* | 300 | 300 | 79 | 173 | (F) |
| Los Morales | Spain | Confederación Hidrográfica del Tajo | W | Morales | 2 | 06/86 | 02/87 | 10/87 | 12/87 | 28 | 200 | 22 | 26 | V | (1) (3) | 0.75 | (3)* | 0.75 | (1) | 300 - 400 | 300 - 400 | 80 74 | 140 128 | (F) |
| Les Olivettes | France | Département de l’Herault | F | La Peyne | 4 | 08/86 | 12/86 | 10/87 | 03/88 | 36 | 255 | 80 | 85 | V | (1) | 0.75 | (16) | 0.75 | (1)* | 300 | 300 | 130 | (R) | |
| Mano | Japan | Fukushima Prefecture | F H W | Mano | 36 | 12/83 | 04/85 | 01/88 | 03/90 | 69 | 239 | 104 | 219 | V | (1) | 0.80 | (1) | 0.80 | (1) | 180 | 500 | 96 | 24 | (F) |
| Ain al Koreima | Morocco | Direction des Aménagements Hydrauliques | I | Akrech | 1 | 06/87 | 09/87 | 02/88 | 03/88 | 26 | 124 | 17 | 20 | 0.20 | (5)* | 0.20 0.75 | (5) (17) | 0.60 | (1)* | 350 | 350 | 70 140 | 30 60 | (S) |
| Shiramizugawa | Japan | Yamagata Prefecture | F I | Shiromizu | 5 | 10/84 | 10/85 | 06/88 | 04/90 | 55 | 367 | 142 | 314 | V | (1) | 0.80 | (1) | 0.80 | (1) | 150 - 200 | 500 | 96 | 24 | (F) |
| Santa Eugenia | Spain | Sociedad Española de Carburos Metálicos S.A. | H | Xallas | 17 | 01/87 | 06/87 | 06/88 | 10/88 | 84 | 290 | 225 | 254 | 0.05 | (3) | 0.75 0.35 | (3)* (3)* | 0.75 | (1) | 250 | 250 | 88 72 | 152 145 | (F) |
| Asahi Ogawa | Japan | Toyama Prefecture | F H | Ogawa | 5 | 03/83 | 05/86 | 06/88 | 06/90 | 84 | 260 | 268 | 361 | V 0.90 | (1) (1) | 0.80 | (1) | 0.80 | (1) | 180 | 500 | 96 | 24 | (F) |
| Stagecoach | USA | Upper Yampa Water Conservancy District, Steamboat Springs, Colorado | H I R W | Yampa | 42 | 08/87 | 06/88 | 07/88 | 11/88 | 46 | 116 | 34 | 39 | V | (1) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 71 | 71 | (F) |
| Vadeni | Romania | Romanian Electricity Authority (RENAL) - Tirgu Jiu Branch | H | Jiu | 5 | 03/86 | 05/88 | 10/88 | 10/92 | 25 | 55 | 14 | 17 | (12) | (12) | ogee | (12) | 300 | 900 | 125 | 0 | (-) | ||
| Rouidat Amont (formerly Rwedat) [H-F] | Morocco | Direction des Aménagements Hydrauliques | I W | Rouidat | 3 | 05/87 | 09/87 | 10/88 | 12/88 | 24 | 125 | 25 | 27 | 0.40 | (7)* | 0.40 | (7)* | 0.40 | (1)* | 400 | 400 | 100 | 15 | (N) |
| Nunome | Japan | Water Resources Development Public Corporation | F W | Nunome | 17 | 05/86 | 01/88 | 10/88 | 12/89 | 72 | 322 | 110 | 330 | V 0.40 | (1) (1) | 0.76 | (1) | 0.76 | (1) | 250 | 750 | 78 | 42 | (F) |
| Knellpoort [A-G] | South Africa | Department of Water & Sanitation | W | Rietspruit | 137 | 04/88 | 05/88 | 11/88 | 09/89 | 50 | 200 | 45 | 59 | V | (1) | 0.60 | (1)* | 0.60 | (1)* | 250 | 250 | 61 | 142 | (F) |
| Los Canchales | Spain | Confederación Hidrográfica del Guadiana | F W | Lácara | 15 | 05/88 | 07/88 | 11/88 | 01/89 | 32 | 240 | 25 | 54 | V | (3) | 0.50 0.80 | (3)* (3)* | 0.50 | (1)* | 250 | 250 | 84 70 | 156 145 | (F) |
| Gantangping | China | Hydropower Bureau, Lanshan County | H | Yonghe | 9 | - /84 | - /86 | - /88 | - /90 | 52 | 180 | 220 | (F) | |||||||||||
| Yuxi [A] | China | W | Yuxi | 1 | - /85 | - /87 | - /88 | - /89 | 38 | 102 | (F) | |||||||||||||
| Urugua-i | Argentina | Electriciad Misiones S.A. | H | Urugua-i | 1175 | 10/85 | 04/88 | 04/89 | - /89 | 77 | 687 | 590 | 626 | V | (6) | 0.80 | (17) | 0.80 | (1) | 400 | 400 | 60 | 0 | (-) |
| S.W. Freese (formerly Stacy - spillway) | USA | Colorado River Municipal Water District | W | Colorado | 700 | 05/87 | 05/88 | 04/89 | 01/90 | 31 | 173 | 89 | 158 | V | (13) | 0.831 | (17) | ogee | (12) | 300 | 300 | 125 | 62 | (C) |
| Tirgu Jiu | Romania | Romanian Electricity Authority (RENAL) - Tirgu Jiu Branch | H | Jiu | 2 | 08/86 | 06/88 | 05/89 | 12/93 | 24 | 61 | 13 | 26 | (12) | (12) | ogee | (12) | 300 | 900 | 125 | 0 | (-) | ||
| Spitskop | South Africa | Department of Water & Sanitation | I | Harts | 61 | 05/88 | 09/88 | 06/89 | 11/89 | 15 | 100 | 17 | 36 | V | (1) (15) | 0.70 | (15) | 0.70 | (1)* | 250 | 250 | 91 | 92 | (F) |
| Rongdi | China | Department of Water Resources & Hydropower, Guangxi Zhuang Autonomous Region | F H I | Dulanghe | 19 | 04/88 | 11/88 | 07/89 | 06/91 | 53 | 136 | 61 | 108 | V | (7) | 0.75 | (10) | 0.65 | (1) | 300 | 300 | 90 69 | 140 111 | (F) |
| Wright’s Retarding Basin | Australia | Australian Capital Territory Government | F | Point Hut Creek | 1 | 01/89 | 06/89 | 08/89 | 10/89 | 18 | 86 | 9 | 9 | V | (7) | 1.00 | (16) | 1.00 | (13) | 300 | 300 | 145 | 73 | (F) |
| Longmentan Nº1 | China | Dehua County, Fujian Province | H I W | Chanxi | 53 | 12/85 | 12/87 | 08/89 | 09/89 | 58 | 150 | 71 | 93 | V 0.30 | (12) (12) | 0.75 | (10) | 0.75 | (13) | 300 | 300 | 72 54 | 82 86 | (F) |
| Wolwedans [A-G] | South Africa | Department of Water & Sanitation | W | Great Brak | 24 | 11/87 | 10/88 | 10/89 | 11/90 | 70 | 268 | 180 | 210 | V | (1) | 0.50 | (1)* | 0.50 | (1)* | 250 | 250 | 58 | 136 | (F) |
| Tongjiezi (with Niurixigou saddle dam) | China | Guodian Dadu River Basin Hydropower Development Co. | F H I N | Dadu | 200 | 01/85 | 10/88 | 12/89 | 10/94 | 88 | 1029 | 407 | 855 | V | (1) | 0.75 | (10) | 0.75 | (1) | 300 - 500 | 300 - 500 | 79 82 | 79 83 | (F) |
| Tashkumyr | Kyrgyzstan | Ministry of Power Industry | H I | Naryn | 140 | - /82 | 03/87 | 12/89 | 12/90 | 75 | 320 | 100 | 1300 | V | (1) | 0.78 | (1) | 0.78 | (1) | 400 | 400 | 90 | 30 | (N) |
| Shangban | China | H | Wenchuanxi | 10 | - /87 | - /88 | - /89 | - /89 | 47 | 122 | 74 | |||||||||||||
| Pirika | Japan | Hokkaido Development Bureau | F H I | Shirobeshit-oshibetsu | 18 | 10/82 | - /88 | - /89 | 10/91 | 40 | 755 | 163 | 360 | V 0.80 | (1) (1) | 0.80 | (1) | 0.80 | (1) | 250 | 750 | 84 | 36 | (F) |
| Dodairagawa | Japan | Gunma Prefecture | F W | Kabura | 5 | 03/86 | 06/88 | 01/90 | 03/92 | 70 | 300 | 167 | 350 | V 0.40 | (1) (1) | 0.75 | (1) | 0.75 | (1) | 180 | 500 | 96 | 24 | (F) |
| Quail Creek South | USA | Washington County Water Conservancy District | W | Quail Creek | 50 | 02/90 | 03/90 | 05/90 | 08/90 | 42 | 610 | 130 | 150 | V | (1) | V 0.85 | (1) (17) | conduit | 300 | 300 | 80 | 53 | (F) | |
| Tianshenqiao Nº2 | China | China Southern Power Grid | F H | Nanpan | 116 | 01/84 | 04/87 | 06/90 | 12/92 | 61 | 471 | 143 | 284 | V | (1) | V 0.40 | (10) | ogee | (1) | 250 | 250 | 79 | 79 | (F) |
| Concepción | Honduras | Servicio Autonomo Nacional Acueductos y Acantarillados (SANAA) | W | San Jose | 35 | 12/88 | 12/89 | 06/90 | 08/90 | 68 | 694 | 270 | 290 | 0.075 | (2) | 0.80 | (3)* | 0.80 | (1)* | 400 | 400 | 65 | 15 | (N) |
| Wriggleswade | South Africa | Department of Water & Sanitation | W | Kubusie | 94 | 07/88 | 07/89 | 07/90 | 12/90 | 34 | 737 | 134 | 165 | V | (1) | V 0.62 | (1)* | 0.62 | (1)* | 250 | 250 | 44 | 66 | (F) |
| Riou | France | Electricité de France | H I R | Riou | 1 | 01/90 | 06/90 | 07/90 | 03/91 | 26 | 308 | 41 | 46 | V | (2) | 0.60 | (14)* | 0.60 | (14)* | 300 | 300 | 120 | (R) | |
| Maroño | Spain | Diputación Foral de Alava | W | Izoria and Idas | 2 | 01/89 | 11/89 | 08/90 | 11/91 | 53 | 182 | 80 | 91 | 0.05 | (3) | V 0.75 | (3)* (3)* | 0.75 | (1)* | 300 | 300 | 80 65 | 160 170 | (F) |
| Caraibas - CEMIG | Brazil | CEMIG (Companhia Energetica de Minas Gerais) | F I | Caraibas | 10 | 04/90 | 07/90 | 09/90 | 02/91 | 26 | 160 | 18 | 22 | 0.10 | (1) | 0.80 | (3)* | 0.80 | (1)* | 300 | 300 | 70 | 20 | (N) |
| Asari | Japan | Hokkaido Prefecture | F W | Asari | 9 | 07/86 | 10/87 | 09/90 | 03/93 | 74 | 390 | 259 | 517 | V 0.30 | (1) (1) | 0.80 | (1) | 0.80 | (1) | 180 | 500 | 96 | 24 | (F) |
| Aoulouz | Morocco | Direction des Aménagements Hydrauliques | F G I | Souss | 110 | 03/88 | 11/89 | 09/90 | 11/91 | 79 | 476 | 680 | 850 | V | (1) | 0.85 | (1)* | 0.85 | (1) | 500 | 500 | 84 63 | 36 27 | (M) |
| Hervás | Spain | Junta de Extremadura | W | Hervás | 1 | 01/89 | 03/90 | 09/90 | 10/90 | 33 | 210 | 24 | 43 | 0.15 | (1) | 0.70 | (1)* (5)* | 0.70 | (1) | 300 | 300 | 80 | 155 | (F) |
| Freeman diversion | USA | United Water Conservancy District | G | Santa Clara | 03/90 | 07/90 | 09/90 | - /91 | 17 | 366 | 101 | 110 | V | (1) | 0.80 | (17) | 0.80 | (17) | 300 | 300 | 125 | 83 | (F) | |
| Kamuro | Japan | Yamagata Prefecture | F W | Kaneyama | 7 | 07/86 | 07/88 | 10/90 | 08/93 | 61 | 257 | 136 | 307 | V 0.60 | (1) (1) | 0.75 | (1) | 0.75 | (1) | 150 - 200 | 500 | 96 | 24 | (F) |
| Glen Melville | South Africa | Department of Water & Sanitation | W | Ecca | 7 | 02/88 | 04/89 | 12/90 | 04/91 | 32 | 380 | 66 | 114 | V | (1) | V 0.75 | (1) (1)* | 0.75 | (1)* | 330 | 330 | 65 | 65 | (F) |
| Thornlea | South Africa | Umlaas Irrigation Board | I | Mlazi | 3 | 06/90 | 10/90 | 12/90 | 02/91 | 17 | 135 | 16 | 17 | V | (1) | 0.90 | (3)* | 0.90 | (1) | 170 | 170 | 38 | 87 | (S) |
| Nickajack Auxillary Spillway | USA | Tennessee Valley Authority | H | Tennessee | 311 | 08/89 | 07/90 | 02/91 | 04/92 | 17 | 427 | 79 | 79 | 0.25 | (3)* | 0.60 | (3)* | 0.60 | (3)* | 300 | 600 | 85 | 119 | (F) |
| Gameleiras | Brazil | CODEVASF | F I R W | Gameleiras | 145 | 07/90 | 12/90 | 04/91 | 05/91 | 29 | 150 | 27 | 29 | V | (1) | (1)* | 400 | 400 | 52 | 13 | (-) | |||
| Cuchillo Negro | USA | City of Truth or Consequences | F | Cuchillo Negro | 10/89 | 03/90 | 05/91 | 07/91 | 50 | 186 | 75 | 82 | V | (7) | 0.90 | (17) | separate | 300 | 300 | 77 | 59 | (F) | ||
| Sakaigawa | Japan | Toyama Prefecture | F H I W | Sakai | 60 | 03/85 | - /87 | 07/91 | 01/93 | 115 | 298 | 373 | 713 | V 0.80 | (1) (1) | 0.78 | (1) | 0.78 | (1) | 180 | 750 | 84 | 36 | (F) |
| New Victoria | Australia | Water Authority of Western Australia | W | Munday Brook | 10 | 08/90 | 03/91 | 08/91 | 11/91 | 52 | 285 | 121 | 135 | V | (14) | 0.325 0.80 | (14)* (14)* | 0.325 0.80 | (14)* (14)* | 300 | 300 | 79 | 160 | (F) |
| Burguillos del Cerro | Spain | Junta de Extremadura | W | Ribera de los Montes | 3 | 12/90 | 05/91 | 09/91 | 12/91 | 24 | 167 | 25 | 33 | V | (14) | 0.13 0.60 | (14)* | 0.60 | (13)* | 300 | 300 | 80 | 135 | (F) |
| Victoria replacement | USA | Upper Peninsula Power Co., Michigan | H | West Branch | 13 | 04/91 | 08/91 | 10/91 | 06/92 | 37 | 100 | 36 | 40 | V | (12) | 0.80 | (3)* | 0.80 | (3)* | 300 | 300 | 67 | 67 | (C) |
| La Puebla de Cazalla | Spain | Confederación Hidrográfica del Guadalquivir | I | Corbones | 74 | 03/88 | 08/89 | 10/91 | 12/91 | 71 | 220 | 205 | 220 | V 0.20 | (3) (3) | 0.80 | (3)* | 0.80 | (3)* | 300 | 300 | 80 | 130 | (F) |
| Belén-Cagüela | Spain | Junta de Andalucia | F | Belén | 1 | 03/91 | 06/91 | 10/91 | 10/91 | 31 | 160 | 24 | 29 | 0.05 | (3) | 0.75 | (3)* | 0.75 | (3)* | 300 | 300 | 73 | 109 | (F) |
| Choldocogagna (or Xoldokogaina) | France | CAPB (Communauté d'Agglomération Pays Basque) | W | Lessarte | 1 | 04/91 | 07/91 | 10/91 | 12/91 | 32 | 132 | 19 | 23 | 0.10 | (1) | 0.75 | (16) | 0.75 | (1)* | 300 | 300 | 110 | (R) | |
| Belén-Gato | Spain | Junta de Andalucia | F | Belén | 1 | 07/91 | 09/91 | 11/91 | 11/91 | 34 | 158 | 36 | 41 | 0.05 | (3) | 0.75 | (3)* | 0.75 | (3)* | 300 | 300 | 73 | 109 | (F) |
| Sabigawa (lower dam) | Japan | Tokyo Electric Power Company | H | Kosabi | 11 | 10/86 | 03/90 | 12/91 | 11/92 | 104 | 273 | 400 | 590 | 0.10 | (1) | 0.80 | (1) | 0.80 | (1) | 250 | 750 | 91 | 39 | (F) |
| Caballar I | Spain | Junta de Andalucia | F | Belén | 1 | 09/91 | 09/91 | 12/91 | 12/91 | 16 | 98 | 6 | 7 | 0.05 | (3) | 0.75 | (3)* | 0.75 | (3)* | 300 | 300 | 73 | 109 | (F) |
| Amatisteros III | Spain | Junta de Andalucia | F | Belén | 1 | - /91 | 09/91 | 12/91 | - /92 | 15 | 75 | 4 | 5 | V | (3) | 0.75 | (3)* | 0.75 | (3) | 300 | 300 | 73 | 109 | (F) |
| Maoeryan [A] | China | Shiqi | 33 | - /68 | - /88 | - /91 | - /93 | 35 | ||||||||||||||||
| Machado | Brazil | COMPESA (Companhia Pernambucana de Saneamento) | H W | Riacho do Chorão | 15 | - /89 | - /90 | - /91 | - /92 | 42 | 360 | |||||||||||||
| Belén-Flores | Spain | Junta de Andalucia | F | Belén | 1 | 09/91 | 11/91 | 01/92 | 01/92 | 28 | 87 | 10 | 12 | 0.05 | (3) | 0.75 | (3)* | 0.75 | (3)* | 300 | 300 | 73 | 109 | (F) |
| Yantan | China | Datang Yantan Hydropower Co. Ltd. | F H N | Hongshui | 3350 | 03/85 | 02/89 | 03/92 | 12/95 | 110 | 525 | 626 | 905 | V | (1) | V 0.80 | (1) (1)* | ogee | (1) | 300 | 300 | 55 | 104 | (F) |
| Alan Henry Spillway | USA | Brazos River Authority | W | Double Mountain Fork | 140 | 03/91 | 12/91 | 04/92 | - /93 | 25 | 84 | 22 | 23 | V | (13) | 1.10 | (17) | ogee | (1) | 300 | 300 | 119 | 59 | (F) |
| Capanda | Angola | Ministry of Energy and Oil of P. R. Angola | H | Kwanza | 4795 | 02/87 | 10/89 | 05/92 | 12/07 | 110 | 1203 | 757 | 1154 | V | (6) | 0.70 | (14) (10) | 0.70 | (13) | 400 | 400 | 70 | 100 | (M) |
| Shuikou | China | Shuikou Hydropower Plant | F H N | Min | 2613 | 03/87 | 10/90 | 05/92 | 05/95 | 101 | 791 | 600 | 1710 | V | (1) | 0.73 | (1) | ogee | (1) | 200 - 330 | 200 - 330 | 60 70 | 110 90 | (F) |
| Jim Wilson (formerly Town Wash Detention) | USA | Town of Mesquite, Nevada | F | Town Wash | 01/92 | 03/92 | 05/92 | 06/92 | 18 | 264 | 43 | 45 | V | (14) | 1.50 | (3) | 1.50 | (3)* (17)* | 200 | 200 | 107 | 71 | (F) | |
| Urdalur | Spain | Confederación Hidrográfica del Ebro | W | Alzania | 5 | 03/90 | 08/91 | 07/92 | 10/92 | 58 | 396 | 150 | 240 | V | (1) | 0.75 | (3)* | 0.75 | (3)* | 300 | 300 | 72 | 108 | (F) |
| Christian E. Siegrist | USA | City of Lebanon Authority | W | Mill | 4 | 09/91 | 04/92 | 07/92 | - /93 | 40 | 213 | 69 | 70 | V | (6) | 0.80 | (17) | 0.80 | (1) | 300 | 300 | 59 | 34 | (F) |
| Taung | South Africa | Department of Water & Sanitation & the former Bophuthatswana Department of Water Affairs | I W | Harts | 66 | 06/90 | 08/91 | 09/92 | 05/93 | 50 | 320 | 132 | 153 | V | (1) | V 0.75 | (1) (1)* | 0.75 | (1)* | 250 | 250 | 44 | 66 | (F) |
| Arriarán | Spain | Diputacion Foral de Gipuzkoa | W | Arriarán | 3 | 10/91 | 04/92 | 09/92 | 02/94 | 58 | 206 | 110 | 113 | 0.05 | (3) | 0.70 | (3)* | 0.70 | (3)* | 300 | 300 | 85 | 135 | (F) |
| Zintel Canyon | USA | City of Kennewick, Washington | F | Zintel | 3 | 03/92 | 07/92 | 10/92 | 12/92 | 39 | 158 | 54 | 55 | V | (7) | 0.85 | (17) | 0.85 | (17) | 300 | 300 | 74 | 0 | (-) |
| Kroombit | Australia | Water Resources Commission, Queensland | G I | Kroombit Creek | 13 | 03/92 | 06/92 | 10/92 | 12/92 | 26 | 250 | 84 | 110 | V | (1) | 0.70 | (1) | 0.70 | (1) | 300 | 300 | 82 | 107 | (F) |
| Burton Gorge | Australia | North Goonyella Coal Properties | W | Isaac | 20 | 07/92 | 09/92 | 11/92 | 12/92 | 26 | 285 | 64 | 68 | V 1.00 | (8) (17) | 0.80 1.00 | (3)* (17) | 0.80 | (13)* | 300 | 300 | 85 | 0 | (-) |
| Ryumon | Japan | Ministry of Construction | F I W | Sakoma | 42 | 09/87 | 03/90 | 11/92 | 03/97 | 100 | 378 | 521 | 836 | V 0.30 | (1) (1) | 0.80 | (1) | 0.80 | (1) | 150 - 200 | 750 - 1000 | 91 | 39 | (F) |
| Joumoua | Morocco | Direction des Aménagements Hydrauliques | W | Joumoua | 7 | 07/89 | 06/90 | 11/92 | 12/92 | 57 | 250 | 150 | 200 | 0.20 | (5) | 0.80 | (1)* | 0.80 | (1)* | 350 | 350 | 105 180 | 45 0 | (-) |
| Wan’an | China | China Guodian Corporation | F H I N | Gan | 2216 | 11/84 | 12/90 | 12/92 | 06/94 | 68 | 1104 | 156 | 1480 | V | (1) | 0.80 | (1) | ogee | (1) | 300 | 300 | 65 | 105 | (F) |
| Trigomil | Mexico | CNA (Comisión Nacional del Agua) | F I | Ayuguila | 324 | 12/86 | 02/91 | 12/92 | 12/93 | 107 | 250 | 362 | 681 | V 0.24 | (5) | V 0.80 | (5) (17) | 0.80 | (1) | 300 | 300 | 148 | 47 | (F) |
| Guangzhou PSS- Lower dam | China | China Southern Power Grid | H | Liuxihe | 30 | 12/94 | 10/91 | 12/92 | 10/00 | 61 | 153 | 32 | 57 | V | (1) | 0.70 | (3)* | ogee 0.78 | (1) (1) | 300 | 300 | 62 | 108 | (F) |
| Paxton | South Africa | Private farmer | I | Tsorwo | 1 | - /90 | 01/91 | 12/92 | - /92 | 17 | 70 | 3 | 3 | V | (3) | V 0.50 | (3) | 0.50 | (3) | 150 | 150 | 70 | 100 | (F) |
| Guxian (GuhXiahn) | China | Yellow River Conservancy Commission | F H I | Luo | 1175 | - /78 | - /89 | - /92 | - /93 | 125 | 315 | |||||||||||||
| Hattabara | Japan | Ministry of Construction | F W | Ashida | 60 | 08/88 | - /89 | - /92 | 03/98 | 85 | 325 | 228 | 500 | V 0.20 | (1) (1) | 0.75 | (1) | 0.75 | (1) | 150 - 200 | 750 | 84 | 36 | (F) |
| Petit Saut | French Guyana | Electricité de France | H | Sinnamary | 3500 | 07/89 | 07/92 | 02/93 | 05/94 | 48 | 740 | 250 | 410 | V | (11) | V 0.80 | (7) (16) | 0.80 | (13) | 300 | 300 | 120 | (R) | |
| Elmer Thomas - replacement | USA | US Fish and Wildlife Service, Department of the Interior | R | Little Medicine Creek | 10 | 02/92 | 01/93 | 02/93 | 05/93 | 34 | 128 | 29 | 34 | V | (1) | 0.64 | (1) | none | 300 | 300 | 89 | 89 | (F) | |
| Jinjiang | China | Jinjiang Electric Co. | F H | Jinjianghe | 189 | 07/90 | 10/91 | 03/93 | 07/93 | 68 | 229 | 182 | 267 | V | (1) | 0.75 | (1) | 0.65 | (1) (1) | 300 | 3000 | 70 | 80 | (F) |
| Marathia [H-F] | Greece | Ministry of Agriculture | I W | Marathia | 3 | 11/91 | 12/92 | 04/93 | 06/93 | 28 | 265 | 31 | 48 | 0.50 | (13) | 0.50 | (10) | 0.50 | (13) | 200 - 300 | 200 - 300 | 55 | 15 | (N) |
| Puding [A] | China | Guizhou Qianyuan Power Co. Ltd. | H I W | Sanchahe | 377 | 03/89 | 06/92 | 05/93 | 02/94 | 75 | 196 | 103 | 137 | V | (1) | 0.35 | (1) | ogee 0.35 | (1) (1) | 300 | 300 | 85 54 | 103 99 | (F) |
| Imi el Kheng | Morocco | Direction des Aménagements Hydrauliques | G I | Berhil | 12 | 04/92 | 09/92 | 07/93 | 04/94 | 39 | 170 | 97 | 109 | 0.20 | (5) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 100 110 | 20 20 | (N) |
| Tsugawa | Japan | Okayama Prefecture | F H W | Kamo | 6 | 10/89 | 10/91 | 07/93 | 03/94 | 76 | 228 | 222 | 342 | V 0.60 | (1) (1) | 0.76 | (1) | 0.76 | (1) | 250 | 750 | 96 | 24 | (F) |
| Cenza | Spain | Iberdrola, S.A. | H | Cenza | 43 | 01/92 | 03/93 | 08/93 | 12/93 | 49 | 609 | 200 | 225 | V | (3) | 0.122 0.75 | (3)* (3)* | 0.75 | (3)* | 300 | 300 | 70 | 130 | (F) |
| Clifford D. Craig (formerly Spring Hollow) | USA | Western Virginia Water Authority | W | off-stream | 12 | 10/92 | 03/93 | 08/93 | - /94 | 74 | 302 | 222 | 223 | V | (6) | 0.80 | (17) | none | 300 | 300 | 53 | 53 | (F) | |
| Hudson River Nº11 | USA | Banks County | W | Mountain Creek | 11/92 | 04/93 | 08/93 | - /93 | 21 | 168 | 26 | 28 | V | (6) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 119 | 84 | (F) | |
| Shuidong | China | Fujian Shuikou Power Generation Group | H N | Youxi | 108 | 04/91 | 11/92 | 10/93 | 12/95 | 63 | 197 | 126 | 184 | V | (7) | 0.75 | (10) | 0.75 | (1) | 300 | 300 | 50 | 90 | (F) |
| Sierra Brava | Spain | Confederación Hidrográfica del Guadiana | I | Pizarroso | 232 | 12/90 | 06/92 | 11/93 | 12/93 | 54 | 835 | 277 | 340 | 0.05 | (14) | 0.75 | (14)* | 0.75 | (14)* | 300 | 300 | 80 | 140 | (F) |
| Kodama | Japan | Fukushima Prefecture | F W | Kodama | 14 | 10/89 | 05/91 | 12/93 | 03/97 | 102 | 280 | 358 | 570 | V 0.20 | (1) (1) | 0.76 | (1) | 0.76 | (1) | 250 | 750 | 91 | 36 | (S) |
| La Cantache (formerly Villaumur) | France | Conseil Departemental d'Ille-et-Vilaine | F | Le Cantache | 7 | 07/93 | 10/93 | 12/93 | 03/94 | 16 | 147 | 11 | 15 | V | (11) | 0.75 | (1)* | 0.75 | (1)* | 300 | 300 | 90 | (R) | |
| Vinoramas | Mexico | CNA (Comisión Nacional del Agua)/Estado de Sinaloa | F I | El Bledal | 102 | 10/91 | 04/93 | 12/93 | 01/94 | 50 | 807 | 117 | 184 | V | (5) | 0.80 | (3)* | 0.80 | (13) | 300 | 300 | 100 | 100 | (M) |
| Miyatoko | Japan | Miyagi Prefecture | F W | Miyatoko | 5 | 06/89 | 06/90 | 12/93 | 01/97 | 48 | 256 | 172 | 280 | 0.60 | (1) | 0.80 | (1) | 0.80 | (1) | 180 | 500 | 96 | 24 | (F) |
| Daguangba | China | Hainan Provincial Electric Power Company (HEPCO) | H I W | Changhua | 1710 | 06/90 | 12/91 | 12/93 | 07/95 | 57 | 719 | 485 | 860 | V | (1) | 0.75 | (10) (3) | 0.75 | (1) | 300 | 300 | 55 | 96 | (F) |
| Sahla | Morocco | Direction des Aménagements Hydrauliques | I W | Sahla | 62 | 05/92 | 11/92 | 12/93 | 07/94 | 55 | 160 | 130 | 160 | 0.20 | (5) | 0.90 | (1)* | 0.80 | (1)* | 300 | 300 | 85 125 | 15 25 | (N) |
| Suoshai | China | Guizhou Hongfeng Hydropower Plant | H | Sancha | 420 | - /89 | - /90 | - /93 | - /94 | 75 | 196 | 88 | ||||||||||||
| Pelo Sinal | Brazil | SUPLAN/RN | W | Taperobá | 76 | 12/91 | - /92 | - /93 | - /94 | 34 | 296 | 69 | 89 | (1) | 300 | 300 | 64 | 16 | (-) | |||||
| Sep | France | Syndicat Mixte pour l’Amenagement de la Haute Morge (SMAHM) | I | Sep | 5 | 04/93 | 09/93 | 01/94 | 03/94 | 46 | 145 | 49 | 58 | V | (11) | 0.72 | (16) | 0.72 | (3)* | 300 | 300 | 120 | (R) | |
| Pak Mun | Thailand | Electricity Generating Authority of Thailand (EGAT) | H | Mun | 04/91 | 12/93 | 03/94 | 06/94 | 26 | 323 | 48 | 50 | V V | (13) (15) | V 0.80 | (13) (15) | separate | 300 | 300 | 58 | 124 | (F) | ||
| Hinata | Japan | Iwate Prefecture | F | Kasshi | 6 | 12/90 | 11/92 | 05/94 | 03/98 | 57 | 290 | 113 | 232 | V | (1) | 0.75 | (1) | 0.75 | (1) | 180 - 250 | 750 | 84 | 36 | (F) |
| Shanzi | China | Lianjiang Water Conservancy Bureau | F H I W | Aojiang | 172 | 08/92 | 11/93 | 05/94 | 06/95 | 66 | 274 | 180 | 272 | V | (5) | 0.80 | (10) | 0.77 | (13) | 300 | 300 | 65 55 | 125 95 | (F) |
| San Lazaro | Mexico | CNA (Comisión Nacional del Agua) | F G W | San Lazaro | 11 | 10/85 | 04/94 | 06/94 | 07/94 | 37 | 176 | 35 | 53 | V 0.20 | (5) | 0.80 | (3)* | 0.80 | (13) | 300 | 300 | 100 90 | 220 220 | (M) |
| Wenquanbao [A] | China | Wenquanbao Reservoir Management Office | F H I W | Tanghe | 7 | 10/91 | 10/92 | 06/94 | - /95 | 48 | 188 | 55 | 63 | V | (4) | 0.30 | (3) | ogee | (13) | 300 | 300 | 110 69 | 68 85 | (F) |
| Rocky Gulch | USA | Phelps Dodge Corporation | P | Rocky Gulch | 05/94 | 05/94 | 06/94 | 07/94 | 18 | 55 | 6 | 7 | V | (1) | 0.80 | (17) | none | 300 | 300 | 184 | 0 | (-) | ||
| San Rafael | Mexico | CFE (Comisión Federal de Electricidad) | F H | Santiago | 26 | 11/93 | 05/94 | 07/94 | 07/94 | 48 | 176 | 81 | 110 | V | (5) | 0.66 0.80 | (3)* | separate | 300 | 300 | 90 | 130 | (N) | |
| Lac Robertson | Canada | Hydro-Québec | H | Ha! Ha! | 587 | 10/92 | 06/94 | 08/94 | 03/95 | 40 | 124 | 28 | 35 | V | (1) | 0.75 | (1)* | separate | 300 | 300 | 85 | 85 | (F) | |
| La Touche Poupard | France | CAEDS | I | Chambon | 15 | 08/93 | 04/94 | 08/94 | 12/94 | 36 | 200 | 34 | 46 | V | (1) | 0.75 | (3)* | 0.75 | (1)* | 300 | 300 | 115 | (R) | |
| Lower Molonglo Bypass Storage | Australia | Icon Water (formerly ACT Electricity and Water) | P | Unnamed creek | 1 | 02/94 | 06/94 | 08/94 | 11/94 | 32 | 120 | 22 | 27 | V | (1) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 96 | 64 | (F) |
| Várzea Grande | Brazil | SUPLAN/PB | W | Picuí | 21 | 10/93 | 10/94 | 10/94 | - /95 | 31 | 135 | 27 | 28 | (1) | (3)* | 300 | 300 | 56 | 14 | (N) | ||||
| Cova da Mandioca | Brazil | CODEVASF (Companhia de Desenvolvimento dos Vales do Sao Francisco do Parnaiba) | I W | Cova da Mandioca | 126 | 01/93 | 09/93 | 12/94 | 12/94 | 32 | 342 | 75 | 79 | V | (1) | 0.75 | (3)* | 0.75 | (1)* | 400 | 400 | 64 | 16 | (-) |
| do Prata | Brazil | Companhia Pernambucana de Saceamento | W | da Prata | 42 | - /92 | 09/93 | 12/94 | - /95 | 26 | 405 | 61 | 75 | 300 | 300 | 80 | 0 | (-) | ||||||
| Catou | China | Dongyuan County | H | Yinjiang | 1 | - /92 | - /93 | - /94 | - /94 | 35 | 115 | 223 | 0.90 | 0.90 | 0.90 | |||||||||
| Maojiang [A] | China | Lanshan County Hydropower Bureau | H I | Xiang | 2 | - /92 | - /93 | - /94 | - /95 | 45 | 150 | 45 | (F) | |||||||||||
| Sishanping [A] | China | Huangcen Reservoir Management Office | F H I | Leishui | 3 | - /92 | - /93 | - /94 | - /95 | 56 | 147 | 18 | (F) | |||||||||||
| Miyagase | Japan | Ministry of Construction | F H W | Nakatsu | 193 | 11/87 | 11/91 | 02/95 | 03/01 | 156 | 400 | 1537 | 2060 | 0.20 0.60 | (1) (1) | 0.625 | (1) | 0.625 | (1) | 150 - 200 | 750 | 91 | 39 | (F) |
| Yoshida | Japan | Kagawa Prefecture | F W | Yoshida | 2 | 07/91 | 07/93 | 02/95 | 03/96 | 75 | 218 | 265 | 304 | V | (1) | 0.75 | (1) | 0.75 | (1) | 250 | 750 | 84 | 36 | (F) |
| Chiya | Japan | Okayama Prefecture | F H W | Takahashi | 28 | 03/89 | 09/92 | 04/95 | 03/98 | 98 | 259 | 396 | 670 | V | (1) | 0.77 | (1) | 0.77 | (1) | 250 | 750 | 91 | 39 | (F) |
| Canoas | Brazil | Companhia de Gestão dos Recursos Hídricos | I W | Riacho da Madeira | 69 | 07/93 | 08/94 | 05/95 | - /96 | 51 | 116 | 87 | 93 | 0.10 | (1) | 0.80 | (10)* | 0.80 | (1)* | 300 | 300 | 64 | 16 | (N) |
| Ohmatsugawa | Japan | Akita Prefecture | F H W | Matsu | 12 | 07/90 | 10/92 | 06/95 | 09/96 | 65 | 296 | 141 | 294 | V 0.70 | (1) (1) | 0.76 | (1) | 0.76 | (1) | 250 | 750 | 91 | 39 | (F) |
| Xibingxi [A-G] | China | Department of Electric Power, Lonyan City, Fujian Province | H W | Longshanxi | 9 | 08/93 | 12/94 | 07/95 | 10/95 | 64 | 93 | 25 | 33 | V 0.08 | (4) (4) | 0.65 | (3) | ogee 0.65 | (13) | 300 - 350 | 300 - 350 | 80 79 | 120 105 | (F) |
| Guanyinge (Kwan-in-Temple) | China | Guanyinge Reservoir Management Bureau | F H I W | Taizi | 2168 | 05/90 | 09/91 | 09/95 | 10/95 | 82 | 1040 | 1240 | 1876 | V 0.10 | (1) (1) | 0.70 | (1) | 0.70 | (1) | 270 - 280 | 750 | 91 | 39 | (F) |
| Satsunaigawa | Japan | Hokkaido Development Bureau | F H I W | Satsunai | 54 | 02/87 | 04/91 | 10/95 | 03/99 | 114 | 300 | 536 | 770 | 0.40 | (1) | 0.80 | (1) | 0.80 | (1) | 250 | 750 | 78 | 42 | (S) |
| Enjil | Morocco | Direction des Aménagements Hydrauliques | I W | Taghoucht | 12 | 11/93 | 03/94 | 10/95 | 03/96 | 36 | 80 | 45 | 57 | 0.20 | (5) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 110 150 | 0 0 | (N) |
| New Peterson Lake | USA | City of Greeley | W | Tributary of Cache La Poudre | 3 | 05/95 | 09/95 | 11/95 | 12/95 | 21 | 70 | 7 | 8 | V | (1) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 145 | 48 | (F) |
| Shiokawa | Japan | Yamanashi Prefecture | F I W | Shio | 12 | 05/93 | 08/93 | 11/95 | 03/99 | 79 | 225 | 299 | 388 | 0.10 0.70 | (1) (1) | 0.76 | (1) | 0.76 | (1) | 250 | 750 | 96 | 24 | (F) |
| Urayama | Japan | Water Resources Development Public Corporation | F H W | Urayama | 58 | 03/90 | 12/92 | 12/95 | 03/99 | 156 | 372 | 1294 | 1750 | V 0.65 | (1) (1) | 0.80 | (1) | 0.80 | (1) | 250 | 750 1000 | 91 | 39 | (F) |
| Shimantan | China | Department of Water Resources, Henan Province | F I W | Gunhe | 120 | 07/93 | 04/94 | 12/95 | 07/96 | 41 | 650 | 272 | 351 | V | (3') | 0.75 | (3)* | 0.75 | (1) | 300 | 300 | 98 51 | 98 107 | (F) |
| Shibanshui | China | Fengdu Water Resources Bureau | F H R | Longxihe | 105 | 12/92 | 04/94 | - /95 | - /96 | 84 | 445 | 335 | 564 | V | (3') | 0.65 | (1) | 0.65 | (13) | 300 | 1000 | 126 60 | 84 90 | (F) |
| Açude Acauã | Brazil | DNOCS (Departamento Nacional de Obras Contra a Seca) | F I W | Paraíba | 247 | - /93 | - /93 | - /95 | - /95 | 79 | 440 | 674 | 734 | (1) | (3)* | (1)* | 300 | 300 | 64 | 16 | (N) | |||
| Juba I | Brazil | Itamarati Norte S.A. (part of Brennand Energia) | H | Juba | - /93 | - /94 | - /95 | - /96 | 21 | 238 | 96 | 113 | 60 | 15 | (N) | |||||||||
| Juba II | Brazil | Itamarati Norte S.A. (part of Brennand Energia) | H | Juba | - /93 | - /94 | - /95 | - /96 | 21 | 238 | 105 | 113 | 60 | 15 | (N) | |||||||||
| Passagem de Trairas | Brazil | Secretaria de Meio Ambiente e dos Recursos Hídricos do Estado do Rio Grande do Norte | R W | Seridó | 50 | - /93 | - /94 | - /95 | - /96 | 26 | 458 | 27 | 28 | 64 | 16 | (N) | ||||||||
| Oeste | Brazil | Barragem Oeste - SDC | F | Itajai do Oeste | 100 | - /93 | - /94 | - /95 | - /96 | 30 | 367 | |||||||||||||
| Nacaome | Honduras | Secretaria de Recursos Naturales | W | Rio Grande Nacaome | 42 | 06/93 | 08/94 | - /95 | - /95 | 54 | 320 | 250 | 300 | 0.15 | (2) | 0.80 | (3)* | 0.80 | (12)* | 400 | 400 | 64 | 21 | (N) |
| Ano Mera [H-F] | Greece | Ministry of Agriculture | I W | Ano Mera | 1 | 04/93 | 03/95 | - /95 | - /97 | 32 | 170 | 49 | 64 | 0.50 | (13) | 0.50 | (10) | 0.50 | (1) | 200 - 300 | 200 - 300 | 55 | 15 | (N) |
| Jordão | Brazil | COPEL (Companhia Paranense de Energia) | H | Jordão | 110 | 05/94 | 01/95 | 02/96 | 09/96 | 95 | 550 | 570 | 647 | V | (1) | 0.74 | (3)* | 0.74 | (12) | 400 | 400 | 60 | 15 | (N) |
| Pangue | Chile | Empresa Electrica Pangue SA | H | Bio-Bio | 175 | 01/92 | 01/95 | 02/96 | 12/96 | 113 | 410 | 670 | 740 | V | (1) | 0.80 | (3)* | 0.80 | (12) | 300 | 300 | 80 | 100 | (N) |
| Derivação do Rio Jordão | Brazil | Copel Geração e Transmissão S.A. | H | Jordão | 110 | 05/94 | 01/95 | 03/96 | 12/97 | 73 | 560 | 576 | 665 | |||||||||||
| Loyalty Road flood retarding basin | Australia | Upper Parramatta River Catchment Trust | F | Darling Mills Creek | 06/95 | 12/95 | 04/96 | 08/96 | 30 | 111 | 20 | 22 | V | (7) | 0.80 | (7) | 0.80 | (7) | 300 | 300 | 50 | 30 | (S) | |
| Bailongtan | China | Guangxi-Guiguang Electric Power Development Co. Ltd. | H I N | Hongshuihe | 340 | 02/93 | 10/95 | 04/96 | 08/97 | 34 | 710 | 62 | 80 | V | (1) | 0.70 | (10)* | 0.70 | (5)* | 300 | 300 | 73 99 | 110 60 | (F) |
| Shimagawa | Japan | Gunma Prefecture | F W | Shima | 9 | 03/91 | - /94 | 05/96 | 03/98 | 90 | 330 | 390 | 516 | V 0.50 | (1) (1) | 0.80 | (1) | 0.80 | (1) | 250 | 750 | 84 | 36 | (F) |
| Jack Turner (formerly Big Haynes) | USA | Conyers-Rockdale Big Haynes Imp. Authority | W | Big Haynes Creek | 10/94 | 02/95 | 06/96 | 09/96 | 27 | 427 | 72 | 74 | V | (8) | 0.80 | (10)* | 0.80 | (10)* | 300 | 300 | 42 39 | 42 39 | (F) | |
| Hiyoshi | Japan | Water Resources Development Public Corporation | F H W | Katsura | 66 | - /83 | 10/94 | 07/96 | 03/98 | 70 | 438 | 440 | 670 | V 0.80 | (1) (1) | 0.80 | (1) | 0.80 | (1) | 250 | 750 1000 | 84 77 | 36 33 | (F) |
| Boqueron | Spain | Confederación Hidrográfica del Segura | F | Rambla del Boqueron | 13 | 10/94 | 02/96 | 08/96 | 12/97 | 58 | 290 | 137 | 145 | 0.05 | (3') | 0.73 | (3') | 0.73 | (3')* | 300 | 300 | 55 | 130 | (F) |
| Grand Falls spillway | Canada | Abitibi-Price Inc. | H | Exploits | 08/96 | 09/96 | 09/96 | 12/96 | 15 | 180 | 7 | 11 | V | (1) | 0.67 | (1)* | 0.67 | (1)* | 200 | 200 | 130 | 75 | (F) | |
| Mantaicheng | China | Wangqing County Water Conservancy Bureau | H I | Gayahe | 10 | 08/92 | 01/93 | 12/96 | 08/97 | 37 | 337 | 78 | 100 | V | (1) | 0.75 | (10) | ogee 0.70 | (1) (1) | 300 | 1000 | 60 | 120 | (F) |
| Dahekou | China | Chongqing Wujiang Power Company | F H | Apengjiang | 115 | - /93 | - /94 | - /96 | - /97 | 85 | 149 | 33 | ||||||||||||
| Guilman-Amorin | Brazil | Arcelor Mittal Brasil S.A. | H | Piracicaba | 12 | - /93 | - /95 | - /96 | 10/97 | 41 | 143 | 85 | 102 | 300 | 300 | 80 | 20 | (N) | ||||||
| Tomisato | Japan | Water Resources Development Public Corporation | F I W | Douzan | 53 | 02/92 | - /95 | 02/97 | 03/00 | 111 | 250 | 355 | 510 | V | (1) | 0.76 | (1) | 0.76 | (1) | 250 | 750 1000 | 84 72 | 36 48 | (F) |
| Platanovryssi | Greece | Public Power Corporation (PPC) | H I | Nestos | 84 | 01/89 | 10/95 | 03/97 | 06/99 | 95 | 305 | 420 | 440 | 0.10 | (14) | 0.75 | (14)* | 0.75 | (13) | 300 | 300 | 50 | 225 | (C) |
| Wanyao | China | Wanyao Reservoir Management Bureau | F H I W | Dahexi | 223 | 10/93 | 01/95 | 05/97 | 07/97 | 83 | 390 | 320 | 458 | V 0.20 | (1) (1) | 0.70 | (5) | 0.75 | (13) | 300 | 300 | 64 | 96 | (F) |
| Queiles y Val | Spain | Confederación Hidrográfica del Ebro | F | Val | 25 | 01/93 | 10/95 | 05/97 | 12/98 | 82 | 375 | 480 | 520 | V 0.33 | (1) (1) | 0.80 | (5) | 0.80 | (1) | 300 | 300 | 80 | 145 | (F) |
| Atance | Spain | Confederación Hidrográfica del Tajo | I | Salado | 35 | 07/96 | 04/97 | 07/97 | 10/97 | 45 | 184 | 65 | 75 | V | (3) | 0.80 | (3)* | 0.80 | (3)* | 300 | 300 | 57 | 133 | (F) |
| Takisato | Japan | Hokkaido Development Bureau | F H I W | Sorachi | 108 | 10/90 | - /93 | 07/97 | 06/00 | 50 | 445 | 327 | 455 | 0.06 | (1) | 0.80 | (1) | 0.80 | (1) | 250 | 750 | 84 | 36 | (F) |
| Kazunogawa | Japan | Tokyo Electric Power Company | H | Tuchimuro | 12 | 11/92 | 08/95 | 07/97 | 11/99 | 105 | 264 | 428 | 622 | V 0.10 | (1) (1) | 0.82 | (1) | 0.82 | (1) | 170 | 1000 | 91 84 | 39 36 | (F) |
| Qedusizi (formerly Mount Pleasant) | South Africa | Department of Water & Sanitation | F | Klip | 128 | 04/94 | 03/95 | 08/97 | 03/98 | 28 | 490 | 78 | 156 | V | (1) | V 0.70 | (1) (1)* | 0.70 | (1)* | 250 | 250 | 46 | 108 | (S) |
| Tie Hack | USA | City of Buffalo | W | South Fork Clear Creek | 3 | 05/96 | 10/96 | 08/97 | - /97 | 41 | 170 | 62 | 69 | V | (1) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 89 | 83 | (F) |
| Shuangxi | China | Department of Electricity, Dapu County, Guangdong Province | F H I W | Meixihe | 95 | 01/95 | 03/96 | 10/97 | 12/97 | 60 | 221 | 113 | 172 | V | (9) | 0.80 | (1) | 0.78 | (1) | 300 | 300 | 90 55 | 110 105 | (F) |
| Cadiangullong | Australia | Cadia Holdings Pty. Lty. | W | Cadiangullong Creek | 4 | 11/96 | 05/97 | 12/97 | 03/98 | 43 | 356 | 114 | 123 | V | (3') | 0.75 | (1)* (3')* | 0.75 | (1)* | 300 | 300 | 90 | 90 | (F) |
| Taolinkou | China | Department of Water Resources, Hebei Province | F H I R W | Qinglonghe | 859 | 11/92 | 12/94 | 12/97 | - /98 | 75 | 500 | 585 | 1350 | V 0.15 | (1) | 0.78 | (1) | ogee 0.65 | (1) (1) | 300 | 300 | 135 70 | 70 85 | (F) |
| do Peixe | Brazil | CPEE (Companhia Paulista de Energia Elétrica) | H | do Peixe | 2 | 02/96 | 12/96 | 12/97 | - /98 | 32 | 300 | 20 | 34 | V | (1) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 120 90 | 0 0 | (-) |
| Santa Clara-GO | Brazil | Saneamento de Goiás S/A | W | 129 | - /86 | - /95 | - /97 | - /97 | 47 | 129 | ||||||||||||||
| Fengxiangxia [A] | China | Fengdu Hydropower Bureau | H | Huilonghe | 8 | - /93 | - /95 | - /97 | - /98 | 90 | 158 | 770 | 0.10 | 0.76 | 0.76 | |||||||||
| Prata | Brazil | COMPESA (Companhia Pernambucana de Saneamento) | W | Capema | 40 | - /95 | - /96 | - /97 | - /98 | 20 | 405 | |||||||||||||
| Pedro Moura Junior (formerly Belo Jardim) | Brazil | COMPESA (Companhia Pernambucana de Saneamento) | W | Ipojuca (Gravata) | 37 | 05/95 | 09/96 | - /97 | - /98 | 34 | 470 | 113 | 125 | (1) | (1)* | (1)* | 300 | 300 | 64 | 16 | (N) | |||
| Contraembalse de Moncion [H-F] | Dominican Republic | INDRHI (Instiuto Nacional de Recursos Hidráulicos de la República Dominicana) | F H I | Mao | 8 | 07/95 | 02/96 | 03/98 | 06/98 | 28 | 254 | 130 | 155 | 0.70 | (1) | 0.67 | (1)* | 0.80 | (1)* | 300 | 300 | 80 | 0 | (-) |
| Bouhouda | Morocco | Direction des Arrenagements Hydrauliques | I W | S’ra | 56 | 05/95 | 04/96 | 05/98 | 09/98 | 55 | 174 | 165 | 186 | 0.20 | (5) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 100 120 | 0 0 | (N) |
| Hayachine | Japan | Iwate Prefecture | F H I W | Hienuki | 17 | 03/93 | 10/95 | 06/98 | 03/00 | 74 | 333 | 141 | 333 | V 0.20 | (1) (1) | 0.76 | (1) | 0.76 | (1) | 250 | 750 | 84 | 36 | (F) |
| Gov. José Richa (formerly Salto Caxias) | Brazil | COPEL (Companhia Paranense de Energia) Geração E Transmissão S.A. | H | Iguaçu | 3573 | 02/95 | 01/96 | 07/98 | 12/98 | 67 | 1083 | 912 | 1438 | V | (13) | 0.75 | (1)* | 0.75 | (12) | 300 | 300 | 80 | 20 | (F) |
| Val da Serra | Brazil | CORSAN (Companhia Riograndense de Saneamento) | W | Ibicui-Mirim | 24 | 07/97 | 11/97 | 07/98 | 11/98 | 37 | 675 | 69 | 95 | V | (13) | (12)* | (12)* | 300 | 300 | 90 | 30 | (F) | ||
| Gassan | Japan | Ministry of Construction | F H I W | Bonji | 65 | 08/88 | 06/94 | 10/98 | 03/01 | 123 | 393 | 731 | 1160 | V | (1) | 0.80 | (1) | 0.80 | (1) | 250 | 750 1000 | 91 | 39 | (F) |
| Penn Forest | USA | Bethlehem Authority, City of Bethlehem | W | Wild Creek | 2 | 08/96 | 09/97 | 10/98 | 12/98 | 49 | 610 | 283 | 283 | V | (6) | 0.50 | (15) (7) | conduit | 300 | 300 | 58 | 41 | (F) | |
| Yongxi Nº3 | China | Yongxi Hydroelectric Co. Ltd. | F H W | Dazhangxi | 68 | 05/96 | 10/97 | 10/98 | 09/99 | 87 | 198 | 170 | 255 | V | (3') | 0.73 | (10) | ogee 0.73 | (1) (1) | 280 | 3000 | 115 80 | 95 90 | (F) |
| Jucazinho | Brazil | DNOCS (Departamento Nacional de Obras Contra a Secas) | F I R W | Capiibaribe | 204 | 07/96 | 11/96 | 10/98 | - /99 | 63 | 442 | 442 | 470 | V | (12) | 0.75 | (1)* | 0.75 | (1)* | 300 | 300 | 64 | 16 | (N) |
| Rialb | Spain | Confederación Hidrográfica del Ebro | I W | Segre | 402 | 01/93 | 10/95 | 12/98 | 01/00 | 99 | 630 | 980 | 1016 | 0.15 0.35 | (1) (1) | 0.40 0.65 | (1) (1) | 0.65 | (1) | 330 | 330 | 70 65 | 130 130 | (F) |
| Huatan | China | Ya’an Electricity Company | H | Yinghe | 8 | 01/96 | 06/96 | 12/98 | 05/99 | 85 | 173 | 240 | 290 | 0.20 | (1) | 0.80 | (1) | 0.80 | (1) | 300 - 400 | 300 - 400 | 78 74 | 95 90 | (F) |
| Changshun | China | Department of Water Resources, Hubei Province | H W | Yujiang | 68 | - /91 | 03/97 | 12/98 | 06/00 | 69 | 279 | 170 | 200 | V | (3') | 0.74 | (3) | 0.80 | (1) | 300 | 5000 | 134 72 | 89 48 | (F) |
| Waijin [A] | China | Fushan Power Station Management Bureau | H I | Nanxi | 7 | - /94 | - /96 | - /98 | - /99 | 47 | 235 | 240 | ||||||||||||
| Kengxiashan [A] | China | Wencheng County Kengxiashan Hydropower Development Co. Ltd. | H | Yuquanxi | 1 | - /96 | - /97 | - /98 | - /98 | 34 | 80 | |||||||||||||
| Bab Louta | Morocco | Direction des Aménagements Hydrauliques | W | Bous Sbaa | 37 | 01/97 | 02/98 | 02/99 | 03/99 | 55 | 110 | 63 | 77 | V | (5) | 0.75 | (1)* | 0.75 | (13) | 300 | 300 | 65 80 | 15 20 | (N) |
| Fenhe Nº2 | China | Department of Water Resources, Shanxi Province | F H W | Fenhe | 130 | 11/96 | 08/98 | 03/99 | 06/00 | 87 | 350 | 362 | 448 | V 0.20 | (1) (1) | 0.75 | (5) | 0.75 | (1) | 300 | 3000 | 127 60 | 84 93 | (F) |
| Jiangya | China | Lishui Hydropower Development Co. Ltd. | F H I N W | Loushui | 1741 | 07/95 | 10/96 | 04/99 | - /01 | 131 | 368 | 1100 | 1310 | V | (3') | 0.80 | (3)* | ogee 0.80 | (13) | 300 | 3000 | 87 64 46 | 107 96 107 | (F) |
| Buckhorn | USA | Town of Wilson | W | Contentea Creek | 03/98 | - /98 | 04/99 | 06/09 | 16 | 781 | 64 | 69 | V | (6) | 300 | 300 | 89 | 0 | (-) | |||||
| Songyue (1st Stage) | China | Helong Electricity Corporation | F H I R W | Hailanhe | 21 | 09/97 | 01/98 | 04/99 | 09/99 | 29 | 271 | 44 | 77 | V | (1) | 0.73 | (10) | conduit | 300 | 2000 | 80 | 100 | (F) | |
| Toker | Eritrea | Government of Eritrea | W | Toker | 14 | 11/96 | 02/98 | 05/99 | 08/99 | 73 | 263 | 187 | 210 | V | (1) | 0.80 | (1)* | 0.80 | (12)* | 330 | 330 | 110 | 85 | (F) |
| Balambano | Indonesia | P.T. Vale Indonesia | H | Larona | 33 | 03/95 | 04/98 | 06/99 | 09/99 | 94 | 352 | 528 | 54 | V | (2) | 0.80 | (1)* | 0.80 | (12) | 420 | 420 | 81 | 54 | (F) |
| Yangxishui Nº3 | China | Shaoguang Electricity Corporation Ltd | H | Yangxishui | 2 | 11/97 | 09/98 | 06/99 | 07/00 | 46 | 202 | 100 | 139 | V | (1) | V 0.75 | (1) (1)* | 0.70 | (12) | 300 | 300 | (F) | ||
| Bertarello | Brazil | CORSAN (Companhia Riograndense de Saneamento) | W | Arroio Burati | 6 | - /98 | 08/98 | 07/99 | - /00 | 29 | 219 | 80 | 115 | V | (13) | (12)* | (12)* | 300 | 300 | 72 | 18 | (N) | ||
| Ziga | Burkina Faso | Oner-Moz | W | Nakambe | 28 | 04/98 | 10/98 | 08/99 | 07/00 | 18 | 120 | 44 | V | (1) | 0.80 | (10)* | 0.80 | (12)* | 300 | 300 | (-) | |||
| Baishi | China | Department of Water Resources, Liaoning Province | F H I W | Dalinghe | 1645 | 09/96 | 04/97 | 09/99 | 12/00 | 49 | 513 | 111 | 603 | V 0.10 | (1) (1) | 0.70 | (1) | 0.76 | (1) | 300 | 300 | 72 | 58 | (F) |
| Rosal | Brazil | Rosal Energia S.A. | H | Itabapoana | 17 | 04/98 | - /98 | 09/99 | - /00 | 37 | 212 | 45 | 75 | (1) | (3)* | (1)* | 300 | 300 | 45 | 55 | (S) | |||
| Suçati | Turkey | ERE Electricity Co. | H | Güredin Creek | 9 | 01/98 | 02/99 | 10/99 | 10/99 | 36 | 192 | 55 | 60 | V | (7) | 0.80 | (7) | 0.80 | (12) | 300 | 300 | 50 | 100 | (S) |
| Barnard Creek Canyon Debris Dam | USA | Davis County Flood Control | F | Barnard Creek | 08/99 | 11/99 | 11/99 | 01/00 | 18 | 46 | 3 | 3 | V | () | 0.75 | ()* | 0.75 | ()* | 300 | 300 | 108 | 84 | (F) | |
| Hongpo [A-G] | China | Xishan Xingyu Water Resources Corporation | W | Qinggoushui | 3 | 10/97 | 07/98 | 11/99 | 12/99 | 55 | 244 | 71 | 77 | V | (3') | 0.50 | (1) | 0.50 | (1) | 300 | 3000 | 54 | 99 | (F) |
| Nagashima sediment dam [H-F] | Japan | Ministry of Construction | Ohi | 1 | 03/97 | 04/99 | 12/99 | 08/00 | 33 | 127 | 23 | 55 | 1.20 | (12) | 1.20 | (12) | 250 | 500 1000 | 40 | 50 | (S) | |||
| Las Blancas | Mexico | CNA (Comisión Nacional del Agua) | I | Álomo & Soso | 124 | 08/98 | 03/99 | 12/99 | 11/00 | 32 | 2795 | 221 | 316 | V | (8) | V 0.75 | (7) (3)* | 0.75 | (1) | 300 | 300 | 100 | 100 | (F) |
| Ponto Novo | Brazil | CERB (Companhia de Engenharia Rural da Bahia) | I W | Itapicuru-açu | 39 | 05/98 | 07/98 | 12/99 | 02/00 | 26 | 266 | 90 | 105 | (1) | (3)* | (1) | 300 | 300 | 72 | 18 | (N) | |||
| Antacoto | Peru | Mantaro | 120 | - /98 | - /98 | - /99 | - /99 | 17 | 65 | (-) | ||||||||||||||
| Zanja Honda | Colombia | I | Chenche | - /97 | - /98 | - /99 | - /00 | 24 | 75 | 75 | 0 | (-) | ||||||||||||
| Nam Leuk spillway | Laos | EDL Generation Public Co. Ltd | H | Nam Leuk | 185 | - /98 | - /98 | - /99 | - /00 | 15 | 60 | |||||||||||||
| Kubusugawa | Japan | Toyama Prefecture | F H I W | Kubusu | 10 | 03/93 | 04/98 | - /99 | 10/02 | 95 | 253 | 364 | 469 | V 0.40 | (1) (1) | 0.78 | (1) | 0.78 | (1) | 250 | 750 | 84 | 36 | (F) |
| Bullard Creek | USA | Natural Resources Conservation Service | F | Bullard Creek | 1 | 10/98 | 08/99 | - /99 | - /99 | 16 | 110 | 7 | 7 | V | (3) | V 0.75 | (3)* | 0.75 | (3)* | 300 | 300 | 148 | 44 | (F) |
| Ohnagami | Japan | Simane Prefecture | F I W | Sutu | 19 | 03/93 | 04/98 | 04/00 | 03/03 | 72 | 334 | 284 | 362 | V 0.25 | (1) (1) | 0.79 | (1) | 0.79 | (1) | 250 | 750 | 84 | 36 | (F) |
| Gaobazhou | China | Qingjiang Hydropower Development Corporation | F H N | Qingjiang | 536 | 05/97 | 11/98 | 04/00 | 01/01 | 57 | 440 | 210 | 940 | V | (9) | 0.75 | (1) | 0.75 | (1) | 300 | 300 | 123 86 | 100 86 | (F) |
| Trout Creek | USA | Paul Moltz | I R | Trout Creek | 1 | 08/99 | 04/00 | 05/00 | 07/00 | 31 | 38 | 9 | 10 | V | (1) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 163 | 0 | (-) |
| Pickle Jar | USA | Paradise Valley Estates | W | 1 | 10/99 | 03/00 | 05/00 | 08/00 | 16 | 57 | 331 | 331 | V | (1) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 90 | 0 | (-) | |
| Beni Haroun | Algeria | ANBT (Agence Nationale des Barrages et Transferts) | I W | El Kebir | 963 | 01/93 | 10/98 | 07/00 | 12/00 | 118 | 714 | 1690 | 1900 | V | (1) | 0.80 | (1)* | 0.80 | (13) | 300 | 300 | 82 | 143 | (F) |
| Origawa | Japan | Ministry of Land, Infrastructure & Transport | F N | Ori | 15 | 02/93 | 11/96 | 07/00 | 03/04 | 114 | 331 | 673 | 742 | V 0.60 | (1) (1) | 0.77 | (1) | 0.77 | (1) | 250 | 750 | 91 | 39 | (F) |
| Karkheh (Pie Pol) | Iran | Khuzestan Water & Energy Authority | F H | Karkeh | 40 | 02/98 | 07/99 | 07/00 | - /01 | 34 | 350 | 130 | 270 | (12) | (12) | ogee | (12) | 300 | 300 | 97 | 33 | (-) | ||
| Shinmiyagawa | Japan | Ministry of Agriculture | I | Miya | 10 | 03/94 | 07/97 | 08/00 | 03/03 | 69 | 325 | 393 | 480 | V | (1) | 0.83 | (1) | 0.83 | (1) | 250 | 750 | 91 | 39 | (F) |
| Pajarito Canyon | USA | US Department of Energy (Los Alamos Lab.)/US Army Corps of Engineers | F | Pajarito | 8 | 06/00 | 07/00 | 08/00 | 09/00 | 36 | 112 | 48 | 48 | V | (15) | 1.00 | (17) | conduit | 300 | 300 | 148 | 0 | (-) | |
| Porce II | Colombia | EPM (Empresas Públicas de Medellín) | H | Porce | 211 | 11/94 | 12/96 | 09/00 | 03/01 | 123 | 425 | 1305 | 1445 | 0.10 | (14) | 0.35 0.75 | (14)* | 0.75 | (13) | 300 | 300 | 132 120 | 88 80 | (N) |
| Tucuruí - 2nd Phase | Brazil | Eletronorte SA | H | Tocantins | 45800 | 06/98 | 06/99 | 09/00 | 10/05 | 78 | 1541 | 288 | 1383 | (3) | (3)* | separate | 300 | 300 | 70 | 30 | (N) | |||
| Inyaka | South Africa | Department of Water & Sanitation | W | Marite | 123 | 01/96 | 06/97 | 10/00 | 03/02 | 53 | 350 | 160 | 327 | V | (1) | 0.68 | (1) | 0.68 | (1) | 250 | 250 | 60 | 120 | (F) |
| Dona Francisca | Brazil | Dona Francisca Energértica SA | H | Jacuí | 335 | 08/98 | 06/99 | 10/00 | 12/00 | 63 | 670 | 485 | 503 | V | (1) | 0.75 | (3)* | 0.75 | (1)* | 300 | 300 | 72 | 18 | (N) |
| Tannur | Jordan | Jordan Valley Authority, Ministry of Water and Irrigation | I | Wadi al Hasa | 17 | 02/99 | 12/99 | 12/00 | 09/01 | 60 | 270 | 250 | 250 | V 1.00 | (3') | 0.80 | (3')* | 0.80 | (3')* | 300 | 1200 | 125 120 | 75 50 | (N) |
| Dagangou | China | Ge'ermu Hydroelectric Responsibility Corporation Ltd. | H | Geermu | 9780 | - /96 | - /98 | - /00 | - /01 | 40 | ||||||||||||||
| Santa Cruz do Apodi | Brazil | Secretaria Estadual do Meio Ambiente e Recursos Hídricos do Rio Grande do Norte | F I R W | Apodi | 600 | - /98 | - /99 | - /00 | 03/02 | 48 | 1660 | 1023 | 1120 | 300 | 300 | 80 | 0 | (-) | ||||||
| Shankou Nº3 [A] | China | Shixing County Power Development Corporation | F H | Du’anshui (Chengjiang) | 48 | 09/99 | 02/00 | 01/01 | 03/01 | 57 | 179 | 90 | 119 | V | (3') | 0.75 | (3') | 0.80 | (1) | 330 | 3000 | 105 63 | 86 80 | (F) |
| Tiúma | Brazil | COMPESA (Companhia Pernambucana de Saneamento) | W | Tiúma | 6 | - /99 | - /00 | 01/01 | 05/01 | 16 | 132 | |||||||||||||
| R'mil | Tunisia | Ministre de l’Agriculture | I | R’mil | 44 | 08/99 | 10/00 | 05/01 | 11/01 | 18 | 260 | 64 | 160 | V | (15) | 0.90 | (16) | 0.90 | (12)* | 300 | 300 | 100 | 0 | (-) |
| Longshou Nº1 [A-G] | China | Department of Electricity, Gansu Province | H | Heihe | 13 | 04/99 | 03/00 | 06/01 | 09/01 | 80 | 258 | 187 | 210 | V 0.20 | (1) (1) | 0.75 | (1) | 0.75 | (1) | 300 | 3000 | 96 58 | 109 113 | (F) |
| Shimenzi [A] | China | Shimenzi Reservoir Engineering Management Office | H I W | Taxi | 80 | 06/98 | 06/99 | 06/01 | 10/01 | 110 | 176 | 188 | 211 | 0.142 V | (3') (3') | V 0.18 | (3) (3) | crest | (12) | 300 | 3000 | 93 62 | 110 110 | (F) |
| Safad | UAE | Ministry of Agriculture and Fisheries | G I | 1 | - /00 | 05/01 | 06/01 | - /01 | 19 | 100 | 9 | 10 | V | (1) | 0.80 | (1)* | 0.80 | (12) | 300 | 300 | 90 | 0 | (-) | |
| North Fork Hughes River | USA | USDA Natural Resources Conservation Service | F R W | North Fork Hughes River | 1480 | 07/99 | 03/01 | 07/01 | - /01 | 26 | 200 | 65 | 65 | V | (8) | 0.80 | (10) | 0.80 | (1) | 300 | 300 | 59 107 | 59 65 | (F) |
| Chubetsu | Japan | Ministry of Land, Infrastructure and Transport | F H I W | Chubetu | 93 | 03/94 | 09/97 | 08/01 | 03/04 | 86 | 290 | 523 | 1007 | V 0.80 | (1) (1) | 0.80 | (1) | 0.80 | (1) | 250 | 750 1000 | 84 | 36 | (F) |
| Showkah | UAE | Ministry of Agriculture and Fisheries | G I | 1 | - /00 | 08/01 | 10/01 | - /01 | 24 | 105 | 18 | 20 | 0.10 | (11) | 0.80 | (1)* | 0.80 | (12) | 300 | 300 | 90 | 0 | (-) | |
| Dachaoshan | China | Department of Electricity, Yunnan Province | F H | Lancang (Mekong) | 89 | 10/97 | 12/98 | 10/01 | 07/02 | 115 | 481 | 757 | 1287 | V 0.20 | (3') | 0.70 | (10)* | 0.70 | (13) | 300 | 300 | 94 67 | 94 101 | (N) |
| Cana Brava | Brazil | Companhia Energética Mercosul (of the Tractebel Group) | H | Tocantins | 2300 | 03/99 | 02/00 | 10/01 | 10/02 | 67 | 510 | 527 | 833 | (1) | (3)* | ogee | (1) | 300 | 300 | 40 | 50 | (S) | ||
| Mianhuatan | China | Mianhuatan Hydroelectric Development Corporation | F H N W | Ting | 2035 | 04/98 | 12/98 | 11/01 | 04/02 | 111 | 302 | 500 | 615 | V | (9) | 0.75 | (3)* | 0.70 | (13) | 300 | 3000 | 82 59 48 | 100 88 88 | (F) |
| Fukuchiyama | Japan | Fukuoka Prefecture | F N W | Fukuti | 3 | 10/98 | - /99 | 12/01 | 03/03 | 65 | 255 | 115 | 201 | V | (1) | 0.78 | (1) | 0.78 | (1) | 250 | 750 | 84 | 36 | (F) |
| Castanhão | Brazil | DNOCS/Minas Gerais | F I R W | Congonhas | 6700 | 10/99 | - /00 | 12/01 | - /02 | 85 | 668 | 890 | 1030 | 300 | 300 | 85 | 0 | (-) | ||||||
| Lajeado (Luis Eduardo Magalhães) | Brazil | Investco (Tractebel) | H | Tocantins | 4982 | 07/98 | 06/01 | 12/01 | 12/02 | 43 | 2100 | 188 | 210 | 300 | 300 | 30 | 40 | (S) | ||||||
| Yanwangbizi | China | Chaoyang Water Conservancy Bureau | F H I W | Daling | 217 | - /96 | - /97 | - /01 | - /02 | 35 | 383 | 87 | 220 | 64 | 118 | (F) | ||||||||
| Rivaldo de Carvalho | Brazil | Companhia de Gestão dos Recursos Hídricos | I W | Condado | 20 | - /95 | - /98 | - /01 | 12/02 | 18 | 270 | |||||||||||||
| Ueno | Japan | Tokyo Electric Power Company | H | Jinryu | 19 | 03/97 | - /98 | - /01 | 06/05 | 120 | 350 | 269 | 720 | V 0.30 | (1) (1) | 0.84 | (1) | 0.84 | (1) | 200 | 1000 | 77 70 | 33 30 | (F) |
| Umari | Brazil | DNOCS (Departamento Nacional de Obras Contra a Seca) | F I R W | do Carmo | 293 | - /98 | - /99 | - /01 | - /01 | 42 | 2308 | 655 | 660 | (12) | 300 | 300 | 70 | 0 | (-) | |||||
| Funil | Brazil | Aliança Geração de Energia SA | H | Rio Grande | 285 | - /97 | - /99 | - /01 | 12/02 | 50 | ||||||||||||||
| Yushi | China | Yushi Reservoir Construction Management Bureau | F I W | Biliuhe | 89 | - /98 | - /99 | - /01 | - /02 | 50 | 267 | 218 | 233 | 70 | 70 | (F) | ||||||||
| Pedras Altas | Brazil | CERB (Companhia de Engenharia Rural da Bahia) | F I R W | Itapicuru-mirim | - /00 | - /00 | - /01 | - /01 | 24 | 1090 | 42 | 60 | 300 | 300 | 34 | 41 | (S) | |||||||
| Pirapama | Brazil | CAGEPE (Companhia Pernambucana de Saneamento) | W | Pirapama | 61 | - /00 | - /00 | - /01 | - /01 | 25 | 300 | 87 | 137 | (1) | 300 | 300 | 72 | 18 | (-) | |||||
| Estreito | Brazil | F I R W | Curimatá | 24 | - /97 | - /00 | - /01 | 11/02 | 26 | 300 | 12 | 14 | 300 | 300 | 64 | 16 | (N) | |||||||
| Xiaoxihe | China | Department of Electricity, Feng Shun County | H I | Xiaoxihe | 5 | - /99 | - /00 | - /01 | - /02 | 62 | 103 | 47 | 66 | (F) | ||||||||||
| Shuangkengkou [A] | China | H | Xiaoxihe | 12 | - /99 | - /00 | - /01 | - /02 | 68 | |||||||||||||||
| Peñas Blancas | Costa Rica | ICE (Instituto Costarricense de Electricidad) | H | Peñas Blancas | 2 | 04/00 | 07/01 | 01/02 | 07/02 | 48 | 211 | 120 | 170 | V | (1) | 0.80 | (1)* | 0.80 | (12) | 300 | 300 | 90 | 35 | (N) |
| Helong | China | Electricity Corporation, Yanji | H R W | Hailanhe | 30 | 11/98 | 08/99 | 01/02 | 12/02 | 30 | 244 | 43 | 89 | V | (1) | 0.75 | (10) | ogee | (10)* | 300 | 2000 | 113 | 113 | (F) |
| Mae Suai | Thailand | Royal Irrigation Department (RID) | I | Mae Suai | 73 | 11/99 | 10/00 | 01/02 | 07/02 | 59 | 340 | 300 | 350 | 0.15 | (15) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 70 | 80 to 100 | (F) |
| Hunting Run | USA | Spotsylvania County | W | Hunting Run | 2 | 05/00 | 02/01 | 01/02 | 08/02 | 36 | 720 | 115 | 128 | V | (8) | (17) | (17) | 300 | 300 | 74 | 37 | (F) | ||
| La Cañada | Bolivia | Prefectura del Departamento de Santa Cruz | I | Comarapa | 10 | 08/00 | 08/01 | 02/02 | 06/02 | 52 | 154 | 72 | 77 | V | (3') | 0.22 0.75 | (3') (3')* | 0.75 | (3')* | 305 | 305 | 140 | 100 | (N) |
| Wala | Jordan | Jordan Valley Authority, Ministry of Water and Irrigation | G | Wala | 9 | 01/99 | 10/00 | 04/02 | 04/03 | 52 | 300 | 240 | 260 | 0.30 | (1) | 0.70 | (1)* | 0.70 | (1)* | 300 | 300 | 120 100 | 0 0 | (-) |
| Shapai [A] | China | Sichuan Minjiang Hydropower Co. Ltd. | H | Caopohe | 18 | 06/97 | 03/00 | 05/02 | 04/03 | 132 | 230 | 380 | 392 | V 0.10 | (3') | 0.21 | (3) | crest 0.21 | (1) | 300 | 300 | 108 89 | 72 89 | (F) |
| Camará | Brazil | Estado da Paraiba (Companhia de Aguas e Esgotus) | W | Riachäo | 27 | 05/00 | 09/01 | 06/02 | - /02 | 56 | 296 | V | (1) | 0.80 | (1)* | 300 | 300 | 80 | 0 | (-) | ||||
| Kutani | Japan | Isikawa Prefecture | F W | Daishoji | 25 | 12/96 | 04/00 | 07/02 | 03/06 | 76 | 280 | 188 | 360 | V 0.80 | (1) (1) | 0.80 | (1) | 0.80 | (1) | 250 | 750 | 84 | 36 | (F) |
| Miel I | Colombia | Isagen S.A. E.S.P. - Hidromiel S.A. E.S.P. | H | La Miel | 565 | 12/97 | 04/00 | 07/02 | 10/02 | 188 | 345 | 1669 | 1730 | V | (4') | 0.75 1.00 | (3')* | 0.75 1.00 | (12) | 300 | 300 | 85 to 160 | 0 | (-) |
| Randleman Lake | USA | Piedmont Triad Regional Water Authority | R W | Deep | 84 | 07/01 | 04/02 | 07/02 | 01/03 | 31 | 280 | 70 | 76 | V | (1) | 0.75 | (1)* | 0.75 | (1)* | 300 | 300 | 89 | 104 | (F) |
| Xiaoyangxi (and saddle dam) | China | Guizhou Province Electric Power Co. | W | Xia Oyangxi | 15 | 05/00 | 01/01 | 10/02 | 12/03 | 45 | 118 | 47 | 49 | V | (3') | 0.75 | (3')* | 0.75 | (12) | 350 | 3500 | 138 60 | 113 90 | (F) |
| Steno [H-F] | Greece | Ministry of Agriculture | I W | Steno | 1 | 02/00 | 07/01 | 10/02 | 06/03 | 32 | 170 | 69 | 70 | 0.70 | (13) | 0.70 | (10) | 0.70 | (1) | 200 - 300 | 200 - 300 | 55 | 5 | (N) |
| Olivenhain | USA | San Diego County Water Authority | W | Escondido Creek | 30 | 06/01 | 02/02 | 10/02 | 07/03 | 97 | 788 | 1070 | 1140 | V | (4') | 0.80 | (3)* | 0.80 | (1)* | 300 | 300 | 74 | 121 | (F) |
| Yangxishui Nº1 | China | Corporation of Energy Development, Ruyuan County, Guangdong Province | H I | Yangxi | 100 | 12/00 | 10/01 | 11/02 | 06/03 | 82 | 244 | 241 | 340 | V | (1) | V 0.75 | (1) (1)* | 0.70 | (12) | 300 | 300 | (F) | ||
| Carnaúba | Brazil | Secretaria Recursos Hídricos | I W | Quixeré | 26 | - /01 | 02/02 | 11/02 | - /03 | 19 | 700 | 300 | 300 | 100 | 0 | (-) | ||||||||
| Koyama | Japan | Ibaraki Prefecture | F I W | Ohkita | 17 | 11/94 | 05/00 | 12/02 | 03/05 | 65 | 462 | 270 | 531 | V | (1) | 0.78 | (1) | 0.78 | (1) | 250 | 750 | 84 | 36 | (S) |
| Nankengyuan [A] | China | Jiangning Nankengyuan Hydropower Development Co. Ltd. | H | Xiaoxihe | 1 | - /98 | - /00 | - /02 | - /03 | 34 | 114 | |||||||||||||
| São Bento | Brazil | CASAN (Companhia Catarinense de Águas e Saneamento) | H | São Bento | 58 | - /99 | - /00 | - /02 | - /03 | 49 | 461 | V | 0.80 | 0.80 | ||||||||||
| Hengxi | China | H | Yangxi | 100 | - /99 | - /00 | - /02 | - /03 | 82 | |||||||||||||||
| Passo do Meio | Brazil | Energética Campos de Cima da Serra Ltda | H | das Antas | 27 | - /00 | - /01 | - /02 | 10/03 | 31 | 110 | |||||||||||||
| Ormeo Junqueira Botelho (formerly Cachoeira da Encoberta) | Brazil | Rio Glória Energética S.A. | H | Glória | 3 | - /99 | - /01 | - /02 | 12/03 | 49 | 218 | |||||||||||||
| Pedrinho 1 | Brazil | Energetica Rio Pedrinho Ltda.. | H | Pedrinho | 1 | - /99 | - /01 | - /02 | - /03 | 16 | 110 | |||||||||||||
| Itiquira I | Brazil | Itiquira Energética SA | H | Itiquira | - /00 | - /01 | - /02 | - /03 | 15 | 22 | ||||||||||||||
| Furquim [H-F] | Brazil | H | - /00 | - /01 | - /02 | - /03 | 18 | |||||||||||||||||
| Ribeirão Riacho Pasto Velho | Brazil | CERB (Companhia de Engenharia Ambiental e Recursos Hidricos da Bahia) | I W | Pasto Velho | 11 | - /00 | - /01 | - /02 | - /03 | 27 | ||||||||||||||
| Guaporé | Brazil | Tangará Energia S/A | H | Guaporé | 18 | - /00 | - /01 | - /02 | - /03 | 32 | 152 | 43 | ||||||||||||
| La Rosilla II [H-F] | Mexico | CNA (Comisión Nacional del Agua) | El Salto | - /00 | - /01 | - /02 | - /03 | 35 | 250 | |||||||||||||||
| Jauru | Brazil | Queiroz Galvão Energética SA (90%) and Cinco Estrelas Agropecuária e Participações Ltda (10%) | H | Jauru | 20 | - /00 | - /01 | - /02 | - /03 | 51 | ||||||||||||||
| Junxi II [A] | China | Longquan City Bureau of Hydropower | H | Junxi | 5 | - /00 | - /01 | - /02 | - /03 | 69 | 192 | |||||||||||||
| Mujib | Jordan | Jordan Valley Authority, Ministry of Water and Irrigation | I W | Mujib | 35 | 01/99 | 01/01 | 02/03 | 11/03 | 67 | 490 | 654 | 694 | 0.10 | (2) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 85 | 0 | (-) |
| Wanmipo | China | Hunan Wuling Hydroelectric Development Corporation | H N | Youshui | 378 | 08/01 | 11/02 | 05/03 | 05/04 | 65 | 238 | 141 | 376 | V | (3') | 0.75 | (12) | ogee | (12) | 300 | 3000 | 86 68 | 103 83 | (F) |
| Ahl Souss (formely Ait M’Zal) | Morocco | Direction des Aménagements Hydrauliques | I W | Izig | 5 | 11/01 | 01/03 | 05/03 | 01/04 | 49 | 222 | 50 | 27 | 0.20 | (1) | 0.80 | (1)* | 0.85 | (12) | 300 | 300 | 80 100 | 0 0 | (-) |
| Linhekou [A] | China | Shaanxi Lan River Hydropower Development Corporation | H I | Lanhe | 147 | - /99 | 12/01 | 06/03 | - /04 | 100 | 311 | 229 | 293 | curve | (3') | curve | (3') | ogee | (1) | 300 | 3000 | 74 66 | 111 111 | (F) |
| Takizawa | Japan | Japan Water Agency | F N W | Nakatu | 63 | 03/99 | 10/01 | 06/03 | 03/07 | 139 | 424 | 810 | 1670 | 0.15 0.70 | (1) (1) | 0.72 | (1) | 0.72 | (1) | 250 | 1000 | 84 72 | 36 48 | (F) |
| Nandoni (formerly Mutoti) | South Africa | Department of Water & Sanitation | I W | Luvuvhu | 164 | 04/98 | 12/99 | 08/03 | 04/04 | 47 | 392 | 150 | 316 | V | (1) | 0.75 | (1) | 0.75 | (1)* | 250 | 250 | 54 | 129 | (F) |
| El Esparragal | Spain | Confederación Hidrográfica del Guadalquivir | E | Viar | 5 | - /02 | 05/03 | 08/03 | 03/04 | 21 | 383 | 62 | 89 | 0.30 | (3')* | 0.90 | (3')* | 0.90 | (3')* | 300 | 300 | 68 | 157 | (F) |
| Ralco | Chile | ENDESA, Spain | H | Bio-Bio | 1200 | 08/99 | 01/02 | 09/03 | 04/04 | 155 | 360 | 1596 | 1640 | V | (3') | 0.80 | (3')* | 0.80 | (12) | 300 | 300 | 133 95 116 | 57 50 41 | (N) |
| Tizidong | China | Chongging Electricity Ltd. | H | Apeng | 25 | 08/01 | 10/02 | 10/03 | 11/03 | 56 | 193 | 72 | 161 | (12) | (12) | (12) | (F) | |||||||
| Huilong PSS - Upper dam | China | Henan Electric Power Corporation | H | Huilonggou | 1 | 06/01 | 11/02 | 11/03 | - /05 | 54 | 208 | 73 | 76 | V | (3') | 0.75 | (3') | none | 300 | 300 | (F) | |||
| Bureyskaya | Russia | RusHydro | F H | Bureya | 21000 | 01/76 | 01/85 | - /03 | - /09 | 139 | 810 | 709 | 3538 | V | (1) | 0.70 | (1) | 0.70 | (1) | 300 - 500 | 300 - 500 | 95 to 110 | 25 to 30 | (N) |
| Maobaguan [A] | China | Shaanxi Hanjiang Hydropower Development Co. Ltd. | H | Renhe | 2 | - /00 | - /02 | - /03 | - /04 | 66 | 120 | 81 | 106 | |||||||||||
| Shanggou [A] | China | Xifeng County Water Conservancy Bureau | W | Yangshui | 1 | - /01 | - /02 | - /03 | - /04 | 39 | 176 | |||||||||||||
| Wangkeng | China | Wang Keng Power Station Co. Ltd. | H | Tangkouxi | 15 | - /01 | - /02 | - /03 | - /04 | 56 | 159 | 38 | 40 | (F) | ||||||||||
| Rio Rejo [H-F] | Peru | Yanacocha Mine | E | Rejo | 1 | - /02 | - /03 | - /03 | - /04 | 35 | 125 | 30 | 33 | 0.70 | (1)* | 0.70 | (1)* | 0.70 | (12) | 300 | 300 | 100 | 0 | (-) |
| Liubo [A] | China | Anhui Hydropower Development Co. Ltd., | F H | Xipihe | 51 | - /02 | - /03 | - /03 | - /04 | 70 | 258 | 130 | 168 | (F) | ||||||||||
| Rompepicos en Corral des Palmas | Mexico | Secretaria de Desarrollo Urbano Y Obras Publicas, Gobierno Del Estado de Nuevo Leon | F | Santa Catarina | 100 | - /02 | 03/03 | - /03 | - /04 | 109 | 250 | 380 | 400 | V | (8) | V 0.85 | (5) (17)* | 0.85 | (12) | 300 | 300 | 65 | 35 | (F) |
| Ghatghar PPS - Upper dam | India | GoMWRD (Government of Maharashtra Water Resources Department) | H | Pravara | 6 | 12/01 | 05/03 | 01/04 | 06/04 | 15 | 503 | 35 | 40 | V | (3') | 0.78 | (3')* | 0.78 | (3')* | 300 | 300 | 88 | 132 | (F) |
| Zhouning | China | Mindong Electromechanical Development Corporation | H | Muyangxi | 47 | - /02 | 04/03 | 03/04 | 06/04 | 73 | 206 | 159 | 199 | V | (3') | 0.72 | (3') | 0.70 | (12) | 300 | 300 | 67 50 | 100 92 | (F) |
| Huilong PSS - Lower dam | China | Henan Electric Power Corporation | H | Huilonggou | 2 | 06/01 | - /02 | 06/04 | - /05 | 54 | 175 | 88 | 105 | V | (3') | 0.75 | (3')* | 0.75 | (12) | 300 | 300 | (F) | ||
| Khun Dan Prakan Chon (formerly Tha Dan) | Thailand | Royal Irrigation Department | I | Nakhon Nayok | 224 | 11/99 | 03/01 | 07/04 | 01/05 | 95 | 2600 | 4900 | 5400 | V 0.40 | (14) | 0.80 | (14)* | 0.80 | (14)* | 300 | 300 | 90 | 100 | (F) |
| Pedrógão | Portugal | EDIA (Empresa de Desenvolvimento e Infra-Estruturas do Alqueva) | F H I | Guadiana | 106 | 08/02 | 02/04 | 08/04 | - /05 | 43 | 448 | 172 | 392 | V | (3') | 0.80 | (3')* | 0.80 | (12)* | 300 | 300 | 55 | 165 | (F) |
| Tamesna (formerly Boukerkour) | Morocco | Direction des Aménagements Hydrauliques | F I W | Zamrine | 56 | 05/03 | 04/04 | 09/04 | 05/05 | 69 | 220 | 190 | 215 | 0.20 | (5) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 100 | 0 | (N) |
| Tongkou | China | Beichuan Bashu Tongkou River Development Corporation | H | Tongkou | 36 | 10/98 | - /02 | - /04 | - /04 | 72 | 198 | 300 | 352 | V | (1) | 1.10 | (1) | ogee | (1) | 300 | 300 | (F) | ||
| Pingban | China | Guangxi-Guiguan Electric Power Co. Ltd. | H | Nanpan | 278 | 12/01 | - /02 | - /04 | 07/05 | 62 | 396 | 150 | 700 | V | (3') | 0.70 | (3') | ogee | (12) | 300 | 300 | (F) | ||
| Pau Ferro | Brazil | COMPESA (Companhia Pernambucana de Saneamento) | W | - | 12 | - /00 | - /02 | - /04 | - /05 | 33 | 210 | |||||||||||||
| Xuanmiaoguan [A] | China | Yineng Co., Ltd. | 41 | - /00 | - /02 | - /04 | - /05 | 66 | 191 | 66 | ||||||||||||||
| Monte Claro | Brazil | CERAN (Companhia Energética Rio das Antas) | H | das Antas | 23 | 04/02 | - /03 | - /04 | 12/04 | 25 | 180 | 35 | 66 | 60 | 15 | |||||||||
| João Leite Saneago | Brazil | SANEAGO (Saneamento de Goiás S.A.) | W | João Leite | 129 | 03/01 | 01/03 | - /04 | - /04 | 55 | 380 | 270 | 290 | 300 | 300 | 80 | 20 | (N) | ||||||
| Sanjiang [A] | China | Sanjianghe | 7 | - /02 | - /03 | - /04 | - /04 | 72 | 138 | 38 | ||||||||||||||
| Changtan [A] | China | Guangdong Shanneng group Co. | H | Tuwushui | 17 | - /03 | - /03 | - /04 | - /04 | 53 | 124 | 29 | ||||||||||||
| Nam Mang 3 | Laos | EDL (Electricite du Laos) | H | Nam Gnong | 49 | - /02 | - /03 | - /04 | 01/05 | 28 | 151 | |||||||||||||
| Risoleta Neves (formerly Candonga) | Brazil | Alianca Geracao de Energia S.A. | H | Doce | 54 | 05/01 | - /03 | - /04 | 05/05 | 53 | 437 | 236 | 248 | 300 | 300 | 40 | 50 | (S) | ||||||
| Quixeramobim | Brazil | DNOCS (Departamento Nacional de Obras Contra as Secas) | W | Banabuiú | 54 | - /01 | - /03 | - /04 | - /05 | 19 | 290 | |||||||||||||
| Fundão | Brazil | ELEJOR - Centrais Elétricas do Rio Jordão | H | Jordao | 34 | - /01 | - /03 | - /04 | - /05 | 43 | 445 | 200 | 220 | 300 | 300 | 64 | 16 | (N) | ||||||
| Yujiankou | China | Chongqing Yujiankou Hydropower Co. Ltd. | H | Long | 9 | 08/01 | - /03 | - /04 | - /05 | 50 | 156 | 118 | 147 | V | (3') | 0.70 | (3') | 0.85 | (1) | (F) | ||||
| Taiho auxiliary dam [H-F] | Japan | North Dam Integrated Control Office | E | Taiho | - /02 | - /03 | - /04 | - /05 | 30 | 110 | 34 | 1.20 | (12) | 1.20 | (12) | 250 | 500 1000 | (S) | ||||||
| Letan | China | Guangxi-Guiguan Electric Power Co. Ltd., | H I N | Xijiang | 950 | - /02 | - /03 | - /04 | - /05 | 66 | 586 | 50 | 210 | |||||||||||
| Yujianhe [A] | China | Guiyang Water Conservancy Bureau | F I W | Wu | 11 | - /02 | - /03 | - /04 | - /05 | 81 | 180 | 105 | 110 | 0.10 | 0.76 | 0.76 | ||||||||
| Xiakou [A] | China | Hubei Nanzhang Xiakou Electric Co. Ltd. | H | Juhe | 99 | - /02 | - /03 | - /04 | - /05 | 85 | 192 | 131 | ||||||||||||
| Jiemian Ataguia [H-F] | China | - /00 | - /02 | - /04 | - /06 | 16 | (F) | |||||||||||||||||
| Qinglianxi | China | H | Meixi | 20 | - /00 | - /02 | - /04 | - /06 | 96 | 178 | ||||||||||||||
| Pindobaçu | Brazil | CERB (Companhia de Engenharia Ambiental e Recursos Hidricos da Bahia) | I W | Itapicuru-aço | 17 | - /01 | - /03 | - /04 | - /05 | 44 | 191 | 75 | 85 | 300 | 300 | 56 | 14 | (N) | ||||||
| Bandeira de Melo | Brazil | CERB (Companhia de Engenharia Ambiental e Recursos Hidricos da Bahia) | I W | Paraguaçu | 112 | - /02 | 09/03 | - /04 | - /05 | 19 | 320 | 75 | 85 | (1) | (1)* | (1)* | 300 | 300 | 56 | 14 | (N) | |||
| Santa Clara-PR | Brazil | Elejor Centrais Elétricas do Rio Jordåo S.A. | H | Jordåo | 431 | 11/02 | 12/03 | - /04 | 01/05 | 67 | 543 | 530 | 606 | (1) | (1) | (1)* | 300 | 300 | 40 | 50 | (S) | |||
| Rio Grande [H-F] | Peru | Yanacocha Mine | E | Rio Grande | 1 | - /03 | - /04 | - /04 | - /05 | 45 | 98 | 72 | 77 | 0.70 | (1) | 0.70 | (1) | 0.70 | (1)* | 300 | 300 | 120 | 0 | (-) |
| Big Cherry | USA | Town of Big Stone Gap | W | South Fork, Powell River | 2 | 04/04 | 09/04 | 01/05 | 07/05 | 26 | 113 | 11 | 12 | 300 | 300 | 82 | 82 | (F) | ||||||
| Saluda dam remediation | USA | South Carolina Electric and Gas | H | Saluda | 1970 | 08/02 | 07/03 | 04/05 | 07/05 | 65 | 2439 | 1004 | 1410 | (5) | (5)* | 300 | 300 | 89 | 89 | (F) | ||||
| Hassan II (formerly Sidi Said) | Morocco | Direction des Aménagements Hydrauliques | F I W | Moulouya | 400 | 02/01 | 03/03 | 04/05 | 03/06 | 115 | 577 | 590 | 690 | V | (5) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 65 80 | 15 20 | (N) |
| Amata | Mexico | CFE (Comisión Federal de Electricidad) | I | San Lorenzo | 14 | 11/03 | 11/04 | 04/05 | 06/05 | 30 | 218 | 42 | 60 | V 1.00 | (8) | 1.00 | (3)* | 1.00 | (12) | 300 | 300 | 120 | 0 | (-) |
| Jagin | Iran | Hormozgan Water Authority | F I W | Jagin | 300 | 12/01 | 05/04 | 05/05 | 09/07 | 78 | 220 | 232 | 382 | V 0.30 | (3') (3')* | 0.75 | (3')* | 0.75 | (12) | 300 | 300 | 105 160 | 90 90 | (N) |
| Zhaolaihe [A] | China | Changyang Electric Power Bureau | H I W | Duhu | 70 | 12/03 | 03/04 | 05/05 | 10/05 | 107 | 206 | 166 | 255 | curve | (3') | curve | (3') | (3') | 300 | 3000 | 84 126 | 126 103 | (F) | |
| Xihe | China | Hanjiang Hydropower Development Ltd. | F H N | Han | 229 | 11/03 | 02/04 | 05/05 | 06/07 | 63 | 346 | 194 | 631 | (F) | ||||||||||
| Çindere [H-F] | Turkey | DSI - State Hydraulic Works | H I W | Buyuk Menderes | 82 | 04/94 | 07/02 | 05/05 | 11/07 | 107 | 280 | 1500 | 1685 | 0.70 | (6) | 0.70 | (1)* | 0.89 | (12) | 300 | 300 | 50 | 20 | (F) |
| Suofengying | China | Guizhou-Wujiang Hydropower Development Co. Ltd. | F H I N W | Wu | 201 | 10/00 | 06/03 | 08/05 | 03/06 | 116 | 165 | 421 | 739 | V 0.25 | (3') (3') | 0.70 | (3') | 0.70 | (1) | 300 | 3000 | 64 | 95 | (F) |
| Kido | Japan | Fukushima Prefecture | F I N W | Kido | 19 | 10/00 | 06/03 | 08/05 | 03/08 | 94 | 350 | 291 | 501 | V 0.10 | (1) (1) | 0.78 | (1) | 0.78 | (1) | 250 | 750 1000 | 84 | 36 | (F) |
| Paradise (formerly Burnett River) | Australia | Sunwater | F I | Burnett | 300 | 11/03 | 06/04 | 09/05 | 11/05 | 50 | 940 | 400 | 400 | V | (8) | 0.64 | (3)* | 0.64 | (1)* | 310 | 310 | 63 | 0 | (-) |
| Chalillo | Belize | Belize Electric Co. Ltd (BECOL) and A. Fortis Co., Canada | H | Macal | 120 | 07/03 | 03/04 | 10/05 | 12/06 | 68 | 425 | 180 | 210 | 0.20 | (1) | 0.75 | (3')* | 0.75 | (12) | 300 | 3600 | 105 | 0 | (N) |
| Barra Grande | Brazil | BAESA (JV of Alcoa, Companhia Paulista de Força e Luz (CPFL), Companhia Brasileira de Alumínio, Camargo Corrêa Cimentos and DME Energética) | H | Pelotas | 50000 | - /01 | - /02 | - /05 | - /06 | 85 | 665 | 1 | ||||||||||||
| Changzhou | China | H | Xun | 56 | - /93 | - /02 | - /05 | - /07 | 56 | |||||||||||||||
| Picada | Brazil | L.D.Q.S.P.E. Geracao de Energia e Participacoes Ltda. | H | do Peixe | 8 | - /02 | - /03 | - /05 | - /06 | 32 | 97 | |||||||||||||
| Xiaqiao [A] | China | Guangxi Longjiang Electric Power Corporation | H | Long | 49 | - /02 | - /03 | - /05 | - /06 | 68 | 167 | 172 | 226 | |||||||||||
| Huizhou PSS - Lower dam | China | China Southern Power Grid | H | Caitouhe | 30 | - /02 | - /03 | - /05 | - /11 | 61 | 420 | 235 | 242 | |||||||||||
| Tangkeng [A] | China | Qingtian Yongwen Hydropower Co. | H | Guxi | 12 | - /03 | - /04 | - /05 | - /05 | 66 | (12) | (12) | (12) | |||||||||||
| Cachoeira Grande | Brazil | EMBASA (Empresa Baiana de Aguas e Saneamento S.A.) | H I | Sapucaia | 5 | - /04 | - /04 | - /05 | - /05 | 16 | 207 | 15 | ||||||||||||
| Peixe Angical | Brazil | Enerpeixa S/A | H | Tocantins | 3 | 04/02 | - /04 | - /05 | 09/06 | 39 | 400 | 500 | 582 | 300 | 300 | 70 | 0 | (-) | ||||||
| São Bernardo | Brazil | CJ Energética S/A | H | Bernardo José | 2 | - /03 | - /04 | - /05 | - /06 | 21 | 120 | |||||||||||||
| Poço do Magro | Brazil | CODEVASF (Companhia de Desenvolvimento dos Vales do São Francisco e do Parnaíba) | W | Poço do Magro | 32 | - /03 | - /04 | - /05 | - /06 | 22 | 540 | 58 | 68 | 64 | 16 | (N) | ||||||||
| Artur Tavares de Melo (formerly Guararema) | Brazil | Usina Central Olho D'Água S/A | I W | Itambé | 21 | - /03 | - /04 | - /05 | - /06 | 30 | 306 | 50 | 300 | 300 | 80 | 0 | (-) | |||||||
| Xixi | China | Xixi Reservoir Development Co. Ltd. | F H I W | Daxi | 85 | - /03 | - /04 | - /05 | - /06 | 71 | 243 | 231 | 244 | (F) | ||||||||||
| Can Asujan [H-F] | Philippines | National Irrigation Administration | I | Can Asujan | 2 | 10/03 | - /04 | - /05 | - /05 | 42 | 135 | 75 | 85 | 0.60 | (8) | 0.60 | (7) | 0.60 | (1) | 170 | 170 | 100 | 0 | (-) |
| Kinta | Malaysia | Lembaga Air Perak/Metropolitan Utilities Corporation | W | Kinta | 30 | 01/03 | 02/04 | 03/06 | 07/06 | 90 | 792 | 952 | 975 | V | (3') | 0.80 | (3')* | 0.80 | (3')* | 300 | 300 | 100 | 100 | (F) |
| Pine Brook | USA | Pine Brook Water District | W | 1 | 01/05 | 10/05 | 04/06 | - /06 | 26 | 170 | 27 | 30 | V | (7) | (17) | separate | 300 | 300 | 95 | 59 | (F) | |||
| Baise | China | Guangxi-Youjiang Hydraulic Development Co.Ltd. | F H I N W | You | 5660 | 10/01 | 12/02 | 04/06 | 12/06 | 130 | 720 | 1995 | 2672 | V | (9) | 0.80 | (1) | 0.80 | (1) | 300 | 3000 | 80 50 | 132 110 | (F) |
| Ghatghar PPS - Lower dam | India | GoMWRD (Government of Maharashtra Water Resources Department) | H | Shahi Nallah | 3 | 12/01 | 12/04 | 05/06 | 03/07 | 86 | 447 | 638 | 646 | 0.141 | (3') | 0.782 | (3')* | 0.782 | (3')* | 300 | 300 | 75 | 150 | (F) |
| Al Wehdah | Jordan/ Syria | Jordan Valley Authority, Ministry of Water and Irrigation | W | Yarmouk | 110 | 06/03 | 02/05 | 07/06 | 12/07 | 103 | 485 | 1426 | 1478 | V 0.60 | (3') | 0.80 | (3')* | 0.80 | 300 | 300 | 70 60 | 60 60 | (F) | |
| Ntimbale | Botswana | Department of Water Affairs | W | 26 | 11/04 | 04/06 | 09/06 | 05/07 | 33 | 153 | 30 | |||||||||||||
| Genesee #2 | USA | Genesee Water and Sanitation District | W | Bear Creek | 1 | 06/06 | 11/06 | 11/06 | 10/07 | 29 | 168 | 24 | V | 300 | 300 | |||||||||
| Nagai | Japan | Ministry of Land, Infrastructure and Transport | F H N W | Okitamano | 51 | 03/00 | 10/02 | 11/06 | 03/11 | 126 | 381 | 703 | 1200 | V 0.50 | (1) (1) | 0.73 | (1) | 0.73 | (1) | 250 | 1000 | 91 | 39 | (F) |
| Dahuashui [A] | China | Wujaing Qingshuihe Hydropower Development Co. Ltd. | F H | Qingshuihe | 276 | 12/03 | 04/05 | 11/06 | - /07 | 135 | 198 | 550 | 670 | curve | (3') | curve | (3') | (1) | 300 | 3000 | 81 94 | 81 94 | (F) | |
| Niuqiao [A] | China | Niu Qiao Reservoir Development Co. Ltd. | H | Qingtonghe | 26 | - /03 | - /05 | 12/06 | - /07 | 62 | 201 | 710 | ||||||||||||
| Pleikrong | Vietnam | EVN (Electrictie de Vietnam) | H | Po Ko | 1048 | 11/05 | 02/05 | 12/06 | - /07 | 65 | 495 | 326 | 450 | V | (1) | 0.80 | (1) | 0.80 | (1) | 300 | 300 | 80 | 210 | (N) |
| El Guapo spillway [H-F] | Venezuela | MARN (Ministerio del Ambiente y los Recursos Naturales) | F I W | El Guapo | 141 | 08/05 | 04/06 | 12/06 | 08/07 | 50 | 138 | 320 | 342 | 0.60 | (1) | 0.85 | (17) | 1.80 | (1) | 300 | 300 | 75 | 0 | (-) |
| Qilitang [A] | China | H | Liuchi | 71 | - /03 | - /04 | - /06 | - /07 | 81 | |||||||||||||||
| Xinjiangshankou | China | H | Kaidu | - /97 | - /04 | - /06 | - /08 | 71 | ||||||||||||||||
| Flor do Sertão | Brazil | Maue Geradora | W | 05/05 | - /05 | - /06 | 10/06 | 19 | 245 | |||||||||||||||
| El Mauro [H-F] | Chile | I | 1088 | - /04 | - /05 | - /06 | - /06 | 23 | 380 | |||||||||||||||
| Baisha | China | China Huadian Corporation | F H | Wanan | 199 | - /04 | - /05 | - /06 | - /06 | 75 | 172 | 211 | 239 | |||||||||||
| Esmeralda | Brazil | Esmeralda S.A. | H | Bernardo José | 1 | - /05 | - /05 | - /06 | - /06 | 19 | 212 | 15 | 27 | 64 | 16 | (N) | ||||||||
| Leidatan | China | Leidatan Corporation | H | Yingtaoyuangou | 94 | 03/03 | - /05 | - /06 | 06/07 | 84 | 202 | 240 | 340 | V | (3') | 0.70 | (3') | 0.70 | (1) | |||||
| Santa Laura | Brazil | Santa Laura S/A | H | Chapecozinho | 19 | - /04 | - /05 | - /06 | - /07 | 27 | 245 | 24 | 42 | |||||||||||
| El Sauz | Mexico | CNA (Comisión Nacional del Agua) | W | - /04 | - /05 | - /06 | - /07 | 30 | ||||||||||||||||
| Mosquitão | Brazil | Concessionária Mosquitão S/A | H | 19 | - /04 | - /05 | - /06 | - /07 | 32 | 236 | 57 | 76 | ||||||||||||
| Hongkou Ataguia [H-F] | China | - /04 | - /05 | - /06 | - /07 | 36 | ||||||||||||||||||
| Xiaoxi | China | Hunan Xiangtou Xinshao Youxi Hydropower Development Corporation Ltd. | H | Zishui | 168 | - /04 | - /05 | - /06 | - /07 | 47 | 268 | |||||||||||||
| Zhouba | China | Chengdu Haineng Power Co. Ltd. | F H | Mabianhe | 204 | - /04 | - /05 | - /06 | - /07 | 73 | 163 | 229 | 405 | V | (1) | 0.70 | (1) | 0.78 | (1) | 300 | 300 | 110 66 | 73 66 | (F) |
| Shaba [A] | China | Guizhou Zhongsui Energy Ltd. | H | Hongdu | 99 | - /04 | - /05 | - /06 | - /07 | 87 | 148 | 67 | 90 | |||||||||||
| Wuchuanshaba [A] | China | H | Wujiang | 9940 | - /04 | - /05 | - /06 | - /07 | 87 | |||||||||||||||
| Daxia | China | China Guodian Corporation | H I | Quan | 20 | - /04 | - /05 | - /06 | - /07 | 88 | 160 | 205 | ||||||||||||
| Zaoshi | China | Lishui Basin Hydraulic and Hydroelectric Development Corporation | F H N W | Dieshui | 1439 | - /04 | - /05 | - /06 | - /07 | 88 | 351 | 450 | 930 | V 0.25 | (3') | 0.80 | (3') | 0.75 | (1) | 300 | 3000 | 53 83 | 99 102 | (F) |
| Jupudu | China | Datang International Power Generation Co. Ltd. | H | Lixian (Black) | 174 | 11/04 | - /05 | - /06 | - /07 | 95 | 320 | 480 | 800 | V 0.20 | (3) | 0.80 | (3) | 0.80 | (3) | |||||
| Khasooye | Iran | Fars Regional Water Authority | I | Tang Charkhi | 15 | - /03 | - /05 | - /06 | - /08 | 19 | 160 | 22 | 28 | |||||||||||
| Tukahe | China | Datang International Power Generation Co. Ltd. | H | Lixian | 78 | 04/04 | 12/05 | - /06 | - /07 | 59 | 300 | 255 | 570 | V | (3') | (3') | (3') | 300 | 3000 | 65 93 | 110 113 | (S) | ||
| Longqiao [A] | China | Lichuan City Yujaing Valley Hudropower Ltd. Hubei Province | H R | Yu | 26 | 12/05 | 03/06 | 02/07 | 05/07 | 95 | 156 | 135 | 160 | curve | (3') | curve | (3) | (3) | ||||||
| Pinalito | Dominican Republic | Corporacion de Empresas de Energia Electrica (CDEEE), Unidad Ejecutora Proyecto Pinalito (UEPP) | H | Tireo | 4 | 09/04 | 11/05 | 03/07 | - /08 | 52 | 210 | 73 | 100 | V | (1) | 0.80 | (1)* | 0.80 | (12) | 300 | 300 | 98 | 8 | (N) |
| Akköy I | Turkey | Akköy Energy A.S. | H | Harsit | 3 | 07/05 | 10/06 | 04/07 | 09/08 | 38 | 144 | 87 | 101 | 0.10 | (1) | 0.80 | (1) | 0.80 | (12) | 300 | 300 | 100 | 100 | (N) |
| Huizhou PSS - Upper dam | China | China Southern Power Grid | H | Xiaojinhe | 30 | 10/04 | 12/05 | 05/07 | - /11 | 56 | 168 | 84 | 93 | V | (1) | 0.75 | (1) | 0.70 | (1) | 300 | 300 | 64 | 125 | (F) |
| Hickory Log Creek | USA | Marietta (Georgia) Water Authority | W | Hickory Log Creek | 1 | 10/05 | 12/06 | 06/07 | 10/07 | 55 | 290 | 165 | V | (8) | 0.80 | (3')* | 0.80 | (1) | 300 | 300 | 89 80 74 | 89 98 104 | (F) | |
| Longtan (Stage 1) | China | Longtan Hydropower Development Co. Ltd. | F H N W | Hongshui | 16210 | 07/01 | 10/04 | 06/07 | 12/09 | 192 | 832 | 4623 | 7400 | V 0.25 | (3') | 0.70 | (3') | 0.68 | (12) | 300 | 300 | 99 86 | 121 109 | (F) |
| Tanger-Med (formerly R’Mel) | Morocco | Direction des Aménagements Hydrauliques | F W | R’Mel | 25 | 05/05 | 06/06 | 06/07 | 10/07 | 80 | 250 | 230 | 243 | V | (11) | 0.75 | (1)* | 0.75 | (1) | 300 | 3000 | 100 90 | 0 0 | (-) |
| Taishir | Mongolia | Ministry of Energy | H I W | Zabkhan | 930 | 02/05 | 05/06 | 06/07 | 12/07 | 60 | 200 | 210 | 250 | V | (2) | 0.72 | (1)* | 0.72 | (12)* | 333 | 333 | 75 | 0 | (-) |
| Yacoub El Mansour (formerly Ouirgane) | Morocco | Direction des Aménagements Hydrauliques | W | N’Fis | 70 | 07/05 | 10/06 | 07/07 | 03/08 | 71 | 233 | 202 | 216 | V | (11) | 0.75 | (1)* | 0.75 | (1)* | 300 | 3000 | 100 | 0 | (-) |
| Elkwater Fork | USA | Natural Resources Conservation Service | W | Tygart Tributory | 3 | - /06 | 04/07 | 08/07 | - /07 | 39 | 204 | 106 | 113 | V | (8) | 0.80 | (3)* | 0.80 | (1)* | 300 | 300 | 59 | 89 | (F) |
| Meander | Australia | Rivers and Water Supply Commission, Tasmania | I W | Meander | 43 | 01/06 | 01/07 | 08/07 | 12/07 | 47 | 180 | 85 | 85 | V | (4) | 0.70 | (10) | 0.70 | (10) | 300 | 300 | 70 | 0 | (-) |
| North Para | Australia | Gawler River Flood Plain Management Authority | F | North Para | 1 | 11/06 | 06/07 | 09/07 | - /07 | 33 | 206 | 50 | 50 | V | (3') | (3')* | (3')* | 300 | 300 | 60 | 160 | (F) | ||
| A Vuong | Vietnam | EVN (Electrictie de Vietnam) | H | Vugia Thubon | 340 | 08/03 | 01/06 | 10/07 | 11/08 | 83 | 240 | 260 | 350 | V | (1) | 0.80 | (1) | 1.00 | (1) | 300 | 300 | 90 | 150 | (N) |
| Nakai, part of Nam Theun 2 HPP | Laos | Nam Theun Power Corporation (NTPC)/EdF (Electricitie de France) | H | Nam Theun | 3530 | 04/04 | 03/06 | 10/07 | 10/09 | 39 | 436 | 150 | 207 | V | (1) | 0.35 0.75 | (10) | 0.75 | (12) | 300 | 300 | 100 | 100 | (F) |
| Dinh Binh | Vietnam | Ministry of Agriculture and Rural Development (MARD) | F H I W | Kon | 226 | 05/04 | 08/05 | 12/07 | 12/08 | 55 | 571 | 183 | 430 | V | (11) | 0.75 | (3')* | ogee | (12) | 300 | 900 | 70 126 | 175 141 | (F) |
| Hongkou | China | Fujian Hongkou Hydropower Co. Ltd. | H W | Huotong | 449 | - /03 | - /05 | - /07 | - /08 | 130 | 341 | 681 | 830 | |||||||||||
| Serra Preta | Brazil | EMBASA (Empresa Baiana de Aguas e Saneamento S/A) | W | Gaviãozinho | 5 | - /05 | - /05 | - /07 | - /08 | 34 | 154 | 44 | 51 | V | 0.80 | 0.80 | 80 | 20 | (N) | |||||
| Ludesa [H-F] | Brazil | CPFL Renovaveis | H | Chapecó | 142 | - /06 | - /06 | - /07 | 04/07 | 25 | 300 | 1.50 | 1.50 | 0.75 | ||||||||||
| Luojiaohe [A] | China | Guizhou Zhongshui Energy Co. Ltd. | H | Luojiao | 46 | - /05 | - /06 | - /07 | - /07 | 81 | 250 | 110 | ||||||||||||
| Castro Alves | Brazil | CERAN (Companhia Energética Rio das Antas) | H | das Antas | 92 | - /05 | - /06 | - /07 | 02/08 | 48 | 350 | 240 | 322 | V | 0.77 | 0.77 | 60 | 15 | (N) | |||||
| Da Ilha (Rio da Prata) | Brazil | Da Ilha Energética S/A | H | das Antas | 16 | - /04 | - /06 | - /07 | 04/08 | 26 | 310 | 80 | 20 | |||||||||||
| Quatorze (XIV) de Julho | Brazil | CERAN (Companhia Energética Rio das Antas) | H | das Antas | 55 | - /05 | - /06 | - /07 | 10/08 | 37 | 281 | 75 | 212 | V | (1) | 0.77 | (1) | 0.77 | (1) | 75 | 15 | (N) | ||
| Duas Serras | Brazil | COMPESA (Companhia Pernambucana de Saneamento) | W | Duas Serras | 2 | - /05 | - /06 | - /07 | - /08 | 19 | 113 | 6 | 300 | 300 | ||||||||||
| Baxiang Nº3 | China | Department of Electricity, Feng Shun County | H | Baxianghe | 8 | - /05 | - /06 | - /07 | - /08 | 44 | 207 | 63 | 83 | |||||||||||
| Tiecheng | China | Gansu Keyuan Electric Power Group Co. Ltd. | H | Datong | 1 | - /05 | - /06 | - /07 | - /08 | 44 | 143 | |||||||||||||
| Shihu | China | Zhouluo County Government | F I W | Lituohe | 58 | - /05 | - /06 | - /07 | - /08 | 56 | 193 | 162 | 354 | |||||||||||
| Yumen | China | Department of WaterResources, Henan Province | F H N | Luohe | 28 | - /05 | - /06 | - /07 | - /08 | 62 | 244 | 133 | 234 | |||||||||||
| Youshui | China | Chongqing Youshui River Hydropower Development Co. Ltd. | H | Youshui | 152 | - /05 | - /06 | - /07 | - /08 | 63 | 194 | |||||||||||||
| Qilinguan [A] | China | Nanhe Hydropower Development Ltd. | H | Nanhe | 14 | - /05 | - /06 | - /07 | - /08 | 77 | 140 | 45 | 55 | |||||||||||
| Manghekou | China | Jiyuan City Water Bureau | Menghe | 11 | - /05 | - /06 | - /07 | - /08 | 78 | 215 | 160 | 249 | ||||||||||||
| Bailianya [A] | China | Anhui Water Resources Development Co. Ltd. | F H I W | Dongpi | 480 | - /05 | - /06 | - /07 | 04/09 | 105 | 422 | 485 | 600 | V | (1) | 0.335 | (1) | 0.335 | (1) | 300 | 3000 | 72 56 | 108 84 | (F) |
| Cotiporã | Brazil | Cotiporã Energetica S.A. | H | Carreiro | 4 | - /07 | - /07 | - /07 | - /07 | 16 | 196 | 21 | 41 | |||||||||||
| Plano Alto | Brazil | SPE Plano Alto Energia S/A | H | Irani | 13 | - /06 | - /07 | - /07 | 02/08 | 38 | 173 | 42 | 78 | V | 0.75 | 0.75 | 72 | 19 | (N) | |||||
| Jararaca | Brazil | Veneto Energética S/A | H | das Antas | 8 | - /06 | - /07 | - /07 | 04/08 | 25 | 219 | 31 | 61 | 72 | 18 | (N) | ||||||||
| Nansha | China | Red River Hydropower Development Co. Ltd. | H | Honghe | 212 | 02/06 | - /07 | - /07 | 07/08 | 85 | ||||||||||||||
| Lurberria | France | Agglomeration Sud Pays Basque | F | Nivelle | 4 | - /06 | - /07 | - /07 | - /08 | 22 | 168 | 190 | ||||||||||||
| Linha Emilia | Brazil | Linha Emília Energética S/A | H | Carreiro | 12 | - /06 | - /07 | - /07 | - /08 | 27 | 214 | 35 | 54 | |||||||||||
| Silin | China | Guizhou-Wujiang Hydropower Development Corporation | F H I N | Wujiang | 1593 | 11/05 | 11/06 | 03/08 | - /09 | 117 | 310 | 825 | 1100 | V | (1) | 0.70 | (1) | 0.70 | (1) | 66 89 | 100 109 | (F) | ||
| Beydag [H-F] | Turkey | DSI - State Hydraulic Works | I W | Kucuk Menderes | 248 | 04/94 | 07/06 | 04/08 | 11/08 | 95 | 800 | 2350 | 2650 | 0.25 | (6) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 60 | 30 | (F) |
| Weihou [A] | China | Xilin River Hydropower Development Co. Ltd. | H | Tuoniang | 133 | 03/05 | - /06 | 04/08 | - /09 | 82 | ||||||||||||||
| Guangzhao | China | Guizhou Qianyuan Power Co. Ltd. | H | Beipan | 3245 | 10/04 | 02/06 | 05/08 | - /09 | 201 | 412 | 2420 | 2800 | V 0.25 | (9) | 0.75 | (1) | 0.75 | (1) | 300 | 300 | 61 71 | 91 87 | (F) |
| Koudiat Acerdoune [H-F] | Algeria | ANBT (Agence Nationale des Barrages et Transfert) | I W | Wadi Isser | 800 | 11/02 | 05/06 | 06/08 | 09/08 | 121 | 492 | 1650 | 1850 | 0.65 | (1)* | 0.65 | (1)* | 0.65 | (1)* | 300 to 400 | 300 to 400 | 77 | 87 | (F) |
| Sidi Yahya (formerly Ain Kwachia) | Morocco | Direction des Aménagements Hydrauliques | I W | Khellata | 11 | 01/07 | 05/07 | 07/08 | 11/08 | 30 | 213 | 60 | 78 | 0.20 | (5) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 105 | 0 | (-) |
| Gelantan | China | Datang International Hydropower Generation Co. Ltd. | H | Lixian | 409 | 01/03 | 09/06 | 08/08 | - /09 | 113 | 466 | 903 | 1200 | V 0.20 | (3') | 0.75 | (3') | 0.75 | (1) | 77 93 | 77 93 | (S) | ||
| La Breña II | Spain | Acuasur | I | Guadiato | 823 | 06/05 | 02/07 | 10/08 | 12/08 | 119 | 685 | 1441 | 1600 | 0.05 0.30 | (3') (3') | 0.75 | (3')* | 0.75 | (3')* | 300 | 300 | 69 | 115 & 46 | (F) |
| Toppu | Japan | Hokkaido Prefecture | F I W | Toppu | 36 | 07/02 | 06/05 | 10/08 | 03/14 | 78 | 309 | 440 | 530 | V 0.80 | (1) (1) | 0.80 | (1) | 0.80 | (1) | 250 | 1000 | 84 | 36 | (F) |
| Boussiaba | Algeria | ANBT (Agence Nationale des Barrages et Transferts) | W | Boussiaba | 120 | 12/06 | 05/08 | 11/08 | 08/09 | 51 | 310 | 160 | 190 | V | (2) | (1)* | (1) | 300 | 300 | 112 | 28 | (F) | ||
| Mangla Emergency Spillway Control Weir | Pakistan | WAPDA (Water and Power Development Authority) | H I | Jhelum | 6500 | 08/04 | 12/07 | 11/08 | 01/09 | 17 | 370 | 54 | 79 | V 0.30 | (3') (3')* | V 0.70 | (3') (3')* | 0.70 | (3')* | 300 | 300 | 60 | 120 | (S) |
| Yeywa | Myanmar | Department of Hydroelectric Power - Ministry of Electric Power | H | Myitnge | 2600 | 10/01 | 02/06 | 12/08 | 12/10 | 137 | 680 | 2473 | 2843 | V | (3') | 0.80 | (3')* | 0.80 | (12) | 300 | 300 | 75 | 145 | (N) |
| Jinghong | China | Huaneng Lancang River Hydropower Co. Ltd. | F H R | Lancang (Mekong) | 1139 | - /04 | - /05 | - /08 | - /09 | 108 | 705 | 848 | 3068 | V | (3) | 0.80 | (3) | (1) | 300 | 64 93 | 93 93 | (S) | ||
| Se San 4 | Vietnam | EVN (Electrictie de Vietnam) | H | Poko | 54 | 12/04 | 03/05 | - /08 | - /09 | 74 | 834 | 753 | 1300 | V | (1) | 0.80 | (1) | 0.80 | (1) | 300 | 300 | 80 | 160 | (N) |
| Santa Rosa II | Brazil | Santa Rosa S/A | H | Grande | 7 | - /06 | - /06 | - /08 | - /08 | 31 | 172 | |||||||||||||
| Chbika | Morocco | Direction des Arrenagements Hydrauliques | I | Chbika | 2 | - /04 | - /06 | - /08 | - /09 | 24 | ||||||||||||||
| El Handak | Morocco | Direction des Arrenagements Hydrauliques | I | El Handak | 1 | - /05 | - /06 | - /08 | - /09 | 27 | ||||||||||||||
| Pengshui | China | Datang International Power Generation Co. Ltd. | H I | Changxi | 1465 | - /05 | - /06 | - /08 | - /09 | 117 | 326 | 608 | 1330 | V | (3') | 0.70 | (3') | 0.70 | (1) | 64 81 | 96 121 | (F) | ||
| Liujiadong | China | Guangxi Water Conservancy and Electric Power Corporation | H | Gui | 26 | - /06 | - /07 | - /08 | - /08 | 61 | 166 | 127 | ||||||||||||
| Cachoeirão (Henrique Nunes Coutinho) | Brazil | Hidrelétrica Cachoeirão SA | H | Manhuaçu | - /07 | - /07 | - /08 | - /08 | 23 | 90 | ||||||||||||||
| Alto Irani [H-F] | Brazil | CPFL Renovaveis | H | Irani | 5 | - /07 | - /07 | - /08 | - /08 | 45 | 243 | 14 | 20 | 2.50 | 2 | 2 | ||||||||
| São Simão | Brazil | São Simão Energia S/A | H | Itapemirim Norte | 11 | - /06 | - /07 | - /08 | 02/09 | 56 | 187 | 92 | 115 | |||||||||||
| Major Gercino (formerly known as Angelina) | Brazil | Lumbrás Energética S.A. | H | Tijucas | 6 | - /07 | - /07 | - /08 | 03/09 | 45 | 178 | |||||||||||||
| Binh Dien | Vietnam | Binh Dien Electricity Joint Stock Company | H | Huu Trach | 424 | 01/05 | - /07 | - /08 | 04/09 | 54 | 571 | 189 | 423 | 300 | 300 | 70 | 105 | (F) | ||||||
| Engenheiro Henrique Kotzian | Brazil | BME Energia SA | H | Ivaí | 9 | - /06 | - /07 | - /08 | 04/09 | 34 | 228 | 58 | 76 | |||||||||||
| Pedra do Garrafão | Brazil | H | Itabapoana | - /07 | - /07 | - /08 | 05/09 | 15 | 110 | |||||||||||||||
| Goiandira | Brazil | Goiás Sul Geração de Energia S.A. | H | Verissimo | 76 | 08/07 | - /07 | - /08 | 05/09 | 44 | 341 | V | 0.75 | 0.75 | ||||||||||
| Retiro Velho | Brazil | Retiro Velho Energetica S/A | H | da Prata | 69 | - /05 | - /07 | - /08 | - /09 | 42 | 56 | |||||||||||||
| Sidi el Mahjoub | Morocco | Direction des Aménagements Hydrauliques | Ifrane | 1 | - /06 | - /07 | - /08 | - /09 | 22 | 15 | 18 | V | (5) | 1.00 | (1)* | 1.00 | (1)* | |||||||
| Shuhe | China | Datang Shaanxi Power Generation Co Ltd | H | Hanjiang | 176 | - /06 | - /07 | - /08 | - /09 | 72 | ||||||||||||||
| Qingxi [A] | China | Guizhou Qianyuan Power Co. Ltd. | H | Furong | 98 | - /06 | - /07 | - /08 | - /09 | 82 | 166 | 154 | ||||||||||||
| Nongling | China | Dehong Longjiang Hydropower Development Co. Ltd. | H | Long | 233 | - /06 | - /07 | - /08 | - /09 | 91 | 280 | 486 | ||||||||||||
| Shankou | China | Xinjiang Yili River Basin Development Authority | H | Tekes | 121 | 04/06 | - /07 | - /08 | - /09 | 50 | 496 | |||||||||||||
| Rodeio Bonito | Brazil | Velcan Energy Development Ltda. | H | Irani | 9 | - /06 | - /07 | - /08 | 01/10 | 32 | 223 | 59 | V | 0.85 | 0.85 | |||||||||
| Picachos | Mexico | CNA (Comisión Nacional del Agua) | I W | Presidio | 322 | 02/07 | 09/07 | - /08 | - /09 | 85 | 256 | 85 | V 0.15 | (12) (12) | 0.85 | (12) | 0.85 | (12) | 300 | 3000 | 50 | 45 | (S) | |
| Engenheiro Ernesto Jorge Dreher | Brazil | BME Energia | H | Ivaí | 4 | - /07 | - /08 | - /08 | 04/09 | 23 | 220 | 29 | 35 | 68 | 17 | (N) | ||||||||
| Las Truchas | Mexico | Desarrollos Mineros San Luis, S.A. de C.V. | H | La Lobor o Las Truchas | - /07 | - /08 | - /08 | - /09 | 35 | 230 | 24 | 300 | 300 | |||||||||||
| Wadi Dayqah | Oman | Ministry of Regional Municipalities and Water Resources | W | Wadi Dayqah | 100 | 08/06 | 01/08 | 04/09 | 11/09 | 75 | 410 | 590 | 650 | V | (3') | 0.75 | (3')* | 0.75 | (3')* | 300 | 1200 | 126 112 | 54 48 | (M) |
| Yunlonghe Nº3 [A] | China | Engshi Yuefeng Yunlong River Hydropower Development Co. Ltd. | H | Yunlong | 44 | 03/06 | 04/07 | 04/09 | - /11 | 139 | 119 | 182 | 207 | curve | (3') | curve | (3') | (3') | ||||||
| El Platanal (formerly Capillucas) | Peru | Cementos Lima S.A. | H | Canete | 5 | 01/07 | 10/08 | 04/09 | 10/09 | 34 | 60 | 75 | 75 | 0.375 | (3') | 0.75 | (3')* | 300 | 300 | 65 | 90 | (N) | ||
| Big Bear Creek | USA | Tennessee Valley Authority | F W | Bear Creek | 47 | 01/08 | 10/08 | 05/09 | 06/09 | 27 | 292 | 60 | 69 | V | (1) | 0.80 | (1)* | 300 | 300 | 77 | 77 | (F) | ||
| Kasegawa | Japan | Ministry of Land, Infrastructure, Transport and Tourism | F H I W | Kase | 71 | 02/05 | 10/07 | 06/09 | 03/12 | 99 | 456 | 830 | 948 | V 0.60 | (1) (1) | 0.75 | (1) | 0.75 | (1) | 250 | 1000 | 84 | 36 | (F) |
| Yunkou [A] | China | Yujiang Hydropower Co. Ltd. | H | Wuni | 35 | 06/07 | 04/08 | 06/09 | - /12 | 119 | 152 | 200 | 205 | |||||||||||
| Vaca | Belize | Belize Electric Company Ltd (BECOL) and A. Fortis Company, Canada | H | Marcal | 12 | 02/07 | 02/08 | 10/09 | 12/11 | 70 | 225 | 200 | 220 | 0.20 | (1) | 0.75 | (3')* | 0.75 | (12) | 300 | 3000 | 94 | 31 | (F) |
| Saf-Saf [H-F] | Algeria | ANBT (Agence Nationale des Barrages et Transfert) | F I W | Saf-Saf | 18 | 03/06 | - /08 | 10/09 | 03/11 | 36 | 270 | 120 | 175 | 0.70 | (12) | 0.70 | (7) | 0.70 | (12) | 300 | 300 | 120 | 0 | (-) |
| Taum Sauk [H-F] | USA | AmerenUE | H | Water source - East Fork of Black River | 6 | 02/07 | 10/07 | 11/09 | 06/10 | 49 | 2060 | 2448 | 2500 | 0.60 | (1) | 0.60 | (1)* | no spillway | 300 | 300 | 59 | 59 | (F) | |
| Deep Creek Nº5D | USA | Yadkin County and NRCS | F W | Deep Creek | 15 | 12/08 | 04/09 | 12/09 | 07/10 | 22 | 226 | 39 | 45 | V | (3') | 0.80 | (3')* | 0.80 | (1)* | 300 | 300 | 89 | 89 | (F) |
| Salto-RS | Brazil | H | Caí | - /07 | - /07 | - /09 | - /09 | 42 | ||||||||||||||||
| Cristalandia | Brazil | EMBASA (Empresa Baiana de Aguas e Saneamento S.A) | W | de Contas | 17 | - /05 | - /07 | - /09 | 01/10 | 22 | 337 | 61 | 68 | |||||||||||
| Wudu | China | Sichuan Wudu Water Conservancy and Hydropower Group Ltd. | F H I W | Fu | 572 | 10/04 | - /07 | - /09 | - /10 | 120 | 631 | 1151 | 1580 | V | (3') | 0.75 | (3') | 0.80 | (3') | (F) | ||||
| São Pedro | Brazil | São Pedro Energia S/A | H | Jacu Braço Norte | 2 | - /06 | - /07 | - /09 | - /10 | 30 | 140 | 22 | 35 | |||||||||||
| Sông Côn 2 | Vietnam | Geruco Song Con Hydro Power Joint Stock Company | H | Song Con | 30 | - /06 | - /07 | - /09 | - /10 | 58 | 260 | |||||||||||||
| Huanghuazhai [A] | China | China Datang Corporation | H | Getu | 1748 | 07/06 | - /07 | - /09 | - /10 | 110 | 253 | 280 | 292 | 52 | 96 | (F) | ||||||||
| Tianhuaban [A] | China | Yunnan Dianneng Niulanjiang Hydropower Development Co. Ltd. | H | Niulan | 66 | 12/06 | - /07 | - /09 | - /10 | 113 | 160 | 182 | 360 | curve | (3') | curve | (3') | ogee | (3) | |||||
| Baishiya | China | Quifeng Water Supply Co. of Fangchenggang City | H I W | Xijiang | 26 | - /04 | - /07 | - /09 | - /12 | 74 | 190 | 230 | 240 | 0.75 | ||||||||||
| Palomino [H-F] | Dominican Republic | EGEHID (Empresa de Generación Hidroeléctrica Dominicana) | H | Yaque del Sur and Blanco | 3 | - /05 | - /07 | - /09 | - /13 | 65 | 153 | |||||||||||||
| Criúva | Brazil | Criúva Energética S/A | H | Lajeado Grange | 7 | - /08 | - /08 | - /09 | 12/09 | 25 | 246 | 80 | 95 | 72 | 18 | (N) | ||||||||
| Chonghu’er | China | Xinjiang-Xinhua-Chonghuer Hydropower Development Co. Ltd. | H | Burgin | 85 | 10/06 | - /08 | - /09 | - /09 | 74 | 545 | 480 | ||||||||||||
| Xiaotianlong | China | Hongguo Water Resources Development Co. | W | Tuochang | 1 | - /07 | - /08 | - /09 | - /09 | 58 | 168 | 125 | ||||||||||||
| Areia Branca | Brazil | Hidrelétrica Areia Branca S.A. (Tractebel Energia) | H | Manhuaçu | - /08 | - /08 | - /09 | - /09 | 28 | 257 | ||||||||||||||
| Palanquinho | Brazil | Serrana Energética S/A | H | das Antas | 6 | - /07 | - /08 | - /09 | 01/10 | 32 | 137 | 89 | 103 | 72 | 18 | (N) | ||||||||
| Mulungu do Morro | Brazil | EMBASA (Empresa Baiana de Aguas e Saneamento S/A) | I W | Tijuco | 2 | - /07 | - /08 | - /09 | 03/10 | 16 | 156 | 13 | ||||||||||||
| Damad | Saudi Arabia | Ministry of Water and Energy of the Kingdom of Saudi Arabia | F I W | Jawrah | 33 | 05/06 | - /08 | - /09 | 05/10 | 52 | 592 | 207 | 384 | 300 - 500 | 1000 - 1500 | |||||||||
| Poço do Marruáo | Brazil | Insituto de Desenvolvimento do Piauí | I W | Riacho do Jorge | 293 | - /07 | - /08 | - /09 | - /10 | 48 | 870 | 293 | 306 | |||||||||||
| Barra dos Coqueiros | Brazil | Gerdau Aços Longos | H W | Claro | 1 | 08/07 | - /08 | - /09 | 07/10 | 60 | 1670 | 172 | 282 | |||||||||||
| Piedade | Brazil | Piedade Usina Geradora de Energia S.A | H | Piedade | 18 | - /06 | - /08 | - /09 | 08/10 | 30 | 397 | |||||||||||||
| Serra do Facão | Brazil | Serra do Facão Energia S.A. (SEFAC) | H | Sao Marcos | 5199 | 02/07 | - /08 | - /09 | 10/10 | 92 | 326 | 610 | 742 | 300 | 300 | 72 | 18 | (N) | ||||||
| Maduhe [A] | China | Yichang Junwang Group Co. | H | Siyang | 33 | - /06 | - /08 | - /09 | - /10 | 100 | 185 | |||||||||||||
| São Gonçalo (formerly Santa Bárbara) | Brazil | SPE São Gonçalo Energia S.A. | H | Santa Bárbara | 6 | - /07 | - /08 | - /09 | - /10 | 28 | 148 | 14 | 26 | V | 0.75 | 0.75 | 68 | 17 | (N) | |||||
| Caçu | Brazil | Gerdau SA | H | Claro | - /07 | - /08 | - /09 | - /10 | 40 | |||||||||||||||
| Yangjiayuan [A] | China | Guizhou Tongzihe Hydropower Development Co. Ltd. | H W | Tongzhi | 78 | - /07 | - /08 | - /09 | - /10 | 68 | 153 | |||||||||||||
| Sehb el Merga | Morocco | Direction des Aménagements Hydrauliques | F I W | Sehb el Merga | 7 | 06/07 | - /08 | - /09 | - /10 | 37 | 480 | 85 | 95 | V | (5) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 65 | 25 | (N) |
| Geliqiao | China | Wujiang Hydropower Development Corporation | H | Qingshuihe | 77 | 01/07 | 04/08 | - /09 | - /10 | 124 | 104 | 500 | ||||||||||||
| Arvoredo | Brazil | SPE Arvoredo Energia S.A. | H | Irani | 12 | - /08 | - /09 | - /09 | 04/10 | 39 | 259 | 53 | 81 | V | 0.75 | 0.75 | 80 | 20 | (N) | |||||
| Feke II | Turkey | Akkur Energy Production Trade and Industry Co. Inc. | H | Göksu | 63 | 12/07 | 12/08 | 02/10 | 08/10 | 70 | 256 | 194 | 227 | 0.07 | (6) | 0.80 | (3')* | separate | 300 | 300 | 60 60 | 60 50 | (F) | |
| Adnan Mendres (formerly Çine) | Turkey | DSI - State Hydraulic Works | F H I W | Çine | 350 | 12/95 | 11/04 | 04/10 | 10/11 | 137 | 300 | 1560 | 1650 | 0.10 0.20 | (7') | 0.85 | (7') | 0.85 | (7') | 300 | 300 | 85 75 | 105 95 | (F) |
| Ulu Sepri (formerly Batu Hampar) | Malaysia | Jabatan Bekalan Air Negeri Sembilan | W | Batu Hampar | 3 | 11/07 | 10/09 | 04/10 | 05/10 | 65 | 236 | 200 | 203 | (3') | (10) | (10) | 300 | 1200 | 65 | 120 | (F) | |||
| Bengoh | Malaysia | Public Works Department | W | Sungai Bengoh | 144 | 06/07 | 06/09 | 05/10 | - /12 | 63 | 267 | 130 | 172 | V | (3') | 0.80 | (3')* | 0.80 | (3')* | 300 | 3000 | 60 | 120 | (F) |
| Kasegawa auxiliary dam [H-F] | Japan | Ministry of Land, Infrastructure, Transport and Tourism | F H I W | Kase | 1 | 03/08 | 10/09 | 06/10 | 09/10 | 29 | 116 | 52 | 68 | 0.80 | (12) | 0.80 | (12) | 0.80 | (12) | 250 | 750 | 80 | 0 | (-) |
| Pirris | Costa Rica | ICE (Instituto Costarricence de Electricidad) | H | Pirris | 36 | 12/06 | 03/09 | 06/10 | 07/11 | 113 | 258 | 695 | 755 | 0.33 | (3')* | 0.50 | (3')* | 0.50 | (12) | 300 | 300 | 88 | 132 | (N) |
| Bramhoek | South Africa | ESKOM | H | Braamhoekspruit | 27 | 04/08 | 06/09 | 06/10 | 02/11 | 37 | 330 | 90 | 98 | V | (3') | 0.67 | (3')* | 0.67 | (3')* | 300 | 1200 | 70 | 95 | (F) |
| Koris Gefiri (Maiden’s bridge) [H-F] | Greece | Ministry of Agriculture | I W | Partheni | 3 | 11/05 | 03/07 | 07/10 | - /16 | 42 | 221 | 170 | 190 | 0.80 | (13) | 0.80 | (3) | 0.80 | (1)* | 300 - 450 | 300 - 450 | 50 | 10 | (N) |
| Ghasre Ghand (formerly Zirdan) | Iran | Sistan & Balouchestan Water Authority | I W | Kajoo | 207 | 11/02 | 08/07 | 08/10 | 11/10 | 65 | 350 | 265 | 437 | (5) | (3)* | 300 | 300 | 98 | 42 | (N) | ||||
| Son La | Vietnam | EVN (Electricté de Vietnam) | F H | Song Da (Black river) | 9260 | 04/04 | 01/08 | 08/10 | 12/12 | 138 | 962 | 2677 | 4800 | V | (3') | 0.73 | (3')* | separate | 300 | 300 | 60 | 160 | (F) | |
| Şirnak | Turkey | DSI - State Hydraulic Works | H | Ortasui | 18 | - /08 | 11/09 | 08/10 | 09/10 | 67 | 198 | 157 | 231 | 0.10 | (1) | 0.80 | (1)* | 0.80 | (12) | 300 | 600 | 125 | 0 | (-) |
| Abou Abbas Al-Sabti (formerly Taskourt) | Morocco | Direction des Aménagements Hydrauliques | I W | Al Mal | 25 | 01/08 | 04/09 | 09/10 | 04/11 | 75 | 408 | 415 | 490 | V | (5) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 73 | 32 | (N) |
| Tobetsu [H-F] | Japan | Hokkaido Prefecture | F I W | Tobetsu | 75 | 10/08 | 06/09 | 09/10 | 10/12 | 52 | 432 | 665 | 803 | 0.80 | (5) | 0.80 | (5) | 0.80 | (1) | 250 | 750 | 100 80 60 | 0 0 | (-) |
| Saladillo | Argentina | Provincia de San Luis | W | Quinto | 02/09 | 09/09 | 09/10 | 01/11 | 79 | 487 | 210 | 249 | (5) | (5) | ||||||||||
| Ban Ve | Vietnam | EVN (Electrictie de Vietnam) | H | Ca | 1500 | 08/04 | 02/07 | 10/10 | 12/11 | 136 | 480 | 1520 | 1750 | v 0.30 | (3') | 0.85 | (3')* | 0.80 | (12) | 300 | 300 | 80 | 120 | (N) |
| Çamlica III [H-F] | Turkey | Akfen Energy | F H | Zamanti | 1 | 04/08 | 04/10 | 12/10 | 04/11 | 52 | 186 | 160 | 182 | 0.70 | (7) | 0.70 | (1)* | 0.70 | (12) | 300 | 300 | 88 | 37 | (F) |
| Wyaralong | Australia | Queensland Water Infrastructure Pty. Ltd. | W | Teviot Brook | 1 | 09/09 | 04/10 | 12/10 | 06/11 | 48 | 464 | 173 | (1) | (1)* | (1) | 300 | 300 | 85 | 85 | (F) | ||||
| Valsamiotis [H-F] | Greece | Crete Development Organisation | I | Valsamiotis | 6 | 10/05 | 05/07 | 12/10 | - /14 | 63 | 335 | 640 | 820 | 0.80 | (13) | 0.80 | (3) | 0.80 | (1)* | 300 | 300 | 60 | 0 | (-) |
| Dong Nai 3 | Vietnam | EVN (Electrictie de Vietnam) | F H | Dong Nai | 1690 | 12/04 | 05/08 | 12/10 | 10/11 | 108 | 594 | 1138 | 1235 | V | (1) | 0.75 | (1)* | 0.75 | (1) | 300 | 300 | 75 | 0 | (-) |
| Nuoc Trong | Vietnam | MARD (Ministry of Agriculture and Rural Development) | H I | Tra Kluc | 290 | 10/07 | 07/09 | 12/10 | 05/11 | 69 | 518 | 446 | 607 | V | (3') | 300 | 300 | 125 80 | 218 230 | (N) | ||||
| Santa Clara-BA | Brazil | Companhia Energetica Santa Clara | H | Mucuri | 151 | - /99 | - /01 | - /02 | - /03 | 59 | 242 | 520 | 600 | 300 | 300 | |||||||||
| Khan Khwar | Pakistan | WAPDA (Water and Power Development Authority) and CTGC (China Three Gorges Corp.) | H | Duber Khwar | 04/03 | - /06 | - /10 | 04/12 | 46 | 112 | ||||||||||||||
| Wuyi | China | Dina | 99 | - /05 | - /07 | - /10 | - /12 | 103 | ||||||||||||||||
| Yongdingqiao | China | Liushahe | 17 | - /05 | - /07 | - /10 | - /12 | 123 | ||||||||||||||||
| Jin’anqiao | China | Hanergy, Yunnan Jinsha River Hydropower Co. Ltd. and Yunnan Investment and Development Co. Ltd. | H N R | Jinsha | 913 | 12/03 | 05/07 | - /10 | - /11 | 160 | 640 | 2400 | 4430 | V | (3) | 0.75 | (3) | 0.75 | (1) | 72 96 | 108 117 | (F) | ||
| Gasparino | Brazil | CERB (Companhia de Engenharia Ambiental e Recursos Hídricos da Bahia) | W | Vaza-Barris | 49 | - /07 | - /08 | - /10 | 10/10 | 23 | 927 | 130 | ||||||||||||
| Rondon II | Brazil | Eletrogoes S/A. | H | Comemorqção | 478 | - /07 | - /08 | - /10 | - /11 | 19 | 460 | |||||||||||||
| Imboulou | Republic of Congo | Délégation Générale des Grands Travaux | H | Léfini | 584 | 09/03 | - /08 | - /10 | 05/11 | 33 | 310 | |||||||||||||
| Moula [H-F] | Tunisia | Ministère de l’Agriculture | W | Bou Terfess | 26 | 02/03 | - /08 | - /10 | 11/11 | 81 | 324 | 422 | 450 | V | (3') | (3')* | (3')* | 300 | 300 | 120 | 0 | (-) | ||
| Çaltikoru [H-F] | Turkey | DSI - State Hydraulic Works | I | İlyasdere | 42 | - /95 | - /08 | - /10 | 12/11 | 65 | 477 | 743 | 800 | 0.35 | (3') | 0.70 | (3')* | 0.70 | (12) | 300 | 300 | 60 | 50 | (F) |
| Saizhu [A] | China | Yunnan Dianneng Group Holding Company | H | Xima | 3 | 04/06 | - /08 | - /10 | - /11 | 72 | 160 | 107 | 115 | curve | (3') | curve | (3') | (3) | ||||||
| Qianchang | China | Guodian Yunnan Power Co Ltd | H | Pudu | 22 | - /07 | - /08 | - /10 | - /11 | 81 | 148 | |||||||||||||
| Tiechuanqiao [A] | China | Yupaojiang | 25 | - /07 | - /08 | - /10 | - /11 | 95 | ||||||||||||||||
| Shidi | China | Chongqing Wujiang Power Company | H | Youshui | 163 | - /06 | - /08 | - /10 | - /12 | 30 | 214 | 260 | ||||||||||||
| Sanliping [A] | China | Hubei Energy Group Co. Ltd. | F H | Nanhe | 499 | - /07 | 05/08 | - /10 | - /11 | 133 | 285 | 390 | (1) | (1) | (1) | |||||||||
| Água Limpa | Brazil | Água Limpa Energia S/A | H | Palmeiras | 10 | - /08 | - /09 | - /10 | 12/10 | 38 | 98 | 42 | ||||||||||||
| Figueirópolis | Brazil | Companhia Hidroelétrica Figueirópolis | H | Jauru | 35 | - /08 | - /09 | - /10 | 12/10 | 16 | 170 | V | 0.43 | 0.75 | ||||||||||
| Porto Estrela | Brazil | H | Santo Antonio | 8 | - /08 | - /09 | - /10 | - /11 | 26 | |||||||||||||||
| Longhuakou | China | Meng County Longhuakou Hydropower Co. Ltd. | Longhua | 30 | - /08 | - /09 | - /10 | - /10 | 63 | 353 | 414 | |||||||||||||
| Ibirama | Brazil | Ibirama Energética SA | H | 1 | - /09 | - /09 | - /10 | - /10 | 15 | 145 | ||||||||||||||
| Ninho da Águia | Brazil | CPFL Renovaveis | H | Santo Antônio | 1 | - /09 | - /09 | - /10 | - /10 | 15 | 94 | 14 | V | 0.75 | 0.75 | |||||||||
| Caju | Brazil | Energisa Geracão Rio Grande S/A | H | Rio Grande | 10 | - /09 | - /09 | - /10 | 03/11 | 38 | 222 | 66 | 82 | |||||||||||
| Pipoca | Brazil | Omega Engergia Renovávelo S/A | H | Manhuaçu | - /07 | - /09 | - /10 | 04/11 | 16 | 200 | (N) | |||||||||||||
| Naen [A] | China | Guangxi Water Conservancy and Electric Power Corporation | H | Baidu | 22 | - /06 | - /09 | - /10 | - /11 | 75 | 217 | |||||||||||||
| São José | Brazil | Ijui Energia S.A. | H | Carreiro | 188 | - /07 | - /09 | - /10 | - /11 | 29 | 790 | |||||||||||||
| Luoboba [A] | China | Enshi Tianfa Electric Ltd. | F H R | Lengshui | 87 | - /07 | - /09 | - /10 | - /11 | 114 | 192 | 21 | 21 | (F) | ||||||||||
| Lavrinha | Brazil | BME | H | Paraiba do Sul | 12/07 | - /09 | - /10 | - /11 | 28 | 85 | ||||||||||||||
| Ingazeira (formerly San Antonio and Cachoeirinha) | Brazil | DNOCS (Departamento Nacional de Obras Contra a Seca) | F I W | Pajeú | 49 | - /08 | - /09 | - /10 | - /11 | 26 | 566 | 64 | 92 | |||||||||||
| Sfeissif | Morocco | Direction des Aménagements Hydrauliques | Safsaf | 20 | - /08 | - /09 | - /10 | - /11 | 29 | V | (5) | 0.85 | (1)* | 0.85 | (1)* | 300 | 300 | 120 | 0 | (-) | ||||
| São Sebastião do Alto | Brazil | Geracao Hidroeletrica Rio Grande S/A | H | Grande | 44 | - /08 | - /09 | - /10 | - /11 | 41 | 210 | 51 | 75 | |||||||||||
| Lechangxia | China | Department of Water Resources, Guandong Province | H I N | Bei | 374 | - /08 | - /09 | - /10 | - /11 | 85 | 256 | |||||||||||||
| Francisco J. Múgica (formerly Nueva Italia) | Mexico | Gobierno del Estado de Michoacán | I | El Marqués | 100 | 03/08 | - /09 | - /10 | - /11 | 90 | 375 | 367 | 451 | V 0.30 | 1.00 | 1.00 | 300 | 300 | 65 | 0 | (-) | |||
| Corrente Grande | Brazil | CPFL Renovaveis | H | Corrente Grande | 12 | - /10 | - /10 | - /10 | - /10 | 20 | 110 | V | 0.75 | 0.75 | ||||||||||
| Marco Balbo | Brazil | H | - /10 | - /10 | - /10 | - /10 | 30 | 42 | 73 | |||||||||||||||
| Ait Moulay Ahmed | Morocco | Direction des Aménagements Hydrauliques | I W | Ain Leuh | 2 | 10/09 | - /10 | 01/11 | 10/11 | 29 | 136 | 18 | 20 | V | (5) | 0.75 | (1)* | 0.75 | (1)* | 300 | 300 | 70 | 30 | (N) |
| El Puente de Santolea | Spain | Acua Ebro | I | Guadalope | 18 | - /09 | 04/10 | 02/11 | 03/11 | 35 | 203 | 65 | 70 | 0.20 | (3')* | 0.60 | (3')* | 0.60 | (3')* | 300 | 300 | 65 | 153 | (F) |
| Las Tunas | Argentina | Provincia de Catamarca | F I W | Las Tunas | 101 | 02/09 | 09/10 | 02/11 | 12/11 | 33 | 259 | 30 | 56 | V | (1) | 200 | 400 | 85 | 25 | (N) | ||||
| Okukubi (Kin) [H-F] | Japan | Okinawa General Bureau, Cabinet Office, Japan | F I W | Okukubi | 79 | 03/09 | 11/10 | 03/11 | 07/11 | 39 | 461 | 339 | 430 | 0.80 | (5) | 0.80 | (5) | 0.80 | (5) | 300 | 750 | 80 | 0 | (-) |
| Changuinola 1 [A-G] | Panama | AES (Allied Energy Systems Co.) Panama SRL | H | Changuinola | 347 | 04/07 | 12/09 | 04/11 | 10/11 | 105 | 595 | 884 | 910 | V | (3') | 0.50 0.70 | (3')* (3')* | 0.50 | (12) | 300 | 300 | 70 65 | 145 150 | (F) |
| Gov. Jayme Canet Junior (formerly Antiga Mauá) | Brazil | Consorcio Energético Cruzeiro do Sul (Copel and Electrosul Centrais Eléctricas SA) | H | Tibagi | 2137 | - /09 | 01/10 | 05/11 | - /12 | 83 | 726 | 633 | 753 | V | (2) | 0.80 | (10) | 300 | 2400 | 60 | 15 | (N) | ||
| Yunishigawa | Japan | Ministry of Land, Infrastructure, Transport and Tourism | F I W | Yunishi | 75 | 08/08 | 09/09 | 05/11 | 09/12 | 119 | 320 | 967 | 1053 | V 0.60 | (1) | 0.78 | (1) | 0.78 | (1) | 250 | 1000 | 91 | 39 | (F) |
| Dong Nai 4 | Vietnam | EVN (Electrictie de Vietnam) | H | Dong Nai | 337 | 12/04 | 03/09 | 06/11 | - /12 | 128 | 481 | 1305 | 1370 | V | (1) | 0.80 | (1)* | 0.80 | (1) | 300 | 300 | 85 | 115 | (N) |
| El Maleh Amont | Morocco | Direction des Aménagements Hydrauliques | F | Maleh | 35 | 01/07 | 09/07 | 06/11 | 10/12 | 49 | 174 | 100 | 140 | 0.20 | (5) | 0.60 | (5) | 0.60 | (5) | 300 | 300 | 120 | 0 | (-) |
| El Realito | Mexico | CNA (Comisión Nacional del Agua) | Santa Maria | 57 | - /08 | 07/09 | 06/11 | - /11 | 85 | 270 | 420 | V | (1) | 0.85 | 0.85 | 300 | 300 | 33 to 66 | 27 to 54 | (S) | ||||
| Güllübag | Turkey | Senerji Enerji | H | Çoruh | 21 | 05/09 | 02/11 | 06/11 | 02/12 | 72 | 97 | 160 | 175 | V | (1) | 0.50 0.70 | (1) (1) | 0.70 | (12) | 300 | 300 | 70 | 70 | (F) |
| Dak Mi 4 | Vietnam | (IDICO) Urban and Industrial Development Zone Investment Company | H | Vu Gia | 313 | 04/07 | 01/08 | 08/11 | 04/12 | 90 | 472 | 720 | 800 | V | (3') | 0.48 0.80 | (3')* (3')* | 0.80 | (1) | 300 | 300 | 95 | 125 | (N) |
| Song Tranh 2 | Vietnam | EVN (Electrictie de Vietnam) | H | Song Tranh | 733 | 03/05 | 04/08 | 08/11 | 12/12 | 96 | 640 | 1032 | 1315 | V | (3') | 0.80 | (1) | 0.75 | (1) | 300 | 300 | 70 | 110 | (N) |
| Gomal Zam [A-G] | Pakistan | WAPDA (Water and Power Development Authority) | F H I | Gomal | 1424 | 07/02 | 08/07 | 09/11 | 06/13 | 133 | 231 | 390 | 474 | V | 0.60 | 0.60 | 300 | 3000 to 4000 | 91 | 91 | (F) | |||
| Yubari Syuparo | Japan | Ministry of Land, Infrastructure and Transport | F H I W | Yubari | 427 | 11/03 | 10/09 | 09/11 | 03/15 | 111 | 390 | 584 | 940 | V 0.80 | (1) (1) | 0.82 | (1) | 0.82 | (1) | 250 | 750 & 1000 | 91 | 39 | (F) |
| Thornton Gap (Tollway) | USA | MWRDGC (Metropolitan Water Reclamation District of Greater Chicago) | F | - | 1 | 02/10 | 06/11 | 09/11 | 11/11 | 35 | 69 | 25 | 25 | V | (3') | (3')* | 300 | 300 | 48 | 79 | (F) | |||
| Menge | Turkey | Enerjisa En. Ut. A.S. | H | Göksu | 51 | 05/09 | 08/10 | 10/11 | 12/11 | 68 | 304 | 349 | 384 | 0.25 | (1) | 0.80 | (3')* | 0.80 | (12) | 300 | 300 | 80 | 40 | (F) |
| Nam Gnouang (Theun Hinboun Expansion) | Laos | Theun Hinboun Power Company | H | Nam Gnouang | 2450 | 10/08 | 03/10 | 12/11 | - /12 | 65 | 480 | 383 | V | (1) | 0.80 | (1)* | 1.00 | (12) | 300 | 300 | 90 | 100 | (F) | |
| Shiyazi | China | Guizhou Zhongshui Energy Co. Ltd. | H | Hongdu | 321 | - /07 | 04/08 | 12/11 | 12/11 | 135 | ||||||||||||||
| Gongguoqiao | China | Huaneng Lancang River Hydropower Co. Ltd. | H | Lancang (Mekong) | 316 | - /08 | - /09 | - /11 | 03/12 | 105 | 356 | 1067 | ||||||||||||
| Boa Sorte | Brazil | Boa Sorte Energética S/A | H | Tijucas | 18 | - /07 | - /09 | - /11 | - /12 | 26 | ||||||||||||||
| Huhehaote (Hohhot) PSS - Upstream lower dam | China | Nei Mongol (Inner Mongolia) Electricity Corporation | H | Halasxinegou | 7 | - /07 | - /09 | - /11 | - /12 | 69 | 242 | 185 | 330 | |||||||||||
| Kamchay | Cambodia | Electricity of Cambodia (44-year BOT to Sinohydro Corporation) | H | Kamchay | 718 | - /07 | - /09 | - /11 | - /12 | 112 | 568 | 1100 | V 0.30 | 0.75 | ||||||||||
| Sanglang [A] | China | Sanglang | 15 | - /08 | - /09 | - /11 | - /12 | 90 | ||||||||||||||||
| Qinglong [A] | China | Enshi Mawei Valley Hydropower Development Co. Ltd. | H | Maweigou | 29 | 12/08 | - /09 | - /11 | - /12 | 140 | 116 | 212 | ||||||||||||
| A Luoi | Vietnam | Central Hydropower Joint Stock Company | H | A Sap | 06/07 | 04/09 | - /11 | - /12 | 50 | 208 | 138 | |||||||||||||
| Sefaköy | Turkey | Püre Energy Üretim Tic. A.S. | H | Aras | 21 | - /08 | - /10 | - /11 | 10/11 | 55 | 148 | 120 | (1) | (1) | ||||||||||
| Anta (with Simplicio) | Brazil | Centrais Eletricas Brasileiras sa Eletrobras | H | Paraiba do Sul | 114 | - /09 | - /10 | - /11 | 12/11 | 30 | 270 | 44 | 55 | |||||||||||
| Moínho | Brazil | Statkraft (Moinho S.A.) | H | Bernado José | 1 | - /09 | - /10 | - /11 | - /11 | 22 | 126 | 9 | 25 | 68 | 17 | (N) | ||||||||
| Nabi | China | Baise WaCun Hydropower Development Co. | H | Xiyang | 57 | - /09 | - /10 | - /11 | - /11 | 69 | 247 | 289 | ||||||||||||
| Lianhuatai | China | Guodian Shaanxi Hydropower Development Co. | H | Dan | 95 | 02/09 | - /10 | - /11 | - /11 | 70 | 221 | 221 | ||||||||||||
| Autódromo | Brazil | Autódromo Energética S/A | H | Carreiro | 4 | - /10 | - /10 | - /11 | - /11 | 23 | 271 | 21 | 47 | 67 | 17 | (N) | ||||||||
| Boa Fé | Brazil | Boa Fé Energética S.A. | H | Carreiro | 5 | - /10 | - /10 | - /11 | - /11 | 26 | 198 | 32 | 58 | |||||||||||
| Lusixi | China | Lusi Reservoir Management Office | W | Lusixi | 33 | - /09 | - /10 | - /11 | - /12 | 39 | 140 | |||||||||||||
| Silopi | Turkey | DSI - State Hydraulic Works | H W | Hezil | 29 | 08/08 | - /10 | - /11 | 02/12 | 89 | 356 | 718 | 752 | 0.10 | (7) | 0.70 | (3')* | 0.70 | (1) | 300 | 300 | 81 | 39 | (-) |
| Santo Antonio-RJ | Brazil | Energisa Geracão Rio Grande S/A | H | Grande | 17 | - /09 | - /10 | - /11 | 02/12 | 44 | 285 | 81 | 105 | |||||||||||
| Santo Antonio-RO | Brazil | Santo Antônio Energia | H | Madeira | 2075 | - /08 | - /10 | - /11 | 03/12 | 25 | 3100 | 560 | 3086 | |||||||||||
| Dr Victor Baptista Adami (formerly Passos Maia) | Brazil | Passos Maia Energética S.A. (Statkraft, Adami & Madeiras) | H | Chapecó | 14 | - /09 | - /10 | - /11 | 09/12 | 34 | 66 | 72 | 18 | (N) | ||||||||||
| Linxihe [A] | China | Hubei Huaqing Power Co. Ltd. | H | Loushui | 52 | - /08 | - /10 | - /11 | - /12 | 74 | 146 | |||||||||||||
| Madushan | China | Honghe Guangyuan Hydropwer and Madushan Development Co. Ltd. | H N W | Honghe | 552 | - /08 | - /09 | - /11 | - /12 | 108 | 353 | 987 | ||||||||||||
| A’hai | China | Yunnan Jinsha River Hydropower Co. Ltd. | F H I | Jinsha | 885 | - /08 | - /10 | - /11 | - /12 | 138 | 482 | 2707 | ||||||||||||
| Ahl Lafouim | Morocco | Direction des Aménagements Hydrauliques | W | Ahl Lafouim | 3 | - /09 | - /10 | - /11 | - /12 | 15 | 95 | 20 | 24 | 0.20 | (5) | 0.80 | (1)* | 0.80 | (1)* | |||||
| Krayma | Morocco | Direction des Aménagements Hydrauliques | W | Tiyoughza | 3 | - /09 | - /10 | - /11 | - /12 | 32 | 170 | 45 | 53 | 0.20 | (5) | 0.80 | (1)* | 0.80 | (1)* | 120 100 | 0 | (-) | ||
| Balkusan | Turkey | Karen Energy | H | Balkusan | 15 | - /09 | - /10 | - /11 | - /12 | 48 | 189 | 60 | 76 | V | (1) | 0.75 | (1)* | 0.75 | (12) | 300 | 1200 | 75 | 50 | |
| Qingyanggou | China | Yumen Hongyuan Industrial Company | H | Sule | - /09 | - /10 | - /11 | - /12 | 64 | 147 | ||||||||||||||
| Dengke | China | Yunnan Baoshan Electric Co. Ltd. | H | Longjiang | 53 | - /09 | - /10 | - /11 | - /12 | 76 | 239 | |||||||||||||
| Rizzanese | France | Electricité de France | H I | Rizzanese | 1 | - /09 | 04/11 | 02/12 | - /12 | 41 | 140 | 64 | 72 | V 1.00 | (6) (10) | V 0.80 | 0.80 | 300 | 300 | 80 | 0 | (-) | ||
| Middle Vaitarna | India | Municipal Corporation of Greater Mumbai | W | Vaitarna | 202 | 10/08 | 05/10 | 04/12 | - /12 | 102 | 565 | 1202 | 1500 | 0.15 | (3') | 0.75 | (3')* | 0.75 | (12) | 300 | 300 | 75 | 145 | (F) |
| Köprü | Turkey | Enerjisa En. Ut. A.S. | H | Göksu | 98 | 07/09 | 12/10 | 04/12 | - /13 | 109 | 413 | 975 | 1050 | V 0.60 | (1) (1) | 0.80 | (1) | 0.80 | (12) | 300 | 300 | 85 | 45 | (F) |
| Dong Nai 2 | Vietnam | Trung Nam Power Jointstock Company | H | Dong Nai | 281 | 04/09 | 12/10 | 05/12 | 03/13 | 80 | 429 | 786 | 1025 | (3')* | 300 | 300 | 80 90 | 120 110 | (N) | |||||
| Portugues [A-G] | USA | US Army Corps of Engineers, Jacksonville and Department of Natural Resources of Puerto Rico | F | Portugues | 20 | 04/08 | 01/11 | 05/12 | 12/13 | 67 | 375 | 270 | 310 | V | (3') | 0.35 | (3')* | 0.35 | (1) | 300 | 300 | 114 | 51 | (F) |
| Bui | Ghana | BPA (Bui Power Authority) | H I | Bui | 12570 | 10/07 | 02/09 | 05/12 | 11/14 | 108 | 493 | 830 | 900 | V | (3') | 0.75 | (3') | 0.75 | (12) | 300 | 3000 | 45 61 | 85 91 | (F) |
| Gökkaya | Turkey | MEM Enerji Elektrik Üretim Sanayi ve Ticaret A.Ş | H | Göksu | 18 | 02/10 | 07/10 | 05/12 | 07/12 | 69 | 118 | 96 | 122 | 0.067 | (1) | 0.80 | (1) | 0.80 | (11) | 300 | 300 | 55 | 55 | (F) |
| Dry Comal Creek | USA | Comal County, Texas | F | Dry Comal Creek | 4 | 10/11 | 03/12 | 08/12 | 12/12 | 26 | 457 | 62 | 67 | V | (3') | 0.80 | (3)* | 0.80 | (1) | 300 | 300 | 60 | 100 | (C) |
| Ban Chat | Vietnam | EVN (Electrictie de Vietnam) | H | Nam Mu | 2138 | 01/06 | 08/09 | 08/12 | 12/13 | 130 | 425 | 1600 | 2 | V | (3') | 0.80 | (3')* | separate | 300 | 300 | 60 | 160 | (F) | |
| San Vicente Dam Raise | USA | San Diego County Water Authority and City of San Diego | W | San Diego | 299 | 06/09 | 09/11 | 09/12 | 09/14 | 103 | 474 | 459 | 465 | V | (4') | 0.78 | (3')* | 0.78 | (3')* | 300 | 300 | 86 | 127 | (F) |
| Devecikonagi | Turkey | MCK Elektrik Uretim A.S. | H I | Emet | 6 | 05/10 | 03/11 | 09/12 | 01/13 | 39 | 313 | 180 | 210 | 0.10 | (2) | 0.75 | (1) | 0.80 | (12) | 300 | 300 | 80 | 40 | (F) |
| Akköy II (Aladereçam) | Turkey | Akköy Energy A.S. | H | Karaovacik | 14 | - /07 | 05/11 | 09/12 | - /13 | 60 | 260 | 226 | 306 | V | (1) | 0.80 | (1) | 0.80 | (12) | 300 | 300 | 85 | 85 | (N) |
| Enlarged Cotter | Australia | Icon Water (formerly ACTEW Corp.) | W | Cotter | 78 | 10/09 | 08/11 | 12/12 | 08/13 | 87 | 350 | 369 | 400 | V | (3') | 0.75 | (3')* | 0.75 | (3')* | 300 400 | 300 400 | 75 | 120 | (F) |
| Nam Ngum 5 [A] | Laos | Nam Ngum 5 Power Company Ltd. (15% Électricité du Laos - Generation Company Ltd., 85% Power) | H | Nam Ting | 314 | 10/08 | 11/11 | 12/12 | 12/12 | 101 | 235 | 298 | 421 | |||||||||||
| Dak Drinh | Vietnam | Petro Vietnam | H | Dak Drinh | 249 | 01/09 | 09/11 | 12/12 | 12/13 | 100 | 466 | 788 | (3') | (3')* | (12) | 300 | 300 | 80 | 115 | (N) | ||||
| Duber Khwar | Pakistan | WAPDA (Water and Power Development Authority) and CTGC (China Three Gorges Corp.) | H | Duber Khwar | 06/03 | - /08 | - /12 | 01/14 | 41 | 202 | ||||||||||||||
| Longkaikou | China | Yunnan Jinsha River Hydropower Co. Ltd. | F H N R W | Jinsha | 558 | 08/07 | 09/08 | - /12 | - /13 | 119 | 768 | 2840 | 3853 | V | (3) | 0.75 | (3) | 300 | 3000 | 96 60 | 96 90 | (F) | ||
| Allai Khwar | Pakistan | WAPDA (Water and Power Development Authority) and CTGC (China Three Gorges Corp.) | H | Allai Khwar | 01/05 | - /09 | - /12 | 03/13 | 51 | 88 | ||||||||||||||
| Shankouyan [A] | China | Shankouyan Hydro Project Development Co. | H | Yuanhe | 105 | 11/07 | - /09 | - /12 | - /13 | 99 | 268 | 272 | ||||||||||||
| Ouro | Brazil | H | - /10 | - /10 | - /12 | - /12 | 16 | |||||||||||||||||
| Grand Poubara | Gabon | Ministries of Mining, Energy, Oil and Water Resources | H | Ogooué | 11/08 | - /10 | - /12 | 08/13 | 37 | 300 | 105 96 | 70 64 | (F) | |||||||||||
| Shatuo | China | Wujiang Hydroelectric Development Corporation | F H N | Wu | 910 | 05/06 | - /10 | - /12 | - /13 | 101 | 631 | 1510 | 1980 | V 0.15 | (3') | 0.75 | (3') | 0.75 | (3) | 300 | 3000 | |||
| Dayuhyan [A] | China | Guizhou Water-investment Hydropower Development Co., Ltd | H | Masha | 61 | - /09 | - /10 | - /12 | - /13 | 81 | ||||||||||||||
| Milanhe | China | Milanhe | 41 | - /09 | - /10 | - /12 | - /13 | 83 | ||||||||||||||||
| Guandi | China | Yalong River Hydropower Development Co. Ltd. | H | Yalong | 760 | - /09 | - /10 | - /12 | - /13 | 168 | 516 | 2970 | 3020 | V 0.30 | 0.70 | 72 | 88 | (F) | ||||||
| Xunyang | China | Hanjiang | - /08 | - /10 | - /12 | - /14 | 58 | |||||||||||||||||
| Marrecas | Brazil | SAMAE (Serviço Autônomo Municipal de Água e Esgoto) | W | Marrecas | 33 | 03/10 | - /11 | - /12 | 12/12 | 35 | 430 | |||||||||||||
| Zhongqiao | China | Zunyi Water Conservancy Bureau | Ren | 99 | - /10 | - /11 | - /12 | - /12 | 60 | |||||||||||||||
| Nankanghe Nº2 [A] | China | Ximeng Fubian Hydropower Development Co. Ltd. | H | Nankang | 31 | - /10 | - /11 | - /12 | - /12 | 68 | 179 | |||||||||||||
| Retiro | Brazil | CTG Brasil | H | Sapucai | 18 | - /10 | - /11 | - /12 | 07/13 | 15 | 482 | |||||||||||||
| Garibaldi | Brazil | Rio Canoas Energia S.A. | H | Canoas | 296 | - /10 | - /11 | - /12 | 09/13 | 42 | 517 | 264 | 382 | |||||||||||
| Çermikler [H-F] | Turkey | DSI - State Hydraulic Works | H | Kizilirmak | 41 | - /08 | - /11 | - /12 | - /13 | 42 | 251 | 160 | ||||||||||||
| Çetintepe | Turkey | DSI - State Hydraulic Works | H | Robozik | 44 | 09/08 | - /11 | - /12 | - /13 | 39 | 173 | 60 | 64 | 0.10 | (1) | 0.80 | (1)* | 0.80 | (12) | 300 | 1200 | 77 | 63 | (N) |
| Toca do Tigre | Brazil | CJ Hydro - Geraçao de Energia S.A | H | Turvo | 6 | - /09 | - /11 | - /12 | - /13 | 22 | 237 | |||||||||||||
| Mamoeiro | Brazil | Companhia de Gestão dos Recursos Hídricos | I W | - | 21 | - /10 | - /11 | - /12 | - /13 | 28 | 310 | |||||||||||||
| Ivan Botelho I (fomerly Antiga Ponte) | Brazil | Centrais Hidrelétricas Grapon S/A | H | Pomba | 17 | - /10 | - /11 | - /12 | - /13 | 32 | 273 | |||||||||||||
| Huong Dien | Vietnam | FPT Corporation | H | Bo | 821 | - /10 | - /11 | - /12 | - /13 | 83 | 260 | 400 | 90 | 100 | (N) | |||||||||
| Pezzi | Brazil | Pezzi Energética S.A. | H | das Antas | 24 | - /11 | - /12 | - /12 | - /13 | 42 | 238 | 44 | 80 | 76 | 19 | (N) | ||||||||
| Serra dos Cavalinhos II | Brazil | Serra dos Cavalinhos II Energética S.A. | H | das Antas | 8 | - /11 | - /12 | - /12 | - /13 | 42 | 123 | 33 | 80 | 72 | 18 | (N) | ||||||||
| Spring Grove | South Africa | TCTA (Trans Caledon Tunnel Authority) | W | Mooi | 140 | 03/11 | 06/12 | 05/13 | 05/14 | 39 | 300 | 96 | 114 | (3') | (3')* | 300 | 300 | 50 | 110 | (F) | ||||
| Murum | Malaysia | SEB (Sarawak Energy Bhd) | H | Murum | 12043 | 10/08 | 05/10 | 07/13 | - /15 | 146 | 440 | 1520 | 1660 | V 0.20 | (3') (3') | 0.70 0.80 | (3)* | 0.70 0.80 | 300 | 3000 | 88 65 | 88 72 | (F) | |
| Cannelton [H-F] | USA | American Municipal Partners (AMP) | H | Ohio | 05/09 | 06/12 | 08/13 | 09/16 | 35 | 158 | 113 | 0.80 | (10) | 0.80 | (10) | separate | 230 | 230 | 118 | 64 | (F) | |||
| De Hoop | South Africa | Department of Water & Sanitation | W | Steelpoort | 347 | 07/07 | 07/09 | 11/13 | 03/14 | 85 | 1015 | 769 | 1012 | V | (3') | (3')* | (3')* | 300 | 1200 | 62 | 145 | (F) | ||
| Captain Meldahl [H-F] | USA | American Municipal Partners (AMP) | H | Ohio | 04/11 | 06/13 | 12/13 | 04/16 | 28 | 84 | 56 | 0.80 | (10) | 0.80 | (10) | separate | 230 | 230 | 116 | 62 | (F) | |||
| Upper Paung Laung | Myanmar | Department of Hydroelectric Power - Ministry of Electric Power | H | Paung Laung | 1285 | 01/06 | 01/11 | 12/13 | - /14 | 103 | 537 | 936 | 1100 | V | (3') | 0.80 | (3')* | 0.80 | (12) | 300 | 300 | 90 | 140 | (N) |
| Kalashuke | China | Department of Water Resources, Xinjiang Province | F H W | E’erqisi | 2419 | - /07 | - /10 | - /13 | - /14 | 122 | 1489 | 2520 | 2890 | 0.75 | 0.75 | 300 | 3000 | (F) | ||||||
| Mamaya Nº1 | China | Guizhou Qianyuan Power Company | H | Beipan | 137 | - /08 | - /10 | - /13 | - /14 | 109 | 250 | 591 | ||||||||||||
| Luntan [A] | China | Luntan Hydraulic Engineering Co. Ltd. | H | Yangcunshui | 180 | 12/08 | - /10 | - /13 | - /14 | 90 | 218 | |||||||||||||
| Sultan Moulay Ali Cherif (formely Tiouine) | Morocco | Direction des Aménagements Hydrauliques | F I W | Iriri | 270 | 05/10 | - /11 | - /13 | - /13 | 90 | 202 | 270 | 380 | V | (1) | 0.80 | (1)* | 0.80 | (1)* | 100 | 0 | (-) | ||
| Rastro de Auto | Brazil | CERTEL | H | Forqueta | - /11 | - /11 | - /13 | - /13 | 23 | 190 | ||||||||||||||
| Angostura | Chile | Colbún SA | H | BioBio | - /09 | - /11 | - /13 | - /14 | 63 | 125 | ||||||||||||||
| Lizhou [A] | China | China Huadian Corporation | H W | Muli | 190 | - /09 | - /11 | - /13 | - /14 | 132 | 211 | |||||||||||||
| Chuanjiang | China | Chuanjiang | 98 | - /10 | - /11 | - /13 | - /14 | 83 | ||||||||||||||||
| Zhaizihe | China | Houhe | 119 | - /10 | - /11 | - /13 | - /14 | 93 | ||||||||||||||||
| Shannipo [A] | China | Guizhou Qianyuan Power Co. Ltd. | H | Beipan | 85 | - /09 | - /11 | - /13 | - /15 | 119 | 205 | 199 | 267 | curve | (3') | curve | (3) | ogee | (3) | |||||
| João Borges | Brazil | Eletrosul Centrais Elétricas SA | H | Caveiras | 23 | - /12 | - /12 | - /13 | 11/13 | 29 | 170 | |||||||||||||
| Shaqian | China | HydroChina Co. | F H | Furong | 57 | 10/11 | - /12 | - /13 | - /13 | 59 | ||||||||||||||
| Barra do Rio Chapéu | Brazil | Eletrosul Centrais Elétricas S/A | H W | Braço do Norte | 2 | - /12 | - /12 | - /13 | - /13 | 25 | 117 | |||||||||||||
| Huanza | Peru | Empresa de Generacion Huanza | H | Pallca | - /10 | - /12 | - /13 | - /14 | 38 | 85 | ||||||||||||||
| Tamellast | Morocco | Direction des Aménagements Hydrauliques | 1 | - /11 | - /12 | - /13 | - /14 | 19 | 27 | V | (5) | 1.00 | (1)* | 1.00 | (1)* | |||||||||
| Shuangfengsi | China | Chengde Shuangfengsi Project Bureau | H | Luanhe | 137 | - /11 | - /12 | - /13 | - /14 | 50 | 535 | 550 | ||||||||||||
| Lower Russei Chrum | Cambodia | Ministry of Mines and Energy | H | Russei Chrum | 62 | - /11 | - /12 | - /13 | - /14 | 59 | 325 | 170 | ||||||||||||
| Hongling | China | Guodian Haikong Hongling water construction Co. Ltd. | H I W | Dabian | 662 | - /11 | - /12 | - /13 | - /14 | 92 | ||||||||||||||
| Huhehaote (Hohhot) PSS - Downstream lower dam | China | Nei Mongol (Inner Mongolia) Electricity Corporation | H | Halasxinegou | 7 | - /12 | - /12 | - /13 | - /14 | 58 | 308 | 205 | 717 | |||||||||||
| Bajo Frío | Panama | Fountain Hydro Power Corp. | H | Chiriqui Viejo | - /12 | - /13 | - /13 | - /14 | 56 | 406 | 87 | 272 | ||||||||||||
| Naras | Turkey | DSI - State Hydraulic Works | F I | Manavgat | 104 | - /10 | 12/12 | 01/14 | 05/14 | 78 | 448 | 620 | 677 | 0.15 | (1) | 0.80 | (1)* | 0.80 | (12) | 300 | 300 | 110 | 90 | (N) |
| Aslandag | Turkey | DSI - State Hydraulic Works | H I W | Bembo | 11 | 09/08 | 11/11 | 02/14 | 11/14 | 69 | 210 | 162 | 202 | 0.10 | (1) | 0.80 | (1)* | 0.80 | (12) | 300 | 1200 | 100 | 80 | (N) |
| Beyhan-I [H-F] | Turkey | Kalehan Energy Üretim ve Ticaret A.S. | H | Murat | 369 | - /09 | 03/12 | 03/14 | 03/15 | 97 | 361 | 1480 | 1661 | 0.70 | (7) | 0.70 | (3') | 300 | 300 | 90 | 40 | (M) | ||
| Song Bung 4 | Vietnam | EVN (Electrictie de Vietnam) | H | Vu Gia | 511 | 09/10 | 06/12 | 04/14 | 01/15 | 114 | 345 | 963 | 1170 | V 0.40 | 0.80 | (3')* | 300 | 3000 | 80 60 | 120 140 | (N) & (F) | |||
| Willow Island [H-F] | USA | American Municipal Partners (AMP) | H | Ohio | 12/11 | 11/13 | 04/14 | 02/16 | 20 | 66 | 49 | 0.80 | (10) | 0.80 | (10) | separate | 230 | 230 | 116 | 62 | (F) | |||
| Cheshmeh Ashegh | Iran | Fars Water Authority | F I W | Cheshmeh Ashegh | 62 | 06/10 | 10/11 | 05/14 | 03/17 | 60 | 375 | 130 | 250 | (1) | (1)* | (12) | 300 | 600 - 900 | 120 | 80 | (N) | |||
| Guanyinyan | China | Datang Huarui Investment Group Ltd. | F H N R | Jinsha | 2263 | - /08 | 09/11 | 05/14 | - /16 | 159 | 1250 | 6473 | 9364 | V 0.10 | (3') | 0.75 | (3') | 0.75 | (1) | 300 | 53 | 99 | (F) | |
| Wadi Umti [H-F] | Oman | Ministry of Rural Municipalities and Water Resources | F | Wadi Umti | 1 | 04/13 | 11/13 | 07/14 | 07/14 | 16 | 145 | 34 | 58 | 0.70 | (12) | 0.70 | (12) | 0.70 | (12) | 300 | 300 | 60 | 0 | (-) |
| Hantangang | South Korea | Kwater (Korean Water Resources Corporation) | F I W | Hantan | 270 | 02/09 | 07/10 | 07/14 | 12/14 | 84 | 690 | 650 | 709 | V | (1) | (1) | (1) | 250 | 750 | 91 | 39 | (F) | ||
| Tsugaru | Japan | Ministry of Land, Infrastructure, Transport and Tourism | F H I | Iwaki | 141 | 10/08 | 05/10 | 08/14 | 03/16 | 97 | 342 | 500 | 717 | V 1.00 | (1) (1) | 0.74 | (1) | 0.74 | (1) | 250 | 1000 | 91 | 39 | (F) |
| Bonyic | Panama | Hidroécología Teribe (HET) S.A. | H | Bonyic | 1 | - /11 | - /13 | 08/14 | - /15 | 37 | 165 | 88 | ||||||||||||
| Smithland [H-F] | USA | American Municipal Partners (AMP) | H | Ohio | 12/11 | 03/14 | 10/14 | 07/17 | 33 | 153 | 120 | 0.80 | (10) | 0.80 | (10) | separate | 230 | 230 | 118 | 64 | (F) | |||
| Pembelik [H-F] | Turkey | Darenhes A.S. | H | PeriSuyu | 358 | 11/10 | 03/13 | 10/14 | - /15 | 88 | 500 | 760 | 838 | 0.70 | (3')* | 0.70 | (3')* | 0.70 | (12) | 300 | 1200 | 120 | 0 | (-) |
| Lithaios [H-F] | Greece | Trikala Prefecture | I | Lithaios | 06/03 | 11/11 | 12/14 | 07/20 | 32 | 526 | 160 | 220 | 0.80 | (13) | 0.80 | (3) | 0.80 | (1)* | 300 | 300 | 50 | 10 | (N) | |
| Xiangjiaba | China | China Three Gorges Corporation | H | Jinsha | 52 | - /06 | - /10 | - /14 | - /16 | 162 | 909 | |||||||||||||
| Tongzilin | China | Yalongjiang Valley Hydropower Development | H | Yalong | 1 | - /08 | - /10 | - /14 | - /16 | 71 | ||||||||||||||
| Ludila | China | Yunnan Huadian Hydropower Co. Ltd. | H | Jingsha | 1718 | 01/07 | - /11 | - /14 | - /15 | 140 | 622 | 1920 | V 0.20 | 0.75 | ||||||||||
| Yalnızardıç | Turkey | Akköy Energy A.S. | H | Gevne | 109 | - /09 | - /11 | - /14 | - /15 | 113 | 300 | 490 | ||||||||||||
| Filiatrinos [H-F] | Greece | Ministry of Rural Development and Food | I | Filiatrinos | 8 | - /10 | - /11 | - /14 | - /16 | 55 | 246 | 370 | 430 | 0.80 | (2) | 0.80 | (10) | 0.80 | (10) | 350 | 350 | 51 | 24 | (F) |
| Rondinha | Brazil | H | Chapecó | - /12 | - /12 | - /14 | - /14 | 20 | ||||||||||||||||
| Kayabeyi | Turkey | Pelin Energy | H I | Kura | 148 | 01/10 | - /12 | - /14 | 02/15 | 159 | 230 | 637 | 780 | 300 | ||||||||||
| Sarrath [H-F] | Tunisia | Ministre de l’Agriculture | I | Oued Sarrath | 21 | - /08 | - /12 | - /14 | 11/15 | 36 | 820 | 335 | 0.70 | 0.70 | 0.70 | |||||||||
| Longtanzui [A] | China | H | Hanshuinanhe | 10 | - /10 | - /12 | - /14 | - /15 | 98 | 205 | ||||||||||||||
| Mamak | Turkey | DSI - State Hydraulic Works | F | Bağ | 1 | - /13 | - /13 | - /14 | - /14 | 31 | 118 | 30 | ||||||||||||
| Manduriacu | Ecuador | CELEC (Corporatión Eléctrica del Ecuador) | H | Mauduriacu | 10 | 12/11 | - /13 | - /14 | 03/15 | 61 | 245 | 114 | 0.25 | 0.75 | 0.75 | (N) | ||||||||
| Gümüsören [H-F] | Turkey | DSI - State Hydraulic Works | H I W | Zamanti | 195 | - /11 | - /13 | - /14 | 06/15 | 37 | 842 | 1890 | 1943 | 0.70 | (3') | 0.76 | (3')* | 0.76 | (12) | 300 | 1200 | 84 | 36 | (F) |
| Oguzlar | Turkey | DSI - State Hydraulic Works | H | Ortasu | 20 | 09/08 | - /13 | - /14 | - /15 | 53 | 431 | 392 | 460 | 0.10 | (1) | 0.80 | (1)* | 0.80 | (12) | 300 | 600 | 100 | 0 | (-) |
| Musatepe | Turkey | DSI - State Hydraulic Works | H | Robozik | 13 | 09/08 | - /13 | - /14 | - /15 | 66 | 165 | 131 | 138 | 0.10 | (1) | 0.80 | (3')* | 0.80 | (12) | 300 | 1200 | 77 | 63 | (N) |
| Lijiahe [A] | China | Xian Water Affair Group | H | Bahe | 53 | - /11 | - /13 | - /14 | - /15 | 99 | 352 | 370 | 478 | |||||||||||
| Songyue (2nd Stage) | China | Helong Electricity Corporation | F H I R W | Hailanhe | 21 | - /12 | - /13 | - /14 | - /15 | 41 | 271 | V | (1) | 0.73 | (10) | conduit | 300 | 2000 | 80 | 100 | (F) | |||
| Karakuz | Turkey | Derin Enerji Uretim San. Ve Tic. A.S. | H | Kökün | 5 | - /12 | - /13 | - /14 | - /15 | 45 | 162 | 400 | ||||||||||||
| Daoliuhe [A] | China | Daoliu | 123 | - /12 | - /13 | - /14 | - /15 | 60 | 187 | |||||||||||||||
| Adigüzel II | Turkey | Peker Energy Inc | H | Büyük Menderes | 15 | - /12 | - /13 | - /14 | - /15 | 61 | 145 | 150 | ||||||||||||
| Eduardo Campos (formerly Serro Azul) | Brazil | W | Una | 303 | - /12 | - /13 | - /14 | - /15 | 66 | 1015 | ||||||||||||||
| Kahe | China | W | 20 | - /12 | - /13 | - /14 | - /15 | 72 | ||||||||||||||||
| Imin Tlit | Morocco | Direction des Aménagements Hydrauliques | Tlit | - /13 | - /14 | - /14 | - /15 | 18 | ||||||||||||||||
| Metolong | Lesotho | Government of the Kingdom of Lesotho/Metolong Authority | W | South Phuthiatsana | 64 | 09/11 | 08/13 | 02/15 | 08/16 | 83 | 278 | 280 | 314 | (3') | (3')* | (3') | 300 | 3000 | 90 | 110 | (F) | |||
| Ayvali | Turkey | Ozdogan Enerji | H | Oltu | 308 | 04/11 | 02/13 | 02/15 | 10/15 | 177 | 405 | 1650 | 1900 | V | (3') | 0.75 | (3')* | 0.75 | (12) | 300 | 300 | 50 100 | 110 120 | (F) |
| Göktas 1 [H-F] | Turkey | Bereket Energy | H | Zamanti | 109 | 04/11 | 03/13 | 03/15 | - /16 | 133 | 200 | 749 | 900 | 0.30 1.00 | (1) (1) | 0.60 1.00 | (1) (1)* | 0.75 | (12) | 300 | 300 | 50 | 50 | (F) |
| Kotanli II [A-G] | Turkey | EBD En. Ür. ve Tic. A.S. | H | Kura | 20 | 10/12 | 05/14 | 04/15 | 11/15 | 70 | 250 | 248 | 252 | 0.15 | (3) | 0.70 | (3')* | 0.70 | (12) | 300 | 300 | 85 | 130 | (N) |
| Lai Chau | Vietnam | EVN (Electrictie de Vietnam) | H | Song Da (Black River) | 1215 | 06/10 | 03/13 | 05/15 | 07/17 | 131 | 620 | 1884 | 2500 | V | (3') | 0.75 | (3')* | 0.75 | (12) | 300 | 300 | 60 | 160 | (F) |
| Teesta low dam (Stage IV) | India | NHPC Ltd. | H | Teesta | 37 | 05/06 | 01/13 | 05/15 | 08/16 | 45 | 196 | 167 | 170 | 0.40 | (3')* | 0.80 | (3')* | separate | 300 | 300 | 85 | 135 | (F) | |
| Cerro del Águila | Peru | IC Power | H | Mantaro | 37 | 11/12 | 08/14 | 06/15 | - /16 | 89 | 270 | 250 | 450 | 0.10 | (1) | 0.75 | (1)* | 0.75 | (12) | 300 | 600 | 115 | 23 | |
| Gokayama | Japan | Fukuoka Prefecture | F N W | Naka | 40 | 06/12 | 06/14 | 07/15 | 03/18 | 103 | 556 | 634 | 935 | V 1.00 | (1) (1) | 0.76 | (1) | 0.76 | (1) | 250 | 1000 | 104 | 26 | (F) |
| Xekaman 1 | Laos | Xekaman Power Ltd. | H | Xe Kaman | 3120 | 03/12 | 05/13 | 07/15 | 12/16 | 120 | 335 | 870 | 1065 | V | (3')* | (3')* | (12) | 300 | 300 | 70 | 130 | (F) | ||
| Tabellout [A-G] | Algeria | ANBT (Agence Nationale des Barrages et Transfert) | I W | Djen Djen | 294 | 03/10 | 03/13 | 08/15 | 12/15 | 121 | 366 | 975 | (12) | (12) | (12)* | 300 | 300 | 85 | 45 | (S) | ||||
| Duck River | USA | Cullman Utilities Board | W | Duck | 31 | 01/14 | - /15 | 09/15 | - /16 | 41 | 90 | 121 | 128 | 0.10 | (1) (3) | (3')* | 1.00 | (1')* (3')* | 300 | 300 | 107 | 55 | (F) | |
| Ulu Jelai/Susu | Malaysia | Tenaga Nasional Berhad (TNB) | H | Bertam, Telom and Lemoi | 18 | 03/11 | 03/14 | 09/15 | 07/16 | 90 | 513 | 731 | 747 | V | (4') | 0.80 | (3')* | 0.80 | (1)* | 400 | 2400 | 100 95 | 0 0 | (-) |
| Gibe III | Ethiopia | Ethiopian Electric Power (EEP) | H | Omo | 14690 | 04/08 | 12/11 | 10/15 | - /16 | 246 | 630 | 6200 | 6400 | 0.25 | (3') | 1.00 | (3')* | 1.00 | (3')* | 400 | 400 | 70 to 120 | 45 to 60 | (S) |
| Rkiza | Morocco | Direction des Aménagements Hydrauliques | F I W | Rkiza | 17 | - /12 | - /13 | - /15 | - /15 | 26 | 500 | 55 | 60 | V | (5) | 0.85 | (1)* | 0.85 | (1)* | |||||
| Tuokou | China | China Power International Development | H | Yuan | 1384 | - /10 | - /12 | - /15 | - /16 | 82 | 649 | |||||||||||||
| Burç | Turkey | Aksa Energy Production Trade and Industry Co. Inc. | H | Göksu | 63 | 01/07 | 01/12 | - /15 | - /17 | 70 | 235 | 232 | 260 | 0.07 | (8) | 0.80 | (1) | separate | 300 | 300 | 60 | 50 to 60 | (F) | |
| Nam Ou 5 | Laos | EDL (Electricite du Laos) | H | Nam Ou | 335 | - /11 | - /13 | - /15 | 05/16 | 74 | 445 | |||||||||||||
| Teles Pires | Brazil | ANEEL (Agência Nacional de Energia Elétrica) | H | Teles Pires | 1 | 07/11 | - /13 | - /15 | 09/16 | 67 | 360 | 500 | 1020 | |||||||||||
| Guoduo | China | Huaneng Guoduo Hydropower Co. Ltd. | H | Zha Qu | 80 | - /12 | - /13 | - /15 | - /16 | 83 | 236 | 550 | ||||||||||||
| Kasimlar | Turkey | Değirmenüstü Energy | H | Köprüçay | 43 | - /12 | - /13 | - /15 | - /16 | 90 | 235 | 330 | ||||||||||||
| Güneysinir Alanözü | Turkey | DSI - State Hydraulic Works | I | Yangılı | 3 | - /13 | - /14 | - /15 | - /15 | 38 | 270 | 71 | ||||||||||||
| Sariveliler Göktepe | Turkey | DSI - State Hydraulic Works | I | Gelenalan | 1 | - /13 | - /14 | - /15 | - /15 | 39 | 330 | 69 | 60 | 0 | (-) | |||||||||
| Bergama Çamavlu | Turkey | DSI - State Hydraulic Works | I | Hasanderesi | 1 | - /14 | - /14 | - /15 | - /15 | 40 | 241 | 69 | 0.10 | (1) | 0.80 | (1) | 300 | 300 | 85 | 35 | (F) | |||
| Mata Velha [H-F] | Brazil | CPFL Renovaveis | H | Preto | 38 | - /14 | - /14 | - /15 | 04/16 | 30 | 180 | 45 | 65 | 1.25 | 1.25 | 1.25 | ||||||||
| Nam Khan 3 | Laos | EDL (Electricite du Laos) | F H W | Nam Khan | 249 | 12/12 | - /14 | - /15 | 06/16 | 67 | 154 | 125 | 145 | |||||||||||
| Fazenda | Brazil | ENEL Green Power Fazenda S.A. | H | dos Apiacás | 2 | - /12 | - /14 | - /15 | 09/16 | 21 | 503 | |||||||||||||
| Salto Apiacás | Brazil | ENEL Green Power Salto Apiacás S.A | H | dos Apiacás | 2 | - /12 | - /14 | - /15 | - /16 | 17 | 486 | |||||||||||||
| Las Cruces (formerly San Bartolo) | Panama | Corporacion de Energia del Istmo Ltd. S.A. | H | San Pablo | 39 | - /13 | - /14 | - /15 | - /16 | 41 | 371 | 77 | V | (3') | 0.85 | (3')* | 0.85 | (12) | 300 | 300 | 90 | 0 | (-) | |
| Shuishimen [A] | China | Yunxi Shuishimen Reservoir Bureau | F H W | Tianhe | 37 | - /13 | - /14 | - /15 | - /16 | 86 | 150 | |||||||||||||
| Dayakou [A] | China | Guangdong Yuedian Group Co., Ltd | H | Nanpeng | 170 | - /13 | - /14 | - /15 | - /16 | 99 | 300 | 210 | ||||||||||||
| Xinchanghe | China | Xinchanghe | 14 | - /14 | - /14 | - /15 | - /16 | 57 | 145 | |||||||||||||||
| Jubinha I | Brazil | Itamarati Norte S.A. | H | Jubinha | 480 | - /15 | - /15 | - /15 | - /15 | 21 | 1540 | |||||||||||||
| Juba IV | Brazil | Itamarati Norte S.A. | H | Juba | 7 | - /15 | - /15 | - /15 | - /15 | 26 | 570 | |||||||||||||
| Apporo [H-F] | Japan | Hokkaido Prefecture | F I W | Atsuma | 106 | 10/14 | 06/15 | 06/16 | 03/18 | 47 | 516 | 354 | 490 | 0.80 | (1) | 0.80 | (1) | 0.80 | (1) | 250 | 750 | 80 | 0 | (-) |
| Neelum-Jhelum | Pakistan | Neelum Jhelum Hydropower Company | H | Neelum | 8 | - /08 | - /14 | 08/16 | 11/17 | 47 | 125 | 156 | 154 | 51 | (S) | |||||||||
| Trung Son | Vietnam | EVN (Electrictie de Vietnam) | F H | Ma | 349 | 11/12 | 04/14 | 08/16 | 02/17 | 88 | 498 | 770 | 1140 | V 0.35 | (3') (3')* | 0.65 | (3')* | 0.65 | (12) | 300 | 300 | 60 70 | 140 150 | (N) |
| Yukari (Upper) Kaleköy | Turkey | Kalehan Energy Üretim ve Ticaret A.S. | H | Murat | 784 | 06/12 | 06/14 | 09/16 | 04/18 | 150 | 516 | 2224 | 2414 | 0.25 | (7) | 0.80 | (1) | 300 | 300 | 90 | 40 | (M) | ||
| Akçakoca | Turkey | DSI - State Hydraulic Works | I W | Sarma | 2 | 01/13 | 05/15 | 10/16 | - /17 | 66 | 148 | 85 | 130 | 0.10 | (1) | 0.80 | (1) | 0.80 | (12) | 300 | ||||
| Ardil | Turkey | DSI - State Hydraulic Works | I | Ardil | 11 | 03/13 | 05/14 | 12/16 | 02/17 | 54 | 266 | 108 | 158 | V | (1) | 0.80 | (1)* | 0.80 | (12) | 300 | 600 | 75 | 75 | |
| Kargi | Turkey | Limak Energy | H | Sakarya | 50 | - /11 | - /15 | 12/16 | 06/17 | 95 | 270 | 535 | ||||||||||||
| Boqaata | Lebanon | Ministry of Energy and Water | W | Boqaata | 6 | 07/12 | 04/15 | 12/16 | 12/21 | 72 | 222 | 200 | 255 | V 0.80 | (12) | 0.80 | (3')* | 0.80 | (3')* | 300 | 300 | 90 | 0 | (-) |
| Uludere | Turkey | DSI - State Hydraulic Works | H | Ortasu | 17 | - /08 | - /12 | - /16 | - /18 | 77 | 431 | 800 | 887 | 0.10 | (1) | 0.80 | (1)* | 300 | 300 | 95 | 45 | (N) | ||
| Dong Nai 5 | Vietnam | Vinacomin | H | Dong Nai | - /10 | - /12 | - /16 | - /18 | 72 | 471 | ||||||||||||||
| Kirazlı Köprü | Turkey | DSI - State Hydraulic Works | H I | Gökırmak | 66 | - /99 | - /13 | - /16 | - /17 | 73 | 280 | 330 | 0.10 | (1) | 0.90 | (1) | 300 | 75 | 50 | (F) | ||||
| Beyyurdu | Turkey | DSI - State Hydraulic Works | H | Bembo | 8 | 09/08 | - /13 | - /16 | - /17 | 78 | 176 | 186 | 209 | 0.10 | (1) | 0.80 | (1)* | 0.80 | (12) | 300 | 1200 | 100 | 80 | (N) |
| Xiaorongjiang | China | Guilin Dayu Water Conservancy, Infrastructure, Construction and Investment Co. Ltd. | H | Xiaorong | 163 | - /10 | - /13 | - /16 | - /17 | 90 | 255 | |||||||||||||
| Belo Monte | Brazil | Norte Energia S.A. | H | Xingu | 5 | - /11 | - /13 | - /16 | - /20 | 74 | 680 | 63 | 2208 | V | 1.20 | separate | ||||||||
| Cacimba Nova | Brazil | Projeto Transposição das Águas do Rio São Francisco | I W | 3 | - /13 | - /14 | - /16 | - /16 | 18 | 196 | 52 | |||||||||||||
| Lianhua | China | Xiamen Water Resources Bureau | H | Lianhuaxi | 33 | - /10 | - /14 | - /16 | - /17 | 30 | 333 | |||||||||||||
| Hechuan | China | H | Jialingjiang | 11 | - /12 | - /14 | - /16 | - /17 | 51 | |||||||||||||||
| Kelebek | Turkey | DSI - State Hydraulic Works | I W | Kelebek | 23 | - /12 | - /14 | - /16 | - /17 | 62 | 193 | 74 | 97 | 0.10 | (1) | 0.80 | (1)* | 0.80 | (12) | 300 | 300 | 120 | (F) | |
| Lushi | China | H | Nujiang | 1288 | - /12 | - /14 | - /16 | - /18 | 165 | |||||||||||||||
| Chucas | Costa Rica | ICE (Instituto Costarricense de Electricidad - Costa Rican Institute of Electricity) | H | Tárcoles | 450 | - /11 | - /14 | - /16 | - /17 | 48 | 130 | 180 | 200 | 0.20 | 0.75 | (3')* | 0.75 | 300 | 2500 | 95 | 96 | (N) | ||
| Karamürsel Tepeköy [H-F] | Turkey | DSI - State Hydraulic Works | I | Uzundere | 1 | - /14 | - /15 | - /16 | - /16 | 19 | 170 | 240 | 0.10 | (1) | 0.70 | (1) | 300 | 300 | 80 | 48 | (F) | |||
| Asana control dam | Peru | Asana | - /14 | - /15 | - /16 | - /16 | 25 | 67 | 0.15 | 0.75 | 0.75 | |||||||||||||
| Güdül Kırkkavak | Turkey | DSI - State Hydraulic Works | I W | Ormanlik | 1 | - /14 | - /15 | - /16 | 10/17 | 49 | 265 | 114 | ||||||||||||
| Zongo II | DR Congo | SNEL | H | 05/12 | - /15 | - /16 | - /17 | 20 | ||||||||||||||||
| Siriji (also know as Murupé) | Brazil | COMPESA (Companhia Pernambucana de Saneamento ) | I W | Siriji | 17 | - /13 | - /15 | - /16 | - /17 | 20 | 100 | |||||||||||||
| Serra dos Cavalinhos I | Brazil | Serra dos Cavalinhos I Energética S.A. | H | das Antas | 12 | - /13 | - /15 | - /16 | - /17 | 30 | 204 | |||||||||||||
| Nazilli İsabeyli | Turkey | DSI - State Hydraulic Works | I | İsabeyli Deresi | 1 | - /14 | - /15 | - /16 | - /17 | 42 | 148 | 70 | ||||||||||||
| Oltu Sivridere | Turkey | DSI - State Hydraulic Works | I | Limontozu | 1 | - /14 | - /15 | - /16 | - /17 | 46 | 63 | 269 | ||||||||||||
| Karareis | Turkey | DSI - State Hydraulic Works | W | Camibogazi | 10 | - /14 | - /15 | - /16 | - /17 | 50 | 295 | 142 | 173 | 0.05 | (3') | 0.80 | (3')* | 0.80 | (12) | 300 | 300 | 98 | 52 | (F) |
| Guanchang | China | H I W | Qiduxi | 24 | - /14 | - /15 | - /16 | - /17 | 54 | 246 | ||||||||||||||
| Yunhe | China | H | Dangjiahe | 14 | - /14 | - /15 | - /16 | - /17 | 68 | 176 | ||||||||||||||
| Haokou | China | Datang Investment Group Ltd. | H | Furong (Pangu) | 90 | - /14 | - /15 | - /16 | - /17 | 85 | 211 | |||||||||||||
| Xiangbiling [A] | China | SPIC Guizhou Jinyuan Hydroelectirc Powerplant | H | Niulan | 263 | - /14 | - /15 | - /16 | - /17 | 136 | 459 | |||||||||||||
| Ambarau [H-F] | DR Congo | RandGold | H | Kibali | 6 | 11/14 | 05/15 | - /16 | - /17 | 21 | 255 | 33 | 40 | 0.75 | (4')* | 0.75 | (1)* | 0.75 | (1) | 300 | 300 | 100 | 0 | (-) |
| Köroglu Kotanli 1 [A-G] | Turkey | EBD Enerji Üretim. ve Tic. A.S. | H | Kura | 73 | 03/15 | 06/15 | 02/17 | 04/17 | 100 | 404 | 640 | 680 | V | (3') | 0.60 | (3')* | 0.60 | (12) | 300 | 300 | 85 | 130 | (N) |
| Patuca 3 | Honduras | ENEE (Empresa Nacional de Energia Eléctrica) | H | Patuca | 208 | - /12 | - /16 | 02/17 | 12/20 | 54 | 160 | 120 | 160 | 0.20 | (1) | 0.75 | (1)* | 0.75 | (12) | 300 | 3000 | 107 | 57 | (N) |
| Laúca | Angola | Ministry of Energy and Water/GAMEK | H | Kwanza | 5482 | 07/12 | 09/14 | 03/17 | 06/18 | 132 | 1075 | 2646 | 2766 | V 0.10 | (1) | 0.85 | (1)* | 0.85 | (12) | 300 | 300 | 90 | 0 | (-) |
| Ibn Hammad | Jordan | Jordan Valley Authority, Ministry of Water and Irrigation | G W | Ibn Hammad | 4 | - /15 | 12/16 | 07/17 | - /22 | 56 | 160 | 160 | 160 | 0.30 | (1) | 0.70 | (1)* | 0.70 | (1)* | 300 | 300 | 90 100 | 0 0 | (-) |
| Enciso | Spain | Confederación Hidrográfica del Ebro, Ministerio de Agricultura Alimentación y Medio Ambiente | I W | Cidacos | 47 | 07/08 | 08/14 | 07/17 | 09/18 | 103 | 376 | 698 | 765 | V | (1) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | 60 | 140 | (F) |
| Okshtuni | Albania | Diteko Sh.p.k | F H | Okshtuni | 7 | 08/15 | 03/17 | 10/17 | 02/18 | 65 | 253 | 141 | 194 | V 0.15 | (12) | 0.90 | (12)* | 0.90 | (12)* | 300 | 300 | 115 | 0 | (-) |
| Sanru [H-F] | Japan | Ministry of Land, Infrastructure, Transport and Tourism | F N W | Sanru | 50 | 08/14 | 09/15 | 10/17 | 03/19 | 46 | 350 | 375 | 500 | 0.80 | (1) | 0.80 | (1) | 0.80 | (1) | 250 | 750 | 80 | 0 | (-) |
| Wanjiakouzi [A] | China | China Datang Corporation | H | Gexiang | 279 | - /09 | - /12 | - /17 | - /18 | 168 | 413 | 760 | 1020 | 66 | 100 | (F) | ||||||||
| Moragahakanda | Sri Lanka | Ministry of Irrigation and Water Resources Management | I | Amban Ganga | 521 | 01/07 | - /13 | - /17 | 07/18 | 65 | ||||||||||||||
| Tamalout [H-F] | Morocco | Direction des Aménagements Hydrauliques | F I W | Ansegmir | 50 | 10/10 | - /13 | - /17 | - /18 | 61 | 320 | 380 | 405 | 0.50 | (5) | 0.70 | (1)* | 0.70 | (1)* | 300 | 300 | 80 70 60 | 0 0 | (-) |
| Dyraaba (part of Uma Oya Project) | Sri Lanka | Ministry of Irrigation and Water Resources Management | H I | Mathatilla Oya | 1 | - /11 | - /13 | - /17 | - /18 | 50 | 165 | 40 | 50 | V | (1) | (1)* | (12) | 300 | 300 | 95 | 95 | (F) | ||
| Ouldjet Mellegue | Algeria | ANBT (Agence Nationale des Barrages et Transfert) | I W | Mellegue | 155 | 10/11 | - /13 | - /17 | - /18 | 51 | 900 | 245 | 320 | V | (1) | 0.80 | (1) | 0.80 | (1) | 300 | 300 | 110 | 0 | (-) |
| El Bolsón | Argentina | Provincia de Catamarca | I W | Albigasta | 38 | - /08 | - /13 | - /17 | - /19 | 64 | 380 | 279 | ||||||||||||
| Ouljet Es Soltane [H-F] | Morocco | Direction des Aménagements Hydrauliques | F I W | Beht | 510 | 05/10 | - /14 | - /17 | - /18 | 98 | 383 | 900 | 930 | 0.50 | (1) | 0.70 | (1)* | 0.70 | (1)* | 300 | 300 | 55 | 25 | (N) |
| Minas San Francisco | Ecuador | Celec Ererjubones Cp | H | Jubones | 14 | - /12 | - /14 | - /17 | 08/18 | 78 | 209 | 300 | 300 | |||||||||||
| Wunonglong | China | Huaneng Lancang River Hydropower Co. Ltd. | H | Lancang (Mekong) | 272 | 06/10 | - /15 | - /17 | - /18 | 138 | 247 | |||||||||||||
| Ouagjdit | Morocco | Direction des Aménagements Hydrauliques | I W | Asif N Talaght | 1 | - /13 | - /15 | - /17 | - /18 | 44 | ||||||||||||||
| Shangshui [A] | China | I W | 12 | - /13 | - /15 | - /17 | - /18 | 58 | 269 | |||||||||||||||
| Sinop | Brazil | Companhia Energetica Sinop-CES | H | Teles Pires | - /14 | - /15 | - /17 | - /19 | 17 | |||||||||||||||
| Üniversite | Turkey | DSI - State Hydraulic Works | W | Çırçıp | 1 | - /15 | - /16 | - /17 | - /17 | 36 | 110 | 20 | ||||||||||||
| Incir | Turkey | Enerji S.A. | H | Buyuk Cay | - /13 | - /16 | - /17 | - /18 | 150 | |||||||||||||||
| Senhora do Porto | Brazil | PCH Senhora do Porto S.A | H | Guanhães | 5 | - /14 | - /16 | - /17 | - /18 | 41 | 167 | |||||||||||||
| Ergani | Turkey | DSI - State Hydraulic Works | I | Golkum | 15 | - /14 | - /16 | - /17 | - /18 | 54 | 229 | 127 | 161 | 0.10 | (1) | 0.80 | (1) | 0.80 | (12) | 300 | 90 | 60 | (F) | |
| Ximihe | China | H I W | Ximihe | 17 | - /14 | - /16 | - /17 | - /18 | 88 | 147 | ||||||||||||||
| Piedra Puntuda | Nicaragua | Hidroelectlea Piedra Puntuda and Energia Tropical Sostearble Cerro Frio S.A. | H | Río Mico | - /15 | - /16 | - /17 | - /18 | 23 | 0.70 1.00 | (5) (5) | 0.70 1.00 | (1)* (1)* | 0.70 | (1)* | |||||||||
| Fendou | China | Muling Fendou Reservoir Construction office | F H I W | Mulenghe | 191 | - /15 | - /16 | - /17 | - /18 | 46 | 406 | |||||||||||||
| Xiahushan | China | F H I W | Dashahe | 196 | - /15 | - /16 | - /17 | - /18 | 74 | 296 | ||||||||||||||
| Wugachong [A] | China | H I W | Mabie | 99 | - /15 | - /16 | - /17 | - /18 | 108 | 182 | ||||||||||||||
| Irahara | Japan | Fukuoka Prefecture | F W | Harai | 29 | 07/14 | 07/15 | 03/18 | 03/19 | 81 | 295 | 372 | 419 | V 0.60 | (1) (1) | 0.77 | (1) | 0.77 | (1) | 250 | 1000 | 84 | 36 | (F) |
| Huangdeng | China | Yunnan Huaneng Lancang River Hydropower Co.,Ltd. | H I R | Lancang (Mekong) | 1613 | 01/10 | 04/15 | 04/18 | 06/19 | 203 | 464 | 2753 | 3670 | (3') | (3') | (12) | 300 | 300 | 82 67 | 100 100 | (F) | |||
| Nam Ngiep 1 | Laos | Nam Ngiep 1 Power Company | H | Nam Ngiep | 1192 | 09/14 | 04/16 | 04/18 | 08/19 | 167 | 540 | 2288 | V | (3') | (3')* | (12) | 300 | 2400 - 3600 | 80 60 | 120 70 | (F) | |||
| Neckartal | Namibia | Ministry of Agriculture, Water and Forestry | I | Fish | 857 | 09/13 | 11/15 | 05/18 | 04/19 | 83 | 520 | 836 | 1043 | 0.20 | (3') | 0.70 | (3')* | 0.70 | (12) | 300 | 300 | 65 65 | 120 45 | (F) |
| Muskrat Falls North Dam | Canada | NALCOR | H | Churchill | 08/15 | 07/17 | 09/18 | 07/19 | 39 | 450 | 208 | 243 | V | (1) | 0.80 | (1)* | 0.80 | (1) | 300 | 3000 & 1500 | 80 | 140 | (F) | |
| Sanhekou [A-G] | China | Ziwuhe | 710 | - /14 | 10/16 | 12/18 | 06/19 | 142 | 472 | |||||||||||||||
| Xayaburi (Left bank closure section) | Laos | XPCL (Xayaburi Power Company Ltd.) | H | Mekong | 03/12 | 01/18 | 12/18 | 10/19 | 40 | 109 | 82 | 85 | V | (1) | (16) | 300 | 300 | 60 | 100 | (F) | ||||
| Javeh [H-F] | Iran | Iran Water & Power Resources Development Company (IWPC) | F I | Javeh Roud | 95 | 03/09 | 07/11 | - /18 | 07/19 | 86 | 301 | 680 | 750 | 0.90 | (3') | 1.20 | (3')* | 1.20 | (12) | 300 | 300 | 94 | 31 | (N) |
| Dahuaqiao | China | Huaneng Lancang River Hydropower Co. Ltd. | H | Lancang (Mekong) | 262 | - /10 | - /13 | - /18 | - /19 | 107 | 232 | 112 | ||||||||||||
| Puhulpola (part of Uma Oya Project) | Sri Lanka | Ministry of Irrigation and Water Resources Management | H I | Dulgolla Oya | 1 | - /11 | - /13 | - /18 | - /19 | 35 | 174 | 30 | 40 | V | (1) | (1)* | (12) | 300 | 300 | 95 | 95 | (F) | ||
| Lidi | China | Huaneng Lancang River Hydropower Co. Ltd. | H | Lancang (Mekong) | 75 | - /10 | - /14 | - /18 | - /19 | 75 | 346 | 1100 | ||||||||||||
| Shangcun | China | W | Shangcunxi | 123 | - /11 | - /14 | - /18 | - /19 | 89 | 338 | ||||||||||||||
| São Roque | Brazil | São Roque Energética S.A. | H | Canoas | - /12 | - /14 | - /18 | - /19 | 68 | 151 | 100 | 583 | V | 0.75 | 0.75 | |||||||||
| Balli | Turkey | DSI - State Hydraulic Works | H | Ortasu | 6 | - /08 | - /14 | - /18 | - /20 | 51 | 188 | 144 | 0.10 | (1) | 0.80 | (1) | 0.70 | (3') | 300 | 300 | 95 | 45 | (N) | |
| Kavsaktepe | Turkey | DSI - State Hydraulic Works | I | Ortasu Creek | 16 | 09/08 | - /14 | - /18 | - /20 | 76 | 268 | 518 | 540 | 0.10 | (1) | 0.80 | (1)* | 0.80 | (1) | 300 | 300 | 95 | 45 | (N) |
| Timkit [H-F] | Morocco | Direction des Aménagements Hydrauliques | G I | Ifegh | 14 | - /10 | - /15 | - /18 | - /19 | 56 | 183 | 124 | 146 | 0.65 | (5) | 0.65 | (1)* | 0.65 | (1)* | 300 | 300 | 56 | 24 | (N) |
| Shoukoubao [H-F] | China | 10 | - /14 | - /16 | - /18 | - /19 | 62 | |||||||||||||||||
| Maojiahe [A] | China | China Power Investment Corporation | H | Qingshuihe | 13 | - /14 | - /16 | - /18 | - /19 | 75 | 166 | |||||||||||||
| Mandian | China | Mandian | 12340 | - /15 | - /16 | - /18 | - /19 | 78 | 231 | |||||||||||||||
| Mangshan | China | F H I W | Changlehe | 133 | - /15 | - /16 | - /18 | - /19 | 101 | 355 | ||||||||||||||
| Gulpur | Pakistan | WAPDA (Water and Power Development Authority) and MIRA Power Ltd. (a subsidiary of KOSEP) | H | Poonch | 22 | 09/14 | - /16 | - /18 | 02/20 | 35 | 238 | |||||||||||||
| Datengxia | China | Guangxi Datengxia Gorge Water Conservancy Development Co. .Ltd. | F H N W | Xijiang | 3479 | - /14 | - /16 | - /18 | 07/20 | 80 | 7100 | |||||||||||||
| Don Sahong | Laos | Don Sahong Power Company (Mega First Corporation Berhad and Électricité du Laos) | H | Mekong | 24 | 10/15 | - /16 | - /18 | 12/19 | 26 | 6800 | 566 | 609 | 0.30 | (1) | 0.75 | (1) | 0.75 | (1) | 300 | 2400 | 55 | 103 | (F) |
| Colonia | Brazil | CERB (Companhia de Engenharia Ambienytal e Recursos Hídricos da Bahia) | W | Colonia | 62 | 09/15 | - /17 | - /18 | 09/18 | 21 | 195 | 30 | 34 | |||||||||||
| Asana [H-F] | Peru | Asana | - /16 | - /17 | - /18 | - /18 | 48 | 214 | 216 | 0.75 | 0.75 | 0.75 | ||||||||||||
| Quebra Dentes | Brazil | Quevedos Energética S.A | H | Toropi | 3 | - /15 | - /17 | - /18 | - /19 | 23 | 206 | |||||||||||||
| Jacaré | Brazil | PCH Jacaré S.A. | H | Guanhães | 14 | - /15 | - /17 | - /18 | - /19 | 33 | 121 | |||||||||||||
| Zhuangli | China | Zhuangli reservoir construction and management office | F H I W | Shizihe | 133 | - /15 | - /17 | - /18 | - /19 | 44 | 49 | |||||||||||||
| Cudi-Circip | Turkey | DSI - State Hydraulic Works | W | Circip | 2 | - /16 | - /17 | - /18 | - /19 | 30 | 213 | 48 | 59 | 0.10 | (1) | 0.80 | (1) | 0.80 | (12) | 300 | 1200 | 98 | 52 | |
| Yeşilvadi (Beylerderesi) | Turkey | DSI - State Hydraulic Works | I | Beyler | 5 | - /16 | - /17 | - /18 | - /19 | 39 | 249 | 170 | V | (1) | 1.00 | (1) | 330 | 330 | 93 | 62 | (F) | |||
| Narli | Turkey | Aksa Energy Production Trade and Industry Co. Inc. | H | Göksu | 27 | - /16 | - /17 | - /18 | - /19 | 47 | 153 | 49 | 68 | (14) | (14) | 300 | 300 | 65 | 50 | (F) | ||||
| Houshan | China | Gouhe | 160 | - /16 | - /17 | - /18 | - /19 | 52 | ||||||||||||||||
| Itaocara | Brazil | Cemig Geração e Transmissão SA and Itaocara Energia Ltda | H | Paraiba do Sul | 1700 | 01/16 | - /17 | - /18 | - /19 | 50 | ||||||||||||||
| Melen | Turkey | DSI - State Hydraulic Works | H I W | Melen | 693 | - /13 | 06/15 | 03/19 | - /25 | 124 | 944 | 1871 | 2096 | 0.15 | (3') | 0.70 | (3')* | 0.70 | (3') | 300 | 300 | 90 | 60 | (F) |
| Yamba | Japan | Ministry of Land, Infrastructure, Transport and Tourism | F H I N W | Agatsuma | 108 | 08/14 | 05/17 | 05/19 | 10/19 | 116 | 291 | 575 | 911 | 0.15 | (1) | 0.80 | (1) | 0.08 | (1) | 250 | 1000 | 91 | 39 | (F) |
| Bouzina | Algeria | ANBT (Agence Nationale des Barrages et Transferts) | I W | 18 | - /14 | 02/18 | 07/19 | 01/23 | 77 | 177 | 250 | 330 | V | (1) | 0.89 | (1)* | 0.89 | (12) | 300 | 300 | 110 77 | 0 33 | (F) | |
| Barra das Águas | Brazil | PCH Águas do Rio Irani Energética SPE Ltda. | H | Irani | 11 | - /17 | 04/18 | 07/19 | - /20 | 34 | 235 | |||||||||||||
| Taşköprü Hasanlı | Turkey | DSI - State Hydraulic Works | I W | Ayvali | 988 | 06/14 | 04/17 | 08/19 | 11/19 | 43 | 157 | 37 | 46 | 0.10 | (1) | 0.80 | (1) | 300 | 66 | 44 | (F) | |||
| Çay | Turkey | DSI - State Hydraulic Works | I | Uludere | 1 | 03/17 | 07/18 | 09/19 | 08/20 | 52 | 122 | 55 | 0.10 | (1) | 0.80 | (1) | 300 | 75 | 50 | |||||
| Karamürsel Ihsaniye | Turkey | DSI - State Hydraulic Works | I W | Suludere | 9 | 03/16 | 07/17 | 09/19 | 10/19 | 69 | 212 | 130 | 185 | 0.10 | (1) | 0.80 | (1) | 300 | 300 | 75 | 45 | (F) | ||
| Saddle Dam D (Xe-Pian Xe-Namnoy) | Laos | Xe-Pian Xe Namnoy Power Company | H | Xepian | 1043 | 10/18 | 04/19 | 10/19 | - /19 | 56 | 430 | 170 | 200 | V | none | 300 | 300 | (F) | ||||||
| Wala Dam Raise | Jordan | Jordan Valley Authority, Ministry of Water and Irrigation | G | Wala | 26 | 09/17 | 06/19 | 10/19 | 07/20 | 67 | 300 | 80 | 82 | 0.30 | (1) | 0.70 | (1)* | 0.70 | (1)* | 300 | 300 | 98 | 52 | (N) |
| Biratori | Japan | Ministry of Land, Infrastructure, Transport and Tourism | F H I N W | Nukapira | 46 | - /73 | - /87 | - /19 | - /21 | 57 | 600 | 180 | V | (1) | 0.78 | (1) | 0.78 | (1) | ||||||
| Taquarembó | Brazil | Estado | W | Taquarembó | 05/08 | - /10 | - /19 | - /20 | 33 | 330 | ||||||||||||||
| Shah wa Arüs | Afghanistan | Ministry of Energy and Water | F H I W | Shakardar | 10 | - /12 | - /13 | - /19 | 04/21 | 78 | 303 | 270 | 337 | V 0.20 | (1) | 0.80 | (1)* | 0.80 | (1) | 300 | 300 | 105 | 45 | (N) |
| Ghadrooni | Iran | Kerman Water Authority | G I W | Gharanghou | 44 | - /08 | - /14 | - /19 | - /20 | 44 | 352 | 106 | 147 | |||||||||||
| Shahri-koor | Iran | Sistan & Baluchestan Water Authority | Barisan (nahang) | 103 | - /12 | - /15 | - /19 | - /21 | 60 | 326 | 330 | |||||||||||||
| Pingzhai | China | H I W | Sanchahe | 1089 | - /13 | - /15 | - /19 | - /21 | 163 | |||||||||||||||
| Los Pilares (Bicentennial) | Mexico | CNA (Comisión Nacional del Agua) | F I W | Mayo | 478 | 02/14 | - /16 | - /19 | 08/20 | 73 | 232 | 600 | 300 | 300 | ||||||||||
| Capulin San Pablo | Costa Rica | Hidrotárcoles | H | Tárcoles | 7 | - /15 | - /16 | - /19 | - /20 | 49 | ||||||||||||||
| Luojiu | China | H | 346 | - /15 | - /17 | - /19 | - /20 | 60 | ||||||||||||||||
| Wacun | China | H | Youjiang | 536 | - /15 | - /17 | - /19 | - /20 | 105 | 365 | ||||||||||||||
| Mellègue Amont [H-F] | Tunisia | Ministère de l’Agriculture | H I | Oued Mellègue | 195 | - /16 | - /17 | - /19 | - /20 | 68 | 430 | 500 | 560 | 0.60 | 0.60 | 0.60 | 90 | 0 | (-) | |||||
| Gaosheng | China | Yalong River Hydropower Development Co. Ltd. | H | Hongdu | 100 | - /16 | - /17 | - /19 | - /20 | 121 | ||||||||||||||
| Wudongde secondary dam | China | China Yangzi River Three Gorges Group | H | Jinsha (Yangtze) | 7400 | 04/18 | - /18 | - /19 | 06/19 | 96 | 163 | 466 | ||||||||||||
| Germinal | Brazil | Companhia de Gestão dos Recursos Hídricos | W | Germinal | 2 | - /16 | - /18 | - /19 | 08/20 | 28 | 210 | |||||||||||||
| Macacos | Brazil | Pesqueiro Energia S/A | H | Jaguariaiva | 1 | - /18 | - /18 | - /19 | - /20 | 16 | 217 | |||||||||||||
| Negreiros | Brazil | Ministério da Integração Nacional | W | dos Negreiros | 24 | - /17 | - /18 | - /19 | - /20 | 37 | 246 | 56 | ||||||||||||
| Çetin [H-F] | Turkey | DSI - State Hydraulic Works | H | Botan | 614 | - /12 | 09/18 | 01/20 | 03/20 | 165 | 492 | 4741 | 4800 | 0.70 | (1) | 0.70 | (1)* | 0.70 | (1)* | 90 | 0 | (-) | ||
| Yunzhen | China | F I W | 96 | - /16 | - /19 | 03/20 | 01/21 | 76 | 173 | |||||||||||||||
| Kafue Gorge Lower (KGL) | Zambia | Kafue Gorge Lower Power Development Co. Ltd. | H | Kafue | 83 | 01/16 | 06/18 | 04/20 | - /20 | 131 | 375 | 1290 | 1390 | 0.20 | (3') | 0.75 | (3') | 0.75 | (12) | 300 | 300 | 60 | 112 | (F) |
| Zungeru | Nigeria | Federal Ministry of Power, Nigeria | F H | Kaduna | 11400 | 09/13 | 01/18 | 08/20 | 10/21 | 101 | 1090 | 1920 | 2400 | V | (3') | 0.75 | (3')* | 0.75 | (12) | 300 | 300 | 59 69 94 | 76 69 76 | (F) |
| Arenal I-II [A-G] | Honduras | Energias Limpias del Yaguala SA de CV | H | Yaguala | 72 | 01/18 | 04/19 | 11/20 | 01/21 | 93 | 273 | 249 | 305 | 0.04 | (3') | 0.40 0.67 | (3') (3') | 0.40 | (13) | |||||
| Sidi Abdellah [H-F] | Morocco | Direction des Aménagements Hydrauliques | F I W | Ouaar | 10 | 04/10 | - /13 | - /20 | - /20 | 68 | 370 | 580 | 610 | 0.50 | (1) | 0.70 | (1)* | 0.70 | (1)* | 300 | 300 | 80 100 | 0 0 | (-) |
| Sharab Garod | Iran | Kohgiloye-Boyerahmad Water Authority | I | Sharab Garod | 1 | - /12 | - /14 | - /20 | - /22 | 15 | 75 | 12 | ||||||||||||
| Asagi (Lower) Kaleköy | Turkey | Kalehan Energy Üretim ve Ticaret A.S. | H | Murat | 556 | 03/13 | - /15 | - /20 | 04/21 | 125 | 346 | 1192 | 1342 | 0.25 | (7) | 0.80 | (3) | separate | 300 | 300 | 90 | 40 | (M) | |
| Ballikaya | Turkey | DSI - State Hydraulic Works | W | Mudurnu | 143 | - /13 | - /15 | - /20 | - /23 | 98 | 357 | 800 | 0.10 0.35 | (1) | 0.70 | (1) | 300 | 300 | 63 83 | 63 83 | ||||
| Yanagawa | Japan | Iwate Prefecture | F H W | Yana | 19 | 12/14 | - /17 | - /20 | 03/21 | 77 | 243 | 213 | ||||||||||||
| Dereçati | Turkey | DSI - State Hydraulic Works | I | Büyükdere | 2 | - /16 | - /18 | - /20 | - /21 | 51 | 174 | 110 | ||||||||||||
| Tan My | Vietnam | Ministry of Agriculture and Rural Development | H I W | Cai | 219 | - /16 | - /18 | - /20 | - /21 | 67 | 603 | 510 | 640 | |||||||||||
| Maojun | China | Junshui | 117 | - /16 | - /18 | - /20 | - /21 | 76 | ||||||||||||||||
| Souapiti | Guinea | Ministry of Energy and Hydraulics | H | Konkouré | 6300 | - /16 | - /18 | - /20 | - /21 | 116 | 1200 | 3 | ||||||||||||
| 3 de Febrero (formerly El Chaparral) [H-F] | El Salvador | Comisión Ejecutiva Hidroeléctrica del Rio Lempa (CEL) | H | Torola | - /09 | - /18 | - /20 | 10/23 | 88 | 324 | 375 | 450 | 0.20 | (7') | 0.80 | (7') | 0.80 | (7') | 300 | 300 | 94 | 63 | (N) | |
| Jinjigou [H-F] | China | Shigaoqiao | 11 | - /19 | - /19 | - /20 | - /20 | 33 | ||||||||||||||||
| Gürsöğüt 1 | Turkey | Limak Energy | H | Sakarya | 77 | - /19 | - /19 | - /20 | - /20 | 67 | 135 | 105 | 115 | |||||||||||
| Miguillas | Brazil | - /17 | - /19 | - /20 | - /21 | 35 | ||||||||||||||||||
| Center Hill Auxiliary Backup Dam | USA | US Army Corps of Engineers - Nashville District | F H R W | Caney Fork | 940 | - /17 | - /19 | - /20 | - /21 | 40 | 293 | 99 | 122 | V | (1) | V 0.83 | (1)* | 0.83 | (1)* | 300 | 300 | 93 | 93 | (F) |
| Salto Y-Y | Nicaragua | H | Bambana | - /18 | - /19 | - /20 | - /21 | 20 | 0.70 1.00 | (5) (5) | 0.70 1.00 | (1)* (1)* | 0.70 | (1)* | ||||||||||
| Bela Vista | Brazil | Bela Vista Geracao de Energia S.A. | H | Chapim | 7 | - /00 | - /00 | - /00 | - /00 | 21 | 393 | |||||||||||||
| Meizhou PSS - Upper dam | China | China Southern Power Grid | H | 41 | - /18 | - /19 | - /20 | - /21 | 60 | |||||||||||||||
| Meizhou PSS - Lower dam | China | China Southern Power Grid | H | 45 | - /18 | - /19 | - /20 | - /21 | 85 | |||||||||||||||
| Gürsöğüt 2 | Turkey | Limak Energy | H | Sakarya | 10 | - /19 | - /19 | - /20 | - /21 | 56 | 275 | 216 | 230 | |||||||||||
| Vizcachas | Peru | Anglo American (Quellaveco copper mine) | W | - /19 | - /20 | - /20 | - /21 | 40 | V 0.10 | (2) | 0.80 | (1) | 0.80 | (12) | ||||||||||
| Nam Kong 3 | Laos | Chaleun Sekong Energy Co Ltd (CSE) | H | Nam Kong | 471 | 11/17 | 03/19 | 02/21 | 11/21 | 65 | 500 | 347 | 400 | V | (3') | 0.75 | (3')* | 0.75 | (12) | 300 | 3000 | 75 | 113 | (F) |
| Dagu | China | China Huadian Group Co. Ltd. | H | Yaluzangbu (Brahmaputra) | 55 | - /16 | 03/19 | 04/21 | - /23 | 118 | 385 | 937 | 1442 | 93 60 | 93 100 | |||||||||
| Busanga [A] | DR Congo | Sicomines | H | Lualaba | 11/17 | - /19 | 07/21 | 11/21 | 142 | 620 | 770 | |||||||||||||
| Dong Mit | Vietnam | H | Song An Lao | 90 | 02/19 | 07/19 | 08/21 | 06/22 | 68 | 378 | 353 | 456 | ||||||||||||
| Hatta PSS-Saddle dam | UAE | DEWA | H | 12/19 | 03/21 | 09/21 | - /24 | 38 | 184 | 41 | 45 | (7) | (7) | (7)* | 300 | 300 | 65 | 120 | (F) | |||||
| Agdez | Morocco | Direction des Aménagements Hydrauliques | F I W | Daraa | 247 | 05/16 | 03/19 | 09/21 | 06/22 | 110 | 317 | 833 | 993 | V | (1) | 0.80 | (1)* | 0.80 | (1)* | (N) | ||||
| Site C | Canada | BC Hydro | H | Peace | 2644 | - /15 | 07/17 | 10/21 | 08/25 | 71 | 800 | 1740 | V | (1) | 0.80 | (3') | 0.80 | (3')* | 300 | 300 | 80 | 130 | (F) | |
| Yangjiang PSP - Upper dam | China | China Southern Power Grid Co. | H | Moyang | 18 | 01/17 | - /19 | 11/21 | 06/22 | 101 | 477 | 652 | 300 | 6000 | ||||||||||
| Hekou [A] | China | 37 | - /17 | - /19 | 12/21 | - /22 | 83 | 193 | ||||||||||||||||
| Fengman (new) | China | Northeast China Electric Power | H | Songhua | 10377 | - /13 | - /15 | - /21 | - /22 | 95 | 1068 | 2700 | ||||||||||||
| Kaddoussa | Morocco | Direction des Aménagements Hydrauliques | F I W | Guir | 220 | - /16 | - /18 | - /21 | - /21 | 62 | 271 | 180 | 210 | V | (1) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | (N) | ||
| Xijiang [H-F] | China | 472 | - /16 | - /18 | - /21 | - /22 | 50 | |||||||||||||||||
| Maling [A] | China | H | 219 | - /16 | - /18 | - /21 | - /22 | 90 | ||||||||||||||||
| Tiddas | Morocco | Direction des Aménagements Hydrauliques | F I W | Bou Regreg | 507 | - /16 | - /18 | - /21 | - /22 | 106 | 345 | 900 | 1 | V | (5) | 0.80 | (1)* | 0.80 | (1)* | 300 | 300 | |||
| Huangzangsi | China | H | Heihe | 403 | - /16 | 08/18 | - /21 | - /22 | 123 | |||||||||||||||
| Gümüshane Bahçecik | Turkey | DSI - State Hydraulic Works | W | Şenkale Deresi | 3 | 06/17 | 11/18 | - /21 | - /22 | 67 | 273 | 148 | 0.10 | (1) | 0.80 | (1)* | 300 | 300 | (N) | |||||
| Cachoeira Cinco Veados | Brazil | Rincão dos Albinos Energética S.A. | H | Toropi | 13 | - /18 | - /19 | - /21 | 08/22 | 35 | 206 | |||||||||||||
| San Julian | Mexico | Peñoles | W | Fuerte | - /16 | - /19 | - /21 | - /22 | 44 | 240 | 300 | 300 | ||||||||||||
| La Trong | Vietnam | H | Song Gianh | 01/90 | 03/90 | 04/90 | 05/90 | 76 | V | (2) | 0.80 | (17) | 0.80 | (17) | (-) | |||||||||
| Kongzhai | China | H | Bala | 3 | - /17 | - /19 | - /21 | - /22 | 47 | |||||||||||||||
| Toudgha | Morocco | Direction des Aménagements Hydrauliques | F I W | Toudgha | 33 | 11/17 | - /19 | - /21 | - /22 | 68 | V | (1) | 0.90 | (1)* | 0.90 | (1)* | ||||||||
| Tuxikou [A] | China | F H | Qianhe | 160 | - /18 | - /19 | - /21 | - /22 | 132 | |||||||||||||||
| Davarlı | Turkey | DSI - State Hydraulic Works | I | Kara Creek | 1 | - /16 | - /19 | - /21 | - /23 | 39 | 119 | 34 | ||||||||||||
| Gürün Çamlıca | Turkey | DSI - State Hydraulic Works | I | Kırkgöz Creek | 1 | - /17 | - /19 | - /21 | - /23 | 28 | 142 | 28 | 0.10 | 0.80 | 300 | 80 | 32 | |||||||
| Rio do Peixe | Brazil | CPFL Energias Renovavies S.A. | H | do Peixe | - /18 | - /20 | - /21 | 07/22 | 32 | 300 | ||||||||||||||
| Nam Theun 1 | Laos | Nam Theun 1 Power Company | H | Nam Kading, aka Nam Theun | 3009 | 08/15 | 01/19 | 01/22 | 08/22 | 187 | 772 | 4141213 | 4320 | (3')* | 300 | 3000 & 9000 | 100 130 | 130 120 | (F) | |||||
| Grand Ethiopian Renaissance Dam (GERD) | Ethiopia | Ethiopian Electric Power (EEP) | H | Blue Nile | 74000 | 12/10 | 05/13 | 05/22 | - /24 | 160 | 1790 | 10100 | 10500 | 0.22 | (3') | 1.00 | (3')* | 1.00 | (3')* | 400 | 400 | 67 to 105 | 23 to 35 | (N) |
| Kabagawa | Japan | Kagawa Prefecture | F W | Kaba | 11 | 10/14 | 11/16 | 05/22 | 09/24 | 89 | 266 | 242 | 448 | V 0.40 | (1) (1) | 0.77 | (1) | 0.77 | (1) | 250 | 1000 | 91 | 39 | (F) |
| Tayabasan weir [H-F] | Philippines | Wawa JV Co. Inc. (Prime Infrastructure Capital Inc and San Lorenzo Ruiz Builders and Developers Group) | H I W | Tayabasan | 1 | - /20 | - /21 | 05/22 | 07/22 | 24 | 114 | 30 | 0.40 | (4') | 0.40 0.92 | (3') | 0.92 | (1)* | 300 | 300 | 90 | 120 | (F) | |
| Kahir [H-F] | Iran | Sistan & Balouchestan Water Authority | I W | Kahir | 314 | 11/10 | - /14 | 07/22 | 08/25 | 55 | 383 | 550 | 730 | 0.80 | (12) | 0.80 | (12) | 0.80 | (12) | |||||
| Hatta PSS-Upper dam | UAE | DEWA | H | 12/19 | 11/21 | 08/22 | - /24 | 72 | 222 | 170 | 180 | (7) | (7) | none | 300 | 300 | 65 | 120 | (F) | |||||
| Huanglinxia | China | H W | Hanshui | 221 | 10/18 | - /20 | 11/22 | 07/23 | 70 | 349 | ||||||||||||||
| Fask | Morocco | Direction des Aménagements Hydrauliques | F I W | Assayad | 79 | 07/17 | 01/19 | 12/22 | 07/23 | 77 | 830 | 1400 | 0.10 | (1) | 0.80 | (1) | 0.80 | (1) | 300 | 300 | (N) | |||
| Julius Nyerere (formerly Rufiji) | Tanzania | TANESCO (Tanzania Electric Supply Company Ltd.) | H | Rufiji | 3680 | 12/18 | 10/20 | - /22 | 12/23 | 134 | 1025 | 1420 | 1940 | 0.20 | (3') | 0.75 | (3')* | 0.75 | (12) | 93 | 62 | (F) | ||
| Fuzikou | China | Guilin Dayu Water Infrastructure Development Investment Co. Ltd. | F H | Lijiang | 188 | 11/11 | - /13 | - /22 | - /23 | 77 | 239 | 304 | ||||||||||||
| Chame Shir [A-G] | Iran | Iran Water & Power Resources Development Company (IWPC) | F H I W | Zohreh | 2300 | - /11 | - /16 | - /22 | 07/23 | 151 | 680 | 1100 | 1200 | V | 0.70 | 300 | 300 | 160 | 0 | (-) | ||||
| Dahe [A] | China | 44 | - /15 | - /17 | - /22 | - /23 | 105 | |||||||||||||||||
| Kapiçay | Turkey | DSI - State Hydraulic Works | H I | Basgöz | 5 | - /14 | - /18 | - /22 | - /24 | 50 | 136 | 126 | V | (1) | 0.80 | (1) | 300 | 84 | 56 | |||||
| Tuoba | China | Huaneng Lancang River Hydropower Co. Ltd. | H | Langcang (Mekong) | 1338 | - /15 | - /18 | - /22 | - /24 | 158 | 508 | 3600 | ||||||||||||
| Baghan | Iran | Boushehr Water Authority | F I W | Baghan | 32 | - /14 | - /18 | - /22 | - /25 | 58 | 311 | 220 | ||||||||||||
| Xiakoutang [A] | China | Lichuan City Yujiang Valley Hudropower Ltd. Hubei Province | F H | Yu | 55 | - /17 | - /19 | - /22 | - /22 | 70 | ||||||||||||||
| Yuwanghe | China | Guizhou Shuicheng Water-investment Co. Ltd. | I W | Yuwanghe | 11 | 09/16 | - /19 | - /22 | 11/23 | 50 | 157 | 106 | ||||||||||||
| Luoyuanhuokou | China | H | Ao | 297 | - /17 | - /19 | - /22 | - /23 | 91 | |||||||||||||||
| Tingzikou | China | Jialing River Tingzikou Water Resources and Hydropower Development Co. Ltd. | F H I N W | Jialing | 4067 | 11/09 | - /19 | - /22 | - /25 | 116 | 995 | |||||||||||||
| Gomaspan (formerly Bastora) | Iraq | Ministry of Agriculture and Water Resources in Kurdistan | I W | Bastora | 215 | - /13 | 03/19 | - /22 | 10/24 | 85 | 577 | 1160 | 1223 | V | 0.80 | 0.80 | ||||||||
| Houay LaNge | Laos | Houay LaNge Power Co. Ltd. (JV of China-based Hebei Construction and Investment Group Co., Ltd (HCIG) and CS Energy (Laos)) | H | Houaylange | 14 | 02/18 | - /20 | - /22 | 05/23 | 59 | 174 | V | (3') | (3')* | (12) | |||||||||
| Ulus Eldeş | Turkey | DSI - State Hydraulic Works | I W | Karakuz Creek | 1 | - /16 | - /20 | - /22 | - /23 | 46 | 125 | 38 | V 0.10 | (1) (1) | 0.80 | (1)* | 300 | 83 | 68 | (F) | ||||
| Wangjiazhou | China | Tuoxi | 21 | - /16 | - /20 | - /22 | - /23 | 62 | 310 | |||||||||||||||
| Haciömer | Turkey | DSI - State Hydraulic Works | I | Say | 4 | - /18 | - /20 | - /22 | - /23 | 50 | 173 | 94 | V | (1) | 0.80 | (1) | ||||||||
| Çalıcaalan | Turkey | DSI - State Hydraulic Works | I | Gök Creek | 1 | - /15 | - /20 | - /22 | - /24 | 33 | 195 | 50 | ||||||||||||
| Uluhan | Turkey | DSI - State Hydraulic Works | I | Gök Creek | 1 | - /17 | - /20 | - /22 | - /24 | 31 | 228 | 30 | ||||||||||||
| Kızlaryolu | Turkey | DSI - State Hydraulic Works | H I | Devrez | 115 | - /17 | - /20 | - /22 | - /23 | 92 | 261 | 447 | ||||||||||||
| Sorkun [H-F] | Turkey | DSI - State Hydraulic Works | I | Dokuzsele Creek | 1 | 07/17 | - /20 | - /22 | - /24 | 24 | 160 | 42 | ||||||||||||
| Guangshan | China | Large and medium sized Irrigation District Service Center of Qiannan Prefecture | I W | Qingshui | 1 | 04/20 | - /21 | - /22 | - /22 | 32 | 198 | V | (1) | V 1.00 | (1) (17) | none | (F) | |||||||
| Singrobo-Ahouaty | Ivory Coast | Ivoirian Hydro Energy | H | Bandama | 105 | 10/19 | - /21 | - /22 | 03/23 | 24 | ||||||||||||||
| Babus | Turkey | DSI - State Hydraulic Works | I | Fındıklı Creek | 1 | 06/18 | - /21 | - /22 | 09/23 | 35 | 229 | 48 | V | (1) | 0.80 | (1)* | ||||||||
| Nam Ngum 4 | Laos | EDL (Electricite du Laos) | H | Nam Ngum | 110 | 02/18 | 03/19 | 01/23 | - /24 | 74 | 252 | 230 | (3')* | 82 | 100 | |||||||||
| Lom Pangar | Cameroon | EDC (Electricity Development Corporation) | F H | Lom | 6000 | - /19 | 02/21 | 03/23 | 09/24 | 46 | 185 | 175 | 290 | V | (1) | 0.85 | (1) | 0.85 | (12) | 300 | 300 | 100 | 100 | (F) |
| Priest Rapids Right Embankment | USA | Grant County Public Utility District | H | Columbia | 10/21 | 04/22 | 03/23 | 10/23 | 17 | 564 | 386 | V | (3') | V 0.75 | (3') (17) | none | 300 | 300 - | 87 | 137 | (F) | |||
| Nam Sum 3 | Laos | Nam Sam 3 Power Co. Ltd. (part of Phongsubthavy Group) | H | Nam Xam | 435 | 10/19 | 07/21 | 04/23 | 12/23 | 122 | 321 | 907 | 987 | V | (3') | (3')* | 60 | 140 | (F) | |||||
| El Tornillito | Honduras | Hidrovolcan | H | Ulua | 242 | - /17 | - /21 | 05/23 | 10/24 | 83 | 440 | |||||||||||||
| Bursa Uludag | Turkey | DSI - State Hydraulic Works | F W | Kirkpinarlar | 1 | 10/21 | 01/22 | 08/23 | 10/23 | 28 | 168 | 60 | ||||||||||||
| Hirase | Japan | F H W | Nishiki | 30 | - /10 | - /16 | - /23 | - /24 | 73 | 300 | 340 | |||||||||||||
| Yozgat (Akdagmadeni) Bahçecik | Turkey | DSI - State Hydraulic Works | I | Gökdelen | 33 | - /15 | - /18 | - /23 | - /24 | 70 | 494 | 614 | V | (1) | 0.80 | (1) | 300 | 84 | 56 | (F) | ||||
| Göle Durançam | Turkey | DSI - State Hydraulic Works | I | Kür Çayı | 37 | - /16 | - /19 | - /23 | - /24 | 22 | 107 | 22 | V | 0.70 | ||||||||||
| Akçali 2 | Turkey | DSI - State Hydraulic Works | I | Sagin | 1 | - /16 | - /19 | - /23 | - /24 | 40 | 148 | 72 | 0.10 | (1) | 0.70 | (1)* | 0.70 | (12) | 300 | 300 | 90 | 60 | (F) | |
| Gündüzler | Turkey | DSI - State Hydraulic Works | I | Degirmen | 8 | - /16 | - /19 | - /23 | - /24 | 65 | 384 | 280 | V | (1) | 0.75 | (1) | 300 | 300 | 113 | 37 | (F) | |||
| Bahçecik | Turkey | W | 3 | - /16 | - /19 | - /23 | - /24 | 69 | 204 | |||||||||||||||
| Aso Tateno | Japan | F | Shirakawa | 10 | - /18 | - /20 | - /23 | 02/24 | 87 | 197 | ||||||||||||||
| Uzundere | Turkey | DSI - State Hydraulic Works | I | Uzun Creek | 1 | - /16 | - /20 | - /23 | - /24 | 42 | 59 | 35 | ||||||||||||
| Aldegirmen | Turkey | DSI - State Hydraulic Works | I W | Akasya | 24 | - /17 | - /20 | - /23 | - /24 | 59 | 227 | 189 | V | (1) | 0.80 | (1)* | 0.80 | (12) | 300 | 300 | 55 | 45 | (F) | |
| Akçakoca Altunçay | Turkey | DSI - State Hydraulic Works | I | Kilsuyu Creek | 1 | - /18 | - /20 | - /23 | - /24 | 33 | 95 | 24 | ||||||||||||
| Inandik | Turkey | DSI - State Hydraulic Works | I | Inandik | 31 | 04/18 | - /20 | - /23 | - /24 | 73 | 343 | 271 | 0.15 | (1) | 0.80 | (1) | 300 | 80 | 80 | |||||
| Jalaur afterbay dam | Philippines | National Irrigation Administration (NIA) | F H I W | Jalaur | - /19 | - /21 | - /23 | 07/24 | 38 | 150 | ||||||||||||||
| Jalaur High Dam (JRMP 2) | Philippines | National Irrigation Administration (NIA) | F H I W | Jalaur | 229 | - /19 | - /21 | - /23 | 07/24 | 109 | 267 | |||||||||||||
| Sehuencas (formerly Ivirizu) | Bolivia | ENDE Valle Hermoso S.A. | H | Ivirizu | 30 | - /18 | - /21 | - /23 | - /24 | 125 | 350 | |||||||||||||
| Manavgat Çardak | Turkey | DSI - State Hydraulic Works | H I | Sağırın Çayı | 8 | - /17 | - /22 | - /23 | - /24 | 44 | 185 | 540 | ||||||||||||
| Maiwan | China | Maiwan Water Conservancy | H I | Nandu | 615 | 04/20 | 03/22 | 05/24 | 07/25 | 79 | 377 | |||||||||||||
| Gölecik | Turkey | DSI - State Hydraulic Works | I W | Gölecik | 36 | 12/16 | 02/21 | 06/24 | - /24 | 95 | 424 | 900 | V | (3') | 0.80 | (3')* | 0.80 | (12) | 300 | 300 | 72 | 48 | (F) | |
| Sidi Abbou | Morocco | Direction des Aménagements Hydrauliques | F H I W | Leben | 200 | 03/21 | 01/23 | 06/24 | - /25 | 71 | 149 | 207 | 257 | V | (1) | 0.90 | (1)* | 0.90 | (1) | 300 | 300 | 110 | 0 | |
| Naruse [H-F] | Japan | Ministry of Land, Infrastructure, Transport and Tourism | F H I W | Naruse | 79 | 05/18 | 10/19 | 08/24 | 11/26 | 115 | 755 | 4450 | 4850 | |||||||||||
| El Zapotillo | Mexico | CNA (Comisión Nacional del Agua) | W | Verde | 910 | - /09 | 11/11 | - /24 | 12/24 | 80 | 271 | 1100 | 1200 | V | (3') | 0.83 | (3)* | 0.83 | (3)* | 300 | 300 | 60 to 80 | 50 to 70 | (S) |
| Hayghar (formerly Dehroud) [H-F] | Iran | Fars Water Authority | F H I W | Firooz Abad | 146 | - /09 | - /12 | - /24 | - /26 | 88 | 230 | 260 | 285 | 0.90 | (3') | 1.20 | (3')* | 1.20 | (12) | 300 | 300 | |||
| Oiticica | Brazil | Secretaria de Meio Ambiente e dos Recursos Hídricos do Estado do Rio Grande do Norte | I W | Piranhas | 556 | - /13 | - /15 | - /24 | 03/25 | 35 | 989 | |||||||||||||
| Divaresh | Iran | Gilan Province Water Authority | I W | Kharshak | 3 | - /13 | - /15 | - /24 | - /26 | 45 | 195 | |||||||||||||
| Asuwagawa [A-G] | Japan | Ministry of Land, Infrastructure, Transport and Tourism | F | Heko | 29 | 07/06 | - /18 | - /24 | - /26 | 96 | ||||||||||||||
| Uchigatani | Japan | F H | Kibishima | 12 | - /14 | - /18 | - /24 | - /26 | 84 | 270 | 328 | |||||||||||||
| Toga | Japan | Ministry of Land, Infrastructure, Transport and Tourism | F I N | Toga | 31 | - /17 | - /19 | - /24 | - /25 | 112 | 232 | 570 | 0.10 0.60 | (1) (1) | 0.69 | (1) | 0.69 | (1) | ||||||
| Huokou | China | Department of Water Conservancy, Fujian Province | F H W | Aojiang | 297 | - /17 | - /21 | - /24 | - /25 | 91 | 338 | 300 | 663 | 0.10 | 0.76 | 0.76 | (F) | |||||||
| Tianjiaotan | China | I W | Beimen | 191 | 04/20 | 11/21 | - /24 | 08/25 | 52 | 295 | ||||||||||||||
| Quanzhou Bailai | China | F H W | 544 | 06/20 | 01/22 | - /24 | 12/25 | 106 | 596 | |||||||||||||||
| Song Giang 1 | Vietnam | Nexif Energy & Song Giang Hydropower Joint Stock Company | H I | Song Cái Nha Trong | - /19 | - /22 | - /24 | - /25 | 26 | |||||||||||||||
| Tekke Kavakli | Turkey | DSI - State Hydraulic Works | I W | Çat | 2 | - /19 | - /22 | - /24 | - /25 | 42 | 325 | 225 | ||||||||||||
| Lengshuihe [H-F] | China | 10 | - /20 | - /22 | - /24 | - /25 | 40 | |||||||||||||||||
| Mikasabonbetsu [H-F] | Japan | Ministry of Land, Infrastructure, Transport and Tourism | F | Honbetsu | 9 | - /85 | - /22 | - /24 | - /26 | 53 | 160 | 180 | 0.80 | (1) | 0.80 | (1) | 0.80 | (1) | ||||||
| Ula Çıtlık | Turkey | DSI - State Hydraulic Works | I | Büyükdere | 1 | - /17 | - /22 | - /24 | - /26 | 29 | 125 | 30 | ||||||||||||
| La Libertad | Mexico | Organismo Servicios de Agua y Drenaje de Monterrey, IPD (SADM) | W | Potosi | 221 | - /20 | 04/22 | - /24 | - /24 | 47 | 1915 | 1118 | 1162 | V | (1) | 0.75 | (3) | 300 | 300 | (F) | ||||
| Mashkid 2 | Iran | Sistan and Balouchestan Water Authority | F I W | Simish & Mashkid | 115 | 10/17 | 04/22 | - /24 | - /25 | 36 | 1450 | 650 | 850 | |||||||||||
| Uçarsu | Turkey | DSI - State Hydraulic Works | W | Uçarsu | 1 | - /18 | - /23 | - /24 | - /25 | 30 | 199 | 50 | ||||||||||||
| Arraias | Brazil | CELG/Electronorte | H | Arraias | - /21 | - /23 | - /24 | - /25 | 29 | 560 | ||||||||||||||
| Dongyang [H-F] | China | Dongyanggou | 5 | 05/22 | - /23 | - /24 | - /25 | 67 | 136 | |||||||||||||||
| Upper Wawa [H-F] | Philippines | Wawa JV Co. Inc. (Prime Infrastructure Capital Inc and San Lorenzo Ruiz Builders and Developers Group) | W | Marikina | 120 | 06/21 | 01/23 | - /24 | - /25 | 87 | 439 | 1035 | 1043 | 0.60 | (3') | 0.80 | (3')* | 0.80 | (3')* | 300 | 3600 | 80 70 | 120 110 | (F) |
| Batang Toru | Indonesia | PT. North Sumatra Hydro Energy | H | Batang Toru | 18 | 10/21 | 07/23 | 03/25 | - /26 | 79 | 137 | 500 | 300 | 2000 | ||||||||||
| Al Khawd | Oman | Ministry of Regional Municipalities and Water Resources | F | Wadi Al Khawd | 78 | 09/22 | 01/24 | 04/25 | 11/25 | 62 | 570 | 654 | 715 | |||||||||||
| Daxingzhai | China | I W | Tong | 113 | 06/22 | 02/24 | 06/25 | - /26 | 69 | 288 | ||||||||||||||
| Bouhdid | Algeria | Direction de l’Hydralique de la Wilaya de Annaba | F | Oued Bouhdid | 1 | - /18 | - /19 | 07/25 | - /25 | 30 | 260 | 60 | 0.10 | 0.90 | (1)* | |||||||||
| Agios Georgios [H-F] | Greece | Terna Energiaki | H | Kapnitsorrema | 7 | 06/23 | 04/24 | 10/25 | 12/25 | 59 | 475 | 765 | 795 | 400 | 400 | |||||||||
| Gross Dam Raise [A-G] | USA | Denver Water | W | South Boulder Creek | 147 | 04/22 | 04/24 | 11/25 | 12/26 | 144 | 610 | 568 | 300 | 300 | ||||||||||
| Gatos | Brazil | SRHS (Secretaria de Recursos Hídricos e de Saneamento) | F W | Sem Nome | 6 | - /12 | - /13 | - /25 | - /26 | 38 | 325 | |||||||||||||
| Katende | DR Congo | SNEL (Société Nationale d'Électricité) | H | Lulua | 08/11 | - /15 | - /25 | - /27 | 16 | |||||||||||||||
| Tersun | Turkey | DSI - State Hydraulic Works | I | Tersun | 9 | - /16 | - /20 | - /25 | - /26 | 51 | 236 | 205 | 0.05 | (1) | 0.80 | (1) | ||||||||
| El-Janneh [A-G] | Lebanon | EBML | H I W | Ibrahim (Abraham) | 38 | - /15 | 02/20 | - /25 | - /26 | 162 | 350 | 1450 | 300 | 300 | ||||||||||
| Zimari | Turkey | DSI - State Hydraulic Works | W | Zimari | 2 | - /18 | - /21 | - /25 | - /26 | 37 | 126 | 80 | ||||||||||||
| Üzengili | Turkey | DSI - State Hydraulic Works | I | Büyük Creek | 1 | - /18 | - /21 | - /25 | - /26 | 50 | 157 | 94 | 0.10 | (1) | 0.80 | (1) | ||||||||
| Fengshan | China | H | 104 | - /20 | - /22 | - /25 | - /25 | 90 | ||||||||||||||||
| Sariçay | Turkey | DSI - State Hydraulic Works | W | Sariçay | 67 | 08/19 | - /22 | - /25 | 07/26 | 125 | 441 | 1163 | ||||||||||||
| Tang e Mashooreh [A] | Iran | Lorestan Water Authority | F I W | Karkheh | 55 | - /13 | - /22 | - /25 | - /26 | 73 | 220 | |||||||||||||
| Nwamitwa | South Africa | Department of Water & Sanitation | W | Groot Letaba | - /17 | - /22 | - /25 | - /26 | 44 | 350 | 170 | 226 | ||||||||||||
| Niulu | China | H I W | Niulushi | 66 | - /18 | - /22 | - /25 | - /26 | 80 | 391 | ||||||||||||||
| Gujun | China | Dazhou Major water works construction and management center | F H | Zhonhe | 128 | 12/20 | - /22 | - /25 | - /26 | 77 | ||||||||||||||
| Leon Hurse | USA | Upper Trinity Regional Water District | W | Sulphur | 00/00 | 00/00 | 00/00 | 00/00 | 32 | 215 | ||||||||||||||
| Xiyin [H-F] | China | Qiuluxi | 28 | 10/21 | - /23 | - /25 | - /26 | 52 | 395 | 329 | 386 | |||||||||||||
| Shiziya | China | 6 | - /22 | - /23 | - /25 | - /26 | 64 | 274 | ||||||||||||||||
| Mohammed V Dam Raise | Morocco | Ministère de l'Equipement, des Transports, de la Logistique et de l'Eau | I W | Moulouya | 980 | - /22 | - /24 | - /25 | - /26 | 73 | ||||||||||||||
| Beni Azimane [H-F] | Morocco | Direction des Aménagements Hydrauliques | F I W | Kert | 44 | 01/22 | 10/22 | 01/26 | 10/26 | 70 | 684 | 800 | 0.50 | (1)* | 0.90 | (1)* | 0.90 | (1)* | 300 | 300 | 100 | 0 | ||
| Assif Ouender | Morocco | AREP (Regional Project Execution Agency) | F I R W | Assif Ouender | 15 | 11/23 | - /25 | 03/26 | 06/26 | 45 | 300 | V | 0.90 | 0.90 | ||||||||||
| Mwache | Kenya | Ministry of Water and Sanitation | I W | Mwache | 136 | 04/22 | 03/25 | 06/26 | - /26 | 84 | 526 | 610 | 620 | (3')* | 300 | 300 | 70 | 150 | ||||||
| Panelas II | Brazil | SRHS (Secretaria de Recursos Hídricos e de Saneamento) | W | Una | 17 | - /16 | - /17 | 06/26 | - /27 | 55 | 311 | |||||||||||||
| Shafaroud | Iran | Iran Water & Power Development Company (IWPCo) | H I W | Shafaroud | 52 | 03/12 | 03/20 | 07/24 | 11/25 | 101 | 300 | 725 | 740 | 0.10 0.50 | (3') | 0.80 | (3')* | 0.80 | (12) | 300 | 300 | |||
| Kheng Grou | Morocco | Direction des Aménagements Hydrauliques | F I W | Kheng Grou | 1070 | 04/22 | 01/24 | 08/26 | - /26 | 79 | 196 | 550 | 55 | 0.20 | (5) | 1.00 | (5) | 1.00 | (13) | 300 | 3000 | |||
| Bahoosh | Iran | Bushehr Water Company | F I | Bahoosh | 9 | - /12 | - /18 | - /26 | - /28 | 37 | ||||||||||||||
| Gwayi-Shangani | Zimbabwe | Zimbabwe National Water Authority (Zinwa) | H I W | Gwayi | 634 | 09/04 | - /22 | - /26 | - /27 | 72 | 305 | 300 | 60 | 140 | (F) | |||||||||
| Yunxiao PSP - Upper dam | China | China Nuclear (Guodian Zhangzhou) Energy | H | 21 | - /17 | - /22 | - /26 | - /27 | 68 | |||||||||||||||
| Ghiz Ghalek (formerly Dashte Palang) | Iran | Boushehr Regional Water Company | F I W | Dashte Palang | 151 | 07/13 | - /22 | - /26 | - /28 | 63 | 800 | 540 | 690 | |||||||||||
| Guanyin | China | Guizhou Water Conservancy Investment Group Co, Ltd | H I W | Guanyinsi | 121 | 12/21 | - /23 | - /26 | - /27 | 109 | ||||||||||||||
| TB | China | H | Lancang (Mekong) | 10/21 | - /23 | - /26 | - /27 | 158 | ||||||||||||||||
| Jiaoyan | China | H | Qingshui | 210 | 12/21 | - /23 | - /26 | - /27 | 96 | |||||||||||||||
| Salipazari | Turkey | DSI - State Hydraulic Works | I W | Degimendere | 16 | - /17 | - /24 | - /26 | - /27 | 89 | 396 | 430 | ||||||||||||
| Piedra Cajón | Nicaragua | H | Río Mico | - /00 | - /00 | - /00 | - /00 | 49 | 0.70 1.00 | (5) (5) | 0.70 1.00 | (1)* (1)* | 0.70 | (1)* | ||||||||||
| Heibaoshan [H-F] | China | Construction Headquarters of Heibaoshan Reservoir Project in Wanyuan City | I W | Dayan | 2 | - /22 | - /24 | - /26 | - /27 | 60 | ||||||||||||||
| Taghzirt | Morocco | Direction des Aménagements Hydrauliques | H I | Derna | 85 | - /22 | - /24 | - /26 | - /27 | 95 | ||||||||||||||
| Cheekeye Fan Debris Barrier | Canada | Matteus West and Squamish Nation | F | Cheekye | 10/23 | - /25 | - /26 | 10/26 | 25 | 200 | 55 | |||||||||||||
| Manavgat Yeniköy Yerköprü | Turkey | DSI - State Hydraulic Works | I | Hamam Suyu | 1 | 09/23 | - /25 | - /26 | - /26 | 35 | 193 | 60 | ||||||||||||
| Lower Chatkal | Uzbekistan | JSC Uzbekgidroenergo | H | Chatkal | 5 | - /23 | - /25 | - /26 | - /27 | 60 | 270 | |||||||||||||
| Bouljir | Morocco | AREP (Regional Project Execution Agency) | F I R W | Boujir | 12 | 07/24 | - /25 | - /26 | - /27 | 25 | 416 | 0.20 | 0.80 | 0.80 | ||||||||||
| Koysha (Gibe IV) | Ethiopia | Ethiopian Electric Power (EEP) | H | Omo | 6900 | 09/13 | 06/20 | 02/27 | 05/28 | 201 | 1020 | 7350 | 7725 | 0.10 0.35 | (3') | 0.70 | (3')* | separate | 300 | 1500 | 130 | 25 | (N) | |
| Söylemez | Turkey | DSI - State Hydraulic Works | H I | Aras | 1295 | 04/22 | 04/24 | 11/27 | 09/28 | 113 | 270 | 718 | 750 | |||||||||||
| Oued Lakhdar | Morocco | Direction des Aménagements Hydrauliques | F H I W | Lakhdar | 150 | - /23 | - /25 | - /27 | - /27 | 110 | ||||||||||||||
| Enchanted Forest | Saudi Arabia | Saudi Arabia's Public Investment Fund (PIF) | R | 3 | - /23 | - /25 | - /27 | - /28 | 38 | 700 | 800 | |||||||||||||
| Trojena | Saudi Arabia | Saudi Arabia's Public Investment Fund (PIF) | R | 3 | - /23 | - /25 | - /27 | - /28 | 145 | 475 | 2345 | |||||||||||||
| Cibeet [H-F] | Indonesia | PUPR (Public Works and Public Housing Ministry) | F H I W | Cibeet | 83 | 09/23 | - /25 | - /27 | - /28 | 47 | 960 | 371 | 0.90 | 0.90 | 0.90 | 250 | 750 | 106 | 0 | (-) | ||||
| Monti Nieddu (formerly Sa Stria) | Italy | Consorzio di Bonifica della Sardegna Meridionale | I W | Monti Nieddu | 35 | 01/98 | - /18 | - /28 | - /28 | 88 | 360 | 333 | 449 | 0.05 | (1) | 0.75 | (1)* | 0.75 | (1) | 300 | 300 | (F) | ||
| Upper Yeywa (Kyaukme) | Myanmar | Department of Hydroelectric Power - Ministry of Electric Power | H | Myitnge | 341 | - /15 | - /24 | - /28 | - /29 | 102 | 266 | 532 | 580 | V | (3') | 0.80 | (3')* | 0.80 | (12) | 300 | 300 | |||
| Qingyukou | China | F H W | Bahe | 141 | 04/22 | - /24 | - /28 | - /29 | 71 | |||||||||||||||
| Caculo-Cabaça | Angola | Ministry of Energy and Water | H | Kwanza | 436 | 08/17 | - /25 | - /28 | 03/29 | 116 | 533 | 1075 | 1450 | V | 0.85 | (12)* | 0.85 | 300 | 2400 | 100 | 0 | |||
| Shin Maruyama | Japan | Kansai Electric Power | F H | Kiso | 131 | - /22 | - /25 | - /28 | - /30 | 118 | 341 | |||||||||||||
| Kala | China | Yalong River Hydropower Development Co. Ltd. | H | Yalong | 234 | 01/24 | 07/25 | - /28 | - /29 | 128 | 2560 | |||||||||||||
| Taraz | Iran | Khuzestan Province Power & Water Authority | H I W | Harkesh | 38 | - /18 | - /22 | - /29 | - /31 | 57 | 350 | 240 | ||||||||||||
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Kazakhstan
Owner: Ministry of Energy
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Irtysh
Reservoir capacity: 31 m3x106
Construction Dates
Start of Project: 05/55
Start of RCC: 05/55
End of RCC: 10/61
End of Project: 12/63
Specifications
Height: 90 metres
Length: 450 metres
Volume of RCC: 587 m3x103
Total volume: 988 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete blocks |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 1200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 135 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 80 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Dongqiao County
Type: Gravity
Purpose(s): Irrigation
River: Zaoshui
Reservoir capacity: 4 m3x106
Construction Dates
Start of Project: -/69
Start of RCC: -/69
End of RCC: -/71
End of Project: -/72
Specifications
Height: 32 metres
Length: 85 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): unknown
River: Dinggeniu
Reservoir capacity: 33 m3x106
Construction Dates
Start of Project: -/74
Start of RCC: -/74
End of RCC: -/78
End of Project: -/79
Specifications
Height: 41 metres
Length: 173 metres
Volume of RCC: -
Total volume: 36 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Japan
Owner: Ministry of Construction
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Shimaji
Reservoir capacity: 21 m3x106
Construction Dates
Start of Project: 09/76
Start of RCC: 09/76
End of RCC: 04/80
End of Project: 03/81
Specifications
Height: 89 metres
Length: 240 metres
Volume of RCC: 165 m3x103
Total volume: 317 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.30 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 150 to | 500 |
| 200 | 700 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Sixian Water Resources Bureau
Type: Thin Arch
Purpose(s): Hydropower
River: Leishui
Reservoir capacity: 4 m3x106
Construction Dates
Start of Project: -/79
Start of RCC: -/79
End of RCC: -/81
End of Project: -/82
Specifications
Height: 35 metres
Length: 33 metres
Volume of RCC: 3 m3x103
Total volume: 3 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: USA
Owner: US Army Corps of Engineers
Type: Gravity
Purpose(s): Flood Control / Recreation
River: Willow Creek
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: 11/81
Start of RCC: 11/81
End of RCC: 09/82
End of Project: 04/83
Specifications
Height: 52 metres
Length: 543 metres
Volume of RCC: 331 m3x103
Total volume: 331 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Unformed face of RCC |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 47 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 19 | Low-lime flyash (ASTM Class F) |

Details
Country: Australia
Owner: Kidston Gold Mines Ltd.
Type: Gravity
Purpose(s): Water Supply
River: Copperfield
Reservoir capacity: 20 m3x106
Construction Dates
Start of Project: 12/83
Start of RCC: 12/83
End of RCC: 09/84
End of Project: 09/84
Specifications
Height: 40 metres
Length: 340 metres
Volume of RCC: 140 m3x103
Total volume: 156 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork |
Downstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork |
| 0.90 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 30 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: Exxon Company, Houston, Texas
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Middle Fork
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 05/84
Start of RCC: 05/84
End of RCC: 09/84
End of Project: 11/84
Specifications
Height: 38 metres
Length: 125 metres
Volume of RCC: 42 m3x103
Total volume: 43 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| conduit |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 66 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: USA
Owner: Winchester Municipal Utility
Type: Gravity
Purpose(s): Water Supply
River: Upper Howard Creek
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 06/84
Start of RCC: 06/84
End of RCC: 11/84
End of Project: 01/85
Specifications
Height: 23 metres
Length: 363 metres
Volume of RCC: 24 m3x103
Total volume: 27 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
| 1.00 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| 1.00 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 104 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: USA
Owner: Douglas County
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: Cow Creek
Reservoir capacity: 52 m3x106
Construction Dates
Start of Project: 07/84
Start of RCC: 07/84
End of RCC: 08/85
End of Project: 10/85
Specifications
Height: 50 metres
Length: 290 metres
Volume of RCC: 161 m3x103
Total volume: 171 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Unformed face of RCC |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 53 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 51 | Low-lime flyash (ASTM Class F) |

Details
Country: Spain
Owner: Junta de Andalucia
Type: Gravity
Purpose(s): Water Supply
River: Cala
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 07/84
Start of RCC: 07/84
End of RCC: 10/85
End of Project: 12/85
Specifications
Height: 25 metres
Length: 124 metres
Volume of RCC: 14 m3x103
Total volume: 20 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.75 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 450 | 450 |
Cementitious material
| Cement (kg/m3) |
|---|
| 72 |
| 61 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 116 | Low-lime flyash (ASTM Class F) |
| 120 |

Details
Country: China
Owner: Kengkou Reservoir Management Office
Type: Gravity
Purpose(s): Hydropower / Water Supply
River: Youxi
Reservoir capacity: 27 m3x106
Construction Dates
Start of Project: 11/84
Start of RCC: 11/84
End of RCC: 04/86
End of Project: 11/86
Specifications
Height: 57 metres
Length: 123 metres
Volume of RCC: 43 m3x103
Total volume: 62 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels with hot poured membrane |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 & | 250 & |
| 500 | 500 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 120 | Low-lime flyash (ASTM Class F) |
| 80 |

Details
Country: Australia
Owner: Rivers and Water Supply Commission of Tasmania
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Coal
Reservoir capacity: 13 m3x106
Construction Dates
Start of Project: 01/86
Start of RCC: 01/86
End of RCC: 06/86
End of Project: 08/86
Specifications
Height: 25 metres
Length: 247 metres
Volume of RCC: 22 m3x103
Total volume: 24 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 1.00 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| separate |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 60 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Ministry of Construction
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Tama
Reservoir capacity: 254 m3x106
Construction Dates
Start of Project: 08/80
Start of RCC: 08/80
End of RCC: 07/86
End of Project: 12/90
Specifications
Height: 100 metres
Length: 441 metres
Volume of RCC: 772 m3x103
Total volume: 1150 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.60 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.81 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.81 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 150 - | 750 |
| 200 | 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: Village of Ruidoso
Type: Gravity
Purpose(s): Water Supply
River: Grindstone
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 09/85
Start of RCC: 09/85
End of RCC: 07/86
End of Project: 10/86
Specifications
Height: 42 metres
Length: 432 metres
Volume of RCC: 88 m3x103
Total volume: 96 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 76 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: USA
Owner: North Jersey District Water Supply Commission and Hackensack Water Company
Type: Gravity
Purpose(s): Water Supply
River: Wanaque
Reservoir capacity: 27 m3x106
Construction Dates
Start of Project: 05/85
Start of RCC: 05/85
End of RCC: 08/86
End of Project: 11/86
Specifications
Height: 48 metres
Length: 670 metres
Volume of RCC: 219 m3x103
Total volume: 232 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.78 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: South Africa
Owner: Department of Water & Sanitation
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Little Fish
Reservoir capacity: 4 m3x106
Construction Dates
Start of Project: 09/84
Start of RCC: 09/84
End of RCC: 08/86
End of Project: 10/87
Specifications
Height: 30 metres
Length: 300 metres
Volume of RCC: 35 m3x103
Total volume: 65 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.60 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.60 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 250 |
Cementitious material
| Cement (kg/m3) |
|---|
| 58 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 58 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: SRH (Secretaria de RecursosHidricos)
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Gravata
Reservoir capacity: 97 m3x106
Construction Dates
Start of Project: 07/85
Start of RCC: 07/85
End of RCC: 10/86
End of Project: 06/87
Specifications
Height: 56 metres
Length: 230 metres
Volume of RCC: 132 m3x103
Total volume: 143 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| separate |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 400 | 400 |
Cementitious material
| Cement (kg/m3) |
|---|
| 55 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 15 | Natural pozzolan (ASTM Class N) |

Details
Country: South Africa
Owner: Department of Water & Sanitation
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Olifants
Reservoir capacity: 104 m3x106
Construction Dates
Start of Project: 09/85
Start of RCC: 09/85
End of RCC: 11/86
End of Project: 07/87
Specifications
Height: 36 metres
Length: 455 metres
Volume of RCC: 101 m3x103
Total volume: 142 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.50 | Traditional concrete against formwork [stepped face] |
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 36 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 74 | Ground-granulated blast-furnace slag |

Details
Country: South Africa
Owner: Department of Water & Sanitation
Type: Gravity
Purpose(s): Water Supply
River: Slang
Reservoir capacity: 190 m3x106
Construction Dates
Start of Project: 05/85
Start of RCC: 05/85
End of RCC: 03/87
End of Project: 09/88
Specifications
Height: 47 metres
Length: 527 metres
Volume of RCC: 97 m3x103
Total volume: 134 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork [stepped face] |
| 0.62 |
Spillway
| Slope | Type |
|---|---|
| 0.62 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 250 |
Cementitious material
| Cement (kg/m3) |
|---|
| 36 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 84 | Ground-granulated blast-furnace slag |

Details
Country: Mexico
Owner: CNA (Comisión Nacional del Agua)
Type: Gravity
Purpose(s): Flood Control
River: Ibarrilla
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 11/86
Start of RCC: 11/86
End of RCC: 05/87
End of Project: 07/87
Specifications
Height: 36 metres
Length: 150 metres
Volume of RCC: 20 m3x103
Total volume: 30 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
| 0.15 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
| 0.80 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 135 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 135 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: Phelps Dodge Morenci Inc & Sumitomo Metal Mining
Type: Gravity
Purpose(s): Flood Control
River: Lower Chase Creek
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 03/87
Start of RCC: 03/87
End of RCC: 06/87
End of Project: 07/87
Specifications
Height: 27 metres
Length: 122 metres
Volume of RCC: 14 m3x103
Total volume: 22 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 40 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: Central Utah Water Conservancy District
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Rock Creek
Reservoir capacity: 37 m3x106
Construction Dates
Start of Project: 12/83
Start of RCC: 12/83
End of RCC: 08/87
End of Project: 12/87
Specifications
Height: 91 metres
Length: 815 metres
Volume of RCC: 1125 m3x103
Total volume: 1281 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Slip-formed/extruded facing elements |
Downstream
| Slope | Type |
|---|---|
| 0.32 | Slip-formed/extruded facing elements |
| 0.60 | Slip-formed/extruded facing elements |
Spillway
| Slope | Type |
|---|---|
| 0.32 | Slip-formed/extruded facing elements [stepped face] |
| 0.60 | Slip-formed/extruded facing elements [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 79 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 173 | Low-lime flyash (ASTM Class F) |

Details
Country: Spain
Owner: Confederación Hidrográfica del Tajo
Type: Gravity
Purpose(s): Water Supply
River: Morales
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 06/86
Start of RCC: 06/86
End of RCC: 10/87
End of Project: 12/87
Specifications
Height: 28 metres
Length: 200 metres
Volume of RCC: 22 m3x103
Total volume: 26 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| RCC against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 - | 300 - |
| 400 | 400 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| 74 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 140 | Low-lime flyash (ASTM Class F) |
| 128 |

Details
Country: France
Owner: Département de l’Herault
Type: Gravity
Purpose(s): Flood Control
River: La Peyne
Reservoir capacity: 4 m3x106
Construction Dates
Start of Project: 08/86
Start of RCC: 08/86
End of RCC: 10/87
End of Project: 03/88
Specifications
Height: 36 metres
Length: 255 metres
Volume of RCC: 80 m3x103
Total volume: 85 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Mechanically compacted unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 130 | ROLAC (mixture of flyash and slag with or without limestone fines) |

Details
Country: Japan
Owner: Fukushima Prefecture
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Mano
Reservoir capacity: 36 m3x106
Construction Dates
Start of Project: 12/83
Start of RCC: 12/83
End of RCC: 01/88
End of Project: 03/90
Specifications
Height: 69 metres
Length: 239 metres
Volume of RCC: 104 m3x103
Total volume: 219 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 180 | 500 |
Cementitious material
| Cement (kg/m3) |
|---|
| 96 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 24 | Low-lime flyash (ASTM Class F) |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Irrigation
River: Akrech
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 06/87
Start of RCC: 06/87
End of RCC: 02/88
End of Project: 03/88
Specifications
Height: 26 metres
Length: 124 metres
Volume of RCC: 17 m3x103
Total volume: 20 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against precast concrete panels [stepped face] |
Downstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against precast concrete panels |
| 0.75 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| 0.60 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 350 | 350 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| 140 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 30 | Ground-granulated blast-furnace slag |
| 60 |

Details
Country: Japan
Owner: Yamagata Prefecture
Type: Gravity
Purpose(s): Flood Control / Irrigation
River: Shiromizu
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: 10/84
Start of RCC: 10/84
End of RCC: 06/88
End of Project: 04/90
Specifications
Height: 55 metres
Length: 367 metres
Volume of RCC: 142 m3x103
Total volume: 314 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 150 - | 500 |
| 200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 96 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 24 | Low-lime flyash (ASTM Class F) |

Details
Country: Spain
Owner: Sociedad Española de Carburos Metálicos S.A.
Type: Gravity
Purpose(s): Hydropower
River: Xallas
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: 01/87
Start of RCC: 01/87
End of RCC: 06/88
End of Project: 10/88
Specifications
Height: 84 metres
Length: 290 metres
Volume of RCC: 225 m3x103
Total volume: 254 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.05 | RCC against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork [stepped face] |
| 0.35 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 250 |
Cementitious material
| Cement (kg/m3) |
|---|
| 88 |
| 72 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 152 | Low-lime flyash (ASTM Class F) |
| 145 |

Details
Country: Japan
Owner: Toyama Prefecture
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Ogawa
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: 03/83
Start of RCC: 03/83
End of RCC: 06/88
End of Project: 06/90
Specifications
Height: 84 metres
Length: 260 metres
Volume of RCC: 268 m3x103
Total volume: 361 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.90 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 180 | 500 |
Cementitious material
| Cement (kg/m3) |
|---|
| 96 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 24 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: Upper Yampa Water Conservancy District, Steamboat Springs, Colorado
Type: Gravity
Purpose(s): Hydropower / Irrigation / Recreation / Water Supply
River: Yampa
Reservoir capacity: 42 m3x106
Construction Dates
Start of Project: 08/87
Start of RCC: 08/87
End of RCC: 07/88
End of Project: 11/88
Specifications
Height: 46 metres
Length: 116 metres
Volume of RCC: 34 m3x103
Total volume: 39 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 71 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 71 | Low-lime flyash (ASTM Class F) |

Details
Country: Romania
Owner: Romanian Electricity Authority (RENAL) - Tirgu Jiu Branch
Type: Gravity
Purpose(s): Hydropower
River: Jiu
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: 03/86
Start of RCC: 03/86
End of RCC: 10/88
End of Project: 10/92
Specifications
Height: 25 metres
Length: 55 metres
Volume of RCC: 14 m3x103
Total volume: 17 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Downstream
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Spillway
| Slope | Type |
|---|---|
| ogee | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 900 |
Cementitious material
| Cement (kg/m3) |
|---|
| 125 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Hardfill
Purpose(s): Irrigation / Water Supply
River: Rouidat
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 05/87
Start of RCC: 05/87
End of RCC: 10/88
End of Project: 12/88
Specifications
Height: 24 metres
Length: 125 metres
Volume of RCC: 25 m3x103
Total volume: 27 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.40 | RCC against precast concrete panels [stepped face] |
Downstream
| Slope | Type |
|---|---|
| 0.40 | RCC against precast concrete panels [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.40 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 400 | 400 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 15 | Natural pozzolan (ASTM Class N) |

Details
Country: Japan
Owner: Water Resources Development Public Corporation
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Nunome
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: 05/86
Start of RCC: 05/86
End of RCC: 10/88
End of Project: 12/89
Specifications
Height: 72 metres
Length: 322 metres
Volume of RCC: 110 m3x103
Total volume: 330 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.40 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 78 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 42 | Low-lime flyash (ASTM Class F) |

Details
Country: South Africa
Owner: Department of Water & Sanitation
Type: Arch-Gravity
Purpose(s): Water Supply
River: Rietspruit
Reservoir capacity: 137 m3x106
Construction Dates
Start of Project: 04/88
Start of RCC: 04/88
End of RCC: 11/88
End of Project: 09/89
Specifications
Height: 50 metres
Length: 200 metres
Volume of RCC: 45 m3x103
Total volume: 59 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.60 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.60 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 250 |
Cementitious material
| Cement (kg/m3) |
|---|
| 61 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 142 | Low-lime flyash (ASTM Class F) |

Details
Country: Spain
Owner: Confederación Hidrográfica del Guadiana
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Lácara
Reservoir capacity: 15 m3x106
Construction Dates
Start of Project: 05/88
Start of RCC: 05/88
End of RCC: 11/88
End of Project: 01/89
Specifications
Height: 32 metres
Length: 240 metres
Volume of RCC: 25 m3x103
Total volume: 54 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.50 | RCC against formwork [stepped face] |
| 0.80 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.50 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 250 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 156 | Low-lime flyash (ASTM Class F) |
| 145 |

Details
Country: China
Owner: Hydropower Bureau, Lanshan County
Type: Gravity
Purpose(s): Hydropower
River: Yonghe
Reservoir capacity: 9 m3x106
Construction Dates
Start of Project: -/84
Start of RCC: -/84
End of RCC: -/88
End of Project: -/90
Specifications
Height: 52 metres
Length: 180 metres
Volume of RCC: -
Total volume: 220 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Water Supply
River: Yuxi
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/85
Start of RCC: -/85
End of RCC: -/88
End of Project: -/89
Specifications
Height: 38 metres
Length: 102 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: Argentina
Owner: Electriciad Misiones S.A.
Type: Gravity
Purpose(s): Hydropower
River: Urugua-i
Reservoir capacity: 1175 m3x106
Construction Dates
Start of Project: 10/85
Start of RCC: 10/85
End of RCC: 04/89
End of Project: -/89
Specifications
Height: 77 metres
Length: 687 metres
Volume of RCC: 590 m3x103
Total volume: 626 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 400 | 400 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: USA
Owner: Colorado River Municipal Water District
Type: Gravity
Purpose(s): Water Supply
River: Colorado
Reservoir capacity: 700 m3x106
Construction Dates
Start of Project: 05/87
Start of RCC: 05/87
End of RCC: 04/89
End of Project: 01/90
Specifications
Height: 31 metres
Length: 173 metres
Volume of RCC: 89 m3x103
Total volume: 158 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Reinforced concrete cast against precast units or slip-formed facing elements |
Downstream
| Slope | Type |
|---|---|
| 0.831 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| ogee | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 125 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 62 | High-lime flyash (ASTM Class C) |

Details
Country: Romania
Owner: Romanian Electricity Authority (RENAL) - Tirgu Jiu Branch
Type: Gravity
Purpose(s): Hydropower
River: Jiu
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 08/86
Start of RCC: 08/86
End of RCC: 05/89
End of Project: 12/93
Specifications
Height: 24 metres
Length: 61 metres
Volume of RCC: 13 m3x103
Total volume: 26 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Downstream
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Spillway
| Slope | Type |
|---|---|
| ogee | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 900 |
Cementitious material
| Cement (kg/m3) |
|---|
| 125 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: South Africa
Owner: Department of Water & Sanitation
Type: Gravity
Purpose(s): Irrigation
River: Harts
Reservoir capacity: 61 m3x106
Construction Dates
Start of Project: 05/88
Start of RCC: 05/88
End of RCC: 06/89
End of Project: 11/89
Specifications
Height: 15 metres
Length: 100 metres
Volume of RCC: 17 m3x103
Total volume: 36 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| RCC supported by fill shoulders |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC supported by fill shoulders |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 250 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 92 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Department of Water Resources & Hydropower, Guangxi Zhuang Autonomous Region
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation
River: Dulanghe
Reservoir capacity: 19 m3x106
Construction Dates
Start of Project: 04/88
Start of RCC: 04/88
End of RCC: 07/89
End of Project: 06/91
Specifications
Height: 53 metres
Length: 136 metres
Volume of RCC: 61 m3x103
Total volume: 108 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| 0.65 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| 69 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 140 | Low-lime flyash (ASTM Class F) |
| 111 |

Details
Country: Australia
Owner: Australian Capital Territory Government
Type: Gravity
Purpose(s): Flood Control
River: Point Hut Creek
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 01/89
Start of RCC: 01/89
End of RCC: 08/89
End of Project: 10/89
Specifications
Height: 18 metres
Length: 86 metres
Volume of RCC: 9 m3x103
Total volume: 9 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 1.00 | Mechanically compacted unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| 1.00 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 145 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 73 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Dehua County, Fujian Province
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Chanxi
Reservoir capacity: 53 m3x106
Construction Dates
Start of Project: 12/85
Start of RCC: 12/85
End of RCC: 08/89
End of Project: 09/89
Specifications
Height: 58 metres
Length: 150 metres
Volume of RCC: 71 m3x103
Total volume: 93 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Reinforced conventional concrete cast after RCC placement |
| 0.30 | Reinforced conventional concrete cast after RCC placement |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 72 |
| 54 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 82 | Low-lime flyash (ASTM Class F) |
| 86 |

Details
Country: South Africa
Owner: Department of Water & Sanitation
Type: Arch-Gravity
Purpose(s): Water Supply
River: Great Brak
Reservoir capacity: 24 m3x106
Construction Dates
Start of Project: 11/87
Start of RCC: 11/87
End of RCC: 10/89
End of Project: 11/90
Specifications
Height: 70 metres
Length: 268 metres
Volume of RCC: 180 m3x103
Total volume: 210 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.50 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.50 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 250 |
Cementitious material
| Cement (kg/m3) |
|---|
| 58 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 136 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Guodian Dadu River Basin Hydropower Development Co.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Navigation
River: Dadu
Reservoir capacity: 200 m3x106
Construction Dates
Start of Project: 01/85
Start of RCC: 01/85
End of RCC: 12/89
End of Project: 10/94
Specifications
Height: 88 metres
Length: 1029 metres
Volume of RCC: 407 m3x103
Total volume: 855 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 - | 300 - |
| 500 | 500 |
Cementitious material
| Cement (kg/m3) |
|---|
| 79 |
| 82 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 79 | Low-lime flyash (ASTM Class F) |
| 83 |

Details
Country: Kyrgyzstan
Owner: Ministry of Power Industry
Type: Gravity
Purpose(s): Hydropower / Irrigation
River: Naryn
Reservoir capacity: 140 m3x106
Construction Dates
Start of Project: -/82
Start of RCC: -/82
End of RCC: 12/89
End of Project: 12/90
Specifications
Height: 75 metres
Length: 320 metres
Volume of RCC: 100 m3x103
Total volume: 1300 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 400 | 400 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 30 | Natural pozzolan (ASTM Class N) |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Wenchuanxi
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: -/87
Start of RCC: -/87
End of RCC: -/89
End of Project: -/89
Specifications
Height: 47 metres
Length: 122 metres
Volume of RCC: -
Total volume: 74 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Japan
Owner: Hokkaido Development Bureau
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation
River: Shirobeshit-oshibetsu
Reservoir capacity: 18 m3x106
Construction Dates
Start of Project: 10/82
Start of RCC: 10/82
End of RCC: -/89
End of Project: 10/91
Specifications
Height: 40 metres
Length: 755 metres
Volume of RCC: 163 m3x103
Total volume: 360 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.80 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Gunma Prefecture
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Kabura
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: 03/86
Start of RCC: 03/86
End of RCC: 01/90
End of Project: 03/92
Specifications
Height: 70 metres
Length: 300 metres
Volume of RCC: 167 m3x103
Total volume: 350 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.40 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 180 | 500 |
Cementitious material
| Cement (kg/m3) |
|---|
| 96 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 24 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: Washington County Water Conservancy District
Type: Gravity
Purpose(s): Water Supply
River: Quail Creek
Reservoir capacity: 50 m3x106
Construction Dates
Start of Project: 02/90
Start of RCC: 02/90
End of RCC: 05/90
End of Project: 08/90
Specifications
Height: 42 metres
Length: 610 metres
Volume of RCC: 130 m3x103
Total volume: 150 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.85 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| conduit |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 53 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: China Southern Power Grid
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Nanpan
Reservoir capacity: 116 m3x106
Construction Dates
Start of Project: 01/84
Start of RCC: 01/84
End of RCC: 06/90
End of Project: 12/92
Specifications
Height: 61 metres
Length: 471 metres
Volume of RCC: 143 m3x103
Total volume: 284 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete blocks |
| 0.40 |
Spillway
| Slope | Type |
|---|---|
| ogee | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 250 |
Cementitious material
| Cement (kg/m3) |
|---|
| 79 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 79 | Low-lime flyash (ASTM Class F) |

Details
Country: Honduras
Owner: Servicio Autonomo Nacional Acueductos y Acantarillados (SANAA)
Type: Gravity
Purpose(s): Water Supply
River: San Jose
Reservoir capacity: 35 m3x106
Construction Dates
Start of Project: 12/88
Start of RCC: 12/88
End of RCC: 06/90
End of Project: 08/90
Specifications
Height: 68 metres
Length: 694 metres
Volume of RCC: 270 m3x103
Total volume: 290 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.075 | Traditional concrete against formwork with external geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 400 | 400 |
Cementitious material
| Cement (kg/m3) |
|---|
| 65 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 15 | Natural pozzolan (ASTM Class N) |

Details
Country: South Africa
Owner: Department of Water & Sanitation
Type: Gravity
Purpose(s): Water Supply
River: Kubusie
Reservoir capacity: 94 m3x106
Construction Dates
Start of Project: 07/88
Start of RCC: 07/88
End of RCC: 07/90
End of Project: 12/90
Specifications
Height: 34 metres
Length: 737 metres
Volume of RCC: 134 m3x103
Total volume: 165 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork [stepped face] |
| 0.62 |
Spillway
| Slope | Type |
|---|---|
| 0.62 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 250 |
Cementitious material
| Cement (kg/m3) |
|---|
| 44 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 66 | Low-lime flyash (ASTM Class F) |

Details
Country: France
Owner: Electricité de France
Type: Gravity
Purpose(s): Hydropower / Irrigation / Recreation
River: Riou
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 01/90
Start of RCC: 01/90
End of RCC: 07/90
End of Project: 03/91
Specifications
Height: 26 metres
Length: 308 metres
Volume of RCC: 41 m3x103
Total volume: 46 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork with external geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.60 | Slip-formed/extruded facing elements [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.60 | Slip-formed/extruded facing elements [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 120 | ROLAC (mixture of flyash and slag with or without limestone fines) |

Details
Country: Spain
Owner: Diputación Foral de Alava
Type: Gravity
Purpose(s): Water Supply
River: Izoria and Idas
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 01/89
Start of RCC: 01/89
End of RCC: 08/90
End of Project: 11/91
Specifications
Height: 53 metres
Length: 182 metres
Volume of RCC: 80 m3x103
Total volume: 91 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.05 | RCC against formwork |
Downstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork [stepped face] |
| 0.75 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| 65 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 160 | Low-lime flyash (ASTM Class F) |
| 170 |

Details
Country: Brazil
Owner: CEMIG (Companhia Energetica de Minas Gerais)
Type: Gravity
Purpose(s): Flood Control / Irrigation
River: Caraibas
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: 04/90
Start of RCC: 04/90
End of RCC: 09/90
End of Project: 02/91
Specifications
Height: 26 metres
Length: 160 metres
Volume of RCC: 18 m3x103
Total volume: 22 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 20 | Natural pozzolan (ASTM Class N) |

Details
Country: Japan
Owner: Hokkaido Prefecture
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Asari
Reservoir capacity: 9 m3x106
Construction Dates
Start of Project: 07/86
Start of RCC: 07/86
End of RCC: 09/90
End of Project: 03/93
Specifications
Height: 74 metres
Length: 390 metres
Volume of RCC: 259 m3x103
Total volume: 517 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.30 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 180 | 500 |
Cementitious material
| Cement (kg/m3) |
|---|
| 96 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 24 | Low-lime flyash (ASTM Class F) |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Groundwater Recharge / Irrigation
River: Souss
Reservoir capacity: 110 m3x106
Construction Dates
Start of Project: 03/88
Start of RCC: 03/88
End of RCC: 09/90
End of Project: 11/91
Specifications
Height: 79 metres
Length: 476 metres
Volume of RCC: 680 m3x103
Total volume: 850 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.85 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.85 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 500 | 500 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| 63 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Milled sand |
| 27 |

Details
Country: Spain
Owner: Junta de Extremadura
Type: Gravity
Purpose(s): Water Supply
River: Hervás
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 01/89
Start of RCC: 01/89
End of RCC: 09/90
End of Project: 10/90
Specifications
Height: 33 metres
Length: 210 metres
Volume of RCC: 24 m3x103
Total volume: 43 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.15 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
| Traditional concrete against precast concrete panels [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 155 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: United Water Conservancy District
Type: Gravity
Purpose(s): Groundwater Recharge
River: Santa Clara
Reservoir capacity: -
Construction Dates
Start of Project: 03/90
Start of RCC: 03/90
End of RCC: 09/90
End of Project: -/91
Specifications
Height: 17 metres
Length: 366 metres
Volume of RCC: 101 m3x103
Total volume: 110 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Unformed face of RCC |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 125 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 83 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Yamagata Prefecture
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Kaneyama
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: 07/86
Start of RCC: 07/86
End of RCC: 10/90
End of Project: 08/93
Specifications
Height: 61 metres
Length: 257 metres
Volume of RCC: 136 m3x103
Total volume: 307 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.60 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 150 - | 500 |
| 200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 96 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 24 | Low-lime flyash (ASTM Class F) |

Details
Country: South Africa
Owner: Department of Water & Sanitation
Type: Gravity
Purpose(s): Water Supply
River: Ecca
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: 02/88
Start of RCC: 02/88
End of RCC: 12/90
End of Project: 04/91
Specifications
Height: 32 metres
Length: 380 metres
Volume of RCC: 66 m3x103
Total volume: 114 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 330 | 330 |
Cementitious material
| Cement (kg/m3) |
|---|
| 65 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 65 | Low-lime flyash (ASTM Class F) |

Details
Country: South Africa
Owner: Umlaas Irrigation Board
Type: Gravity
Purpose(s): Irrigation
River: Mlazi
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 06/90
Start of RCC: 06/90
End of RCC: 12/90
End of Project: 02/91
Specifications
Height: 17 metres
Length: 135 metres
Volume of RCC: 16 m3x103
Total volume: 17 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.90 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.90 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 170 | 170 |
Cementitious material
| Cement (kg/m3) |
|---|
| 38 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 87 | Ground-granulated blast-furnace slag |

Details
Country: USA
Owner: Tennessee Valley Authority
Type: Gravity
Purpose(s): Hydropower
River: Tennessee
Reservoir capacity: 311 m3x106
Construction Dates
Start of Project: 08/89
Start of RCC: 08/89
End of RCC: 02/91
End of Project: 04/92
Specifications
Height: 17 metres
Length: 427 metres
Volume of RCC: 79 m3x103
Total volume: 79 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.25 | RCC against formwork [stepped face] |
Downstream
| Slope | Type |
|---|---|
| 0.60 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.60 | RCC against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 600 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 119 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: CODEVASF
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: Gameleiras
Reservoir capacity: 145 m3x106
Construction Dates
Start of Project: 07/90
Start of RCC: 07/90
End of RCC: 04/91
End of Project: 05/91
Specifications
Height: 29 metres
Length: 150 metres
Volume of RCC: 27 m3x103
Total volume: 29 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| [stepped face] |
Spillway
| Slope | Type |
|---|---|
| Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 400 | 400 |
Cementitious material
| Cement (kg/m3) |
|---|
| 52 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 13 | No pozzolan used |

Details
Country: USA
Owner: City of Truth or Consequences
Type: Gravity
Purpose(s): Flood Control
River: Cuchillo Negro
Reservoir capacity: -
Construction Dates
Start of Project: 10/89
Start of RCC: 10/89
End of RCC: 05/91
End of Project: 07/91
Specifications
Height: 50 metres
Length: 186 metres
Volume of RCC: 75 m3x103
Total volume: 82 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.90 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| separate |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 77 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 59 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Toyama Prefecture
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Sakai
Reservoir capacity: 60 m3x106
Construction Dates
Start of Project: 03/85
Start of RCC: 03/85
End of RCC: 07/91
End of Project: 01/93
Specifications
Height: 115 metres
Length: 298 metres
Volume of RCC: 373 m3x103
Total volume: 713 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.80 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 180 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: Australia
Owner: Water Authority of Western Australia
Type: Gravity
Purpose(s): Water Supply
River: Munday Brook
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: 08/90
Start of RCC: 08/90
End of RCC: 08/91
End of Project: 11/91
Specifications
Height: 52 metres
Length: 285 metres
Volume of RCC: 121 m3x103
Total volume: 135 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Slip-formed/extruded facing elements |
Downstream
| Slope | Type |
|---|---|
| 0.325 | Slip-formed/extruded facing elements [stepped face] |
| 0.80 | Slip-formed/extruded facing elements [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.325 | Slip-formed/extruded facing elements [stepped face] |
| 0.80 | Slip-formed/extruded facing elements [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 79 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 160 | Low-lime flyash (ASTM Class F) |

Details
Country: Spain
Owner: Junta de Extremadura
Type: Gravity
Purpose(s): Water Supply
River: Ribera de los Montes
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 12/90
Start of RCC: 12/90
End of RCC: 09/91
End of Project: 12/91
Specifications
Height: 24 metres
Length: 167 metres
Volume of RCC: 25 m3x103
Total volume: 33 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Slip-formed/extruded facing elements |
Downstream
| Slope | Type |
|---|---|
| 0.13 | Slip-formed/extruded facing elements [stepped face] |
| 0.60 |
Spillway
| Slope | Type |
|---|---|
| 0.60 | Reinforced concrete cast against precast units or slip-formed facing elements [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 135 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: Upper Peninsula Power Co., Michigan
Type: Gravity
Purpose(s): Hydropower
River: West Branch
Reservoir capacity: 13 m3x106
Construction Dates
Start of Project: 04/91
Start of RCC: 04/91
End of RCC: 10/91
End of Project: 06/92
Specifications
Height: 37 metres
Length: 100 metres
Volume of RCC: 36 m3x103
Total volume: 40 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Reinforced conventional concrete cast after RCC placement |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 67 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 67 | High-lime flyash (ASTM Class C) |

Details
Country: Spain
Owner: Confederación Hidrográfica del Guadalquivir
Type: Gravity
Purpose(s): Irrigation
River: Corbones
Reservoir capacity: 74 m3x106
Construction Dates
Start of Project: 03/88
Start of RCC: 03/88
End of RCC: 10/91
End of Project: 12/91
Specifications
Height: 71 metres
Length: 220 metres
Volume of RCC: 205 m3x103
Total volume: 220 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork |
| 0.20 | RCC against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 130 | Low-lime flyash (ASTM Class F) |

Details
Country: Spain
Owner: Junta de Andalucia
Type: Gravity
Purpose(s): Flood Control
River: Belén
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 03/91
Start of RCC: 03/91
End of RCC: 10/91
End of Project: 10/91
Specifications
Height: 31 metres
Length: 160 metres
Volume of RCC: 24 m3x103
Total volume: 29 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.05 | RCC against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 73 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 109 | Low-lime flyash (ASTM Class F) |

Details
Country: France
Owner: CAPB (Communauté d'Agglomération Pays Basque)
Type: Gravity
Purpose(s): Water Supply
River: Lessarte
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 04/91
Start of RCC: 04/91
End of RCC: 10/91
End of Project: 12/91
Specifications
Height: 32 metres
Length: 132 metres
Volume of RCC: 19 m3x103
Total volume: 23 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Mechanically compacted unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 110 | ROLAC (mixture of flyash and slag with or without limestone fines) |

Details
Country: Spain
Owner: Junta de Andalucia
Type: Gravity
Purpose(s): Flood Control
River: Belén
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 07/91
Start of RCC: 07/91
End of RCC: 11/91
End of Project: 11/91
Specifications
Height: 34 metres
Length: 158 metres
Volume of RCC: 36 m3x103
Total volume: 41 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.05 | RCC against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 73 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 109 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Tokyo Electric Power Company
Type: Gravity
Purpose(s): Hydropower
River: Kosabi
Reservoir capacity: 11 m3x106
Construction Dates
Start of Project: 10/86
Start of RCC: 10/86
End of RCC: 12/91
End of Project: 11/92
Specifications
Height: 104 metres
Length: 273 metres
Volume of RCC: 400 m3x103
Total volume: 590 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | Low-lime flyash (ASTM Class F) |

Details
Country: Spain
Owner: Junta de Andalucia
Type: Gravity
Purpose(s): Flood Control
River: Belén
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 09/91
Start of RCC: 09/91
End of RCC: 12/91
End of Project: 12/91
Specifications
Height: 16 metres
Length: 98 metres
Volume of RCC: 6 m3x103
Total volume: 7 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.05 | RCC against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 73 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 109 | Low-lime flyash (ASTM Class F) |

Details
Country: Spain
Owner: Junta de Andalucia
Type: Gravity
Purpose(s): Flood Control
River: Belén
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/91
Start of RCC: -/91
End of RCC: 12/91
End of Project: -/92
Specifications
Height: 15 metres
Length: 75 metres
Volume of RCC: 4 m3x103
Total volume: 5 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 73 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 109 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): unknown
River: Shiqi
Reservoir capacity: 33 m3x106
Construction Dates
Start of Project: -/68
Start of RCC: -/68
End of RCC: -/91
End of Project: -/93
Specifications
Height: 35 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: COMPESA (Companhia Pernambucana de Saneamento)
Type: Gravity
Purpose(s): Hydropower / Water Supply
River: Riacho do Chorão
Reservoir capacity: 15 m3x106
Construction Dates
Start of Project: -/89
Start of RCC: -/89
End of RCC: -/91
End of Project: -/92
Specifications
Height: 42 metres
Length: 360 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Spain
Owner: Junta de Andalucia
Type: Gravity
Purpose(s): Flood Control
River: Belén
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 09/91
Start of RCC: 09/91
End of RCC: 01/92
End of Project: 01/92
Specifications
Height: 28 metres
Length: 87 metres
Volume of RCC: 10 m3x103
Total volume: 12 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.05 | RCC against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 73 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 109 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Datang Yantan Hydropower Co. Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation
River: Hongshui
Reservoir capacity: 3350 m3x106
Construction Dates
Start of Project: 03/85
Start of RCC: 03/85
End of RCC: 03/92
End of Project: 12/95
Specifications
Height: 110 metres
Length: 525 metres
Volume of RCC: 626 m3x103
Total volume: 905 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| ogee | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 55 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 104 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: Brazos River Authority
Type: Gravity
Purpose(s): Water Supply
River: Double Mountain Fork
Reservoir capacity: 140 m3x106
Construction Dates
Start of Project: 03/91
Start of RCC: 03/91
End of RCC: 04/92
End of Project: -/93
Specifications
Height: 25 metres
Length: 84 metres
Volume of RCC: 22 m3x103
Total volume: 23 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Reinforced concrete cast against precast units or slip-formed facing elements |
Downstream
| Slope | Type |
|---|---|
| 1.10 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| ogee | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 119 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 59 | Low-lime flyash (ASTM Class F) |

Details
Country: Angola
Owner: Ministry of Energy and Oil of P. R. Angola
Type: Gravity
Purpose(s): Hydropower
River: Kwanza
Reservoir capacity: 4795 m3x106
Construction Dates
Start of Project: 02/87
Start of RCC: 02/87
End of RCC: 05/92
End of Project: 12/07
Specifications
Height: 110 metres
Length: 1203 metres
Volume of RCC: 757 m3x103
Total volume: 1154 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Slip-formed/extruded facing elements |
| RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 400 | 400 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Milled sand |

Details
Country: China
Owner: Shuikou Hydropower Plant
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation
River: Min
Reservoir capacity: 2613 m3x106
Construction Dates
Start of Project: 03/87
Start of RCC: 03/87
End of RCC: 05/92
End of Project: 05/95
Specifications
Height: 101 metres
Length: 791 metres
Volume of RCC: 600 m3x103
Total volume: 1710 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.73 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| ogee | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 200 - | 200 - |
| 330 | 330 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 110 | Low-lime flyash (ASTM Class F) |
| 90 |

Details
Country: USA
Owner: Town of Mesquite, Nevada
Type: Gravity
Purpose(s): Flood Control
River: Town Wash
Reservoir capacity: -
Construction Dates
Start of Project: 01/92
Start of RCC: 01/92
End of RCC: 05/92
End of Project: 06/92
Specifications
Height: 18 metres
Length: 264 metres
Volume of RCC: 43 m3x103
Total volume: 45 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Slip-formed/extruded facing elements |
Downstream
| Slope | Type |
|---|---|
| 1.50 | RCC against formwork |
Spillway
| Slope | Type |
|---|---|
| 1.50 | RCC against formwork [stepped face] |
| Unformed face of RCC [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 200 | 200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 107 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 71 | Low-lime flyash (ASTM Class F) |

Details
Country: Spain
Owner: Confederación Hidrográfica del Ebro
Type: Gravity
Purpose(s): Water Supply
River: Alzania
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: 03/90
Start of RCC: 03/90
End of RCC: 07/92
End of Project: 10/92
Specifications
Height: 58 metres
Length: 396 metres
Volume of RCC: 150 m3x103
Total volume: 240 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 72 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 108 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: City of Lebanon Authority
Type: Gravity
Purpose(s): Water Supply
River: Mill
Reservoir capacity: 4 m3x106
Construction Dates
Start of Project: 09/91
Start of RCC: 09/91
End of RCC: 07/92
End of Project: -/93
Specifications
Height: 40 metres
Length: 213 metres
Volume of RCC: 69 m3x103
Total volume: 70 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 59 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 34 | Low-lime flyash (ASTM Class F) |

Details
Country: South Africa
Owner: Department of Water & Sanitation & the former Bophuthatswana Department of Water Affairs
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Harts
Reservoir capacity: 66 m3x106
Construction Dates
Start of Project: 06/90
Start of RCC: 06/90
End of RCC: 09/92
End of Project: 05/93
Specifications
Height: 50 metres
Length: 320 metres
Volume of RCC: 132 m3x103
Total volume: 153 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 250 |
Cementitious material
| Cement (kg/m3) |
|---|
| 44 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 66 | Low-lime flyash (ASTM Class F) |

Details
Country: Spain
Owner: Diputacion Foral de Gipuzkoa
Type: Gravity
Purpose(s): Water Supply
River: Arriarán
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 10/91
Start of RCC: 10/91
End of RCC: 09/92
End of Project: 02/94
Specifications
Height: 58 metres
Length: 206 metres
Volume of RCC: 110 m3x103
Total volume: 113 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.05 | RCC against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 135 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: City of Kennewick, Washington
Type: Gravity
Purpose(s): Flood Control
River: Zintel
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 03/92
Start of RCC: 03/92
End of RCC: 10/92
End of Project: 12/92
Specifications
Height: 39 metres
Length: 158 metres
Volume of RCC: 54 m3x103
Total volume: 55 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.85 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| 0.85 | Unformed face of RCC |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 74 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Australia
Owner: Water Resources Commission, Queensland
Type: Gravity
Purpose(s): Groundwater Recharge / Irrigation
River: Kroombit Creek
Reservoir capacity: 13 m3x106
Construction Dates
Start of Project: 03/92
Start of RCC: 03/92
End of RCC: 10/92
End of Project: 12/92
Specifications
Height: 26 metres
Length: 250 metres
Volume of RCC: 84 m3x103
Total volume: 110 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 82 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 107 | Low-lime flyash (ASTM Class F) |

Details
Country: Australia
Owner: North Goonyella Coal Properties
Type: Gravity
Purpose(s): Water Supply
River: Isaac
Reservoir capacity: 20 m3x106
Construction Dates
Start of Project: 07/92
Start of RCC: 07/92
End of RCC: 11/92
End of Project: 12/92
Specifications
Height: 26 metres
Length: 285 metres
Volume of RCC: 64 m3x103
Total volume: 68 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels with geomembrane |
| 1.00 | Unformed face of RCC |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork [stepped face] |
| 1.00 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced concrete cast against precast units or slip-formed facing elements [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Japan
Owner: Ministry of Construction
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Sakoma
Reservoir capacity: 42 m3x106
Construction Dates
Start of Project: 09/87
Start of RCC: 09/87
End of RCC: 11/92
End of Project: 03/97
Specifications
Height: 100 metres
Length: 378 metres
Volume of RCC: 521 m3x103
Total volume: 836 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.30 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 150 - | 750 - |
| 200 | 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | Low-lime flyash (ASTM Class F) |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Water Supply
River: Joumoua
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: 07/89
Start of RCC: 07/89
End of RCC: 11/92
End of Project: 12/92
Specifications
Height: 57 metres
Length: 250 metres
Volume of RCC: 150 m3x103
Total volume: 200 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 350 | 350 |
Cementitious material
| Cement (kg/m3) |
|---|
| 105 |
| 180 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 45 | No pozzolan used |
| 0 |

Details
Country: China
Owner: China Guodian Corporation
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Navigation
River: Gan
Reservoir capacity: 2216 m3x106
Construction Dates
Start of Project: 11/84
Start of RCC: 11/84
End of RCC: 12/92
End of Project: 06/94
Specifications
Height: 68 metres
Length: 1104 metres
Volume of RCC: 156 m3x103
Total volume: 1480 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| ogee | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 65 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 105 | Low-lime flyash (ASTM Class F) |

Details
Country: Mexico
Owner: CNA (Comisión Nacional del Agua)
Type: Gravity
Purpose(s): Flood Control / Irrigation
River: Ayuguila
Reservoir capacity: 324 m3x106
Construction Dates
Start of Project: 12/86
Start of RCC: 12/86
End of RCC: 12/92
End of Project: 12/93
Specifications
Height: 107 metres
Length: 250 metres
Volume of RCC: 362 m3x103
Total volume: 681 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
| 0.24 |
Downstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
| 0.80 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 148 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 47 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: China Southern Power Grid
Type: Gravity
Purpose(s): Hydropower
River: Liuxihe
Reservoir capacity: 30 m3x106
Construction Dates
Start of Project: 12/94
Start of RCC: 12/94
End of RCC: 12/92
End of Project: 10/00
Specifications
Height: 61 metres
Length: 153 metres
Volume of RCC: 32 m3x103
Total volume: 57 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| ogee | Traditional concrete against formwork |
| 0.78 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 62 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 108 | Low-lime flyash (ASTM Class F) |

Details
Country: South Africa
Owner: Private farmer
Type: Gravity
Purpose(s): Irrigation
River: Tsorwo
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/90
Start of RCC: -/90
End of RCC: 12/92
End of Project: -/92
Specifications
Height: 17 metres
Length: 70 metres
Volume of RCC: 3 m3x103
Total volume: 3 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork |
Downstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork |
| 0.50 |
Spillway
| Slope | Type |
|---|---|
| 0.50 | RCC against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 150 | 150 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Yellow River Conservancy Commission
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation
River: Luo
Reservoir capacity: 1175 m3x106
Construction Dates
Start of Project: -/78
Start of RCC: -/78
End of RCC: -/92
End of Project: -/93
Specifications
Height: 125 metres
Length: 315 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Japan
Owner: Ministry of Construction
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Ashida
Reservoir capacity: 60 m3x106
Construction Dates
Start of Project: 08/88
Start of RCC: 08/88
End of RCC: -/92
End of Project: 03/98
Specifications
Height: 85 metres
Length: 325 metres
Volume of RCC: 228 m3x103
Total volume: 500 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.20 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 150 - | 750 |
| 200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: French Guyana
Owner: Electricité de France
Type: Gravity
Purpose(s): Hydropower
River: Sinnamary
Reservoir capacity: 3500 m3x106
Construction Dates
Start of Project: 07/89
Start of RCC: 07/89
End of RCC: 02/93
End of Project: 05/94
Specifications
Height: 48 metres
Length: 740 metres
Volume of RCC: 250 m3x103
Total volume: 410 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Reinforced conventional concrete cast before RCC placement |
Downstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels |
| 0.80 | Mechanically compacted unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 120 | ROLAC (mixture of flyash and slag with or without limestone fines) |

Details
Country: USA
Owner: US Fish and Wildlife Service, Department of the Interior
Type: Gravity
Purpose(s): Recreation
River: Little Medicine Creek
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: 02/92
Start of RCC: 02/92
End of RCC: 02/93
End of Project: 05/93
Specifications
Height: 34 metres
Length: 128 metres
Volume of RCC: 29 m3x103
Total volume: 34 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.64 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| none |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 89 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 89 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Jinjiang Electric Co.
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Jinjianghe
Reservoir capacity: 189 m3x106
Construction Dates
Start of Project: 07/90
Start of RCC: 07/90
End of RCC: 03/93
End of Project: 07/93
Specifications
Height: 68 metres
Length: 229 metres
Volume of RCC: 182 m3x103
Total volume: 267 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.65 | Traditional concrete against formwork |
| Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 80 | Low-lime flyash (ASTM Class F) |

Details
Country: Greece
Owner: Ministry of Agriculture
Type: Hardfill
Purpose(s): Irrigation / Water Supply
River: Marathia
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 11/91
Start of RCC: 11/91
End of RCC: 04/93
End of Project: 06/93
Specifications
Height: 28 metres
Length: 265 metres
Volume of RCC: 31 m3x103
Total volume: 48 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.50 | Reinforced concrete cast against precast units or slip-formed facing elements |
Downstream
| Slope | Type |
|---|---|
| 0.50 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| 0.50 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 200 - | 200 - |
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 55 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 15 | Natural pozzolan (ASTM Class N) |

Details
Country: China
Owner: Guizhou Qianyuan Power Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower / Irrigation / Water Supply
River: Sanchahe
Reservoir capacity: 377 m3x106
Construction Dates
Start of Project: 03/89
Start of RCC: 03/89
End of RCC: 05/93
End of Project: 02/94
Specifications
Height: 75 metres
Length: 196 metres
Volume of RCC: 103 m3x103
Total volume: 137 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.35 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| ogee | Traditional concrete against formwork |
| 0.35 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| 54 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 103 | Low-lime flyash (ASTM Class F) |
| 99 |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Groundwater Recharge / Irrigation
River: Berhil
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: 04/92
Start of RCC: 04/92
End of RCC: 07/93
End of Project: 04/94
Specifications
Height: 39 metres
Length: 170 metres
Volume of RCC: 97 m3x103
Total volume: 109 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| 110 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 20 | Natural pozzolan (ASTM Class N) |
| 20 |

Details
Country: Japan
Owner: Okayama Prefecture
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Kamo
Reservoir capacity: 6 m3x106
Construction Dates
Start of Project: 10/89
Start of RCC: 10/89
End of RCC: 07/93
End of Project: 03/94
Specifications
Height: 76 metres
Length: 228 metres
Volume of RCC: 222 m3x103
Total volume: 342 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.60 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 96 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 24 | Low-lime flyash (ASTM Class F) |

Details
Country: Spain
Owner: Iberdrola, S.A.
Type: Gravity
Purpose(s): Hydropower
River: Cenza
Reservoir capacity: 43 m3x106
Construction Dates
Start of Project: 01/92
Start of RCC: 01/92
End of RCC: 08/93
End of Project: 12/93
Specifications
Height: 49 metres
Length: 609 metres
Volume of RCC: 200 m3x103
Total volume: 225 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.122 | RCC against formwork [stepped face] |
| 0.75 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 130 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: Western Virginia Water Authority
Type: Gravity
Purpose(s): Water Supply
River: off-stream
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: 10/92
Start of RCC: 10/92
End of RCC: 08/93
End of Project: -/94
Specifications
Height: 74 metres
Length: 302 metres
Volume of RCC: 222 m3x103
Total volume: 223 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| none |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 53 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 53 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: Banks County
Type: Gravity
Purpose(s): Water Supply
River: Mountain Creek
Reservoir capacity: -
Construction Dates
Start of Project: 11/92
Start of RCC: 11/92
End of RCC: 08/93
End of Project: -/93
Specifications
Height: 21 metres
Length: 168 metres
Volume of RCC: 26 m3x103
Total volume: 28 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 119 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 84 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Fujian Shuikou Power Generation Group
Type: Gravity
Purpose(s): Hydropower / Navigation
River: Youxi
Reservoir capacity: 108 m3x106
Construction Dates
Start of Project: 04/91
Start of RCC: 04/91
End of RCC: 10/93
End of Project: 12/95
Specifications
Height: 63 metres
Length: 197 metres
Volume of RCC: 126 m3x103
Total volume: 184 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 50 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 90 | Low-lime flyash (ASTM Class F) |

Details
Country: Spain
Owner: Confederación Hidrográfica del Guadiana
Type: Gravity
Purpose(s): Irrigation
River: Pizarroso
Reservoir capacity: 232 m3x106
Construction Dates
Start of Project: 12/90
Start of RCC: 12/90
End of RCC: 11/93
End of Project: 12/93
Specifications
Height: 54 metres
Length: 835 metres
Volume of RCC: 277 m3x103
Total volume: 340 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.05 | Slip-formed/extruded facing elements |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Slip-formed/extruded facing elements [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Slip-formed/extruded facing elements [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 140 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Fukushima Prefecture
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Kodama
Reservoir capacity: 14 m3x106
Construction Dates
Start of Project: 10/89
Start of RCC: 10/89
End of RCC: 12/93
End of Project: 03/97
Specifications
Height: 102 metres
Length: 280 metres
Volume of RCC: 358 m3x103
Total volume: 570 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.20 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Ground-granulated blast-furnace slag |

Details
Country: France
Owner: Conseil Departemental d'Ille-et-Vilaine
Type: Gravity
Purpose(s): Flood Control
River: Le Cantache
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: 07/93
Start of RCC: 07/93
End of RCC: 12/93
End of Project: 03/94
Specifications
Height: 16 metres
Length: 147 metres
Volume of RCC: 11 m3x103
Total volume: 15 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Reinforced conventional concrete cast before RCC placement |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 90 | ROLAC (mixture of flyash and slag with or without limestone fines) |

Details
Country: Mexico
Owner: CNA (Comisión Nacional del Agua)/Estado de Sinaloa
Type: Gravity
Purpose(s): Flood Control / Irrigation
River: El Bledal
Reservoir capacity: 102 m3x106
Construction Dates
Start of Project: 10/91
Start of RCC: 10/91
End of RCC: 12/93
End of Project: 01/94
Specifications
Height: 50 metres
Length: 807 metres
Volume of RCC: 117 m3x103
Total volume: 184 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Milled sand |

Details
Country: Japan
Owner: Miyagi Prefecture
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Miyatoko
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: 06/89
Start of RCC: 06/89
End of RCC: 12/93
End of Project: 01/97
Specifications
Height: 48 metres
Length: 256 metres
Volume of RCC: 172 m3x103
Total volume: 280 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.60 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 180 | 500 |
Cementitious material
| Cement (kg/m3) |
|---|
| 96 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 24 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Hainan Provincial Electric Power Company (HEPCO)
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Changhua
Reservoir capacity: 1710 m3x106
Construction Dates
Start of Project: 06/90
Start of RCC: 06/90
End of RCC: 12/93
End of Project: 07/95
Specifications
Height: 57 metres
Length: 719 metres
Volume of RCC: 485 m3x103
Total volume: 860 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against precast concrete blocks |
| RCC against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 55 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 96 | Low-lime flyash (ASTM Class F) |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Sahla
Reservoir capacity: 62 m3x106
Construction Dates
Start of Project: 05/92
Start of RCC: 05/92
End of RCC: 12/93
End of Project: 07/94
Specifications
Height: 55 metres
Length: 160 metres
Volume of RCC: 130 m3x103
Total volume: 160 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.90 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| 125 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 15 | Natural pozzolan (ASTM Class N) |
| 25 |

Details
Country: China
Owner: Guizhou Hongfeng Hydropower Plant
Type: Gravity
Purpose(s): Hydropower
River: Sancha
Reservoir capacity: 420 m3x106
Construction Dates
Start of Project: -/89
Start of RCC: -/89
End of RCC: -/93
End of Project: -/94
Specifications
Height: 75 metres
Length: 196 metres
Volume of RCC: -
Total volume: 88 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: SUPLAN/RN
Type: Gravity
Purpose(s): Water Supply
River: Taperobá
Reservoir capacity: 76 m3x106
Construction Dates
Start of Project: 12/91
Start of RCC: 12/91
End of RCC: -/93
End of Project: -/94
Specifications
Height: 34 metres
Length: 296 metres
Volume of RCC: 69 m3x103
Total volume: 89 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 16 | No pozzolan used |

Details
Country: France
Owner: Syndicat Mixte pour l’Amenagement de la Haute Morge (SMAHM)
Type: Gravity
Purpose(s): Irrigation
River: Sep
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: 04/93
Start of RCC: 04/93
End of RCC: 01/94
End of Project: 03/94
Specifications
Height: 46 metres
Length: 145 metres
Volume of RCC: 49 m3x103
Total volume: 58 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Reinforced conventional concrete cast before RCC placement |
Downstream
| Slope | Type |
|---|---|
| 0.72 | Mechanically compacted unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| 0.72 | RCC against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 120 | ROLAC (mixture of flyash and slag with or without limestone fines) |

Details
Country: Thailand
Owner: Electricity Generating Authority of Thailand (EGAT)
Type: Gravity
Purpose(s): Hydropower
River: Mun
Reservoir capacity: -
Construction Dates
Start of Project: 04/91
Start of RCC: 04/91
End of RCC: 03/94
End of Project: 06/94
Specifications
Height: 26 metres
Length: 323 metres
Volume of RCC: 48 m3x103
Total volume: 50 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Reinforced concrete cast against precast units or slip-formed facing elements |
| Vertical | RCC supported by fill shoulders |
Downstream
| Slope | Type |
|---|---|
| Vertical | Reinforced concrete cast against precast units or slip-formed facing elements |
| 0.80 | RCC supported by fill shoulders |
Spillway
| Slope | Type |
|---|---|
| separate |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 58 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 124 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Iwate Prefecture
Type: Gravity
Purpose(s): Flood Control
River: Kasshi
Reservoir capacity: 6 m3x106
Construction Dates
Start of Project: 12/90
Start of RCC: 12/90
End of RCC: 05/94
End of Project: 03/98
Specifications
Height: 57 metres
Length: 290 metres
Volume of RCC: 113 m3x103
Total volume: 232 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 180 - | 750 |
| 250 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Lianjiang Water Conservancy Bureau
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Aojiang
Reservoir capacity: 172 m3x106
Construction Dates
Start of Project: 08/92
Start of RCC: 08/92
End of RCC: 05/94
End of Project: 06/95
Specifications
Height: 66 metres
Length: 274 metres
Volume of RCC: 180 m3x103
Total volume: 272 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| 0.77 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 65 |
| 55 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 125 | Low-lime flyash (ASTM Class F) |
| 95 |

Details
Country: Mexico
Owner: CNA (Comisión Nacional del Agua)
Type: Gravity
Purpose(s): Flood Control / Groundwater Recharge / Water Supply
River: San Lazaro
Reservoir capacity: 11 m3x106
Construction Dates
Start of Project: 10/85
Start of RCC: 10/85
End of RCC: 06/94
End of Project: 07/94
Specifications
Height: 37 metres
Length: 176 metres
Volume of RCC: 35 m3x103
Total volume: 53 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
| 0.20 |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 220 | Milled sand |
| 220 |

Details
Country: China
Owner: Wenquanbao Reservoir Management Office
Type: Thin Arch
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Tanghe
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: 10/91
Start of RCC: 10/91
End of RCC: 06/94
End of Project: -/95
Specifications
Height: 48 metres
Length: 188 metres
Volume of RCC: 55 m3x103
Total volume: 63 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork with external geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.30 | RCC against formwork |
Spillway
| Slope | Type |
|---|---|
| ogee | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 110 |
| 69 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 68 | Low-lime flyash (ASTM Class F) |
| 85 |

Details
Country: USA
Owner: Phelps Dodge Corporation
Type: Gravity
Purpose(s): Pollution Control
River: Rocky Gulch
Reservoir capacity: -
Construction Dates
Start of Project: 05/94
Start of RCC: 05/94
End of RCC: 06/94
End of Project: 07/94
Specifications
Height: 18 metres
Length: 55 metres
Volume of RCC: 6 m3x103
Total volume: 7 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| none |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 184 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Mexico
Owner: CFE (Comisión Federal de Electricidad)
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Santiago
Reservoir capacity: 26 m3x106
Construction Dates
Start of Project: 11/93
Start of RCC: 11/93
End of RCC: 07/94
End of Project: 07/94
Specifications
Height: 48 metres
Length: 176 metres
Volume of RCC: 81 m3x103
Total volume: 110 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.66 | RCC against formwork [stepped face] |
| 0.80 |
Spillway
| Slope | Type |
|---|---|
| separate |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 130 | Natural pozzolan (ASTM Class N) |

Details
Country: Canada
Owner: Hydro-Québec
Type: Gravity
Purpose(s): Hydropower
River: Ha! Ha!
Reservoir capacity: 587 m3x106
Construction Dates
Start of Project: 10/92
Start of RCC: 10/92
End of RCC: 08/94
End of Project: 03/95
Specifications
Height: 40 metres
Length: 124 metres
Volume of RCC: 28 m3x103
Total volume: 35 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| separate |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 85 | Low-lime flyash (ASTM Class F) |

Details
Country: France
Owner: CAEDS
Type: Gravity
Purpose(s): Irrigation
River: Chambon
Reservoir capacity: 15 m3x106
Construction Dates
Start of Project: 08/93
Start of RCC: 08/93
End of RCC: 08/94
End of Project: 12/94
Specifications
Height: 36 metres
Length: 200 metres
Volume of RCC: 34 m3x103
Total volume: 46 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 115 | ROLAC (mixture of flyash and slag with or without limestone fines) |

Details
Country: Australia
Owner: Icon Water (formerly ACT Electricity and Water)
Type: Gravity
Purpose(s): Pollution Control
River: Unnamed creek
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 02/94
Start of RCC: 02/94
End of RCC: 08/94
End of Project: 11/94
Specifications
Height: 32 metres
Length: 120 metres
Volume of RCC: 22 m3x103
Total volume: 27 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 96 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 64 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: SUPLAN/PB
Type: Gravity
Purpose(s): Water Supply
River: Picuí
Reservoir capacity: 21 m3x106
Construction Dates
Start of Project: 10/93
Start of RCC: 10/93
End of RCC: 10/94
End of Project: -/95
Specifications
Height: 31 metres
Length: 135 metres
Volume of RCC: 27 m3x103
Total volume: 28 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 56 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 14 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: CODEVASF (Companhia de Desenvolvimento dos Vales do Sao Francisco do Parnaiba)
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Cova da Mandioca
Reservoir capacity: 126 m3x106
Construction Dates
Start of Project: 01/93
Start of RCC: 01/93
End of RCC: 12/94
End of Project: 12/94
Specifications
Height: 32 metres
Length: 342 metres
Volume of RCC: 75 m3x103
Total volume: 79 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 400 | 400 |
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 16 | No pozzolan used |

Details
Country: Brazil
Owner: Companhia Pernambucana de Saceamento
Type: Gravity
Purpose(s): Water Supply
River: da Prata
Reservoir capacity: 42 m3x106
Construction Dates
Start of Project: -/92
Start of RCC: -/92
End of RCC: 12/94
End of Project: -/95
Specifications
Height: 26 metres
Length: 405 metres
Volume of RCC: 61 m3x103
Total volume: 75 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
| [stepped face] |
Spillway
| Slope | Type |
|---|---|
| [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: China
Owner: Dongyuan County
Type: Gravity
Purpose(s): Hydropower
River: Yinjiang
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/92
Start of RCC: -/92
End of RCC: -/94
End of Project: -/94
Specifications
Height: 35 metres
Length: 115 metres
Volume of RCC: -
Total volume: 223 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.90 |
Downstream
| Slope | Type |
|---|---|
| 0.90 | [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.90 | [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Lanshan County Hydropower Bureau
Type: Thin Arch
Purpose(s): Hydropower / Irrigation
River: Xiang
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/92
Start of RCC: -/92
End of RCC: -/94
End of Project: -/95
Specifications
Height: 45 metres
Length: 150 metres
Volume of RCC: -
Total volume: 45 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: China
Owner: Huangcen Reservoir Management Office
Type: Thin Arch
Purpose(s): Flood Control / Hydropower / Irrigation
River: Leishui
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/92
Start of RCC: -/92
End of RCC: -/94
End of Project: -/95
Specifications
Height: 56 metres
Length: 147 metres
Volume of RCC: -
Total volume: 18 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: Japan
Owner: Ministry of Construction
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Nakatsu
Reservoir capacity: 193 m3x106
Construction Dates
Start of Project: 11/87
Start of RCC: 11/87
End of RCC: 02/95
End of Project: 03/01
Specifications
Height: 156 metres
Length: 400 metres
Volume of RCC: 1537 m3x103
Total volume: 2060 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against formwork |
| 0.60 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.625 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.625 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 150 - | 750 |
| 200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Kagawa Prefecture
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Yoshida
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 07/91
Start of RCC: 07/91
End of RCC: 02/95
End of Project: 03/96
Specifications
Height: 75 metres
Length: 218 metres
Volume of RCC: 265 m3x103
Total volume: 304 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Okayama Prefecture
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Takahashi
Reservoir capacity: 28 m3x106
Construction Dates
Start of Project: 03/89
Start of RCC: 03/89
End of RCC: 04/95
End of Project: 03/98
Specifications
Height: 98 metres
Length: 259 metres
Volume of RCC: 396 m3x103
Total volume: 670 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.77 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.77 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: Companhia de Gestão dos Recursos Hídricos
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Riacho da Madeira
Reservoir capacity: 69 m3x106
Construction Dates
Start of Project: 07/93
Start of RCC: 07/93
End of RCC: 05/95
End of Project: -/96
Specifications
Height: 51 metres
Length: 116 metres
Volume of RCC: 87 m3x103
Total volume: 93 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against precast concrete blocks [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 16 | Natural pozzolan (ASTM Class N) |

Details
Country: Japan
Owner: Akita Prefecture
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Matsu
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: 07/90
Start of RCC: 07/90
End of RCC: 06/95
End of Project: 09/96
Specifications
Height: 65 metres
Length: 296 metres
Volume of RCC: 141 m3x103
Total volume: 294 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.70 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Department of Electric Power, Lonyan City, Fujian Province
Type: Arch-Gravity
Purpose(s): Hydropower / Water Supply
River: Longshanxi
Reservoir capacity: 9 m3x106
Construction Dates
Start of Project: 08/93
Start of RCC: 08/93
End of RCC: 07/95
End of Project: 10/95
Specifications
Height: 64 metres
Length: 93 metres
Volume of RCC: 25 m3x103
Total volume: 33 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork with external geomembrane |
| 0.08 | RCC against formwork with external geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.65 | RCC against formwork |
Spillway
| Slope | Type |
|---|---|
| ogee | Reinforced concrete cast against precast units or slip-formed facing elements |
| 0.65 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 - | 300 - |
| 350 | 350 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| 79 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 120 | Low-lime flyash (ASTM Class F) |
| 105 |

Details
Country: China
Owner: Guanyinge Reservoir Management Bureau
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Taizi
Reservoir capacity: 2168 m3x106
Construction Dates
Start of Project: 05/90
Start of RCC: 05/90
End of RCC: 09/95
End of Project: 10/95
Specifications
Height: 82 metres
Length: 1040 metres
Volume of RCC: 1240 m3x103
Total volume: 1876 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 270 - | 750 |
| 280 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Hokkaido Development Bureau
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Satsunai
Reservoir capacity: 54 m3x106
Construction Dates
Start of Project: 02/87
Start of RCC: 02/87
End of RCC: 10/95
End of Project: 03/99
Specifications
Height: 114 metres
Length: 300 metres
Volume of RCC: 536 m3x103
Total volume: 770 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.40 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 78 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 42 | Ground-granulated blast-furnace slag |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Taghoucht
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: 11/93
Start of RCC: 11/93
End of RCC: 10/95
End of Project: 03/96
Specifications
Height: 36 metres
Length: 80 metres
Volume of RCC: 45 m3x103
Total volume: 57 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 110 |
| 150 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | Natural pozzolan (ASTM Class N) |
| 0 |

Details
Country: USA
Owner: City of Greeley
Type: Gravity
Purpose(s): Water Supply
River: Tributary of Cache La Poudre
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 05/95
Start of RCC: 05/95
End of RCC: 11/95
End of Project: 12/95
Specifications
Height: 21 metres
Length: 70 metres
Volume of RCC: 7 m3x103
Total volume: 8 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 145 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 48 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Yamanashi Prefecture
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Shio
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: 05/93
Start of RCC: 05/93
End of RCC: 11/95
End of Project: 03/99
Specifications
Height: 79 metres
Length: 225 metres
Volume of RCC: 299 m3x103
Total volume: 388 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
| 0.70 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 96 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 24 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Water Resources Development Public Corporation
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Urayama
Reservoir capacity: 58 m3x106
Construction Dates
Start of Project: 03/90
Start of RCC: 03/90
End of RCC: 12/95
End of Project: 03/99
Specifications
Height: 156 metres
Length: 372 metres
Volume of RCC: 1294 m3x103
Total volume: 1750 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.65 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
| 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Department of Water Resources, Henan Province
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Gunhe
Reservoir capacity: 120 m3x106
Construction Dates
Start of Project: 07/93
Start of RCC: 07/93
End of RCC: 12/95
End of Project: 07/96
Specifications
Height: 41 metres
Length: 650 metres
Volume of RCC: 272 m3x103
Total volume: 351 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 98 |
| 51 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 98 | Low-lime flyash (ASTM Class F) |
| 107 |

Details
Country: China
Owner: Fengdu Water Resources Bureau
Type: Gravity
Purpose(s): Flood Control / Hydropower / Recreation
River: Longxihe
Reservoir capacity: 105 m3x106
Construction Dates
Start of Project: 12/92
Start of RCC: 12/92
End of RCC: -/95
End of Project: -/96
Specifications
Height: 84 metres
Length: 445 metres
Volume of RCC: 335 m3x103
Total volume: 564 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.65 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.65 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 126 |
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 84 | Low-lime flyash (ASTM Class F) |
| 90 |

Details
Country: Brazil
Owner: DNOCS (Departamento Nacional de Obras Contra a Seca)
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Paraíba
Reservoir capacity: 247 m3x106
Construction Dates
Start of Project: -/93
Start of RCC: -/93
End of RCC: -/95
End of Project: -/95
Specifications
Height: 79 metres
Length: 440 metres
Volume of RCC: 674 m3x103
Total volume: 734 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 16 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Itamarati Norte S.A. (part of Brennand Energia)
Type: Gravity
Purpose(s): Hydropower
River: Juba
Reservoir capacity: -
Construction Dates
Start of Project: -/93
Start of RCC: -/93
End of RCC: -/95
End of Project: -/96
Specifications
Height: 21 metres
Length: 238 metres
Volume of RCC: 96 m3x103
Total volume: 113 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 15 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Itamarati Norte S.A. (part of Brennand Energia)
Type: Gravity
Purpose(s): Hydropower
River: Juba
Reservoir capacity: -
Construction Dates
Start of Project: -/93
Start of RCC: -/93
End of RCC: -/95
End of Project: -/96
Specifications
Height: 21 metres
Length: 238 metres
Volume of RCC: 105 m3x103
Total volume: 113 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 15 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Secretaria de Meio Ambiente e dos Recursos Hídricos do Estado do Rio Grande do Norte
Type: Gravity
Purpose(s): Recreation / Water Supply
River: Seridó
Reservoir capacity: 50 m3x106
Construction Dates
Start of Project: -/93
Start of RCC: -/93
End of RCC: -/95
End of Project: -/96
Specifications
Height: 26 metres
Length: 458 metres
Volume of RCC: 27 m3x103
Total volume: 28 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 16 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Barragem Oeste - SDC
Type: Gravity
Purpose(s): Flood Control
River: Itajai do Oeste
Reservoir capacity: 100 m3x106
Construction Dates
Start of Project: -/93
Start of RCC: -/93
End of RCC: -/95
End of Project: -/96
Specifications
Height: 30 metres
Length: 367 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Honduras
Owner: Secretaria de Recursos Naturales
Type: Gravity
Purpose(s): Water Supply
River: Rio Grande Nacaome
Reservoir capacity: 42 m3x106
Construction Dates
Start of Project: 06/93
Start of RCC: 06/93
End of RCC: -/95
End of Project: -/95
Specifications
Height: 54 metres
Length: 320 metres
Volume of RCC: 250 m3x103
Total volume: 300 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.15 | Traditional concrete against formwork with external geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 400 | 400 |
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 21 | Natural pozzolan (ASTM Class N) |

Details
Country: Greece
Owner: Ministry of Agriculture
Type: Hardfill
Purpose(s): Irrigation / Water Supply
River: Ano Mera
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 04/93
Start of RCC: 04/93
End of RCC: -/95
End of Project: -/97
Specifications
Height: 32 metres
Length: 170 metres
Volume of RCC: 49 m3x103
Total volume: 64 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.50 | Reinforced concrete cast against precast units or slip-formed facing elements |
Downstream
| Slope | Type |
|---|---|
| 0.50 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| 0.50 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 200 - | 200 - |
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 55 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 15 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: COPEL (Companhia Paranense de Energia)
Type: Gravity
Purpose(s): Hydropower
River: Jordão
Reservoir capacity: 110 m3x106
Construction Dates
Start of Project: 05/94
Start of RCC: 05/94
End of RCC: 02/96
End of Project: 09/96
Specifications
Height: 95 metres
Length: 550 metres
Volume of RCC: 570 m3x103
Total volume: 647 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.74 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.74 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 400 | 400 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 15 | Natural pozzolan (ASTM Class N) |

Details
Country: Chile
Owner: Empresa Electrica Pangue SA
Type: Gravity
Purpose(s): Hydropower
River: Bio-Bio
Reservoir capacity: 175 m3x106
Construction Dates
Start of Project: 01/92
Start of RCC: 01/92
End of RCC: 02/96
End of Project: 12/96
Specifications
Height: 113 metres
Length: 410 metres
Volume of RCC: 670 m3x103
Total volume: 740 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Copel Geração e Transmissão S.A.
Type: Gravity
Purpose(s): Hydropower
River: Jordão
Reservoir capacity: 110 m3x106
Construction Dates
Start of Project: 05/94
Start of RCC: 05/94
End of RCC: 03/96
End of Project: 12/97
Specifications
Height: 73 metres
Length: 560 metres
Volume of RCC: 576 m3x103
Total volume: 665 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Australia
Owner: Upper Parramatta River Catchment Trust
Type: Gravity
Purpose(s): Flood Control
River: Darling Mills Creek
Reservoir capacity: -
Construction Dates
Start of Project: 06/95
Start of RCC: 06/95
End of RCC: 04/96
End of Project: 08/96
Specifications
Height: 30 metres
Length: 111 metres
Volume of RCC: 20 m3x103
Total volume: 22 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against precast concrete panels |
Spillway
| Slope | Type |
|---|---|
| 0.80 | RCC against precast concrete panels |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 50 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 30 | Ground-granulated blast-furnace slag |

Details
Country: China
Owner: Guangxi-Guiguang Electric Power Development Co. Ltd.
Type: Gravity
Purpose(s): Hydropower / Irrigation / Navigation
River: Hongshuihe
Reservoir capacity: 340 m3x106
Construction Dates
Start of Project: 02/93
Start of RCC: 02/93
End of RCC: 04/96
End of Project: 08/97
Specifications
Height: 34 metres
Length: 710 metres
Volume of RCC: 62 m3x103
Total volume: 80 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against precast concrete blocks [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against precast concrete panels [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 73 |
| 99 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 110 | Low-lime flyash (ASTM Class F) |
| 60 |

Details
Country: Japan
Owner: Gunma Prefecture
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Shima
Reservoir capacity: 9 m3x106
Construction Dates
Start of Project: 03/91
Start of RCC: 03/91
End of RCC: 05/96
End of Project: 03/98
Specifications
Height: 90 metres
Length: 330 metres
Volume of RCC: 390 m3x103
Total volume: 516 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.50 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: Conyers-Rockdale Big Haynes Imp. Authority
Type: Gravity
Purpose(s): Water Supply
River: Big Haynes Creek
Reservoir capacity: -
Construction Dates
Start of Project: 10/94
Start of RCC: 10/94
End of RCC: 06/96
End of Project: 09/96
Specifications
Height: 27 metres
Length: 427 metres
Volume of RCC: 72 m3x103
Total volume: 74 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against precast concrete blocks [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | RCC against precast concrete blocks [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 42 |
| 39 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 42 | Low-lime flyash (ASTM Class F) |
| 39 |

Details
Country: Japan
Owner: Water Resources Development Public Corporation
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Katsura
Reservoir capacity: 66 m3x106
Construction Dates
Start of Project: -/83
Start of RCC: -/83
End of RCC: 07/96
End of Project: 03/98
Specifications
Height: 70 metres
Length: 438 metres
Volume of RCC: 440 m3x103
Total volume: 670 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.80 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
| 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| 77 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |
| 33 |

Details
Country: Spain
Owner: Confederación Hidrográfica del Segura
Type: Gravity
Purpose(s): Flood Control
River: Rambla del Boqueron
Reservoir capacity: 13 m3x106
Construction Dates
Start of Project: 10/94
Start of RCC: 10/94
End of RCC: 08/96
End of Project: 12/97
Specifications
Height: 58 metres
Length: 290 metres
Volume of RCC: 137 m3x103
Total volume: 145 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.05 | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.73 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| 0.73 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 55 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 130 | Low-lime flyash (ASTM Class F) |

Details
Country: Canada
Owner: Abitibi-Price Inc.
Type: Gravity
Purpose(s): Hydropower
River: Exploits
Reservoir capacity: -
Construction Dates
Start of Project: 08/96
Start of RCC: 08/96
End of RCC: 09/96
End of Project: 12/96
Specifications
Height: 15 metres
Length: 180 metres
Volume of RCC: 7 m3x103
Total volume: 11 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.67 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.67 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 200 | 200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 130 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 75 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Wangqing County Water Conservancy Bureau
Type: Gravity
Purpose(s): Hydropower / Irrigation
River: Gayahe
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: 08/92
Start of RCC: 08/92
End of RCC: 12/96
End of Project: 08/97
Specifications
Height: 37 metres
Length: 337 metres
Volume of RCC: 78 m3x103
Total volume: 100 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| ogee | Traditional concrete against formwork |
| 0.70 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 120 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Chongqing Wujiang Power Company
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Apengjiang
Reservoir capacity: 115 m3x106
Construction Dates
Start of Project: -/93
Start of RCC: -/93
End of RCC: -/96
End of Project: -/97
Specifications
Height: 85 metres
Length: 149 metres
Volume of RCC: -
Total volume: 33 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Arcelor Mittal Brasil S.A.
Type: Gravity
Purpose(s): Hydropower
River: Piracicaba
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: -/93
Start of RCC: -/93
End of RCC: -/96
End of Project: 10/97
Specifications
Height: 41 metres
Length: 143 metres
Volume of RCC: 85 m3x103
Total volume: 102 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 20 | Natural pozzolan (ASTM Class N) |

Details
Country: Japan
Owner: Water Resources Development Public Corporation
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Douzan
Reservoir capacity: 53 m3x106
Construction Dates
Start of Project: 02/92
Start of RCC: 02/92
End of RCC: 02/97
End of Project: 03/00
Specifications
Height: 111 metres
Length: 250 metres
Volume of RCC: 355 m3x103
Total volume: 510 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
| 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| 72 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |
| 48 |

Details
Country: Greece
Owner: Public Power Corporation (PPC)
Type: Gravity
Purpose(s): Hydropower / Irrigation
River: Nestos
Reservoir capacity: 84 m3x106
Construction Dates
Start of Project: 01/89
Start of RCC: 01/89
End of RCC: 03/97
End of Project: 06/99
Specifications
Height: 95 metres
Length: 305 metres
Volume of RCC: 420 m3x103
Total volume: 440 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Slip-formed/extruded facing elements |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Slip-formed/extruded facing elements [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 50 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 225 | High-lime flyash (ASTM Class C) |

Details
Country: China
Owner: Wanyao Reservoir Management Bureau
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Dahexi
Reservoir capacity: 223 m3x106
Construction Dates
Start of Project: 10/93
Start of RCC: 10/93
End of RCC: 05/97
End of Project: 07/97
Specifications
Height: 83 metres
Length: 390 metres
Volume of RCC: 320 m3x103
Total volume: 458 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.20 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against precast concrete panels |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 96 | Low-lime flyash (ASTM Class F) |

Details
Country: Spain
Owner: Confederación Hidrográfica del Ebro
Type: Gravity
Purpose(s): Flood Control
River: Val
Reservoir capacity: 25 m3x106
Construction Dates
Start of Project: 01/93
Start of RCC: 01/93
End of RCC: 05/97
End of Project: 12/98
Specifications
Height: 82 metres
Length: 375 metres
Volume of RCC: 480 m3x103
Total volume: 520 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.33 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against precast concrete panels |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 145 | Low-lime flyash (ASTM Class F) |

Details
Country: Spain
Owner: Confederación Hidrográfica del Tajo
Type: Gravity
Purpose(s): Irrigation
River: Salado
Reservoir capacity: 35 m3x106
Construction Dates
Start of Project: 07/96
Start of RCC: 07/96
End of RCC: 07/97
End of Project: 10/97
Specifications
Height: 45 metres
Length: 184 metres
Volume of RCC: 65 m3x103
Total volume: 75 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 57 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 133 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Hokkaido Development Bureau
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Sorachi
Reservoir capacity: 108 m3x106
Construction Dates
Start of Project: 10/90
Start of RCC: 10/90
End of RCC: 07/97
End of Project: 06/00
Specifications
Height: 50 metres
Length: 445 metres
Volume of RCC: 327 m3x103
Total volume: 455 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.06 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Tokyo Electric Power Company
Type: Gravity
Purpose(s): Hydropower
River: Tuchimuro
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: 11/92
Start of RCC: 11/92
End of RCC: 07/97
End of Project: 11/99
Specifications
Height: 105 metres
Length: 264 metres
Volume of RCC: 428 m3x103
Total volume: 622 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.82 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.82 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 170 | 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | Low-lime flyash (ASTM Class F) |
| 36 |

Details
Country: South Africa
Owner: Department of Water & Sanitation
Type: Gravity
Purpose(s): Flood Control
River: Klip
Reservoir capacity: 128 m3x106
Construction Dates
Start of Project: 04/94
Start of RCC: 04/94
End of RCC: 08/97
End of Project: 03/98
Specifications
Height: 28 metres
Length: 490 metres
Volume of RCC: 78 m3x103
Total volume: 156 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.70 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 250 |
Cementitious material
| Cement (kg/m3) |
|---|
| 46 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 108 | Ground-granulated blast-furnace slag |

Details
Country: USA
Owner: City of Buffalo
Type: Gravity
Purpose(s): Water Supply
River: South Fork Clear Creek
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 05/96
Start of RCC: 05/96
End of RCC: 08/97
End of Project: -/97
Specifications
Height: 41 metres
Length: 170 metres
Volume of RCC: 62 m3x103
Total volume: 69 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 89 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 83 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Department of Electricity, Dapu County, Guangdong Province
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Meixihe
Reservoir capacity: 95 m3x106
Construction Dates
Start of Project: 01/95
Start of RCC: 01/95
End of RCC: 10/97
End of Project: 12/97
Specifications
Height: 60 metres
Length: 221 metres
Volume of RCC: 113 m3x103
Total volume: 172 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels with hot poured membrane |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| 55 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 110 | Low-lime flyash (ASTM Class F) |
| 105 |

Details
Country: Australia
Owner: Cadia Holdings Pty. Lty.
Type: Gravity
Purpose(s): Water Supply
River: Cadiangullong Creek
Reservoir capacity: 4 m3x106
Construction Dates
Start of Project: 11/96
Start of RCC: 11/96
End of RCC: 12/97
End of Project: 03/98
Specifications
Height: 43 metres
Length: 356 metres
Volume of RCC: 114 m3x103
Total volume: 123 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
| RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 90 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Department of Water Resources, Hebei Province
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Recreation / Water Supply
River: Qinglonghe
Reservoir capacity: 859 m3x106
Construction Dates
Start of Project: 11/92
Start of RCC: 11/92
End of RCC: 12/97
End of Project: -/98
Specifications
Height: 75 metres
Length: 500 metres
Volume of RCC: 585 m3x103
Total volume: 1350 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.15 |
Downstream
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| ogee | Traditional concrete against formwork |
| 0.65 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 135 |
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 70 | Low-lime flyash (ASTM Class F) |
| 85 |

Details
Country: Brazil
Owner: CPEE (Companhia Paulista de Energia Elétrica)
Type: Gravity
Purpose(s): Hydropower
River: do Peixe
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 02/96
Start of RCC: 02/96
End of RCC: 12/97
End of Project: -/98
Specifications
Height: 32 metres
Length: 300 metres
Volume of RCC: 20 m3x103
Total volume: 34 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 120 |
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |
| 0 |

Details
Country: Brazil
Owner: Saneamento de Goiás S/A
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: 129 m3x106
Construction Dates
Start of Project: -/86
Start of RCC: -/86
End of RCC: -/97
End of Project: -/97
Specifications
Height: 47 metres
Length: -
Volume of RCC: -
Total volume: 129 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Fengdu Hydropower Bureau
Type: Thin Arch
Purpose(s): Hydropower
River: Huilonghe
Reservoir capacity: 8 m3x106
Construction Dates
Start of Project: -/93
Start of RCC: -/93
End of RCC: -/97
End of Project: -/98
Specifications
Height: 90 metres
Length: 158 metres
Volume of RCC: -
Total volume: 770 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 |
Downstream
| Slope | Type |
|---|---|
| 0.76 |
Spillway
| Slope | Type |
|---|---|
| 0.76 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: COMPESA (Companhia Pernambucana de Saneamento)
Type: Gravity
Purpose(s): Water Supply
River: Capema
Reservoir capacity: 40 m3x106
Construction Dates
Start of Project: -/95
Start of RCC: -/95
End of RCC: -/97
End of Project: -/98
Specifications
Height: 20 metres
Length: 405 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: COMPESA (Companhia Pernambucana de Saneamento)
Type: Gravity
Purpose(s): Water Supply
River: Ipojuca (Gravata)
Reservoir capacity: 37 m3x106
Construction Dates
Start of Project: 05/95
Start of RCC: 05/95
End of RCC: -/97
End of Project: -/98
Specifications
Height: 34 metres
Length: 470 metres
Volume of RCC: 113 m3x103
Total volume: 125 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 16 | Natural pozzolan (ASTM Class N) |

Details
Country: Dominican Republic
Owner: INDRHI (Instiuto Nacional de Recursos Hidráulicos de la República Dominicana)
Type: Hardfill
Purpose(s): Flood Control / Hydropower / Irrigation
River: Mao
Reservoir capacity: 8 m3x106
Construction Dates
Start of Project: 07/95
Start of RCC: 07/95
End of RCC: 03/98
End of Project: 06/98
Specifications
Height: 28 metres
Length: 254 metres
Volume of RCC: 130 m3x103
Total volume: 155 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.67 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Morocco
Owner: Direction des Arrenagements Hydrauliques
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: S’ra
Reservoir capacity: 56 m3x106
Construction Dates
Start of Project: 05/95
Start of RCC: 05/95
End of RCC: 05/98
End of Project: 09/98
Specifications
Height: 55 metres
Length: 174 metres
Volume of RCC: 165 m3x103
Total volume: 186 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| 120 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | Natural pozzolan (ASTM Class N) |
| 0 |

Details
Country: Japan
Owner: Iwate Prefecture
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Hienuki
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: 03/93
Start of RCC: 03/93
End of RCC: 06/98
End of Project: 03/00
Specifications
Height: 74 metres
Length: 333 metres
Volume of RCC: 141 m3x103
Total volume: 333 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.20 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: COPEL (Companhia Paranense de Energia) Geração E Transmissão S.A.
Type: Gravity
Purpose(s): Hydropower
River: Iguaçu
Reservoir capacity: 3573 m3x106
Construction Dates
Start of Project: 02/95
Start of RCC: 02/95
End of RCC: 07/98
End of Project: 12/98
Specifications
Height: 67 metres
Length: 1083 metres
Volume of RCC: 912 m3x103
Total volume: 1438 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Reinforced concrete cast against precast units or slip-formed facing elements |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 20 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: CORSAN (Companhia Riograndense de Saneamento)
Type: Gravity
Purpose(s): Water Supply
River: Ibicui-Mirim
Reservoir capacity: 24 m3x106
Construction Dates
Start of Project: 07/97
Start of RCC: 07/97
End of RCC: 07/98
End of Project: 11/98
Specifications
Height: 37 metres
Length: 675 metres
Volume of RCC: 69 m3x103
Total volume: 95 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Reinforced concrete cast against precast units or slip-formed facing elements |
Downstream
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement [stepped face] |
Spillway
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 30 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Ministry of Construction
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Bonji
Reservoir capacity: 65 m3x106
Construction Dates
Start of Project: 08/88
Start of RCC: 08/88
End of RCC: 10/98
End of Project: 03/01
Specifications
Height: 123 metres
Length: 393 metres
Volume of RCC: 731 m3x103
Total volume: 1160 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
| 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: Bethlehem Authority, City of Bethlehem
Type: Gravity
Purpose(s): Water Supply
River: Wild Creek
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 08/96
Start of RCC: 08/96
End of RCC: 10/98
End of Project: 12/98
Specifications
Height: 49 metres
Length: 610 metres
Volume of RCC: 283 m3x103
Total volume: 283 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.50 | RCC supported by fill shoulders |
| RCC against precast concrete panels |
Spillway
| Slope | Type |
|---|---|
| conduit |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 58 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 41 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Yongxi Hydroelectric Co. Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Dazhangxi
Reservoir capacity: 68 m3x106
Construction Dates
Start of Project: 05/96
Start of RCC: 05/96
End of RCC: 10/98
End of Project: 09/99
Specifications
Height: 87 metres
Length: 198 metres
Volume of RCC: 170 m3x103
Total volume: 255 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.73 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| ogee | Traditional concrete against formwork |
| 0.73 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 280 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 115 |
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 95 | Low-lime flyash (ASTM Class F) |
| 90 |

Details
Country: Brazil
Owner: DNOCS (Departamento Nacional de Obras Contra a Secas)
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: Capiibaribe
Reservoir capacity: 204 m3x106
Construction Dates
Start of Project: 07/96
Start of RCC: 07/96
End of RCC: 10/98
End of Project: -/99
Specifications
Height: 63 metres
Length: 442 metres
Volume of RCC: 442 m3x103
Total volume: 470 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Reinforced conventional concrete cast after RCC placement |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 16 | Natural pozzolan (ASTM Class N) |

Details
Country: Spain
Owner: Confederación Hidrográfica del Ebro
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Segre
Reservoir capacity: 402 m3x106
Construction Dates
Start of Project: 01/93
Start of RCC: 01/93
End of RCC: 12/98
End of Project: 01/00
Specifications
Height: 99 metres
Length: 630 metres
Volume of RCC: 980 m3x103
Total volume: 1016 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.15 | Traditional concrete against formwork |
| 0.35 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.40 | Traditional concrete against formwork |
| 0.65 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.65 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 330 | 330 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| 65 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 130 | Low-lime flyash (ASTM Class F) |
| 130 |

Details
Country: China
Owner: Ya’an Electricity Company
Type: Gravity
Purpose(s): Hydropower
River: Yinghe
Reservoir capacity: 8 m3x106
Construction Dates
Start of Project: 01/96
Start of RCC: 01/96
End of RCC: 12/98
End of Project: 05/99
Specifications
Height: 85 metres
Length: 173 metres
Volume of RCC: 240 m3x103
Total volume: 290 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 - | 300 - |
| 400 | 400 |
Cementitious material
| Cement (kg/m3) |
|---|
| 78 |
| 74 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 95 | Low-lime flyash (ASTM Class F) |
| 90 |

Details
Country: China
Owner: Department of Water Resources, Hubei Province
Type: Gravity
Purpose(s): Hydropower / Water Supply
River: Yujiang
Reservoir capacity: 68 m3x106
Construction Dates
Start of Project: -/91
Start of RCC: -/91
End of RCC: 12/98
End of Project: 06/00
Specifications
Height: 69 metres
Length: 279 metres
Volume of RCC: 170 m3x103
Total volume: 200 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.74 | RCC against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 5000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 134 |
| 72 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 89 | Low-lime flyash (ASTM Class F) |
| 48 |

Details
Country: China
Owner: Fushan Power Station Management Bureau
Type: Thin Arch
Purpose(s): Hydropower / Irrigation
River: Nanxi
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: -/94
Start of RCC: -/94
End of RCC: -/98
End of Project: -/99
Specifications
Height: 47 metres
Length: 235 metres
Volume of RCC: -
Total volume: 240 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Wencheng County Kengxiashan Hydropower Development Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Yuquanxi
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/96
Start of RCC: -/96
End of RCC: -/98
End of Project: -/98
Specifications
Height: 34 metres
Length: 80 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Water Supply
River: Bous Sbaa
Reservoir capacity: 37 m3x106
Construction Dates
Start of Project: 01/97
Start of RCC: 01/97
End of RCC: 02/99
End of Project: 03/99
Specifications
Height: 55 metres
Length: 110 metres
Volume of RCC: 63 m3x103
Total volume: 77 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 65 |
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 15 | Natural pozzolan (ASTM Class N) |
| 20 |

Details
Country: China
Owner: Department of Water Resources, Shanxi Province
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Fenhe
Reservoir capacity: 130 m3x106
Construction Dates
Start of Project: 11/96
Start of RCC: 11/96
End of RCC: 03/99
End of Project: 06/00
Specifications
Height: 87 metres
Length: 350 metres
Volume of RCC: 362 m3x103
Total volume: 448 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.20 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against precast concrete panels |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 127 |
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 84 | Low-lime flyash (ASTM Class F) |
| 93 |

Details
Country: China
Owner: Lishui Hydropower Development Co. Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Navigation / Water Supply
River: Loushui
Reservoir capacity: 1741 m3x106
Construction Dates
Start of Project: 07/95
Start of RCC: 07/95
End of RCC: 04/99
End of Project: -/01
Specifications
Height: 131 metres
Length: 368 metres
Volume of RCC: 1100 m3x103
Total volume: 1310 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| ogee | Reinforced concrete cast against precast units or slip-formed facing elements |
| 0.80 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 87 |
| 64 46 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 107 | Low-lime flyash (ASTM Class F) |
| 96 107 |

Details
Country: USA
Owner: Town of Wilson
Type: Gravity
Purpose(s): Water Supply
River: Contentea Creek
Reservoir capacity: -
Construction Dates
Start of Project: 03/98
Start of RCC: 03/98
End of RCC: 04/99
End of Project: 06/09
Specifications
Height: 16 metres
Length: 781 metres
Volume of RCC: 64 m3x103
Total volume: 69 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 89 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: China
Owner: Helong Electricity Corporation
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Recreation / Water Supply
River: Hailanhe
Reservoir capacity: 21 m3x106
Construction Dates
Start of Project: 09/97
Start of RCC: 09/97
End of RCC: 04/99
End of Project: 09/99
Specifications
Height: 29 metres
Length: 271 metres
Volume of RCC: 44 m3x103
Total volume: 77 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.73 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| conduit |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 2000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Low-lime flyash (ASTM Class F) |

Details
Country: Eritrea
Owner: Government of Eritrea
Type: Gravity
Purpose(s): Water Supply
River: Toker
Reservoir capacity: 14 m3x106
Construction Dates
Start of Project: 11/96
Start of RCC: 11/96
End of RCC: 05/99
End of Project: 08/99
Specifications
Height: 73 metres
Length: 263 metres
Volume of RCC: 187 m3x103
Total volume: 210 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 330 | 330 |
Cementitious material
| Cement (kg/m3) |
|---|
| 110 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 85 | Low-lime flyash (ASTM Class F) |

Details
Country: Indonesia
Owner: P.T. Vale Indonesia
Type: Gravity
Purpose(s): Hydropower
River: Larona
Reservoir capacity: 33 m3x106
Construction Dates
Start of Project: 03/95
Start of RCC: 03/95
End of RCC: 06/99
End of Project: 09/99
Specifications
Height: 94 metres
Length: 352 metres
Volume of RCC: 528 m3x103
Total volume: 54 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork with external geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 420 | 420 |
Cementitious material
| Cement (kg/m3) |
|---|
| 81 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 54 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Shaoguang Electricity Corporation Ltd
Type: Gravity
Purpose(s): Hydropower
River: Yangxishui
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 11/97
Start of RCC: 11/97
End of RCC: 06/99
End of Project: 07/00
Specifications
Height: 46 metres
Length: 202 metres
Volume of RCC: 100 m3x103
Total volume: 139 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: Brazil
Owner: CORSAN (Companhia Riograndense de Saneamento)
Type: Gravity
Purpose(s): Water Supply
River: Arroio Burati
Reservoir capacity: 6 m3x106
Construction Dates
Start of Project: -/98
Start of RCC: -/98
End of RCC: 07/99
End of Project: -/00
Specifications
Height: 29 metres
Length: 219 metres
Volume of RCC: 80 m3x103
Total volume: 115 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Reinforced concrete cast against precast units or slip-formed facing elements |
Downstream
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement [stepped face] |
Spillway
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 72 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 18 | Natural pozzolan (ASTM Class N) |

Details
Country: Burkina Faso
Owner: Oner-Moz
Type: Gravity
Purpose(s): Water Supply
River: Nakambe
Reservoir capacity: 28 m3x106
Construction Dates
Start of Project: 04/98
Start of RCC: 04/98
End of RCC: 08/99
End of Project: 07/00
Specifications
Height: 18 metres
Length: 120 metres
Volume of RCC: 44 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against precast concrete blocks [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| No pozzolan used | |

Details
Country: China
Owner: Department of Water Resources, Liaoning Province
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Dalinghe
Reservoir capacity: 1645 m3x106
Construction Dates
Start of Project: 09/96
Start of RCC: 09/96
End of RCC: 09/99
End of Project: 12/00
Specifications
Height: 49 metres
Length: 513 metres
Volume of RCC: 111 m3x103
Total volume: 603 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 72 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 58 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: Rosal Energia S.A.
Type: Gravity
Purpose(s): Hydropower
River: Itabapoana
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: 04/98
Start of RCC: 04/98
End of RCC: 09/99
End of Project: -/00
Specifications
Height: 37 metres
Length: 212 metres
Volume of RCC: 45 m3x103
Total volume: 75 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 45 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 55 | Ground-granulated blast-furnace slag |

Details
Country: Turkey
Owner: ERE Electricity Co.
Type: Gravity
Purpose(s): Hydropower
River: Güredin Creek
Reservoir capacity: 9 m3x106
Construction Dates
Start of Project: 01/98
Start of RCC: 01/98
End of RCC: 10/99
End of Project: 10/99
Specifications
Height: 36 metres
Length: 192 metres
Volume of RCC: 55 m3x103
Total volume: 60 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against precast concrete panels |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 50 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Ground-granulated blast-furnace slag |

Details
Country: USA
Owner: Davis County Flood Control
Type: Gravity
Purpose(s): Flood Control
River: Barnard Creek
Reservoir capacity: -
Construction Dates
Start of Project: 08/99
Start of RCC: 08/99
End of RCC: 11/99
End of Project: 01/00
Specifications
Height: 18 metres
Length: 46 metres
Volume of RCC: 3 m3x103
Total volume: 3 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
| 0.75 | [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 108 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 84 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Xishan Xingyu Water Resources Corporation
Type: Arch-Gravity
Purpose(s): Water Supply
River: Qinggoushui
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 10/97
Start of RCC: 10/97
End of RCC: 11/99
End of Project: 12/99
Specifications
Height: 55 metres
Length: 244 metres
Volume of RCC: 71 m3x103
Total volume: 77 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.50 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.50 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 54 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 99 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Ministry of Construction
Type: Hardfill
Purpose(s): unknown
River: Ohi
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 03/97
Start of RCC: 03/97
End of RCC: 12/99
End of Project: 08/00
Specifications
Height: 33 metres
Length: 127 metres
Volume of RCC: 23 m3x103
Total volume: 55 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 1.20 | Reinforced conventional concrete cast after RCC placement |
Downstream
| Slope | Type |
|---|---|
| 1.20 | Reinforced conventional concrete cast after RCC placement |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 500 |
| 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 40 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 50 | Ground-granulated blast-furnace slag |

Details
Country: Mexico
Owner: CNA (Comisión Nacional del Agua)
Type: Gravity
Purpose(s): Irrigation
River: Álomo & Soso
Reservoir capacity: 124 m3x106
Construction Dates
Start of Project: 08/98
Start of RCC: 08/98
End of RCC: 12/99
End of Project: 11/00
Specifications
Height: 32 metres
Length: 2795 metres
Volume of RCC: 221 m3x103
Total volume: 316 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels |
| 0.75 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: CERB (Companhia de Engenharia Rural da Bahia)
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Itapicuru-açu
Reservoir capacity: 39 m3x106
Construction Dates
Start of Project: 05/98
Start of RCC: 05/98
End of RCC: 12/99
End of Project: 02/00
Specifications
Height: 26 metres
Length: 266 metres
Volume of RCC: 90 m3x103
Total volume: 105 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 72 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 18 | Natural pozzolan (ASTM Class N) |

Details
Country: Peru
Owner: -
Type: Gravity
Purpose(s): unknown
River: Mantaro
Reservoir capacity: 120 m3x106
Construction Dates
Start of Project: -/98
Start of RCC: -/98
End of RCC: -/99
End of Project: -/99
Specifications
Height: 17 metres
Length: 65 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| No pozzolan used | |

Details
Country: Colombia
Owner: -
Type: Gravity
Purpose(s): Irrigation
River: Chenche
Reservoir capacity: -
Construction Dates
Start of Project: -/97
Start of RCC: -/97
End of RCC: -/99
End of Project: -/00
Specifications
Height: 24 metres
Length: -
Volume of RCC: 75 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 75 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Laos
Owner: EDL Generation Public Co. Ltd
Type: Gravity
Purpose(s): Hydropower
River: Nam Leuk
Reservoir capacity: 185 m3x106
Construction Dates
Start of Project: -/98
Start of RCC: -/98
End of RCC: -/99
End of Project: -/00
Specifications
Height: 15 metres
Length: 60 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Japan
Owner: Toyama Prefecture
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Kubusu
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: 03/93
Start of RCC: 03/93
End of RCC: -/99
End of Project: 10/02
Specifications
Height: 95 metres
Length: 253 metres
Volume of RCC: 364 m3x103
Total volume: 469 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.40 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: Natural Resources Conservation Service
Type: Gravity
Purpose(s): Flood Control
River: Bullard Creek
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 10/98
Start of RCC: 10/98
End of RCC: -/99
End of Project: -/99
Specifications
Height: 16 metres
Length: 110 metres
Volume of RCC: 7 m3x103
Total volume: 7 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork |
Downstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork [stepped face] |
| 0.75 |
Spillway
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 148 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 44 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Simane Prefecture
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Sutu
Reservoir capacity: 19 m3x106
Construction Dates
Start of Project: 03/93
Start of RCC: 03/93
End of RCC: 04/00
End of Project: 03/03
Specifications
Height: 72 metres
Length: 334 metres
Volume of RCC: 284 m3x103
Total volume: 362 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.25 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.79 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.79 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Qingjiang Hydropower Development Corporation
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation
River: Qingjiang
Reservoir capacity: 536 m3x106
Construction Dates
Start of Project: 05/97
Start of RCC: 05/97
End of RCC: 04/00
End of Project: 01/01
Specifications
Height: 57 metres
Length: 440 metres
Volume of RCC: 210 m3x103
Total volume: 940 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels with hot poured membrane |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 123 |
| 86 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Low-lime flyash (ASTM Class F) |
| 86 |

Details
Country: USA
Owner: Paul Moltz
Type: Gravity
Purpose(s): Irrigation / Recreation
River: Trout Creek
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 08/99
Start of RCC: 08/99
End of RCC: 05/00
End of Project: 07/00
Specifications
Height: 31 metres
Length: 38 metres
Volume of RCC: 9 m3x103
Total volume: 10 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 163 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: USA
Owner: Paradise Valley Estates
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 10/99
Start of RCC: 10/99
End of RCC: 05/00
End of Project: 08/00
Specifications
Height: 16 metres
Length: 57 metres
Volume of RCC: 331 m3x103
Total volume: 331 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Algeria
Owner: ANBT (Agence Nationale des Barrages et Transferts)
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: El Kebir
Reservoir capacity: 963 m3x106
Construction Dates
Start of Project: 01/93
Start of RCC: 01/93
End of RCC: 07/00
End of Project: 12/00
Specifications
Height: 118 metres
Length: 714 metres
Volume of RCC: 1690 m3x103
Total volume: 1900 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 82 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 143 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Ministry of Land, Infrastructure & Transport
Type: Gravity
Purpose(s): Flood Control / Navigation
River: Ori
Reservoir capacity: 15 m3x106
Construction Dates
Start of Project: 02/93
Start of RCC: 02/93
End of RCC: 07/00
End of Project: 03/04
Specifications
Height: 114 metres
Length: 331 metres
Volume of RCC: 673 m3x103
Total volume: 742 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.60 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.77 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.77 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | Low-lime flyash (ASTM Class F) |

Details
Country: Iran
Owner: Khuzestan Water & Energy Authority
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Karkeh
Reservoir capacity: 40 m3x106
Construction Dates
Start of Project: 02/98
Start of RCC: 02/98
End of RCC: 07/00
End of Project: -/01
Specifications
Height: 34 metres
Length: 350 metres
Volume of RCC: 130 m3x103
Total volume: 270 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Downstream
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Spillway
| Slope | Type |
|---|---|
| ogee | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 97 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 33 | No pozzolan used |

Details
Country: Japan
Owner: Ministry of Agriculture
Type: Gravity
Purpose(s): Irrigation
River: Miya
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: 03/94
Start of RCC: 03/94
End of RCC: 08/00
End of Project: 03/03
Specifications
Height: 69 metres
Length: 325 metres
Volume of RCC: 393 m3x103
Total volume: 480 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.83 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.83 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: US Department of Energy (Los Alamos Lab.)/US Army Corps of Engineers
Type: Gravity
Purpose(s): Flood Control
River: Pajarito
Reservoir capacity: 8 m3x106
Construction Dates
Start of Project: 06/00
Start of RCC: 06/00
End of RCC: 08/00
End of Project: 09/00
Specifications
Height: 36 metres
Length: 112 metres
Volume of RCC: 48 m3x103
Total volume: 48 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC supported by fill shoulders |
Downstream
| Slope | Type |
|---|---|
| 1.00 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| conduit |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 148 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Colombia
Owner: EPM (Empresas Públicas de Medellín)
Type: Gravity
Purpose(s): Hydropower
River: Porce
Reservoir capacity: 211 m3x106
Construction Dates
Start of Project: 11/94
Start of RCC: 11/94
End of RCC: 09/00
End of Project: 03/01
Specifications
Height: 123 metres
Length: 425 metres
Volume of RCC: 1305 m3x103
Total volume: 1445 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Slip-formed/extruded facing elements |
Downstream
| Slope | Type |
|---|---|
| 0.35 | Slip-formed/extruded facing elements [stepped face] |
| 0.75 |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 132 |
| 120 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 88 | Natural pozzolan (ASTM Class N) |
| 80 |

Details
Country: Brazil
Owner: Eletronorte SA
Type: Gravity
Purpose(s): Hydropower
River: Tocantins
Reservoir capacity: 45800 m3x106
Construction Dates
Start of Project: 06/98
Start of RCC: 06/98
End of RCC: 09/00
End of Project: 10/05
Specifications
Height: 78 metres
Length: 1541 metres
Volume of RCC: 288 m3x103
Total volume: 1383 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| RCC against formwork |
Downstream
| Slope | Type |
|---|---|
| RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| separate |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 30 | Natural pozzolan (ASTM Class N) |

Details
Country: South Africa
Owner: Department of Water & Sanitation
Type: Gravity
Purpose(s): Water Supply
River: Marite
Reservoir capacity: 123 m3x106
Construction Dates
Start of Project: 01/96
Start of RCC: 01/96
End of RCC: 10/00
End of Project: 03/02
Specifications
Height: 53 metres
Length: 350 metres
Volume of RCC: 160 m3x103
Total volume: 327 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.68 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.68 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 250 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 120 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: Dona Francisca Energértica SA
Type: Gravity
Purpose(s): Hydropower
River: Jacuí
Reservoir capacity: 335 m3x106
Construction Dates
Start of Project: 08/98
Start of RCC: 08/98
End of RCC: 10/00
End of Project: 12/00
Specifications
Height: 63 metres
Length: 670 metres
Volume of RCC: 485 m3x103
Total volume: 503 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 72 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 18 | Natural pozzolan (ASTM Class N) |

Details
Country: Jordan
Owner: Jordan Valley Authority, Ministry of Water and Irrigation
Type: Gravity
Purpose(s): Irrigation
River: Wadi al Hasa
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: 02/99
Start of RCC: 02/99
End of RCC: 12/00
End of Project: 09/01
Specifications
Height: 60 metres
Length: 270 metres
Volume of RCC: 250 m3x103
Total volume: 250 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
| 1.00 |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 1200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 125 |
| 120 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 75 | Natural pozzolan (ASTM Class N) |
| 50 |

Details
Country: China
Owner: Ge'ermu Hydroelectric Responsibility Corporation Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Geermu
Reservoir capacity: 9780 m3x106
Construction Dates
Start of Project: -/96
Start of RCC: -/96
End of RCC: -/00
End of Project: -/01
Specifications
Height: 40 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Secretaria Estadual do Meio Ambiente e Recursos Hídricos do Rio Grande do Norte
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: Apodi
Reservoir capacity: 600 m3x106
Construction Dates
Start of Project: -/98
Start of RCC: -/98
End of RCC: -/00
End of Project: 03/02
Specifications
Height: 48 metres
Length: 1660 metres
Volume of RCC: 1023 m3x103
Total volume: 1120 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: China
Owner: Shixing County Power Development Corporation
Type: Thin Arch
Purpose(s): Flood Control / Hydropower
River: Du’anshui (Chengjiang)
Reservoir capacity: 48 m3x106
Construction Dates
Start of Project: 09/99
Start of RCC: 09/99
End of RCC: 01/01
End of Project: 03/01
Specifications
Height: 57 metres
Length: 179 metres
Volume of RCC: 90 m3x103
Total volume: 119 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 330 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 105 |
| 63 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 86 | Low-lime flyash (ASTM Class F) |
| 80 |

Details
Country: Brazil
Owner: COMPESA (Companhia Pernambucana de Saneamento)
Type: Gravity
Purpose(s): Water Supply
River: Tiúma
Reservoir capacity: 6 m3x106
Construction Dates
Start of Project: -/99
Start of RCC: -/99
End of RCC: 01/01
End of Project: 05/01
Specifications
Height: 16 metres
Length: 132 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Tunisia
Owner: Ministre de l’Agriculture
Type: Gravity
Purpose(s): Irrigation
River: R’mil
Reservoir capacity: 44 m3x106
Construction Dates
Start of Project: 08/99
Start of RCC: 08/99
End of RCC: 05/01
End of Project: 11/01
Specifications
Height: 18 metres
Length: 260 metres
Volume of RCC: 64 m3x103
Total volume: 160 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC supported by fill shoulders |
Downstream
| Slope | Type |
|---|---|
| 0.90 | Mechanically compacted unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| 0.90 | Reinforced conventional concrete cast after RCC placement [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: China
Owner: Department of Electricity, Gansu Province
Type: Arch-Gravity
Purpose(s): Hydropower
River: Heihe
Reservoir capacity: 13 m3x106
Construction Dates
Start of Project: 04/99
Start of RCC: 04/99
End of RCC: 06/01
End of Project: 09/01
Specifications
Height: 80 metres
Length: 258 metres
Volume of RCC: 187 m3x103
Total volume: 210 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.20 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 96 |
| 58 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 109 | Low-lime flyash (ASTM Class F) |
| 113 |

Details
Country: China
Owner: Shimenzi Reservoir Engineering Management Office
Type: Thin Arch
Purpose(s): Hydropower / Irrigation / Water Supply
River: Taxi
Reservoir capacity: 80 m3x106
Construction Dates
Start of Project: 06/98
Start of RCC: 06/98
End of RCC: 06/01
End of Project: 10/01
Specifications
Height: 110 metres
Length: 176 metres
Volume of RCC: 188 m3x103
Total volume: 211 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.142 | RCC against formwork (GEVR/GE-RCC) |
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork |
| 0.18 | RCC against formwork |
Spillway
| Slope | Type |
|---|---|
| crest | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 93 |
| 62 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 110 | Low-lime flyash (ASTM Class F) |
| 110 |

Details
Country: UAE
Owner: Ministry of Agriculture and Fisheries
Type: Gravity
Purpose(s): Groundwater Recharge / Irrigation
River: -
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: 06/01
End of Project: -/01
Specifications
Height: 19 metres
Length: 100 metres
Volume of RCC: 9 m3x103
Total volume: 10 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: USA
Owner: USDA Natural Resources Conservation Service
Type: Gravity
Purpose(s): Flood Control / Recreation / Water Supply
River: North Fork Hughes River
Reservoir capacity: 1480 m3x106
Construction Dates
Start of Project: 07/99
Start of RCC: 07/99
End of RCC: 07/01
End of Project: -/01
Specifications
Height: 26 metres
Length: 200 metres
Volume of RCC: 65 m3x103
Total volume: 65 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 59 |
| 107 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 59 | Low-lime flyash (ASTM Class F) |
| 65 |

Details
Country: Japan
Owner: Ministry of Land, Infrastructure and Transport
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Chubetu
Reservoir capacity: 93 m3x106
Construction Dates
Start of Project: 03/94
Start of RCC: 03/94
End of RCC: 08/01
End of Project: 03/04
Specifications
Height: 86 metres
Length: 290 metres
Volume of RCC: 523 m3x103
Total volume: 1007 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.80 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
| 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: UAE
Owner: Ministry of Agriculture and Fisheries
Type: Gravity
Purpose(s): Groundwater Recharge / Irrigation
River: -
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: 10/01
End of Project: -/01
Specifications
Height: 24 metres
Length: 105 metres
Volume of RCC: 18 m3x103
Total volume: 20 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Reinforced conventional concrete cast before RCC placement |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: China
Owner: Department of Electricity, Yunnan Province
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Lancang (Mekong)
Reservoir capacity: 89 m3x106
Construction Dates
Start of Project: 10/97
Start of RCC: 10/97
End of RCC: 10/01
End of Project: 07/02
Specifications
Height: 115 metres
Length: 481 metres
Volume of RCC: 757 m3x103
Total volume: 1287 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
| 0.20 |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against precast concrete blocks [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 94 |
| 67 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 94 | Natural pozzolan (ASTM Class N) |
| 101 |

Details
Country: Brazil
Owner: Companhia Energética Mercosul (of the Tractebel Group)
Type: Gravity
Purpose(s): Hydropower
River: Tocantins
Reservoir capacity: 2300 m3x106
Construction Dates
Start of Project: 03/99
Start of RCC: 03/99
End of RCC: 10/01
End of Project: 10/02
Specifications
Height: 67 metres
Length: 510 metres
Volume of RCC: 527 m3x103
Total volume: 833 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| ogee | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 40 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 50 | Ground-granulated blast-furnace slag |

Details
Country: China
Owner: Mianhuatan Hydroelectric Development Corporation
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation / Water Supply
River: Ting
Reservoir capacity: 2035 m3x106
Construction Dates
Start of Project: 04/98
Start of RCC: 04/98
End of RCC: 11/01
End of Project: 04/02
Specifications
Height: 111 metres
Length: 302 metres
Volume of RCC: 500 m3x103
Total volume: 615 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels with hot poured membrane |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 82 |
| 59 48 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Low-lime flyash (ASTM Class F) |
| 88 88 |

Details
Country: Japan
Owner: Fukuoka Prefecture
Type: Gravity
Purpose(s): Flood Control / Navigation / Water Supply
River: Fukuti
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 10/98
Start of RCC: 10/98
End of RCC: 12/01
End of Project: 03/03
Specifications
Height: 65 metres
Length: 255 metres
Volume of RCC: 115 m3x103
Total volume: 201 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: DNOCS/Minas Gerais
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: Congonhas
Reservoir capacity: 6700 m3x106
Construction Dates
Start of Project: 10/99
Start of RCC: 10/99
End of RCC: 12/01
End of Project: -/02
Specifications
Height: 85 metres
Length: 668 metres
Volume of RCC: 890 m3x103
Total volume: 1030 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Brazil
Owner: Investco (Tractebel)
Type: Gravity
Purpose(s): Hydropower
River: Tocantins
Reservoir capacity: 4982 m3x106
Construction Dates
Start of Project: 07/98
Start of RCC: 07/98
End of RCC: 12/01
End of Project: 12/02
Specifications
Height: 43 metres
Length: 2100 metres
Volume of RCC: 188 m3x103
Total volume: 210 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 30 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 40 | Ground-granulated blast-furnace slag |

Details
Country: China
Owner: Chaoyang Water Conservancy Bureau
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Daling
Reservoir capacity: 217 m3x106
Construction Dates
Start of Project: -/96
Start of RCC: -/96
End of RCC: -/01
End of Project: -/02
Specifications
Height: 35 metres
Length: 383 metres
Volume of RCC: 87 m3x103
Total volume: 220 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 118 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: Companhia de Gestão dos Recursos Hídricos
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Condado
Reservoir capacity: 20 m3x106
Construction Dates
Start of Project: -/95
Start of RCC: -/95
End of RCC: -/01
End of Project: 12/02
Specifications
Height: 18 metres
Length: 270 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Japan
Owner: Tokyo Electric Power Company
Type: Gravity
Purpose(s): Hydropower
River: Jinryu
Reservoir capacity: 19 m3x106
Construction Dates
Start of Project: 03/97
Start of RCC: 03/97
End of RCC: -/01
End of Project: 06/05
Specifications
Height: 120 metres
Length: 350 metres
Volume of RCC: 269 m3x103
Total volume: 720 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.30 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.84 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.84 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 200 | 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 77 |
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 33 | Low-lime flyash (ASTM Class F) |
| 30 |

Details
Country: Brazil
Owner: DNOCS (Departamento Nacional de Obras Contra a Seca)
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: do Carmo
Reservoir capacity: 293 m3x106
Construction Dates
Start of Project: -/98
Start of RCC: -/98
End of RCC: -/01
End of Project: -/01
Specifications
Height: 42 metres
Length: 2308 metres
Volume of RCC: 655 m3x103
Total volume: 660 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Brazil
Owner: Aliança Geração de Energia SA
Type: Gravity
Purpose(s): Hydropower
River: Rio Grande
Reservoir capacity: 285 m3x106
Construction Dates
Start of Project: -/97
Start of RCC: -/97
End of RCC: -/01
End of Project: 12/02
Specifications
Height: 50 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Yushi Reservoir Construction Management Bureau
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Biliuhe
Reservoir capacity: 89 m3x106
Construction Dates
Start of Project: -/98
Start of RCC: -/98
End of RCC: -/01
End of Project: -/02
Specifications
Height: 50 metres
Length: 267 metres
Volume of RCC: 218 m3x103
Total volume: 233 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 70 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: CERB (Companhia de Engenharia Rural da Bahia)
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: Itapicuru-mirim
Reservoir capacity: -
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/01
End of Project: -/01
Specifications
Height: 24 metres
Length: 1090 metres
Volume of RCC: 42 m3x103
Total volume: 60 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 34 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 41 | Ground-granulated blast-furnace slag |

Details
Country: Brazil
Owner: CAGEPE (Companhia Pernambucana de Saneamento)
Type: Gravity
Purpose(s): Water Supply
River: Pirapama
Reservoir capacity: 61 m3x106
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/01
End of Project: -/01
Specifications
Height: 25 metres
Length: 300 metres
Volume of RCC: 87 m3x103
Total volume: 137 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 72 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 18 | No pozzolan used |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: Curimatá
Reservoir capacity: 24 m3x106
Construction Dates
Start of Project: -/97
Start of RCC: -/97
End of RCC: -/01
End of Project: 11/02
Specifications
Height: 26 metres
Length: 300 metres
Volume of RCC: 12 m3x103
Total volume: 14 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 16 | Natural pozzolan (ASTM Class N) |

Details
Country: China
Owner: Department of Electricity, Feng Shun County
Type: Gravity
Purpose(s): Hydropower / Irrigation
River: Xiaoxihe
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: -/99
Start of RCC: -/99
End of RCC: -/01
End of Project: -/02
Specifications
Height: 62 metres
Length: 103 metres
Volume of RCC: 47 m3x103
Total volume: 66 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower
River: Xiaoxihe
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: -/99
Start of RCC: -/99
End of RCC: -/01
End of Project: -/02
Specifications
Height: 68 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Costa Rica
Owner: ICE (Instituto Costarricense de Electricidad)
Type: Gravity
Purpose(s): Hydropower
River: Peñas Blancas
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 04/00
Start of RCC: 04/00
End of RCC: 01/02
End of Project: 07/02
Specifications
Height: 48 metres
Length: 211 metres
Volume of RCC: 120 m3x103
Total volume: 170 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 35 | Natural pozzolan (ASTM Class N) |

Details
Country: China
Owner: Electricity Corporation, Yanji
Type: Gravity
Purpose(s): Hydropower / Recreation / Water Supply
River: Hailanhe
Reservoir capacity: 30 m3x106
Construction Dates
Start of Project: 11/98
Start of RCC: 11/98
End of RCC: 01/02
End of Project: 12/02
Specifications
Height: 30 metres
Length: 244 metres
Volume of RCC: 43 m3x103
Total volume: 89 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| ogee | RCC against precast concrete blocks [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 2000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 113 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 113 | Low-lime flyash (ASTM Class F) |

Details
Country: Thailand
Owner: Royal Irrigation Department (RID)
Type: Gravity
Purpose(s): Irrigation
River: Mae Suai
Reservoir capacity: 73 m3x106
Construction Dates
Start of Project: 11/99
Start of RCC: 11/99
End of RCC: 01/02
End of Project: 07/02
Specifications
Height: 59 metres
Length: 340 metres
Volume of RCC: 300 m3x103
Total volume: 350 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.15 | RCC supported by fill shoulders |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 80 to | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: Spotsylvania County
Type: Gravity
Purpose(s): Water Supply
River: Hunting Run
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 05/00
Start of RCC: 05/00
End of RCC: 01/02
End of Project: 08/02
Specifications
Height: 36 metres
Length: 720 metres
Volume of RCC: 115 m3x103
Total volume: 128 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
| Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| Unformed face of RCC |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 74 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 37 | Low-lime flyash (ASTM Class F) |

Details
Country: Bolivia
Owner: Prefectura del Departamento de Santa Cruz
Type: Gravity
Purpose(s): Irrigation
River: Comarapa
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: 08/00
Start of RCC: 08/00
End of RCC: 02/02
End of Project: 06/02
Specifications
Height: 52 metres
Length: 154 metres
Volume of RCC: 72 m3x103
Total volume: 77 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.22 | RCC against formwork (GEVR/GE-RCC) |
| 0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 305 | 305 |
Cementitious material
| Cement (kg/m3) |
|---|
| 140 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Natural pozzolan (ASTM Class N) |

Details
Country: Jordan
Owner: Jordan Valley Authority, Ministry of Water and Irrigation
Type: Gravity
Purpose(s): Groundwater Recharge
River: Wala
Reservoir capacity: 9 m3x106
Construction Dates
Start of Project: 01/99
Start of RCC: 01/99
End of RCC: 04/02
End of Project: 04/03
Specifications
Height: 52 metres
Length: 300 metres
Volume of RCC: 240 m3x103
Total volume: 260 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.30 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 120 |
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |
| 0 |

Details
Country: China
Owner: Sichuan Minjiang Hydropower Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Caopohe
Reservoir capacity: 18 m3x106
Construction Dates
Start of Project: 06/97
Start of RCC: 06/97
End of RCC: 05/02
End of Project: 04/03
Specifications
Height: 132 metres
Length: 230 metres
Volume of RCC: 380 m3x103
Total volume: 392 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
| 0.10 |
Downstream
| Slope | Type |
|---|---|
| 0.21 | RCC against formwork |
Spillway
| Slope | Type |
|---|---|
| crest | Traditional concrete against formwork |
| 0.21 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 108 |
| 89 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 72 | Low-lime flyash (ASTM Class F) |
| 89 |

Details
Country: Brazil
Owner: Estado da Paraiba (Companhia de Aguas e Esgotus)
Type: Gravity
Purpose(s): Water Supply
River: Riachäo
Reservoir capacity: 27 m3x106
Construction Dates
Start of Project: 05/00
Start of RCC: 05/00
End of RCC: 06/02
End of Project: -/02
Specifications
Height: 56 metres
Length: 296 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Japan
Owner: Isikawa Prefecture
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Daishoji
Reservoir capacity: 25 m3x106
Construction Dates
Start of Project: 12/96
Start of RCC: 12/96
End of RCC: 07/02
End of Project: 03/06
Specifications
Height: 76 metres
Length: 280 metres
Volume of RCC: 188 m3x103
Total volume: 360 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.80 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: Colombia
Owner: Isagen S.A. E.S.P. - Hidromiel S.A. E.S.P.
Type: Gravity
Purpose(s): Hydropower
River: La Miel
Reservoir capacity: 565 m3x106
Construction Dates
Start of Project: 12/97
Start of RCC: 12/97
End of RCC: 07/02
End of Project: 10/02
Specifications
Height: 188 metres
Length: 345 metres
Volume of RCC: 1669 m3x103
Total volume: 1730 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork with external geomembrane (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
| 1.00 |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced conventional concrete cast after RCC placement |
| 1.00 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 to |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: USA
Owner: Piedmont Triad Regional Water Authority
Type: Gravity
Purpose(s): Recreation / Water Supply
River: Deep
Reservoir capacity: 84 m3x106
Construction Dates
Start of Project: 07/01
Start of RCC: 07/01
End of RCC: 07/02
End of Project: 01/03
Specifications
Height: 31 metres
Length: 280 metres
Volume of RCC: 70 m3x103
Total volume: 76 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 89 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 104 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Guizhou Province Electric Power Co.
Type: Gravity
Purpose(s): Water Supply
River: Xia Oyangxi
Reservoir capacity: 15 m3x106
Construction Dates
Start of Project: 05/00
Start of RCC: 05/00
End of RCC: 10/02
End of Project: 12/03
Specifications
Height: 45 metres
Length: 118 metres
Volume of RCC: 47 m3x103
Total volume: 49 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 350 | 3500 |
Cementitious material
| Cement (kg/m3) |
|---|
| 138 |
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 113 | Low-lime flyash (ASTM Class F) |
| 90 |

Details
Country: Greece
Owner: Ministry of Agriculture
Type: Hardfill
Purpose(s): Irrigation / Water Supply
River: Steno
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 02/00
Start of RCC: 02/00
End of RCC: 10/02
End of Project: 06/03
Specifications
Height: 32 metres
Length: 170 metres
Volume of RCC: 69 m3x103
Total volume: 70 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.70 | Reinforced concrete cast against precast units or slip-formed facing elements |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 200 - | 200 - |
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 55 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 5 | Natural pozzolan (ASTM Class N) |

Details
Country: USA
Owner: San Diego County Water Authority
Type: Gravity
Purpose(s): Water Supply
River: Escondido Creek
Reservoir capacity: 30 m3x106
Construction Dates
Start of Project: 06/01
Start of RCC: 06/01
End of RCC: 10/02
End of Project: 07/03
Specifications
Height: 97 metres
Length: 788 metres
Volume of RCC: 1070 m3x103
Total volume: 1140 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork with external geomembrane (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 74 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 121 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Corporation of Energy Development, Ruyuan County, Guangdong Province
Type: Gravity
Purpose(s): Hydropower / Irrigation
River: Yangxi
Reservoir capacity: 100 m3x106
Construction Dates
Start of Project: 12/00
Start of RCC: 12/00
End of RCC: 11/02
End of Project: 06/03
Specifications
Height: 82 metres
Length: 244 metres
Volume of RCC: 241 m3x103
Total volume: 340 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: Brazil
Owner: Secretaria Recursos Hídricos
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Quixeré
Reservoir capacity: 26 m3x106
Construction Dates
Start of Project: -/01
Start of RCC: -/01
End of RCC: 11/02
End of Project: -/03
Specifications
Height: 19 metres
Length: 700 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
| [stepped face] |
Spillway
| Slope | Type |
|---|---|
| [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Japan
Owner: Ibaraki Prefecture
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Ohkita
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: 11/94
Start of RCC: 11/94
End of RCC: 12/02
End of Project: 03/05
Specifications
Height: 65 metres
Length: 462 metres
Volume of RCC: 270 m3x103
Total volume: 531 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Ground-granulated blast-furnace slag |

Details
Country: China
Owner: Jiangning Nankengyuan Hydropower Development Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Xiaoxihe
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/98
Start of RCC: -/98
End of RCC: -/02
End of Project: -/03
Specifications
Height: 34 metres
Length: 114 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: CASAN (Companhia Catarinense de Águas e Saneamento)
Type: Gravity
Purpose(s): Hydropower
River: São Bento
Reservoir capacity: 58 m3x106
Construction Dates
Start of Project: -/99
Start of RCC: -/99
End of RCC: -/02
End of Project: -/03
Specifications
Height: 49 metres
Length: 461 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
| 0.80 |
Spillway
| Slope | Type |
|---|---|
| 0.80 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Yangxi
Reservoir capacity: 100 m3x106
Construction Dates
Start of Project: -/99
Start of RCC: -/99
End of RCC: -/02
End of Project: -/03
Specifications
Height: 82 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Energética Campos de Cima da Serra Ltda
Type: Gravity
Purpose(s): Hydropower
River: das Antas
Reservoir capacity: 27 m3x106
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/02
End of Project: 10/03
Specifications
Height: 31 metres
Length: 110 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Rio Glória Energética S.A.
Type: Gravity
Purpose(s): Hydropower
River: Glória
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/99
Start of RCC: -/99
End of RCC: -/02
End of Project: 12/03
Specifications
Height: 49 metres
Length: 218 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Energetica Rio Pedrinho Ltda..
Type: Gravity
Purpose(s): Hydropower
River: Pedrinho
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/99
Start of RCC: -/99
End of RCC: -/02
End of Project: -/03
Specifications
Height: 16 metres
Length: 110 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Itiquira Energética SA
Type: Gravity
Purpose(s): Hydropower
River: Itiquira
Reservoir capacity: -
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/02
End of Project: -/03
Specifications
Height: 15 metres
Length: -
Volume of RCC: 22 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: -
Type: Hardfill
Purpose(s): Hydropower
River: -
Reservoir capacity: -
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/02
End of Project: -/03
Specifications
Height: 18 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: CERB (Companhia de Engenharia Ambiental e Recursos Hidricos da Bahia)
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Pasto Velho
Reservoir capacity: 11 m3x106
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/02
End of Project: -/03
Specifications
Height: 27 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Tangará Energia S/A
Type: Gravity
Purpose(s): Hydropower
River: Guaporé
Reservoir capacity: 18 m3x106
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/02
End of Project: -/03
Specifications
Height: 32 metres
Length: 152 metres
Volume of RCC: -
Total volume: 43 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Mexico
Owner: CNA (Comisión Nacional del Agua)
Type: Hardfill
Purpose(s): unknown
River: El Salto
Reservoir capacity: -
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/02
End of Project: -/03
Specifications
Height: 35 metres
Length: 250 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Queiroz Galvão Energética SA (90%) and Cinco Estrelas Agropecuária e Participações Ltda (10%)
Type: Gravity
Purpose(s): Hydropower
River: Jauru
Reservoir capacity: 20 m3x106
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/02
End of Project: -/03
Specifications
Height: 51 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Longquan City Bureau of Hydropower
Type: Thin Arch
Purpose(s): Hydropower
River: Junxi
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/02
End of Project: -/03
Specifications
Height: 69 metres
Length: 192 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Jordan
Owner: Jordan Valley Authority, Ministry of Water and Irrigation
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Mujib
Reservoir capacity: 35 m3x106
Construction Dates
Start of Project: 01/99
Start of RCC: 01/99
End of RCC: 02/03
End of Project: 11/03
Specifications
Height: 67 metres
Length: 490 metres
Volume of RCC: 654 m3x103
Total volume: 694 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork with external geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: China
Owner: Hunan Wuling Hydroelectric Development Corporation
Type: Gravity
Purpose(s): Hydropower / Navigation
River: Youshui
Reservoir capacity: 378 m3x106
Construction Dates
Start of Project: 08/01
Start of RCC: 08/01
End of RCC: 05/03
End of Project: 05/04
Specifications
Height: 65 metres
Length: 238 metres
Volume of RCC: 141 m3x103
Total volume: 376 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Reinforced conventional concrete cast after RCC placement |
Spillway
| Slope | Type |
|---|---|
| ogee | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 86 |
| 68 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 103 | Low-lime flyash (ASTM Class F) |
| 83 |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Izig
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: 11/01
Start of RCC: 11/01
End of RCC: 05/03
End of Project: 01/04
Specifications
Height: 49 metres
Length: 222 metres
Volume of RCC: 50 m3x103
Total volume: 27 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.85 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |
| 0 |

Details
Country: China
Owner: Shaanxi Lan River Hydropower Development Corporation
Type: Thin Arch
Purpose(s): Hydropower / Irrigation
River: Lanhe
Reservoir capacity: 147 m3x106
Construction Dates
Start of Project: -/99
Start of RCC: -/99
End of RCC: 06/03
End of Project: -/04
Specifications
Height: 100 metres
Length: 311 metres
Volume of RCC: 229 m3x103
Total volume: 293 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| curve | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| curve | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| ogee | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 74 |
| 66 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 111 | Low-lime flyash (ASTM Class F) |
| 111 |

Details
Country: Japan
Owner: Japan Water Agency
Type: Gravity
Purpose(s): Flood Control / Navigation / Water Supply
River: Nakatu
Reservoir capacity: 63 m3x106
Construction Dates
Start of Project: 03/99
Start of RCC: 03/99
End of RCC: 06/03
End of Project: 03/07
Specifications
Height: 139 metres
Length: 424 metres
Volume of RCC: 810 m3x103
Total volume: 1670 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.15 | Traditional concrete against formwork |
| 0.70 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.72 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.72 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| 72 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |
| 48 |

Details
Country: South Africa
Owner: Department of Water & Sanitation
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Luvuvhu
Reservoir capacity: 164 m3x106
Construction Dates
Start of Project: 04/98
Start of RCC: 04/98
End of RCC: 08/03
End of Project: 04/04
Specifications
Height: 47 metres
Length: 392 metres
Volume of RCC: 150 m3x103
Total volume: 316 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 250 |
Cementitious material
| Cement (kg/m3) |
|---|
| 54 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 129 | Low-lime flyash (ASTM Class F) |

Details
Country: Spain
Owner: Confederación Hidrográfica del Guadalquivir
Type: Gravity
Purpose(s): Environmental
River: Viar
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: -/02
Start of RCC: -/02
End of RCC: 08/03
End of Project: 03/04
Specifications
Height: 21 metres
Length: 383 metres
Volume of RCC: 62 m3x103
Total volume: 89 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.30 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Downstream
| Slope | Type |
|---|---|
| 0.90 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.90 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 68 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 157 | Low-lime flyash (ASTM Class F) |

Details
Country: Chile
Owner: ENDESA, Spain
Type: Gravity
Purpose(s): Hydropower
River: Bio-Bio
Reservoir capacity: 1200 m3x106
Construction Dates
Start of Project: 08/99
Start of RCC: 08/99
End of RCC: 09/03
End of Project: 04/04
Specifications
Height: 155 metres
Length: 360 metres
Volume of RCC: 1596 m3x103
Total volume: 1640 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 133 |
| 95 116 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 57 | Natural pozzolan (ASTM Class N) |
| 50 41 |

Details
Country: China
Owner: Chongging Electricity Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Apeng
Reservoir capacity: 25 m3x106
Construction Dates
Start of Project: 08/01
Start of RCC: 08/01
End of RCC: 10/03
End of Project: 11/03
Specifications
Height: 56 metres
Length: 193 metres
Volume of RCC: 72 m3x103
Total volume: 161 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Downstream
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Spillway
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: China
Owner: Henan Electric Power Corporation
Type: Gravity
Purpose(s): Hydropower
River: Huilonggou
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 06/01
Start of RCC: 06/01
End of RCC: 11/03
End of Project: -/05
Specifications
Height: 54 metres
Length: 208 metres
Volume of RCC: 73 m3x103
Total volume: 76 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| none |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: Russia
Owner: RusHydro
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Bureya
Reservoir capacity: 21000 m3x106
Construction Dates
Start of Project: 01/76
Start of RCC: 01/76
End of RCC: -/03
End of Project: -/09
Specifications
Height: 139 metres
Length: 810 metres
Volume of RCC: 709 m3x103
Total volume: 3538 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 - | 300 - |
| 500 | 500 |
Cementitious material
| Cement (kg/m3) |
|---|
| 95 to |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 25 to | Natural pozzolan (ASTM Class N) |

Details
Country: China
Owner: Shaanxi Hanjiang Hydropower Development Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Renhe
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/03
End of Project: -/04
Specifications
Height: 66 metres
Length: 120 metres
Volume of RCC: 81 m3x103
Total volume: 106 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Xifeng County Water Conservancy Bureau
Type: Thin Arch
Purpose(s): Water Supply
River: Yangshui
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/01
Start of RCC: -/01
End of RCC: -/03
End of Project: -/04
Specifications
Height: 39 metres
Length: 176 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Wang Keng Power Station Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Tangkouxi
Reservoir capacity: 15 m3x106
Construction Dates
Start of Project: -/01
Start of RCC: -/01
End of RCC: -/03
End of Project: -/04
Specifications
Height: 56 metres
Length: 159 metres
Volume of RCC: 38 m3x103
Total volume: 40 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: Peru
Owner: Yanacocha Mine
Type: Hardfill
Purpose(s): Environmental
River: Rejo
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/02
Start of RCC: -/02
End of RCC: -/03
End of Project: -/04
Specifications
Height: 35 metres
Length: 125 metres
Volume of RCC: 30 m3x103
Total volume: 33 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: China
Owner: Anhui Hydropower Development Co. Ltd.,
Type: Thin Arch
Purpose(s): Flood Control / Hydropower
River: Xipihe
Reservoir capacity: 51 m3x106
Construction Dates
Start of Project: -/02
Start of RCC: -/02
End of RCC: -/03
End of Project: -/04
Specifications
Height: 70 metres
Length: 258 metres
Volume of RCC: 130 m3x103
Total volume: 168 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: Mexico
Owner: Secretaria de Desarrollo Urbano Y Obras Publicas, Gobierno Del Estado de Nuevo Leon
Type: Gravity
Purpose(s): Flood Control
River: Santa Catarina
Reservoir capacity: 100 m3x106
Construction Dates
Start of Project: -/02
Start of RCC: -/02
End of RCC: -/03
End of Project: -/04
Specifications
Height: 109 metres
Length: 250 metres
Volume of RCC: 380 m3x103
Total volume: 400 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
| 0.85 | Unformed face of RCC [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.85 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 65 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 35 | Low-lime flyash (ASTM Class F) |

Details
Country: India
Owner: GoMWRD (Government of Maharashtra Water Resources Department)
Type: Gravity
Purpose(s): Hydropower
River: Pravara
Reservoir capacity: 6 m3x106
Construction Dates
Start of Project: 12/01
Start of RCC: 12/01
End of RCC: 01/04
End of Project: 06/04
Specifications
Height: 15 metres
Length: 503 metres
Volume of RCC: 35 m3x103
Total volume: 40 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.78 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.78 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 88 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 132 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Mindong Electromechanical Development Corporation
Type: Gravity
Purpose(s): Hydropower
River: Muyangxi
Reservoir capacity: 47 m3x106
Construction Dates
Start of Project: -/02
Start of RCC: -/02
End of RCC: 03/04
End of Project: 06/04
Specifications
Height: 73 metres
Length: 206 metres
Volume of RCC: 159 m3x103
Total volume: 199 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.72 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 67 |
| 50 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Low-lime flyash (ASTM Class F) |
| 92 |

Details
Country: China
Owner: Henan Electric Power Corporation
Type: Gravity
Purpose(s): Hydropower
River: Huilonggou
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 06/01
Start of RCC: 06/01
End of RCC: 06/04
End of Project: -/05
Specifications
Height: 54 metres
Length: 175 metres
Volume of RCC: 88 m3x103
Total volume: 105 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: Thailand
Owner: Royal Irrigation Department
Type: Gravity
Purpose(s): Irrigation
River: Nakhon Nayok
Reservoir capacity: 224 m3x106
Construction Dates
Start of Project: 11/99
Start of RCC: 11/99
End of RCC: 07/04
End of Project: 01/05
Specifications
Height: 95 metres
Length: 2600 metres
Volume of RCC: 4900 m3x103
Total volume: 5400 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Slip-formed/extruded facing elements |
| 0.40 |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Slip-formed/extruded facing elements [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Slip-formed/extruded facing elements [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Low-lime flyash (ASTM Class F) |

Details
Country: Portugal
Owner: EDIA (Empresa de Desenvolvimento e Infra-Estruturas do Alqueva)
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation
River: Guadiana
Reservoir capacity: 106 m3x106
Construction Dates
Start of Project: 08/02
Start of RCC: 08/02
End of RCC: 08/04
End of Project: -/05
Specifications
Height: 43 metres
Length: 448 metres
Volume of RCC: 172 m3x103
Total volume: 392 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 55 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 165 | Low-lime flyash (ASTM Class F) |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Zamrine
Reservoir capacity: 56 m3x106
Construction Dates
Start of Project: 05/03
Start of RCC: 05/03
End of RCC: 09/04
End of Project: 05/05
Specifications
Height: 69 metres
Length: 220 metres
Volume of RCC: 190 m3x103
Total volume: 215 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | Natural pozzolan (ASTM Class N) |

Details
Country: China
Owner: Beichuan Bashu Tongkou River Development Corporation
Type: Gravity
Purpose(s): Hydropower
River: Tongkou
Reservoir capacity: 36 m3x106
Construction Dates
Start of Project: 10/98
Start of RCC: 10/98
End of RCC: -/04
End of Project: -/04
Specifications
Height: 72 metres
Length: 198 metres
Volume of RCC: 300 m3x103
Total volume: 352 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 1.10 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| ogee | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: China
Owner: Guangxi-Guiguan Electric Power Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Nanpan
Reservoir capacity: 278 m3x106
Construction Dates
Start of Project: 12/01
Start of RCC: 12/01
End of RCC: -/04
End of Project: 07/05
Specifications
Height: 62 metres
Length: 396 metres
Volume of RCC: 150 m3x103
Total volume: 700 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| ogee | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: Brazil
Owner: COMPESA (Companhia Pernambucana de Saneamento)
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/04
End of Project: -/05
Specifications
Height: 33 metres
Length: 210 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Yineng Co., Ltd.
Type: Thin Arch
Purpose(s): unknown
River: -
Reservoir capacity: 41 m3x106
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/04
End of Project: -/05
Specifications
Height: 66 metres
Length: 191 metres
Volume of RCC: -
Total volume: 66 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: CERAN (Companhia Energética Rio das Antas)
Type: Gravity
Purpose(s): Hydropower
River: das Antas
Reservoir capacity: 23 m3x106
Construction Dates
Start of Project: 04/02
Start of RCC: 04/02
End of RCC: -/04
End of Project: 12/04
Specifications
Height: 25 metres
Length: 180 metres
Volume of RCC: 35 m3x103
Total volume: 66 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 15 | |

Details
Country: Brazil
Owner: SANEAGO (Saneamento de Goiás S.A.)
Type: Gravity
Purpose(s): Water Supply
River: João Leite
Reservoir capacity: 129 m3x106
Construction Dates
Start of Project: 03/01
Start of RCC: 03/01
End of RCC: -/04
End of Project: -/04
Specifications
Height: 55 metres
Length: 380 metres
Volume of RCC: 270 m3x103
Total volume: 290 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 20 | Natural pozzolan (ASTM Class N) |

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): unknown
River: Sanjianghe
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: -/02
Start of RCC: -/02
End of RCC: -/04
End of Project: -/04
Specifications
Height: 72 metres
Length: 138 metres
Volume of RCC: -
Total volume: 38 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Guangdong Shanneng group Co.
Type: Thin Arch
Purpose(s): Hydropower
River: Tuwushui
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/03
Start of RCC: -/03
End of RCC: -/04
End of Project: -/04
Specifications
Height: 53 metres
Length: 124 metres
Volume of RCC: -
Total volume: 29 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Laos
Owner: EDL (Electricite du Laos)
Type: Gravity
Purpose(s): Hydropower
River: Nam Gnong
Reservoir capacity: 49 m3x106
Construction Dates
Start of Project: -/02
Start of RCC: -/02
End of RCC: -/04
End of Project: 01/05
Specifications
Height: 28 metres
Length: 151 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Alianca Geracao de Energia S.A.
Type: Gravity
Purpose(s): Hydropower
River: Doce
Reservoir capacity: 54 m3x106
Construction Dates
Start of Project: 05/01
Start of RCC: 05/01
End of RCC: -/04
End of Project: 05/05
Specifications
Height: 53 metres
Length: 437 metres
Volume of RCC: 236 m3x103
Total volume: 248 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 40 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 50 | Ground-granulated blast-furnace slag |

Details
Country: Brazil
Owner: DNOCS (Departamento Nacional de Obras Contra as Secas)
Type: Gravity
Purpose(s): Water Supply
River: Banabuiú
Reservoir capacity: 54 m3x106
Construction Dates
Start of Project: -/01
Start of RCC: -/01
End of RCC: -/04
End of Project: -/05
Specifications
Height: 19 metres
Length: 290 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: ELEJOR - Centrais Elétricas do Rio Jordão
Type: Gravity
Purpose(s): Hydropower
River: Jordao
Reservoir capacity: 34 m3x106
Construction Dates
Start of Project: -/01
Start of RCC: -/01
End of RCC: -/04
End of Project: -/05
Specifications
Height: 43 metres
Length: 445 metres
Volume of RCC: 200 m3x103
Total volume: 220 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 16 | Natural pozzolan (ASTM Class N) |

Details
Country: China
Owner: Chongqing Yujiankou Hydropower Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Long
Reservoir capacity: 9 m3x106
Construction Dates
Start of Project: 08/01
Start of RCC: 08/01
End of RCC: -/04
End of Project: -/05
Specifications
Height: 50 metres
Length: 156 metres
Volume of RCC: 118 m3x103
Total volume: 147 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| 0.85 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: Japan
Owner: North Dam Integrated Control Office
Type: Hardfill
Purpose(s): Environmental
River: Taiho
Reservoir capacity: -
Construction Dates
Start of Project: -/02
Start of RCC: -/02
End of RCC: -/04
End of Project: -/05
Specifications
Height: 30 metres
Length: 110 metres
Volume of RCC: 34 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 1.20 | Reinforced conventional concrete cast after RCC placement |
Downstream
| Slope | Type |
|---|---|
| 1.20 | Reinforced conventional concrete cast after RCC placement |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 500 |
| 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Ground-granulated blast-furnace slag | |

Details
Country: China
Owner: Guangxi-Guiguan Electric Power Co. Ltd.,
Type: Gravity
Purpose(s): Hydropower / Irrigation / Navigation
River: Xijiang
Reservoir capacity: 950 m3x106
Construction Dates
Start of Project: -/02
Start of RCC: -/02
End of RCC: -/04
End of Project: -/05
Specifications
Height: 66 metres
Length: 586 metres
Volume of RCC: 50 m3x103
Total volume: 210 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Guiyang Water Conservancy Bureau
Type: Thin Arch
Purpose(s): Flood Control / Irrigation / Water Supply
River: Wu
Reservoir capacity: 11 m3x106
Construction Dates
Start of Project: -/02
Start of RCC: -/02
End of RCC: -/04
End of Project: -/05
Specifications
Height: 81 metres
Length: 180 metres
Volume of RCC: 105 m3x103
Total volume: 110 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 |
Downstream
| Slope | Type |
|---|---|
| 0.76 |
Spillway
| Slope | Type |
|---|---|
| 0.76 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Hubei Nanzhang Xiakou Electric Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Juhe
Reservoir capacity: 99 m3x106
Construction Dates
Start of Project: -/02
Start of RCC: -/02
End of RCC: -/04
End of Project: -/05
Specifications
Height: 85 metres
Length: 192 metres
Volume of RCC: -
Total volume: 131 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Hardfill
Purpose(s): unknown
River: -
Reservoir capacity: -
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/04
End of Project: -/06
Specifications
Height: 16 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Meixi
Reservoir capacity: 20 m3x106
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/04
End of Project: -/06
Specifications
Height: 96 metres
Length: 178 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: CERB (Companhia de Engenharia Ambiental e Recursos Hidricos da Bahia)
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Itapicuru-aço
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/01
Start of RCC: -/01
End of RCC: -/04
End of Project: -/05
Specifications
Height: 44 metres
Length: 191 metres
Volume of RCC: 75 m3x103
Total volume: 85 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 56 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 14 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: CERB (Companhia de Engenharia Ambiental e Recursos Hidricos da Bahia)
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Paraguaçu
Reservoir capacity: 112 m3x106
Construction Dates
Start of Project: -/02
Start of RCC: -/02
End of RCC: -/04
End of Project: -/05
Specifications
Height: 19 metres
Length: 320 metres
Volume of RCC: 75 m3x103
Total volume: 85 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 56 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 14 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Elejor Centrais Elétricas do Rio Jordåo S.A.
Type: Gravity
Purpose(s): Hydropower
River: Jordåo
Reservoir capacity: 431 m3x106
Construction Dates
Start of Project: 11/02
Start of RCC: 11/02
End of RCC: -/04
End of Project: 01/05
Specifications
Height: 67 metres
Length: 543 metres
Volume of RCC: 530 m3x103
Total volume: 606 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 40 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 50 | Ground-granulated blast-furnace slag |

Details
Country: Peru
Owner: Yanacocha Mine
Type: Hardfill
Purpose(s): Environmental
River: Rio Grande
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/03
Start of RCC: -/03
End of RCC: -/04
End of Project: -/05
Specifications
Height: 45 metres
Length: 98 metres
Volume of RCC: 72 m3x103
Total volume: 77 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 120 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: USA
Owner: Town of Big Stone Gap
Type: Gravity
Purpose(s): Water Supply
River: South Fork, Powell River
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 04/04
Start of RCC: 04/04
End of RCC: 01/05
End of Project: 07/05
Specifications
Height: 26 metres
Length: 113 metres
Volume of RCC: 11 m3x103
Total volume: 12 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 82 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 82 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: South Carolina Electric and Gas
Type: Gravity
Purpose(s): Hydropower
River: Saluda
Reservoir capacity: 1970 m3x106
Construction Dates
Start of Project: 08/02
Start of RCC: 08/02
End of RCC: 04/05
End of Project: 07/05
Specifications
Height: 65 metres
Length: 2439 metres
Volume of RCC: 1004 m3x103
Total volume: 1410 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| Traditional concrete against precast concrete panels [stepped face] |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 89 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 89 | Low-lime flyash (ASTM Class F) |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Moulouya
Reservoir capacity: 400 m3x106
Construction Dates
Start of Project: 02/01
Start of RCC: 02/01
End of RCC: 04/05
End of Project: 03/06
Specifications
Height: 115 metres
Length: 577 metres
Volume of RCC: 590 m3x103
Total volume: 690 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 65 |
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 15 | Natural pozzolan (ASTM Class N) |
| 20 |

Details
Country: Mexico
Owner: CFE (Comisión Federal de Electricidad)
Type: Gravity
Purpose(s): Irrigation
River: San Lorenzo
Reservoir capacity: 14 m3x106
Construction Dates
Start of Project: 11/03
Start of RCC: 11/03
End of RCC: 04/05
End of Project: 06/05
Specifications
Height: 30 metres
Length: 218 metres
Volume of RCC: 42 m3x103
Total volume: 60 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels with geomembrane |
| 1.00 |
Downstream
| Slope | Type |
|---|---|
| 1.00 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 1.00 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 120 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Iran
Owner: Hormozgan Water Authority
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Jagin
Reservoir capacity: 300 m3x106
Construction Dates
Start of Project: 12/01
Start of RCC: 12/01
End of RCC: 05/05
End of Project: 09/07
Specifications
Height: 78 metres
Length: 220 metres
Volume of RCC: 232 m3x103
Total volume: 382 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
| 0.30 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 105 |
| 160 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 90 | Natural pozzolan (ASTM Class N) |
| 90 |

Details
Country: China
Owner: Changyang Electric Power Bureau
Type: Thin Arch
Purpose(s): Hydropower / Irrigation / Water Supply
River: Duhu
Reservoir capacity: 70 m3x106
Construction Dates
Start of Project: 12/03
Start of RCC: 12/03
End of RCC: 05/05
End of Project: 10/05
Specifications
Height: 107 metres
Length: 206 metres
Volume of RCC: 166 m3x103
Total volume: 255 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| curve | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| curve | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| 126 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 126 | Low-lime flyash (ASTM Class F) |
| 103 |

Details
Country: China
Owner: Hanjiang Hydropower Development Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation
River: Han
Reservoir capacity: 229 m3x106
Construction Dates
Start of Project: 11/03
Start of RCC: 11/03
End of RCC: 05/05
End of Project: 06/07
Specifications
Height: 63 metres
Length: 346 metres
Volume of RCC: 194 m3x103
Total volume: 631 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Hardfill
Purpose(s): Hydropower / Irrigation / Water Supply
River: Buyuk Menderes
Reservoir capacity: 82 m3x106
Construction Dates
Start of Project: 04/94
Start of RCC: 04/94
End of RCC: 05/05
End of Project: 11/07
Specifications
Height: 107 metres
Length: 280 metres
Volume of RCC: 1500 m3x103
Total volume: 1685 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.89 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 50 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 20 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Guizhou-Wujiang Hydropower Development Co. Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Navigation / Water Supply
River: Wu
Reservoir capacity: 201 m3x106
Construction Dates
Start of Project: 10/00
Start of RCC: 10/00
End of RCC: 08/05
End of Project: 03/06
Specifications
Height: 116 metres
Length: 165 metres
Volume of RCC: 421 m3x103
Total volume: 739 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
| 0.25 | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 95 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Fukushima Prefecture
Type: Gravity
Purpose(s): Flood Control / Irrigation / Navigation / Water Supply
River: Kido
Reservoir capacity: 19 m3x106
Construction Dates
Start of Project: 10/00
Start of RCC: 10/00
End of RCC: 08/05
End of Project: 03/08
Specifications
Height: 94 metres
Length: 350 metres
Volume of RCC: 291 m3x103
Total volume: 501 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
| 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: Australia
Owner: Sunwater
Type: Gravity
Purpose(s): Flood Control / Irrigation
River: Burnett
Reservoir capacity: 300 m3x106
Construction Dates
Start of Project: 11/03
Start of RCC: 11/03
End of RCC: 09/05
End of Project: 11/05
Specifications
Height: 50 metres
Length: 940 metres
Volume of RCC: 400 m3x103
Total volume: 400 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.64 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.64 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 310 | 310 |
Cementitious material
| Cement (kg/m3) |
|---|
| 63 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Belize
Owner: Belize Electric Co. Ltd (BECOL) and A. Fortis Co., Canada
Type: Gravity
Purpose(s): Hydropower
River: Macal
Reservoir capacity: 120 m3x106
Construction Dates
Start of Project: 07/03
Start of RCC: 07/03
End of RCC: 10/05
End of Project: 12/06
Specifications
Height: 68 metres
Length: 425 metres
Volume of RCC: 180 m3x103
Total volume: 210 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3600 |
Cementitious material
| Cement (kg/m3) |
|---|
| 105 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: BAESA (JV of Alcoa, Companhia Paulista de Força e Luz (CPFL), Companhia Brasileira de Alumínio, Camargo Corrêa Cimentos and DME Energética)
Type: Gravity
Purpose(s): Hydropower
River: Pelotas
Reservoir capacity: 50000 m3x106
Construction Dates
Start of Project: -/01
Start of RCC: -/01
End of RCC: -/05
End of Project: -/06
Specifications
Height: 85 metres
Length: 665 metres
Volume of RCC: 1 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Xun
Reservoir capacity: 56 m3x106
Construction Dates
Start of Project: -/93
Start of RCC: -/93
End of RCC: -/05
End of Project: -/07
Specifications
Height: 56 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: L.D.Q.S.P.E. Geracao de Energia e Participacoes Ltda.
Type: Gravity
Purpose(s): Hydropower
River: do Peixe
Reservoir capacity: 8 m3x106
Construction Dates
Start of Project: -/02
Start of RCC: -/02
End of RCC: -/05
End of Project: -/06
Specifications
Height: 32 metres
Length: 97 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Guangxi Longjiang Electric Power Corporation
Type: Thin Arch
Purpose(s): Hydropower
River: Long
Reservoir capacity: 49 m3x106
Construction Dates
Start of Project: -/02
Start of RCC: -/02
End of RCC: -/05
End of Project: -/06
Specifications
Height: 68 metres
Length: 167 metres
Volume of RCC: 172 m3x103
Total volume: 226 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: China Southern Power Grid
Type: Gravity
Purpose(s): Hydropower
River: Caitouhe
Reservoir capacity: 30 m3x106
Construction Dates
Start of Project: -/02
Start of RCC: -/02
End of RCC: -/05
End of Project: -/11
Specifications
Height: 61 metres
Length: 420 metres
Volume of RCC: 235 m3x103
Total volume: 242 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Qingtian Yongwen Hydropower Co.
Type: Thin Arch
Purpose(s): Hydropower
River: Guxi
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: -/03
Start of RCC: -/03
End of RCC: -/05
End of Project: -/05
Specifications
Height: 66 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Downstream
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Spillway
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: EMBASA (Empresa Baiana de Aguas e Saneamento S.A.)
Type: Gravity
Purpose(s): Hydropower / Irrigation
River: Sapucaia
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/05
End of Project: -/05
Specifications
Height: 16 metres
Length: 207 metres
Volume of RCC: 15 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Enerpeixa S/A
Type: Gravity
Purpose(s): Hydropower
River: Tocantins
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 04/02
Start of RCC: 04/02
End of RCC: -/05
End of Project: 09/06
Specifications
Height: 39 metres
Length: 400 metres
Volume of RCC: 500 m3x103
Total volume: 582 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Brazil
Owner: CJ Energética S/A
Type: Gravity
Purpose(s): Hydropower
River: Bernardo José
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/03
Start of RCC: -/03
End of RCC: -/05
End of Project: -/06
Specifications
Height: 21 metres
Length: 120 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: CODEVASF (Companhia de Desenvolvimento dos Vales do São Francisco e do Parnaíba)
Type: Gravity
Purpose(s): Water Supply
River: Poço do Magro
Reservoir capacity: 32 m3x106
Construction Dates
Start of Project: -/03
Start of RCC: -/03
End of RCC: -/05
End of Project: -/06
Specifications
Height: 22 metres
Length: 540 metres
Volume of RCC: 58 m3x103
Total volume: 68 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 16 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Usina Central Olho D'Água S/A
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Itambé
Reservoir capacity: 21 m3x106
Construction Dates
Start of Project: -/03
Start of RCC: -/03
End of RCC: -/05
End of Project: -/06
Specifications
Height: 30 metres
Length: 306 metres
Volume of RCC: 50 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
| [stepped face] |
Spillway
| Slope | Type |
|---|---|
| [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: China
Owner: Xixi Reservoir Development Co. Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Daxi
Reservoir capacity: 85 m3x106
Construction Dates
Start of Project: -/03
Start of RCC: -/03
End of RCC: -/05
End of Project: -/06
Specifications
Height: 71 metres
Length: 243 metres
Volume of RCC: 231 m3x103
Total volume: 244 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: Philippines
Owner: National Irrigation Administration
Type: Hardfill
Purpose(s): Irrigation
River: Can Asujan
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 10/03
Start of RCC: 10/03
End of RCC: -/05
End of Project: -/05
Specifications
Height: 42 metres
Length: 135 metres
Volume of RCC: 75 m3x103
Total volume: 85 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.60 | RCC against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.60 | RCC against precast concrete panels |
Spillway
| Slope | Type |
|---|---|
| 0.60 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 170 | 170 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Malaysia
Owner: Lembaga Air Perak/Metropolitan Utilities Corporation
Type: Gravity
Purpose(s): Water Supply
River: Kinta
Reservoir capacity: 30 m3x106
Construction Dates
Start of Project: 01/03
Start of RCC: 01/03
End of RCC: 03/06
End of Project: 07/06
Specifications
Height: 90 metres
Length: 792 metres
Volume of RCC: 952 m3x103
Total volume: 975 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: Pine Brook Water District
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 01/05
Start of RCC: 01/05
End of RCC: 04/06
End of Project: -/06
Specifications
Height: 26 metres
Length: 170 metres
Volume of RCC: 27 m3x103
Total volume: 30 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| separate |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 95 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 59 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Guangxi-Youjiang Hydraulic Development Co.Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Navigation / Water Supply
River: You
Reservoir capacity: 5660 m3x106
Construction Dates
Start of Project: 10/01
Start of RCC: 10/01
End of RCC: 04/06
End of Project: 12/06
Specifications
Height: 130 metres
Length: 720 metres
Volume of RCC: 1995 m3x103
Total volume: 2672 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels with hot poured membrane |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| 50 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 132 | Low-lime flyash (ASTM Class F) |
| 110 |

Details
Country: India
Owner: GoMWRD (Government of Maharashtra Water Resources Department)
Type: Gravity
Purpose(s): Hydropower
River: Shahi Nallah
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 12/01
Start of RCC: 12/01
End of RCC: 05/06
End of Project: 03/07
Specifications
Height: 86 metres
Length: 447 metres
Volume of RCC: 638 m3x103
Total volume: 646 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.141 | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.782 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.782 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 75 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 150 | Low-lime flyash (ASTM Class F) |

Details
Country: Jordan/ Syria
Owner: Jordan Valley Authority, Ministry of Water and Irrigation
Type: Gravity
Purpose(s): Water Supply
River: Yarmouk
Reservoir capacity: 110 m3x106
Construction Dates
Start of Project: 06/03
Start of RCC: 06/03
End of RCC: 07/06
End of Project: 12/07
Specifications
Height: 103 metres
Length: 485 metres
Volume of RCC: 1426 m3x103
Total volume: 1478 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
| 0.60 |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 60 | Low-lime flyash (ASTM Class F) |
| 60 |

Details
Country: Botswana
Owner: Department of Water Affairs
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: 26 m3x106
Construction Dates
Start of Project: 11/04
Start of RCC: 11/04
End of RCC: 09/06
End of Project: 05/07
Specifications
Height: 33 metres
Length: 153 metres
Volume of RCC: 30 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: USA
Owner: Genesee Water and Sanitation District
Type: Gravity
Purpose(s): Water Supply
River: Bear Creek
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 06/06
Start of RCC: 06/06
End of RCC: 11/06
End of Project: 10/07
Specifications
Height: 29 metres
Length: 168 metres
Volume of RCC: 24 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Japan
Owner: Ministry of Land, Infrastructure and Transport
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation / Water Supply
River: Okitamano
Reservoir capacity: 51 m3x106
Construction Dates
Start of Project: 03/00
Start of RCC: 03/00
End of RCC: 11/06
End of Project: 03/11
Specifications
Height: 126 metres
Length: 381 metres
Volume of RCC: 703 m3x103
Total volume: 1200 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.50 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.73 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.73 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Wujaing Qingshuihe Hydropower Development Co. Ltd.
Type: Thin Arch
Purpose(s): Flood Control / Hydropower
River: Qingshuihe
Reservoir capacity: 276 m3x106
Construction Dates
Start of Project: 12/03
Start of RCC: 12/03
End of RCC: 11/06
End of Project: -/07
Specifications
Height: 135 metres
Length: 198 metres
Volume of RCC: 550 m3x103
Total volume: 670 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| curve | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| curve | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 81 |
| 94 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 81 | Low-lime flyash (ASTM Class F) |
| 94 |

Details
Country: China
Owner: Niu Qiao Reservoir Development Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Qingtonghe
Reservoir capacity: 26 m3x106
Construction Dates
Start of Project: -/03
Start of RCC: -/03
End of RCC: 12/06
End of Project: -/07
Specifications
Height: 62 metres
Length: 201 metres
Volume of RCC: -
Total volume: 710 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Vietnam
Owner: EVN (Electrictie de Vietnam)
Type: Gravity
Purpose(s): Hydropower
River: Po Ko
Reservoir capacity: 1048 m3x106
Construction Dates
Start of Project: 11/05
Start of RCC: 11/05
End of RCC: 12/06
End of Project: -/07
Specifications
Height: 65 metres
Length: 495 metres
Volume of RCC: 326 m3x103
Total volume: 450 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 210 | Natural pozzolan (ASTM Class N) |

Details
Country: Venezuela
Owner: MARN (Ministerio del Ambiente y los Recursos Naturales)
Type: Hardfill
Purpose(s): Flood Control / Irrigation / Water Supply
River: El Guapo
Reservoir capacity: 141 m3x106
Construction Dates
Start of Project: 08/05
Start of RCC: 08/05
End of RCC: 12/06
End of Project: 08/07
Specifications
Height: 50 metres
Length: 138 metres
Volume of RCC: 320 m3x103
Total volume: 342 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.60 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.85 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| 1.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 75 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower
River: Liuchi
Reservoir capacity: 71 m3x106
Construction Dates
Start of Project: -/03
Start of RCC: -/03
End of RCC: -/06
End of Project: -/07
Specifications
Height: 81 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Kaidu
Reservoir capacity: -
Construction Dates
Start of Project: -/97
Start of RCC: -/97
End of RCC: -/06
End of Project: -/08
Specifications
Height: 71 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Maue Geradora
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: -
Construction Dates
Start of Project: 05/05
Start of RCC: 05/05
End of RCC: -/06
End of Project: 10/06
Specifications
Height: 19 metres
Length: 245 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Chile
Owner: -
Type: Hardfill
Purpose(s): Irrigation
River: -
Reservoir capacity: 1088 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/06
End of Project: -/06
Specifications
Height: 23 metres
Length: 380 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: China Huadian Corporation
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Wanan
Reservoir capacity: 199 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/06
End of Project: -/06
Specifications
Height: 75 metres
Length: 172 metres
Volume of RCC: 211 m3x103
Total volume: 239 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Esmeralda S.A.
Type: Gravity
Purpose(s): Hydropower
River: Bernardo José
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/06
End of Project: -/06
Specifications
Height: 19 metres
Length: 212 metres
Volume of RCC: 15 m3x103
Total volume: 27 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 16 | Natural pozzolan (ASTM Class N) |

Details
Country: China
Owner: Leidatan Corporation
Type: Gravity
Purpose(s): Hydropower
River: Yingtaoyuangou
Reservoir capacity: 94 m3x106
Construction Dates
Start of Project: 03/03
Start of RCC: 03/03
End of RCC: -/06
End of Project: 06/07
Specifications
Height: 84 metres
Length: 202 metres
Volume of RCC: 240 m3x103
Total volume: 340 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Santa Laura S/A
Type: Gravity
Purpose(s): Hydropower
River: Chapecozinho
Reservoir capacity: 19 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/06
End of Project: -/07
Specifications
Height: 27 metres
Length: 245 metres
Volume of RCC: 24 m3x103
Total volume: 42 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Mexico
Owner: CNA (Comisión Nacional del Agua)
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: -
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/06
End of Project: -/07
Specifications
Height: 30 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Concessionária Mosquitão S/A
Type: Gravity
Purpose(s): Hydropower
River: -
Reservoir capacity: 19 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/06
End of Project: -/07
Specifications
Height: 32 metres
Length: 236 metres
Volume of RCC: 57 m3x103
Total volume: 76 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Hardfill
Purpose(s): unknown
River: -
Reservoir capacity: -
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/06
End of Project: -/07
Specifications
Height: 36 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Hunan Xiangtou Xinshao Youxi Hydropower Development Corporation Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Zishui
Reservoir capacity: 168 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/06
End of Project: -/07
Specifications
Height: 47 metres
Length: 268 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Chengdu Haineng Power Co. Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Mabianhe
Reservoir capacity: 204 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/06
End of Project: -/07
Specifications
Height: 73 metres
Length: 163 metres
Volume of RCC: 229 m3x103
Total volume: 405 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 110 |
| 66 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 73 | Low-lime flyash (ASTM Class F) |
| 66 |

Details
Country: China
Owner: Guizhou Zhongsui Energy Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Hongdu
Reservoir capacity: 99 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/06
End of Project: -/07
Specifications
Height: 87 metres
Length: 148 metres
Volume of RCC: 67 m3x103
Total volume: 90 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower
River: Wujiang
Reservoir capacity: 9940 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/06
End of Project: -/07
Specifications
Height: 87 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: China Guodian Corporation
Type: Gravity
Purpose(s): Hydropower / Irrigation
River: Quan
Reservoir capacity: 20 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/06
End of Project: -/07
Specifications
Height: 88 metres
Length: 160 metres
Volume of RCC: -
Total volume: 205 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Lishui Basin Hydraulic and Hydroelectric Development Corporation
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation / Water Supply
River: Dieshui
Reservoir capacity: 1439 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/06
End of Project: -/07
Specifications
Height: 88 metres
Length: 351 metres
Volume of RCC: 450 m3x103
Total volume: 930 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
| 0.25 |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 53 |
| 83 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 99 | Low-lime flyash (ASTM Class F) |
| 102 |

Details
Country: China
Owner: Datang International Power Generation Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Lixian (Black)
Reservoir capacity: 174 m3x106
Construction Dates
Start of Project: 11/04
Start of RCC: 11/04
End of RCC: -/06
End of Project: -/07
Specifications
Height: 95 metres
Length: 320 metres
Volume of RCC: 480 m3x103
Total volume: 800 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork |
| 0.20 |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Iran
Owner: Fars Regional Water Authority
Type: Gravity
Purpose(s): Irrigation
River: Tang Charkhi
Reservoir capacity: 15 m3x106
Construction Dates
Start of Project: -/03
Start of RCC: -/03
End of RCC: -/06
End of Project: -/08
Specifications
Height: 19 metres
Length: 160 metres
Volume of RCC: 22 m3x103
Total volume: 28 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Datang International Power Generation Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Lixian
Reservoir capacity: 78 m3x106
Construction Dates
Start of Project: 04/04
Start of RCC: 04/04
End of RCC: -/06
End of Project: -/07
Specifications
Height: 59 metres
Length: 300 metres
Volume of RCC: 255 m3x103
Total volume: 570 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 65 |
| 93 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 110 | Ground-granulated blast-furnace slag |
| 113 |

Details
Country: China
Owner: Lichuan City Yujaing Valley Hudropower Ltd. Hubei Province
Type: Thin Arch
Purpose(s): Hydropower / Recreation
River: Yu
Reservoir capacity: 26 m3x106
Construction Dates
Start of Project: 12/05
Start of RCC: 12/05
End of RCC: 02/07
End of Project: 05/07
Specifications
Height: 95 metres
Length: 156 metres
Volume of RCC: 135 m3x103
Total volume: 160 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| curve | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| curve | RCC against formwork |
Spillway
| Slope | Type |
|---|---|
| RCC against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Dominican Republic
Owner: Corporacion de Empresas de Energia Electrica (CDEEE), Unidad Ejecutora Proyecto Pinalito (UEPP)
Type: Gravity
Purpose(s): Hydropower
River: Tireo
Reservoir capacity: 4 m3x106
Construction Dates
Start of Project: 09/04
Start of RCC: 09/04
End of RCC: 03/07
End of Project: -/08
Specifications
Height: 52 metres
Length: 210 metres
Volume of RCC: 73 m3x103
Total volume: 100 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 98 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 8 | Natural pozzolan (ASTM Class N) |

Details
Country: Turkey
Owner: Akköy Energy A.S.
Type: Gravity
Purpose(s): Hydropower
River: Harsit
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 07/05
Start of RCC: 07/05
End of RCC: 04/07
End of Project: 09/08
Specifications
Height: 38 metres
Length: 144 metres
Volume of RCC: 87 m3x103
Total volume: 101 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Natural pozzolan (ASTM Class N) |

Details
Country: China
Owner: China Southern Power Grid
Type: Gravity
Purpose(s): Hydropower
River: Xiaojinhe
Reservoir capacity: 30 m3x106
Construction Dates
Start of Project: 10/04
Start of RCC: 10/04
End of RCC: 05/07
End of Project: -/11
Specifications
Height: 56 metres
Length: 168 metres
Volume of RCC: 84 m3x103
Total volume: 93 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 125 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: Marietta (Georgia) Water Authority
Type: Gravity
Purpose(s): Water Supply
River: Hickory Log Creek
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 10/05
Start of RCC: 10/05
End of RCC: 06/07
End of Project: 10/07
Specifications
Height: 55 metres
Length: 290 metres
Volume of RCC: 165 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 89 |
| 80 74 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 89 | Low-lime flyash (ASTM Class F) |
| 98 104 |

Details
Country: China
Owner: Longtan Hydropower Development Co. Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation / Water Supply
River: Hongshui
Reservoir capacity: 16210 m3x106
Construction Dates
Start of Project: 07/01
Start of RCC: 07/01
End of RCC: 06/07
End of Project: 12/09
Specifications
Height: 192 metres
Length: 832 metres
Volume of RCC: 4623 m3x103
Total volume: 7400 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
| 0.25 |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| 0.68 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 99 |
| 86 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 121 | Low-lime flyash (ASTM Class F) |
| 109 |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: R’Mel
Reservoir capacity: 25 m3x106
Construction Dates
Start of Project: 05/05
Start of RCC: 05/05
End of RCC: 06/07
End of Project: 10/07
Specifications
Height: 80 metres
Length: 250 metres
Volume of RCC: 230 m3x103
Total volume: 243 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Reinforced conventional concrete cast before RCC placement |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |
| 0 |

Details
Country: Mongolia
Owner: Ministry of Energy
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Zabkhan
Reservoir capacity: 930 m3x106
Construction Dates
Start of Project: 02/05
Start of RCC: 02/05
End of RCC: 06/07
End of Project: 12/07
Specifications
Height: 60 metres
Length: 200 metres
Volume of RCC: 210 m3x103
Total volume: 250 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork with external geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.72 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.72 | Reinforced conventional concrete cast after RCC placement [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 333 | 333 |
Cementitious material
| Cement (kg/m3) |
|---|
| 75 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Water Supply
River: N’Fis
Reservoir capacity: 70 m3x106
Construction Dates
Start of Project: 07/05
Start of RCC: 07/05
End of RCC: 07/07
End of Project: 03/08
Specifications
Height: 71 metres
Length: 233 metres
Volume of RCC: 202 m3x103
Total volume: 216 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Reinforced conventional concrete cast before RCC placement |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: USA
Owner: Natural Resources Conservation Service
Type: Gravity
Purpose(s): Water Supply
River: Tygart Tributory
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: 08/07
End of Project: -/07
Specifications
Height: 39 metres
Length: 204 metres
Volume of RCC: 106 m3x103
Total volume: 113 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 59 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 89 | Low-lime flyash (ASTM Class F) |

Details
Country: Australia
Owner: Rivers and Water Supply Commission, Tasmania
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Meander
Reservoir capacity: 43 m3x106
Construction Dates
Start of Project: 01/06
Start of RCC: 01/06
End of RCC: 08/07
End of Project: 12/07
Specifications
Height: 47 metres
Length: 180 metres
Volume of RCC: 85 m3x103
Total volume: 85 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork with external geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| 0.70 | RCC against precast concrete blocks |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Australia
Owner: Gawler River Flood Plain Management Authority
Type: Gravity
Purpose(s): Flood Control
River: North Para
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 11/06
Start of RCC: 11/06
End of RCC: 09/07
End of Project: -/07
Specifications
Height: 33 metres
Length: 206 metres
Volume of RCC: 50 m3x103
Total volume: 50 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 160 | Low-lime flyash (ASTM Class F) |

Details
Country: Vietnam
Owner: EVN (Electrictie de Vietnam)
Type: Gravity
Purpose(s): Hydropower
River: Vugia Thubon
Reservoir capacity: 340 m3x106
Construction Dates
Start of Project: 08/03
Start of RCC: 08/03
End of RCC: 10/07
End of Project: 11/08
Specifications
Height: 83 metres
Length: 240 metres
Volume of RCC: 260 m3x103
Total volume: 350 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 1.00 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 150 | Natural pozzolan (ASTM Class N) |

Details
Country: Laos
Owner: Nam Theun Power Corporation (NTPC)/EdF (Electricitie de France)
Type: Gravity
Purpose(s): Hydropower
River: Nam Theun
Reservoir capacity: 3530 m3x106
Construction Dates
Start of Project: 04/04
Start of RCC: 04/04
End of RCC: 10/07
End of Project: 10/09
Specifications
Height: 39 metres
Length: 436 metres
Volume of RCC: 150 m3x103
Total volume: 207 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.35 | RCC against precast concrete blocks |
| 0.75 |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Low-lime flyash (ASTM Class F) |

Details
Country: Vietnam
Owner: Ministry of Agriculture and Rural Development (MARD)
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Kon
Reservoir capacity: 226 m3x106
Construction Dates
Start of Project: 05/04
Start of RCC: 05/04
End of RCC: 12/07
End of Project: 12/08
Specifications
Height: 55 metres
Length: 571 metres
Volume of RCC: 183 m3x103
Total volume: 430 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Reinforced conventional concrete cast before RCC placement |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| ogee | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 900 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| 126 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 175 | Low-lime flyash (ASTM Class F) |
| 141 |

Details
Country: China
Owner: Fujian Hongkou Hydropower Co. Ltd.
Type: Gravity
Purpose(s): Hydropower / Water Supply
River: Huotong
Reservoir capacity: 449 m3x106
Construction Dates
Start of Project: -/03
Start of RCC: -/03
End of RCC: -/07
End of Project: -/08
Specifications
Height: 130 metres
Length: 341 metres
Volume of RCC: 681 m3x103
Total volume: 830 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: EMBASA (Empresa Baiana de Aguas e Saneamento S/A)
Type: Gravity
Purpose(s): Water Supply
River: Gaviãozinho
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: -/08
Specifications
Height: 34 metres
Length: 154 metres
Volume of RCC: 44 m3x103
Total volume: 51 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
| 0.80 |
Spillway
| Slope | Type |
|---|---|
| 0.80 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 20 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: CPFL Renovaveis
Type: Hardfill
Purpose(s): Hydropower
River: Chapecó
Reservoir capacity: 142 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/07
End of Project: 04/07
Specifications
Height: 25 metres
Length: 300 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 1.50 |
Downstream
| Slope | Type |
|---|---|
| 1.50 |
Spillway
| Slope | Type |
|---|---|
| 0.75 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Guizhou Zhongshui Energy Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Luojiao
Reservoir capacity: 46 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: -/07
Specifications
Height: 81 metres
Length: 250 metres
Volume of RCC: -
Total volume: 110 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: CERAN (Companhia Energética Rio das Antas)
Type: Gravity
Purpose(s): Hydropower
River: das Antas
Reservoir capacity: 92 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: 02/08
Specifications
Height: 48 metres
Length: 350 metres
Volume of RCC: 240 m3x103
Total volume: 322 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
| 0.77 |
Spillway
| Slope | Type |
|---|---|
| 0.77 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 15 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Da Ilha Energética S/A
Type: Gravity
Purpose(s): Hydropower
River: das Antas
Reservoir capacity: 16 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/07
End of Project: 04/08
Specifications
Height: 26 metres
Length: 310 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 20 | |

Details
Country: Brazil
Owner: CERAN (Companhia Energética Rio das Antas)
Type: Gravity
Purpose(s): Hydropower
River: das Antas
Reservoir capacity: 55 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: 10/08
Specifications
Height: 37 metres
Length: 281 metres
Volume of RCC: 75 m3x103
Total volume: 212 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.77 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.77 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 75 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 15 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: COMPESA (Companhia Pernambucana de Saneamento)
Type: Gravity
Purpose(s): Water Supply
River: Duas Serras
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: -/08
Specifications
Height: 19 metres
Length: 113 metres
Volume of RCC: 6 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Department of Electricity, Feng Shun County
Type: Gravity
Purpose(s): Hydropower
River: Baxianghe
Reservoir capacity: 8 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: -/08
Specifications
Height: 44 metres
Length: 207 metres
Volume of RCC: 63 m3x103
Total volume: 83 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Gansu Keyuan Electric Power Group Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Datong
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: -/08
Specifications
Height: 44 metres
Length: 143 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Zhouluo County Government
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Lituohe
Reservoir capacity: 58 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: -/08
Specifications
Height: 56 metres
Length: 193 metres
Volume of RCC: 162 m3x103
Total volume: 354 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Department of WaterResources, Henan Province
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation
River: Luohe
Reservoir capacity: 28 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: -/08
Specifications
Height: 62 metres
Length: 244 metres
Volume of RCC: 133 m3x103
Total volume: 234 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Chongqing Youshui River Hydropower Development Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Youshui
Reservoir capacity: 152 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: -/08
Specifications
Height: 63 metres
Length: 194 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Nanhe Hydropower Development Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Nanhe
Reservoir capacity: 14 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: -/08
Specifications
Height: 77 metres
Length: 140 metres
Volume of RCC: 45 m3x103
Total volume: 55 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Jiyuan City Water Bureau
Type: Gravity
Purpose(s): unknown
River: Menghe
Reservoir capacity: 11 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: -/08
Specifications
Height: 78 metres
Length: 215 metres
Volume of RCC: 160 m3x103
Total volume: 249 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Anhui Water Resources Development Co. Ltd.
Type: Thin Arch
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Dongpi
Reservoir capacity: 480 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/07
End of Project: 04/09
Specifications
Height: 105 metres
Length: 422 metres
Volume of RCC: 485 m3x103
Total volume: 600 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.335 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.335 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 72 |
| 56 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 108 | Low-lime flyash (ASTM Class F) |
| 84 |

Details
Country: Brazil
Owner: Cotiporã Energetica S.A.
Type: Gravity
Purpose(s): Hydropower
River: Carreiro
Reservoir capacity: 4 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/07
End of Project: -/07
Specifications
Height: 16 metres
Length: 196 metres
Volume of RCC: 21 m3x103
Total volume: 41 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: SPE Plano Alto Energia S/A
Type: Gravity
Purpose(s): Hydropower
River: Irani
Reservoir capacity: 13 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/07
End of Project: 02/08
Specifications
Height: 38 metres
Length: 173 metres
Volume of RCC: 42 m3x103
Total volume: 78 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
| 0.75 |
Spillway
| Slope | Type |
|---|---|
| 0.75 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 72 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 19 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Veneto Energética S/A
Type: Gravity
Purpose(s): Hydropower
River: das Antas
Reservoir capacity: 8 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/07
End of Project: 04/08
Specifications
Height: 25 metres
Length: 219 metres
Volume of RCC: 31 m3x103
Total volume: 61 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 72 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 18 | Natural pozzolan (ASTM Class N) |

Details
Country: China
Owner: Red River Hydropower Development Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Honghe
Reservoir capacity: 212 m3x106
Construction Dates
Start of Project: 02/06
Start of RCC: 02/06
End of RCC: -/07
End of Project: 07/08
Specifications
Height: 85 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: France
Owner: Agglomeration Sud Pays Basque
Type: Gravity
Purpose(s): Flood Control
River: Nivelle
Reservoir capacity: 4 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/07
End of Project: -/08
Specifications
Height: 22 metres
Length: 168 metres
Volume of RCC: -
Total volume: 190 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Linha Emília Energética S/A
Type: Gravity
Purpose(s): Hydropower
River: Carreiro
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/07
End of Project: -/08
Specifications
Height: 27 metres
Length: 214 metres
Volume of RCC: 35 m3x103
Total volume: 54 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Guizhou-Wujiang Hydropower Development Corporation
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Navigation
River: Wujiang
Reservoir capacity: 1593 m3x106
Construction Dates
Start of Project: 11/05
Start of RCC: 11/05
End of RCC: 03/08
End of Project: -/09
Specifications
Height: 117 metres
Length: 310 metres
Volume of RCC: 825 m3x103
Total volume: 1100 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 66 |
| 89 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Low-lime flyash (ASTM Class F) |
| 109 |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Hardfill
Purpose(s): Irrigation / Water Supply
River: Kucuk Menderes
Reservoir capacity: 248 m3x106
Construction Dates
Start of Project: 04/94
Start of RCC: 04/94
End of RCC: 04/08
End of Project: 11/08
Specifications
Height: 95 metres
Length: 800 metres
Volume of RCC: 2350 m3x103
Total volume: 2650 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.25 | Traditional concrete against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 30 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Xilin River Hydropower Development Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Tuoniang
Reservoir capacity: 133 m3x106
Construction Dates
Start of Project: 03/05
Start of RCC: 03/05
End of RCC: 04/08
End of Project: -/09
Specifications
Height: 82 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Guizhou Qianyuan Power Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Beipan
Reservoir capacity: 3245 m3x106
Construction Dates
Start of Project: 10/04
Start of RCC: 10/04
End of RCC: 05/08
End of Project: -/09
Specifications
Height: 201 metres
Length: 412 metres
Volume of RCC: 2420 m3x103
Total volume: 2800 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against precast concrete panels with hot poured membrane |
| 0.25 |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 61 |
| 71 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 91 | Low-lime flyash (ASTM Class F) |
| 87 |

Details
Country: Algeria
Owner: ANBT (Agence Nationale des Barrages et Transfert)
Type: Hardfill
Purpose(s): Irrigation / Water Supply
River: Wadi Isser
Reservoir capacity: 800 m3x106
Construction Dates
Start of Project: 11/02
Start of RCC: 11/02
End of RCC: 06/08
End of Project: 09/08
Specifications
Height: 121 metres
Length: 492 metres
Volume of RCC: 1650 m3x103
Total volume: 1850 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.65 | Traditional concrete against formwork [stepped face] |
Downstream
| Slope | Type |
|---|---|
| 0.65 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.65 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 to | 300 to |
| 400 | 400 |
Cementitious material
| Cement (kg/m3) |
|---|
| 77 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 87 | Low-lime flyash (ASTM Class F) |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Khellata
Reservoir capacity: 11 m3x106
Construction Dates
Start of Project: 01/07
Start of RCC: 01/07
End of RCC: 07/08
End of Project: 11/08
Specifications
Height: 30 metres
Length: 213 metres
Volume of RCC: 60 m3x103
Total volume: 78 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 105 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: China
Owner: Datang International Hydropower Generation Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Lixian
Reservoir capacity: 409 m3x106
Construction Dates
Start of Project: 01/03
Start of RCC: 01/03
End of RCC: 08/08
End of Project: -/09
Specifications
Height: 113 metres
Length: 466 metres
Volume of RCC: 903 m3x103
Total volume: 1200 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
| 0.20 |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 77 |
| 93 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 77 | Ground-granulated blast-furnace slag |
| 93 |

Details
Country: Spain
Owner: Acuasur
Type: Gravity
Purpose(s): Irrigation
River: Guadiato
Reservoir capacity: 823 m3x106
Construction Dates
Start of Project: 06/05
Start of RCC: 06/05
End of RCC: 10/08
End of Project: 12/08
Specifications
Height: 119 metres
Length: 685 metres
Volume of RCC: 1441 m3x103
Total volume: 1600 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.05 | RCC against formwork (GEVR/GE-RCC) |
| 0.30 | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 69 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 115 & | Low-lime flyash (ASTM Class F) |
| 46 |

Details
Country: Japan
Owner: Hokkaido Prefecture
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Toppu
Reservoir capacity: 36 m3x106
Construction Dates
Start of Project: 07/02
Start of RCC: 07/02
End of RCC: 10/08
End of Project: 03/14
Specifications
Height: 78 metres
Length: 309 metres
Volume of RCC: 440 m3x103
Total volume: 530 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.80 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: Algeria
Owner: ANBT (Agence Nationale des Barrages et Transferts)
Type: Gravity
Purpose(s): Water Supply
River: Boussiaba
Reservoir capacity: 120 m3x106
Construction Dates
Start of Project: 12/06
Start of RCC: 12/06
End of RCC: 11/08
End of Project: 08/09
Specifications
Height: 51 metres
Length: 310 metres
Volume of RCC: 160 m3x103
Total volume: 190 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork with external geomembrane |
Downstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 112 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 28 | Low-lime flyash (ASTM Class F) |

Details
Country: Pakistan
Owner: WAPDA (Water and Power Development Authority)
Type: Gravity
Purpose(s): Hydropower / Irrigation
River: Jhelum
Reservoir capacity: 6500 m3x106
Construction Dates
Start of Project: 08/04
Start of RCC: 08/04
End of RCC: 11/08
End of Project: 01/09
Specifications
Height: 17 metres
Length: 370 metres
Volume of RCC: 54 m3x103
Total volume: 79 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
| 0.30 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Downstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
| 0.70 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 120 | Ground-granulated blast-furnace slag |

Details
Country: Myanmar
Owner: Department of Hydroelectric Power - Ministry of Electric Power
Type: Gravity
Purpose(s): Hydropower
River: Myitnge
Reservoir capacity: 2600 m3x106
Construction Dates
Start of Project: 10/01
Start of RCC: 10/01
End of RCC: 12/08
End of Project: 12/10
Specifications
Height: 137 metres
Length: 680 metres
Volume of RCC: 2473 m3x103
Total volume: 2843 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 75 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 145 | Natural pozzolan (ASTM Class N) |

Details
Country: China
Owner: Huaneng Lancang River Hydropower Co. Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Recreation
River: Lancang (Mekong)
Reservoir capacity: 1139 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/08
End of Project: -/09
Specifications
Height: 108 metres
Length: 705 metres
Volume of RCC: 848 m3x103
Total volume: 3068 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork |
Spillway
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| 93 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 93 | Ground-granulated blast-furnace slag |
| 93 |

Details
Country: Vietnam
Owner: EVN (Electrictie de Vietnam)
Type: Gravity
Purpose(s): Hydropower
River: Poko
Reservoir capacity: 54 m3x106
Construction Dates
Start of Project: 12/04
Start of RCC: 12/04
End of RCC: -/08
End of Project: -/09
Specifications
Height: 74 metres
Length: 834 metres
Volume of RCC: 753 m3x103
Total volume: 1300 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 160 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Santa Rosa S/A
Type: Gravity
Purpose(s): Hydropower
River: Grande
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/08
End of Project: -/08
Specifications
Height: 31 metres
Length: 172 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Arrenagements Hydrauliques
Type: Gravity
Purpose(s): Irrigation
River: Chbika
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/08
End of Project: -/09
Specifications
Height: 24 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Arrenagements Hydrauliques
Type: Gravity
Purpose(s): Irrigation
River: El Handak
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/08
End of Project: -/09
Specifications
Height: 27 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Datang International Power Generation Co. Ltd.
Type: Gravity
Purpose(s): Hydropower / Irrigation
River: Changxi
Reservoir capacity: 1465 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/08
End of Project: -/09
Specifications
Height: 117 metres
Length: 326 metres
Volume of RCC: 608 m3x103
Total volume: 1330 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 64 |
| 81 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 96 | Low-lime flyash (ASTM Class F) |
| 121 |

Details
Country: China
Owner: Guangxi Water Conservancy and Electric Power Corporation
Type: Gravity
Purpose(s): Hydropower
River: Gui
Reservoir capacity: 26 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/08
End of Project: -/08
Specifications
Height: 61 metres
Length: 166 metres
Volume of RCC: -
Total volume: 127 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Hidrelétrica Cachoeirão SA
Type: Gravity
Purpose(s): Hydropower
River: Manhuaçu
Reservoir capacity: -
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/08
End of Project: -/08
Specifications
Height: 23 metres
Length: 90 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: CPFL Renovaveis
Type: Hardfill
Purpose(s): Hydropower
River: Irani
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/08
End of Project: -/08
Specifications
Height: 45 metres
Length: 243 metres
Volume of RCC: 14 m3x103
Total volume: 20 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 2.50 |
Downstream
| Slope | Type |
|---|---|
| 2 |
Spillway
| Slope | Type |
|---|---|
| 2 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: São Simão Energia S/A
Type: Gravity
Purpose(s): Hydropower
River: Itapemirim Norte
Reservoir capacity: 11 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/08
End of Project: 02/09
Specifications
Height: 56 metres
Length: 187 metres
Volume of RCC: 92 m3x103
Total volume: 115 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Lumbrás Energética S.A.
Type: Gravity
Purpose(s): Hydropower
River: Tijucas
Reservoir capacity: 6 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/08
End of Project: 03/09
Specifications
Height: 45 metres
Length: 178 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Vietnam
Owner: Binh Dien Electricity Joint Stock Company
Type: Gravity
Purpose(s): Hydropower
River: Huu Trach
Reservoir capacity: 424 m3x106
Construction Dates
Start of Project: 01/05
Start of RCC: 01/05
End of RCC: -/08
End of Project: 04/09
Specifications
Height: 54 metres
Length: 571 metres
Volume of RCC: 189 m3x103
Total volume: 423 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 105 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: BME Energia SA
Type: Gravity
Purpose(s): Hydropower
River: Ivaí
Reservoir capacity: 9 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/08
End of Project: 04/09
Specifications
Height: 34 metres
Length: 228 metres
Volume of RCC: 58 m3x103
Total volume: 76 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Itabapoana
Reservoir capacity: -
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/08
End of Project: 05/09
Specifications
Height: 15 metres
Length: 110 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Goiás Sul Geração de Energia S.A.
Type: Gravity
Purpose(s): Hydropower
River: Verissimo
Reservoir capacity: 76 m3x106
Construction Dates
Start of Project: 08/07
Start of RCC: 08/07
End of RCC: -/08
End of Project: 05/09
Specifications
Height: 44 metres
Length: 341 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
| 0.75 |
Spillway
| Slope | Type |
|---|---|
| 0.75 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Retiro Velho Energetica S/A
Type: Gravity
Purpose(s): Hydropower
River: da Prata
Reservoir capacity: 69 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/08
End of Project: -/09
Specifications
Height: 42 metres
Length: 56 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): unknown
River: Ifrane
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/08
End of Project: -/09
Specifications
Height: 22 metres
Length: -
Volume of RCC: 15 m3x103
Total volume: 18 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 1.00 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 1.00 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Datang Shaanxi Power Generation Co Ltd
Type: Gravity
Purpose(s): Hydropower
River: Hanjiang
Reservoir capacity: 176 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/08
End of Project: -/09
Specifications
Height: 72 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Guizhou Qianyuan Power Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Furong
Reservoir capacity: 98 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/08
End of Project: -/09
Specifications
Height: 82 metres
Length: 166 metres
Volume of RCC: -
Total volume: 154 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Dehong Longjiang Hydropower Development Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Long
Reservoir capacity: 233 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/08
End of Project: -/09
Specifications
Height: 91 metres
Length: 280 metres
Volume of RCC: -
Total volume: 486 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Xinjiang Yili River Basin Development Authority
Type: Gravity
Purpose(s): Hydropower
River: Tekes
Reservoir capacity: 121 m3x106
Construction Dates
Start of Project: 04/06
Start of RCC: 04/06
End of RCC: -/08
End of Project: -/09
Specifications
Height: 50 metres
Length: 496 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Velcan Energy Development Ltda.
Type: Gravity
Purpose(s): Hydropower
River: Irani
Reservoir capacity: 9 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/08
End of Project: 01/10
Specifications
Height: 32 metres
Length: 223 metres
Volume of RCC: -
Total volume: 59 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
| 0.85 |
Spillway
| Slope | Type |
|---|---|
| 0.85 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Mexico
Owner: CNA (Comisión Nacional del Agua)
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Presidio
Reservoir capacity: 322 m3x106
Construction Dates
Start of Project: 02/07
Start of RCC: 02/07
End of RCC: -/08
End of Project: -/09
Specifications
Height: 85 metres
Length: 256 metres
Volume of RCC: 85 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Reinforced conventional concrete cast after RCC placement |
| 0.15 | Reinforced conventional concrete cast after RCC placement |
Downstream
| Slope | Type |
|---|---|
| 0.85 | Reinforced conventional concrete cast after RCC placement |
Spillway
| Slope | Type |
|---|---|
| 0.85 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 50 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 45 | Ground-granulated blast-furnace slag |

Details
Country: Brazil
Owner: BME Energia
Type: Gravity
Purpose(s): Hydropower
River: Ivaí
Reservoir capacity: 4 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/08
End of Project: 04/09
Specifications
Height: 23 metres
Length: 220 metres
Volume of RCC: 29 m3x103
Total volume: 35 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 68 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 17 | Natural pozzolan (ASTM Class N) |

Details
Country: Mexico
Owner: Desarrollos Mineros San Luis, S.A. de C.V.
Type: Gravity
Purpose(s): Hydropower
River: La Lobor o Las Truchas
Reservoir capacity: -
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/08
End of Project: -/09
Specifications
Height: 35 metres
Length: 230 metres
Volume of RCC: 24 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Oman
Owner: Ministry of Regional Municipalities and Water Resources
Type: Gravity
Purpose(s): Water Supply
River: Wadi Dayqah
Reservoir capacity: 100 m3x106
Construction Dates
Start of Project: 08/06
Start of RCC: 08/06
End of RCC: 04/09
End of Project: 11/09
Specifications
Height: 75 metres
Length: 410 metres
Volume of RCC: 590 m3x103
Total volume: 650 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 1200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 126 |
| 112 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 54 | Milled sand |
| 48 |

Details
Country: China
Owner: Engshi Yuefeng Yunlong River Hydropower Development Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Yunlong
Reservoir capacity: 44 m3x106
Construction Dates
Start of Project: 03/06
Start of RCC: 03/06
End of RCC: 04/09
End of Project: -/11
Specifications
Height: 139 metres
Length: 119 metres
Volume of RCC: 182 m3x103
Total volume: 207 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| curve | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| curve | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Peru
Owner: Cementos Lima S.A.
Type: Gravity
Purpose(s): Hydropower
River: Canete
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: 01/07
Start of RCC: 01/07
End of RCC: 04/09
End of Project: 10/09
Specifications
Height: 34 metres
Length: 60 metres
Volume of RCC: 75 m3x103
Total volume: 75 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.375 | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 65 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 90 | Natural pozzolan (ASTM Class N) |

Details
Country: USA
Owner: Tennessee Valley Authority
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Bear Creek
Reservoir capacity: 47 m3x106
Construction Dates
Start of Project: 01/08
Start of RCC: 01/08
End of RCC: 05/09
End of Project: 06/09
Specifications
Height: 27 metres
Length: 292 metres
Volume of RCC: 60 m3x103
Total volume: 69 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 77 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 77 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Ministry of Land, Infrastructure, Transport and Tourism
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Kase
Reservoir capacity: 71 m3x106
Construction Dates
Start of Project: 02/05
Start of RCC: 02/05
End of RCC: 06/09
End of Project: 03/12
Specifications
Height: 99 metres
Length: 456 metres
Volume of RCC: 830 m3x103
Total volume: 948 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.60 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Yujiang Hydropower Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Wuni
Reservoir capacity: 35 m3x106
Construction Dates
Start of Project: 06/07
Start of RCC: 06/07
End of RCC: 06/09
End of Project: -/12
Specifications
Height: 119 metres
Length: 152 metres
Volume of RCC: 200 m3x103
Total volume: 205 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Belize
Owner: Belize Electric Company Ltd (BECOL) and A. Fortis Company, Canada
Type: Gravity
Purpose(s): Hydropower
River: Marcal
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: 02/07
Start of RCC: 02/07
End of RCC: 10/09
End of Project: 12/11
Specifications
Height: 70 metres
Length: 225 metres
Volume of RCC: 200 m3x103
Total volume: 220 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 94 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 31 | Low-lime flyash (ASTM Class F) |

Details
Country: Algeria
Owner: ANBT (Agence Nationale des Barrages et Transfert)
Type: Hardfill
Purpose(s): Flood Control / Irrigation / Water Supply
River: Saf-Saf
Reservoir capacity: 18 m3x106
Construction Dates
Start of Project: 03/06
Start of RCC: 03/06
End of RCC: 10/09
End of Project: 03/11
Specifications
Height: 36 metres
Length: 270 metres
Volume of RCC: 120 m3x103
Total volume: 175 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.70 | Reinforced conventional concrete cast after RCC placement |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against precast concrete panels |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 120 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: USA
Owner: AmerenUE
Type: Hardfill
Purpose(s): Hydropower
River: Water source - East Fork of Black River
Reservoir capacity: 6 m3x106
Construction Dates
Start of Project: 02/07
Start of RCC: 02/07
End of RCC: 11/09
End of Project: 06/10
Specifications
Height: 49 metres
Length: 2060 metres
Volume of RCC: 2448 m3x103
Total volume: 2500 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.60 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.60 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| no | |
| spillway |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 59 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 59 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: Yadkin County and NRCS
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Deep Creek
Reservoir capacity: 15 m3x106
Construction Dates
Start of Project: 12/08
Start of RCC: 12/08
End of RCC: 12/09
End of Project: 07/10
Specifications
Height: 22 metres
Length: 226 metres
Volume of RCC: 39 m3x103
Total volume: 45 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 89 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 89 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Caí
Reservoir capacity: -
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/09
End of Project: -/09
Specifications
Height: 42 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: EMBASA (Empresa Baiana de Aguas e Saneamento S.A)
Type: Gravity
Purpose(s): Water Supply
River: de Contas
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/09
End of Project: 01/10
Specifications
Height: 22 metres
Length: 337 metres
Volume of RCC: 61 m3x103
Total volume: 68 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Sichuan Wudu Water Conservancy and Hydropower Group Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Fu
Reservoir capacity: 572 m3x106
Construction Dates
Start of Project: 10/04
Start of RCC: 10/04
End of RCC: -/09
End of Project: -/10
Specifications
Height: 120 metres
Length: 631 metres
Volume of RCC: 1151 m3x103
Total volume: 1580 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: Brazil
Owner: São Pedro Energia S/A
Type: Gravity
Purpose(s): Hydropower
River: Jacu Braço Norte
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/09
End of Project: -/10
Specifications
Height: 30 metres
Length: 140 metres
Volume of RCC: 22 m3x103
Total volume: 35 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Vietnam
Owner: Geruco Song Con Hydro Power Joint Stock Company
Type: Gravity
Purpose(s): Hydropower
River: Song Con
Reservoir capacity: 30 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/09
End of Project: -/10
Specifications
Height: 58 metres
Length: 260 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: China Datang Corporation
Type: Thin Arch
Purpose(s): Hydropower
River: Getu
Reservoir capacity: 1748 m3x106
Construction Dates
Start of Project: 07/06
Start of RCC: 07/06
End of RCC: -/09
End of Project: -/10
Specifications
Height: 110 metres
Length: 253 metres
Volume of RCC: 280 m3x103
Total volume: 292 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 52 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 96 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Yunnan Dianneng Niulanjiang Hydropower Development Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Niulan
Reservoir capacity: 66 m3x106
Construction Dates
Start of Project: 12/06
Start of RCC: 12/06
End of RCC: -/09
End of Project: -/10
Specifications
Height: 113 metres
Length: 160 metres
Volume of RCC: 182 m3x103
Total volume: 360 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| curve | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| curve | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| ogee | RCC against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Quifeng Water Supply Co. of Fangchenggang City
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Xijiang
Reservoir capacity: 26 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/09
End of Project: -/12
Specifications
Height: 74 metres
Length: 190 metres
Volume of RCC: 230 m3x103
Total volume: 240 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
| 0.75 |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Dominican Republic
Owner: EGEHID (Empresa de Generación Hidroeléctrica Dominicana)
Type: Hardfill
Purpose(s): Hydropower
River: Yaque del Sur and Blanco
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/09
End of Project: -/13
Specifications
Height: 65 metres
Length: 153 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Criúva Energética S/A
Type: Gravity
Purpose(s): Hydropower
River: Lajeado Grange
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/09
End of Project: 12/09
Specifications
Height: 25 metres
Length: 246 metres
Volume of RCC: 80 m3x103
Total volume: 95 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 72 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 18 | Natural pozzolan (ASTM Class N) |

Details
Country: China
Owner: Xinjiang-Xinhua-Chonghuer Hydropower Development Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Burgin
Reservoir capacity: 85 m3x106
Construction Dates
Start of Project: 10/06
Start of RCC: 10/06
End of RCC: -/09
End of Project: -/09
Specifications
Height: 74 metres
Length: 545 metres
Volume of RCC: -
Total volume: 480 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Hongguo Water Resources Development Co.
Type: Gravity
Purpose(s): Water Supply
River: Tuochang
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/09
End of Project: -/09
Specifications
Height: 58 metres
Length: 168 metres
Volume of RCC: -
Total volume: 125 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Hidrelétrica Areia Branca S.A. (Tractebel Energia)
Type: Gravity
Purpose(s): Hydropower
River: Manhuaçu
Reservoir capacity: -
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/09
End of Project: -/09
Specifications
Height: 28 metres
Length: 257 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Serrana Energética S/A
Type: Gravity
Purpose(s): Hydropower
River: das Antas
Reservoir capacity: 6 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/09
End of Project: 01/10
Specifications
Height: 32 metres
Length: 137 metres
Volume of RCC: 89 m3x103
Total volume: 103 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 72 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 18 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: EMBASA (Empresa Baiana de Aguas e Saneamento S/A)
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Tijuco
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/09
End of Project: 03/10
Specifications
Height: 16 metres
Length: 156 metres
Volume of RCC: 13 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Saudi Arabia
Owner: Ministry of Water and Energy of the Kingdom of Saudi Arabia
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Jawrah
Reservoir capacity: 33 m3x106
Construction Dates
Start of Project: 05/06
Start of RCC: 05/06
End of RCC: -/09
End of Project: 05/10
Specifications
Height: 52 metres
Length: 592 metres
Volume of RCC: 207 m3x103
Total volume: 384 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 - | 1000 - |
| 500 | 1500 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Insituto de Desenvolvimento do Piauí
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Riacho do Jorge
Reservoir capacity: 293 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/09
End of Project: -/10
Specifications
Height: 48 metres
Length: 870 metres
Volume of RCC: 293 m3x103
Total volume: 306 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Gerdau Aços Longos
Type: Gravity
Purpose(s): Hydropower / Water Supply
River: Claro
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 08/07
Start of RCC: 08/07
End of RCC: -/09
End of Project: 07/10
Specifications
Height: 60 metres
Length: 1670 metres
Volume of RCC: 172 m3x103
Total volume: 282 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Piedade Usina Geradora de Energia S.A
Type: Gravity
Purpose(s): Hydropower
River: Piedade
Reservoir capacity: 18 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/09
End of Project: 08/10
Specifications
Height: 30 metres
Length: 397 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Serra do Facão Energia S.A. (SEFAC)
Type: Gravity
Purpose(s): Hydropower
River: Sao Marcos
Reservoir capacity: 5199 m3x106
Construction Dates
Start of Project: 02/07
Start of RCC: 02/07
End of RCC: -/09
End of Project: 10/10
Specifications
Height: 92 metres
Length: 326 metres
Volume of RCC: 610 m3x103
Total volume: 742 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 72 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 18 | Natural pozzolan (ASTM Class N) |

Details
Country: China
Owner: Yichang Junwang Group Co.
Type: Thin Arch
Purpose(s): Hydropower
River: Siyang
Reservoir capacity: 33 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/09
End of Project: -/10
Specifications
Height: 100 metres
Length: 185 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: SPE São Gonçalo Energia S.A.
Type: Gravity
Purpose(s): Hydropower
River: Santa Bárbara
Reservoir capacity: 6 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/09
End of Project: -/10
Specifications
Height: 28 metres
Length: 148 metres
Volume of RCC: 14 m3x103
Total volume: 26 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
| 0.75 |
Spillway
| Slope | Type |
|---|---|
| 0.75 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 68 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 17 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Gerdau SA
Type: Gravity
Purpose(s): Hydropower
River: Claro
Reservoir capacity: -
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/09
End of Project: -/10
Specifications
Height: 40 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Guizhou Tongzihe Hydropower Development Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower / Water Supply
River: Tongzhi
Reservoir capacity: 78 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/09
End of Project: -/10
Specifications
Height: 68 metres
Length: 153 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Sehb el Merga
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: 06/07
Start of RCC: 06/07
End of RCC: -/09
End of Project: -/10
Specifications
Height: 37 metres
Length: 480 metres
Volume of RCC: 85 m3x103
Total volume: 95 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 65 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 25 | Natural pozzolan (ASTM Class N) |

Details
Country: China
Owner: Wujiang Hydropower Development Corporation
Type: Gravity
Purpose(s): Hydropower
River: Qingshuihe
Reservoir capacity: 77 m3x106
Construction Dates
Start of Project: 01/07
Start of RCC: 01/07
End of RCC: -/09
End of Project: -/10
Specifications
Height: 124 metres
Length: 104 metres
Volume of RCC: -
Total volume: 500 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: SPE Arvoredo Energia S.A.
Type: Gravity
Purpose(s): Hydropower
River: Irani
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/09
End of Project: 04/10
Specifications
Height: 39 metres
Length: 259 metres
Volume of RCC: 53 m3x103
Total volume: 81 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
| 0.75 |
Spillway
| Slope | Type |
|---|---|
| 0.75 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 20 | Natural pozzolan (ASTM Class N) |

Details
Country: Turkey
Owner: Akkur Energy Production Trade and Industry Co. Inc.
Type: Gravity
Purpose(s): Hydropower
River: Göksu
Reservoir capacity: 63 m3x106
Construction Dates
Start of Project: 12/07
Start of RCC: 12/07
End of RCC: 02/10
End of Project: 08/10
Specifications
Height: 70 metres
Length: 256 metres
Volume of RCC: 194 m3x103
Total volume: 227 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.07 | Traditional concrete against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| separate |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 60 | Low-lime flyash (ASTM Class F) |
| 50 |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Çine
Reservoir capacity: 350 m3x106
Construction Dates
Start of Project: 12/95
Start of RCC: 12/95
End of RCC: 04/10
End of Project: 10/11
Specifications
Height: 137 metres
Length: 300 metres
Volume of RCC: 1560 m3x103
Total volume: 1650 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | RCC against precast concrete panels (GEVR/GE-RCC) |
| 0.20 |
Downstream
| Slope | Type |
|---|---|
| 0.85 | RCC against precast concrete panels (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| 0.85 | RCC against precast concrete panels (GEVR/GE-RCC) |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| 75 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 105 | Low-lime flyash (ASTM Class F) |
| 95 |

Details
Country: Malaysia
Owner: Jabatan Bekalan Air Negeri Sembilan
Type: Gravity
Purpose(s): Water Supply
River: Batu Hampar
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 11/07
Start of RCC: 11/07
End of RCC: 04/10
End of Project: 05/10
Specifications
Height: 65 metres
Length: 236 metres
Volume of RCC: 200 m3x103
Total volume: 203 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| RCC against precast concrete blocks |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 1200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 65 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 120 | Low-lime flyash (ASTM Class F) |

Details
Country: Malaysia
Owner: Public Works Department
Type: Gravity
Purpose(s): Water Supply
River: Sungai Bengoh
Reservoir capacity: 144 m3x106
Construction Dates
Start of Project: 06/07
Start of RCC: 06/07
End of RCC: 05/10
End of Project: -/12
Specifications
Height: 63 metres
Length: 267 metres
Volume of RCC: 130 m3x103
Total volume: 172 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 120 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Ministry of Land, Infrastructure, Transport and Tourism
Type: Hardfill
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Kase
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 03/08
Start of RCC: 03/08
End of RCC: 06/10
End of Project: 09/10
Specifications
Height: 29 metres
Length: 116 metres
Volume of RCC: 52 m3x103
Total volume: 68 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Costa Rica
Owner: ICE (Instituto Costarricence de Electricidad)
Type: Gravity
Purpose(s): Hydropower
River: Pirris
Reservoir capacity: 36 m3x106
Construction Dates
Start of Project: 12/06
Start of RCC: 12/06
End of RCC: 06/10
End of Project: 07/11
Specifications
Height: 113 metres
Length: 258 metres
Volume of RCC: 695 m3x103
Total volume: 755 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.33 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Downstream
| Slope | Type |
|---|---|
| 0.50 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.50 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 88 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 132 | Natural pozzolan (ASTM Class N) |

Details
Country: South Africa
Owner: ESKOM
Type: Gravity
Purpose(s): Hydropower
River: Braamhoekspruit
Reservoir capacity: 27 m3x106
Construction Dates
Start of Project: 04/08
Start of RCC: 04/08
End of RCC: 06/10
End of Project: 02/11
Specifications
Height: 37 metres
Length: 330 metres
Volume of RCC: 90 m3x103
Total volume: 98 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.67 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.67 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 1200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 95 | Low-lime flyash (ASTM Class F) |

Details
Country: Greece
Owner: Ministry of Agriculture
Type: Hardfill
Purpose(s): Irrigation / Water Supply
River: Partheni
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 11/05
Start of RCC: 11/05
End of RCC: 07/10
End of Project: -/16
Specifications
Height: 42 metres
Length: 221 metres
Volume of RCC: 170 m3x103
Total volume: 190 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.80 | Reinforced concrete cast against precast units or slip-formed facing elements |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 - | 300 - |
| 450 | 450 |
Cementitious material
| Cement (kg/m3) |
|---|
| 50 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 10 | Natural pozzolan (ASTM Class N) |

Details
Country: Iran
Owner: Sistan & Balouchestan Water Authority
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Kajoo
Reservoir capacity: 207 m3x106
Construction Dates
Start of Project: 11/02
Start of RCC: 11/02
End of RCC: 08/10
End of Project: 11/10
Specifications
Height: 65 metres
Length: 350 metres
Volume of RCC: 265 m3x103
Total volume: 437 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 98 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 42 | Natural pozzolan (ASTM Class N) |

Details
Country: Vietnam
Owner: EVN (Electricté de Vietnam)
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Song Da (Black river)
Reservoir capacity: 9260 m3x106
Construction Dates
Start of Project: 04/04
Start of RCC: 04/04
End of RCC: 08/10
End of Project: 12/12
Specifications
Height: 138 metres
Length: 962 metres
Volume of RCC: 2677 m3x103
Total volume: 4800 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.73 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| separate |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 160 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Hydropower
River: Ortasui
Reservoir capacity: 18 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: 08/10
End of Project: 09/10
Specifications
Height: 67 metres
Length: 198 metres
Volume of RCC: 157 m3x103
Total volume: 231 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 600 |
Cementitious material
| Cement (kg/m3) |
|---|
| 125 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Al Mal
Reservoir capacity: 25 m3x106
Construction Dates
Start of Project: 01/08
Start of RCC: 01/08
End of RCC: 09/10
End of Project: 04/11
Specifications
Height: 75 metres
Length: 408 metres
Volume of RCC: 415 m3x103
Total volume: 490 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 73 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 32 | Natural pozzolan (ASTM Class N) |

Details
Country: Japan
Owner: Hokkaido Prefecture
Type: Hardfill
Purpose(s): Flood Control / Irrigation / Water Supply
River: Tobetsu
Reservoir capacity: 75 m3x106
Construction Dates
Start of Project: 10/08
Start of RCC: 10/08
End of RCC: 09/10
End of Project: 10/12
Specifications
Height: 52 metres
Length: 432 metres
Volume of RCC: 665 m3x103
Total volume: 803 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against precast concrete panels |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| 80 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |
| 0 |

Details
Country: Argentina
Owner: Provincia de San Luis
Type: Gravity
Purpose(s): Water Supply
River: Quinto
Reservoir capacity: -
Construction Dates
Start of Project: 02/09
Start of RCC: 02/09
End of RCC: 09/10
End of Project: 01/11
Specifications
Height: 79 metres
Length: 487 metres
Volume of RCC: 210 m3x103
Total volume: 249 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| Traditional concrete against precast concrete panels |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Vietnam
Owner: EVN (Electrictie de Vietnam)
Type: Gravity
Purpose(s): Hydropower
River: Ca
Reservoir capacity: 1500 m3x106
Construction Dates
Start of Project: 08/04
Start of RCC: 08/04
End of RCC: 10/10
End of Project: 12/11
Specifications
Height: 136 metres
Length: 480 metres
Volume of RCC: 1520 m3x103
Total volume: 1750 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| v | RCC against formwork (GEVR/GE-RCC) |
| 0.30 |
Downstream
| Slope | Type |
|---|---|
| 0.85 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 120 | Natural pozzolan (ASTM Class N) |

Details
Country: Turkey
Owner: Akfen Energy
Type: Hardfill
Purpose(s): Flood Control / Hydropower
River: Zamanti
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 04/08
Start of RCC: 04/08
End of RCC: 12/10
End of Project: 04/11
Specifications
Height: 52 metres
Length: 186 metres
Volume of RCC: 160 m3x103
Total volume: 182 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.70 | RCC against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 88 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 37 | Low-lime flyash (ASTM Class F) |

Details
Country: Australia
Owner: Queensland Water Infrastructure Pty. Ltd.
Type: Gravity
Purpose(s): Water Supply
River: Teviot Brook
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 09/09
Start of RCC: 09/09
End of RCC: 12/10
End of Project: 06/11
Specifications
Height: 48 metres
Length: 464 metres
Volume of RCC: 173 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 85 | Low-lime flyash (ASTM Class F) |

Details
Country: Greece
Owner: Crete Development Organisation
Type: Hardfill
Purpose(s): Irrigation
River: Valsamiotis
Reservoir capacity: 6 m3x106
Construction Dates
Start of Project: 10/05
Start of RCC: 10/05
End of RCC: 12/10
End of Project: -/14
Specifications
Height: 63 metres
Length: 335 metres
Volume of RCC: 640 m3x103
Total volume: 820 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.80 | Reinforced concrete cast against precast units or slip-formed facing elements |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Vietnam
Owner: EVN (Electrictie de Vietnam)
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Dong Nai
Reservoir capacity: 1690 m3x106
Construction Dates
Start of Project: 12/04
Start of RCC: 12/04
End of RCC: 12/10
End of Project: 10/11
Specifications
Height: 108 metres
Length: 594 metres
Volume of RCC: 1138 m3x103
Total volume: 1235 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 75 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Vietnam
Owner: MARD (Ministry of Agriculture and Rural Development)
Type: Gravity
Purpose(s): Hydropower / Irrigation
River: Tra Kluc
Reservoir capacity: 290 m3x106
Construction Dates
Start of Project: 10/07
Start of RCC: 10/07
End of RCC: 12/10
End of Project: 05/11
Specifications
Height: 69 metres
Length: 518 metres
Volume of RCC: 446 m3x103
Total volume: 607 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 125 |
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 218 | Natural pozzolan (ASTM Class N) |
| 230 |

Details
Country: Brazil
Owner: Companhia Energetica Santa Clara
Type: Gravity
Purpose(s): Hydropower
River: Mucuri
Reservoir capacity: 151 m3x106
Construction Dates
Start of Project: -/99
Start of RCC: -/99
End of RCC: -/02
End of Project: -/03
Specifications
Height: 59 metres
Length: 242 metres
Volume of RCC: 520 m3x103
Total volume: 600 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Pakistan
Owner: WAPDA (Water and Power Development Authority) and CTGC (China Three Gorges Corp.)
Type: Gravity
Purpose(s): Hydropower
River: Duber Khwar
Reservoir capacity: -
Construction Dates
Start of Project: 04/03
Start of RCC: 04/03
End of RCC: -/10
End of Project: 04/12
Specifications
Height: 46 metres
Length: 112 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): unknown
River: Dina
Reservoir capacity: 99 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/10
End of Project: -/12
Specifications
Height: 103 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): unknown
River: Liushahe
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/05
Start of RCC: -/05
End of RCC: -/10
End of Project: -/12
Specifications
Height: 123 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Hanergy, Yunnan Jinsha River Hydropower Co. Ltd. and Yunnan Investment and Development Co. Ltd.
Type: Gravity
Purpose(s): Hydropower / Navigation / Recreation
River: Jinsha
Reservoir capacity: 913 m3x106
Construction Dates
Start of Project: 12/03
Start of RCC: 12/03
End of RCC: -/10
End of Project: -/11
Specifications
Height: 160 metres
Length: 640 metres
Volume of RCC: 2400 m3x103
Total volume: 4430 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 72 |
| 96 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 108 | Low-lime flyash (ASTM Class F) |
| 117 |

Details
Country: Brazil
Owner: CERB (Companhia de Engenharia Ambiental e Recursos Hídricos da Bahia)
Type: Gravity
Purpose(s): Water Supply
River: Vaza-Barris
Reservoir capacity: 49 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/10
End of Project: 10/10
Specifications
Height: 23 metres
Length: 927 metres
Volume of RCC: -
Total volume: 130 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Eletrogoes S/A.
Type: Gravity
Purpose(s): Hydropower
River: Comemorqção
Reservoir capacity: 478 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/10
End of Project: -/11
Specifications
Height: 19 metres
Length: 460 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Republic of Congo
Owner: Délégation Générale des Grands Travaux
Type: Gravity
Purpose(s): Hydropower
River: Léfini
Reservoir capacity: 584 m3x106
Construction Dates
Start of Project: 09/03
Start of RCC: 09/03
End of RCC: -/10
End of Project: 05/11
Specifications
Height: 33 metres
Length: 310 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Tunisia
Owner: Ministère de l’Agriculture
Type: Hardfill
Purpose(s): Water Supply
River: Bou Terfess
Reservoir capacity: 26 m3x106
Construction Dates
Start of Project: 02/03
Start of RCC: 02/03
End of RCC: -/10
End of Project: 11/11
Specifications
Height: 81 metres
Length: 324 metres
Volume of RCC: 422 m3x103
Total volume: 450 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 120 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Hardfill
Purpose(s): Irrigation
River: İlyasdere
Reservoir capacity: 42 m3x106
Construction Dates
Start of Project: -/95
Start of RCC: -/95
End of RCC: -/10
End of Project: 12/11
Specifications
Height: 65 metres
Length: 477 metres
Volume of RCC: 743 m3x103
Total volume: 800 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.35 | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 50 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Yunnan Dianneng Group Holding Company
Type: Thin Arch
Purpose(s): Hydropower
River: Xima
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 04/06
Start of RCC: 04/06
End of RCC: -/10
End of Project: -/11
Specifications
Height: 72 metres
Length: 160 metres
Volume of RCC: 107 m3x103
Total volume: 115 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| curve | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| curve | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| RCC against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Guodian Yunnan Power Co Ltd
Type: Gravity
Purpose(s): Hydropower
River: Pudu
Reservoir capacity: 22 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/10
End of Project: -/11
Specifications
Height: 81 metres
Length: 148 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): unknown
River: Yupaojiang
Reservoir capacity: 25 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/10
End of Project: -/11
Specifications
Height: 95 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Chongqing Wujiang Power Company
Type: Gravity
Purpose(s): Hydropower
River: Youshui
Reservoir capacity: 163 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/10
End of Project: -/12
Specifications
Height: 30 metres
Length: 214 metres
Volume of RCC: -
Total volume: 260 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Hubei Energy Group Co. Ltd.
Type: Thin Arch
Purpose(s): Flood Control / Hydropower
River: Nanhe
Reservoir capacity: 499 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/10
End of Project: -/11
Specifications
Height: 133 metres
Length: 285 metres
Volume of RCC: -
Total volume: 390 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Água Limpa Energia S/A
Type: Gravity
Purpose(s): Hydropower
River: Palmeiras
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/10
End of Project: 12/10
Specifications
Height: 38 metres
Length: 98 metres
Volume of RCC: 42 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Companhia Hidroelétrica Figueirópolis
Type: Gravity
Purpose(s): Hydropower
River: Jauru
Reservoir capacity: 35 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/10
End of Project: 12/10
Specifications
Height: 16 metres
Length: 170 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
| 0.43 |
Spillway
| Slope | Type |
|---|---|
| 0.75 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Santo Antonio
Reservoir capacity: 8 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/10
End of Project: -/11
Specifications
Height: 26 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Meng County Longhuakou Hydropower Co. Ltd.
Type: Gravity
Purpose(s): unknown
River: Longhua
Reservoir capacity: 30 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/10
End of Project: -/10
Specifications
Height: 63 metres
Length: 353 metres
Volume of RCC: -
Total volume: 414 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Ibirama Energética SA
Type: Gravity
Purpose(s): Hydropower
River: -
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/10
End of Project: -/10
Specifications
Height: 15 metres
Length: 145 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: CPFL Renovaveis
Type: Gravity
Purpose(s): Hydropower
River: Santo Antônio
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/10
End of Project: -/10
Specifications
Height: 15 metres
Length: 94 metres
Volume of RCC: -
Total volume: 14 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
| 0.75 |
Spillway
| Slope | Type |
|---|---|
| 0.75 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Energisa Geracão Rio Grande S/A
Type: Gravity
Purpose(s): Hydropower
River: Rio Grande
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/10
End of Project: 03/11
Specifications
Height: 38 metres
Length: 222 metres
Volume of RCC: 66 m3x103
Total volume: 82 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Omega Engergia Renovávelo S/A
Type: Gravity
Purpose(s): Hydropower
River: Manhuaçu
Reservoir capacity: -
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/10
End of Project: 04/11
Specifications
Height: 16 metres
Length: 200 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Natural pozzolan (ASTM Class N) | |

Details
Country: China
Owner: Guangxi Water Conservancy and Electric Power Corporation
Type: Thin Arch
Purpose(s): Hydropower
River: Baidu
Reservoir capacity: 22 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/10
End of Project: -/11
Specifications
Height: 75 metres
Length: 217 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Ijui Energia S.A.
Type: Gravity
Purpose(s): Hydropower
River: Carreiro
Reservoir capacity: 188 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/10
End of Project: -/11
Specifications
Height: 29 metres
Length: 790 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Enshi Tianfa Electric Ltd.
Type: Thin Arch
Purpose(s): Flood Control / Hydropower / Recreation
River: Lengshui
Reservoir capacity: 87 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/10
End of Project: -/11
Specifications
Height: 114 metres
Length: 192 metres
Volume of RCC: 21 m3x103
Total volume: 21 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: Brazil
Owner: BME
Type: Gravity
Purpose(s): Hydropower
River: Paraiba do Sul
Reservoir capacity: -
Construction Dates
Start of Project: 12/07
Start of RCC: 12/07
End of RCC: -/10
End of Project: -/11
Specifications
Height: 28 metres
Length: -
Volume of RCC: 85 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: DNOCS (Departamento Nacional de Obras Contra a Seca)
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Pajeú
Reservoir capacity: 49 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/10
End of Project: -/11
Specifications
Height: 26 metres
Length: 566 metres
Volume of RCC: 64 m3x103
Total volume: 92 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): unknown
River: Safsaf
Reservoir capacity: 20 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/10
End of Project: -/11
Specifications
Height: 29 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.85 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.85 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 120 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Brazil
Owner: Geracao Hidroeletrica Rio Grande S/A
Type: Gravity
Purpose(s): Hydropower
River: Grande
Reservoir capacity: 44 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/10
End of Project: -/11
Specifications
Height: 41 metres
Length: 210 metres
Volume of RCC: 51 m3x103
Total volume: 75 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Department of Water Resources, Guandong Province
Type: Gravity
Purpose(s): Hydropower / Irrigation / Navigation
River: Bei
Reservoir capacity: 374 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/10
End of Project: -/11
Specifications
Height: 85 metres
Length: 256 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Mexico
Owner: Gobierno del Estado de Michoacán
Type: Gravity
Purpose(s): Irrigation
River: El Marqués
Reservoir capacity: 100 m3x106
Construction Dates
Start of Project: 03/08
Start of RCC: 03/08
End of RCC: -/10
End of Project: -/11
Specifications
Height: 90 metres
Length: 375 metres
Volume of RCC: 367 m3x103
Total volume: 451 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | |
| 0.30 |
Downstream
| Slope | Type |
|---|---|
| 1.00 |
Spillway
| Slope | Type |
|---|---|
| 1.00 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 65 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Brazil
Owner: CPFL Renovaveis
Type: Gravity
Purpose(s): Hydropower
River: Corrente Grande
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/10
End of Project: -/10
Specifications
Height: 20 metres
Length: 110 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
| 0.75 |
Spillway
| Slope | Type |
|---|---|
| 0.75 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: -
Reservoir capacity: -
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/10
End of Project: -/10
Specifications
Height: 30 metres
Length: -
Volume of RCC: 42 m3x103
Total volume: 73 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Ain Leuh
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 10/09
Start of RCC: 10/09
End of RCC: 01/11
End of Project: 10/11
Specifications
Height: 29 metres
Length: 136 metres
Volume of RCC: 18 m3x103
Total volume: 20 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 30 | Natural pozzolan (ASTM Class N) |

Details
Country: Spain
Owner: Acua Ebro
Type: Gravity
Purpose(s): Irrigation
River: Guadalope
Reservoir capacity: 18 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: 02/11
End of Project: 03/11
Specifications
Height: 35 metres
Length: 203 metres
Volume of RCC: 65 m3x103
Total volume: 70 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Downstream
| Slope | Type |
|---|---|
| 0.60 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.60 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 65 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 153 | Low-lime flyash (ASTM Class F) |

Details
Country: Argentina
Owner: Provincia de Catamarca
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Las Tunas
Reservoir capacity: 101 m3x106
Construction Dates
Start of Project: 02/09
Start of RCC: 02/09
End of RCC: 02/11
End of Project: 12/11
Specifications
Height: 33 metres
Length: 259 metres
Volume of RCC: 30 m3x103
Total volume: 56 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 200 | 400 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 25 | Natural pozzolan (ASTM Class N) |

Details
Country: Japan
Owner: Okinawa General Bureau, Cabinet Office, Japan
Type: Hardfill
Purpose(s): Flood Control / Irrigation / Water Supply
River: Okukubi
Reservoir capacity: 79 m3x106
Construction Dates
Start of Project: 03/09
Start of RCC: 03/09
End of RCC: 03/11
End of Project: 07/11
Specifications
Height: 39 metres
Length: 461 metres
Volume of RCC: 339 m3x103
Total volume: 430 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against precast concrete panels |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against precast concrete panels |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Panama
Owner: AES (Allied Energy Systems Co.) Panama SRL
Type: Arch-Gravity
Purpose(s): Hydropower
River: Changuinola
Reservoir capacity: 347 m3x106
Construction Dates
Start of Project: 04/07
Start of RCC: 04/07
End of RCC: 04/11
End of Project: 10/11
Specifications
Height: 105 metres
Length: 595 metres
Volume of RCC: 884 m3x103
Total volume: 910 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.50 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
| 0.70 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.50 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| 65 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 145 | Low-lime flyash (ASTM Class F) |
| 150 |

Details
Country: Brazil
Owner: Consorcio Energético Cruzeiro do Sul (Copel and Electrosul Centrais Eléctricas SA)
Type: Gravity
Purpose(s): Hydropower
River: Tibagi
Reservoir capacity: 2137 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: 05/11
End of Project: -/12
Specifications
Height: 83 metres
Length: 726 metres
Volume of RCC: 633 m3x103
Total volume: 753 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork with external geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 2400 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 15 | Natural pozzolan (ASTM Class N) |

Details
Country: Japan
Owner: Ministry of Land, Infrastructure, Transport and Tourism
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Yunishi
Reservoir capacity: 75 m3x106
Construction Dates
Start of Project: 08/08
Start of RCC: 08/08
End of RCC: 05/11
End of Project: 09/12
Specifications
Height: 119 metres
Length: 320 metres
Volume of RCC: 967 m3x103
Total volume: 1053 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.60 |
Downstream
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | Low-lime flyash (ASTM Class F) |

Details
Country: Vietnam
Owner: EVN (Electrictie de Vietnam)
Type: Gravity
Purpose(s): Hydropower
River: Dong Nai
Reservoir capacity: 337 m3x106
Construction Dates
Start of Project: 12/04
Start of RCC: 12/04
End of RCC: 06/11
End of Project: -/12
Specifications
Height: 128 metres
Length: 481 metres
Volume of RCC: 1305 m3x103
Total volume: 1370 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 115 | Natural pozzolan (ASTM Class N) |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control
River: Maleh
Reservoir capacity: 35 m3x106
Construction Dates
Start of Project: 01/07
Start of RCC: 01/07
End of RCC: 06/11
End of Project: 10/12
Specifications
Height: 49 metres
Length: 174 metres
Volume of RCC: 100 m3x103
Total volume: 140 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.60 | Traditional concrete against precast concrete panels |
Spillway
| Slope | Type |
|---|---|
| 0.60 | Traditional concrete against precast concrete panels |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 120 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Mexico
Owner: CNA (Comisión Nacional del Agua)
Type: Gravity
Purpose(s): unknown
River: Santa Maria
Reservoir capacity: 57 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: 06/11
End of Project: -/11
Specifications
Height: 85 metres
Length: 270 metres
Volume of RCC: 420 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.85 |
Spillway
| Slope | Type |
|---|---|
| 0.85 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 33 to |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 27 to | Ground-granulated blast-furnace slag |

Details
Country: Turkey
Owner: Senerji Enerji
Type: Gravity
Purpose(s): Hydropower
River: Çoruh
Reservoir capacity: 21 m3x106
Construction Dates
Start of Project: 05/09
Start of RCC: 05/09
End of RCC: 06/11
End of Project: 02/12
Specifications
Height: 72 metres
Length: 97 metres
Volume of RCC: 160 m3x103
Total volume: 175 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.50 | Traditional concrete against formwork |
| 0.70 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 70 | Low-lime flyash (ASTM Class F) |

Details
Country: Vietnam
Owner: (IDICO) Urban and Industrial Development Zone Investment Company
Type: Gravity
Purpose(s): Hydropower
River: Vu Gia
Reservoir capacity: 313 m3x106
Construction Dates
Start of Project: 04/07
Start of RCC: 04/07
End of RCC: 08/11
End of Project: 04/12
Specifications
Height: 90 metres
Length: 472 metres
Volume of RCC: 720 m3x103
Total volume: 800 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.48 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 95 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 125 | Natural pozzolan (ASTM Class N) |

Details
Country: Vietnam
Owner: EVN (Electrictie de Vietnam)
Type: Gravity
Purpose(s): Hydropower
River: Song Tranh
Reservoir capacity: 733 m3x106
Construction Dates
Start of Project: 03/05
Start of RCC: 03/05
End of RCC: 08/11
End of Project: 12/12
Specifications
Height: 96 metres
Length: 640 metres
Volume of RCC: 1032 m3x103
Total volume: 1315 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 110 | Natural pozzolan (ASTM Class N) |

Details
Country: Pakistan
Owner: WAPDA (Water and Power Development Authority)
Type: Arch-Gravity
Purpose(s): Flood Control / Hydropower / Irrigation
River: Gomal
Reservoir capacity: 1424 m3x106
Construction Dates
Start of Project: 07/02
Start of RCC: 07/02
End of RCC: 09/11
End of Project: 06/13
Specifications
Height: 133 metres
Length: 231 metres
Volume of RCC: 390 m3x103
Total volume: 474 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
| 0.60 |
Spillway
| Slope | Type |
|---|---|
| 0.60 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 to |
| 4000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 91 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Ministry of Land, Infrastructure and Transport
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Yubari
Reservoir capacity: 427 m3x106
Construction Dates
Start of Project: 11/03
Start of RCC: 11/03
End of RCC: 09/11
End of Project: 03/15
Specifications
Height: 111 metres
Length: 390 metres
Volume of RCC: 584 m3x103
Total volume: 940 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.80 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.82 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.82 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 & |
| 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: MWRDGC (Metropolitan Water Reclamation District of Greater Chicago)
Type: Gravity
Purpose(s): Flood Control
River: -
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 02/10
Start of RCC: 02/10
End of RCC: 09/11
End of Project: 11/11
Specifications
Height: 35 metres
Length: 69 metres
Volume of RCC: 25 m3x103
Total volume: 25 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 48 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 79 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: Enerjisa En. Ut. A.S.
Type: Gravity
Purpose(s): Hydropower
River: Göksu
Reservoir capacity: 51 m3x106
Construction Dates
Start of Project: 05/09
Start of RCC: 05/09
End of RCC: 10/11
End of Project: 12/11
Specifications
Height: 68 metres
Length: 304 metres
Volume of RCC: 349 m3x103
Total volume: 384 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.25 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 40 | Low-lime flyash (ASTM Class F) |

Details
Country: Laos
Owner: Theun Hinboun Power Company
Type: Gravity
Purpose(s): Hydropower
River: Nam Gnouang
Reservoir capacity: 2450 m3x106
Construction Dates
Start of Project: 10/08
Start of RCC: 10/08
End of RCC: 12/11
End of Project: -/12
Specifications
Height: 65 metres
Length: 480 metres
Volume of RCC: 383 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 1.00 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Guizhou Zhongshui Energy Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Hongdu
Reservoir capacity: 321 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: 12/11
End of Project: 12/11
Specifications
Height: 135 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Huaneng Lancang River Hydropower Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Lancang (Mekong)
Reservoir capacity: 316 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/11
End of Project: 03/12
Specifications
Height: 105 metres
Length: 356 metres
Volume of RCC: -
Total volume: 1067 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Boa Sorte Energética S/A
Type: Gravity
Purpose(s): Hydropower
River: Tijucas
Reservoir capacity: 18 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/11
End of Project: -/12
Specifications
Height: 26 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Nei Mongol (Inner Mongolia) Electricity Corporation
Type: Gravity
Purpose(s): Hydropower
River: Halasxinegou
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/11
End of Project: -/12
Specifications
Height: 69 metres
Length: 242 metres
Volume of RCC: 185 m3x103
Total volume: 330 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Cambodia
Owner: Electricity of Cambodia (44-year BOT to Sinohydro Corporation)
Type: Gravity
Purpose(s): Hydropower
River: Kamchay
Reservoir capacity: 718 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/11
End of Project: -/12
Specifications
Height: 112 metres
Length: 568 metres
Volume of RCC: 1100 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | |
| 0.30 |
Downstream
| Slope | Type |
|---|---|
| 0.75 |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): unknown
River: Sanglang
Reservoir capacity: 15 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/11
End of Project: -/12
Specifications
Height: 90 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Enshi Mawei Valley Hydropower Development Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Maweigou
Reservoir capacity: 29 m3x106
Construction Dates
Start of Project: 12/08
Start of RCC: 12/08
End of RCC: -/11
End of Project: -/12
Specifications
Height: 140 metres
Length: 116 metres
Volume of RCC: -
Total volume: 212 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Vietnam
Owner: Central Hydropower Joint Stock Company
Type: Gravity
Purpose(s): Hydropower
River: A Sap
Reservoir capacity: -
Construction Dates
Start of Project: 06/07
Start of RCC: 06/07
End of RCC: -/11
End of Project: -/12
Specifications
Height: 50 metres
Length: 208 metres
Volume of RCC: 138 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: Püre Energy Üretim Tic. A.S.
Type: Gravity
Purpose(s): Hydropower
River: Aras
Reservoir capacity: 21 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/11
End of Project: 10/11
Specifications
Height: 55 metres
Length: 148 metres
Volume of RCC: 120 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Centrais Eletricas Brasileiras sa Eletrobras
Type: Gravity
Purpose(s): Hydropower
River: Paraiba do Sul
Reservoir capacity: 114 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/11
End of Project: 12/11
Specifications
Height: 30 metres
Length: 270 metres
Volume of RCC: 44 m3x103
Total volume: 55 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Statkraft (Moinho S.A.)
Type: Gravity
Purpose(s): Hydropower
River: Bernado José
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/11
End of Project: -/11
Specifications
Height: 22 metres
Length: 126 metres
Volume of RCC: 9 m3x103
Total volume: 25 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 68 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 17 | Natural pozzolan (ASTM Class N) |

Details
Country: China
Owner: Baise WaCun Hydropower Development Co.
Type: Gravity
Purpose(s): Hydropower
River: Xiyang
Reservoir capacity: 57 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/11
End of Project: -/11
Specifications
Height: 69 metres
Length: 247 metres
Volume of RCC: -
Total volume: 289 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Guodian Shaanxi Hydropower Development Co.
Type: Gravity
Purpose(s): Hydropower
River: Dan
Reservoir capacity: 95 m3x106
Construction Dates
Start of Project: 02/09
Start of RCC: 02/09
End of RCC: -/11
End of Project: -/11
Specifications
Height: 70 metres
Length: 221 metres
Volume of RCC: -
Total volume: 221 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Autódromo Energética S/A
Type: Gravity
Purpose(s): Hydropower
River: Carreiro
Reservoir capacity: 4 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/11
End of Project: -/11
Specifications
Height: 23 metres
Length: 271 metres
Volume of RCC: 21 m3x103
Total volume: 47 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 67 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 17 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Boa Fé Energética S.A.
Type: Gravity
Purpose(s): Hydropower
River: Carreiro
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/11
End of Project: -/11
Specifications
Height: 26 metres
Length: 198 metres
Volume of RCC: 32 m3x103
Total volume: 58 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Lusi Reservoir Management Office
Type: Gravity
Purpose(s): Water Supply
River: Lusixi
Reservoir capacity: 33 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/11
End of Project: -/12
Specifications
Height: 39 metres
Length: 140 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Hydropower / Water Supply
River: Hezil
Reservoir capacity: 29 m3x106
Construction Dates
Start of Project: 08/08
Start of RCC: 08/08
End of RCC: -/11
End of Project: 02/12
Specifications
Height: 89 metres
Length: 356 metres
Volume of RCC: 718 m3x103
Total volume: 752 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | RCC against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 81 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | No pozzolan used |

Details
Country: Brazil
Owner: Energisa Geracão Rio Grande S/A
Type: Gravity
Purpose(s): Hydropower
River: Grande
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/11
End of Project: 02/12
Specifications
Height: 44 metres
Length: 285 metres
Volume of RCC: 81 m3x103
Total volume: 105 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Santo Antônio Energia
Type: Gravity
Purpose(s): Hydropower
River: Madeira
Reservoir capacity: 2075 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/11
End of Project: 03/12
Specifications
Height: 25 metres
Length: 3100 metres
Volume of RCC: 560 m3x103
Total volume: 3086 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Passos Maia Energética S.A. (Statkraft, Adami & Madeiras)
Type: Gravity
Purpose(s): Hydropower
River: Chapecó
Reservoir capacity: 14 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/11
End of Project: 09/12
Specifications
Height: 34 metres
Length: -
Volume of RCC: 66 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 72 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 18 | Natural pozzolan (ASTM Class N) |

Details
Country: China
Owner: Hubei Huaqing Power Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Loushui
Reservoir capacity: 52 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/11
End of Project: -/12
Specifications
Height: 74 metres
Length: 146 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Honghe Guangyuan Hydropwer and Madushan Development Co. Ltd.
Type: Gravity
Purpose(s): Hydropower / Navigation / Water Supply
River: Honghe
Reservoir capacity: 552 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/11
End of Project: -/12
Specifications
Height: 108 metres
Length: 353 metres
Volume of RCC: -
Total volume: 987 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Yunnan Jinsha River Hydropower Co. Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation
River: Jinsha
Reservoir capacity: 885 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/11
End of Project: -/12
Specifications
Height: 138 metres
Length: 482 metres
Volume of RCC: -
Total volume: 2707 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Water Supply
River: Ahl Lafouim
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/11
End of Project: -/12
Specifications
Height: 15 metres
Length: 95 metres
Volume of RCC: 20 m3x103
Total volume: 24 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Water Supply
River: Tiyoughza
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/11
End of Project: -/12
Specifications
Height: 32 metres
Length: 170 metres
Volume of RCC: 45 m3x103
Total volume: 53 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 120 |
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Turkey
Owner: Karen Energy
Type: Gravity
Purpose(s): Hydropower
River: Balkusan
Reservoir capacity: 15 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/11
End of Project: -/12
Specifications
Height: 48 metres
Length: 189 metres
Volume of RCC: 60 m3x103
Total volume: 76 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 1200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 75 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 50 | |

Details
Country: China
Owner: Yumen Hongyuan Industrial Company
Type: Gravity
Purpose(s): Hydropower
River: Sule
Reservoir capacity: -
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/11
End of Project: -/12
Specifications
Height: 64 metres
Length: 147 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Yunnan Baoshan Electric Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Longjiang
Reservoir capacity: 53 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/11
End of Project: -/12
Specifications
Height: 76 metres
Length: 239 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: France
Owner: Electricité de France
Type: Gravity
Purpose(s): Hydropower / Irrigation
River: Rizzanese
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: 02/12
End of Project: -/12
Specifications
Height: 41 metres
Length: 140 metres
Volume of RCC: 64 m3x103
Total volume: 72 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels with geomembrane |
| 1.00 | RCC against precast concrete blocks |
Downstream
| Slope | Type |
|---|---|
| Vertical | |
| 0.80 |
Spillway
| Slope | Type |
|---|---|
| 0.80 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: India
Owner: Municipal Corporation of Greater Mumbai
Type: Gravity
Purpose(s): Water Supply
River: Vaitarna
Reservoir capacity: 202 m3x106
Construction Dates
Start of Project: 10/08
Start of RCC: 10/08
End of RCC: 04/12
End of Project: -/12
Specifications
Height: 102 metres
Length: 565 metres
Volume of RCC: 1202 m3x103
Total volume: 1500 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.15 | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 75 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 145 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: Enerjisa En. Ut. A.S.
Type: Gravity
Purpose(s): Hydropower
River: Göksu
Reservoir capacity: 98 m3x106
Construction Dates
Start of Project: 07/09
Start of RCC: 07/09
End of RCC: 04/12
End of Project: -/13
Specifications
Height: 109 metres
Length: 413 metres
Volume of RCC: 975 m3x103
Total volume: 1050 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.60 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 45 | Low-lime flyash (ASTM Class F) |

Details
Country: Vietnam
Owner: Trung Nam Power Jointstock Company
Type: Gravity
Purpose(s): Hydropower
River: Dong Nai
Reservoir capacity: 281 m3x106
Construction Dates
Start of Project: 04/09
Start of RCC: 04/09
End of RCC: 05/12
End of Project: 03/13
Specifications
Height: 80 metres
Length: 429 metres
Volume of RCC: 786 m3x103
Total volume: 1025 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 120 | Natural pozzolan (ASTM Class N) |
| 110 |

Details
Country: USA
Owner: US Army Corps of Engineers, Jacksonville and Department of Natural Resources of Puerto Rico
Type: Arch-Gravity
Purpose(s): Flood Control
River: Portugues
Reservoir capacity: 20 m3x106
Construction Dates
Start of Project: 04/08
Start of RCC: 04/08
End of RCC: 05/12
End of Project: 12/13
Specifications
Height: 67 metres
Length: 375 metres
Volume of RCC: 270 m3x103
Total volume: 310 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.35 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.35 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 114 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 51 | Low-lime flyash (ASTM Class F) |

Details
Country: Ghana
Owner: BPA (Bui Power Authority)
Type: Gravity
Purpose(s): Hydropower / Irrigation
River: Bui
Reservoir capacity: 12570 m3x106
Construction Dates
Start of Project: 10/07
Start of RCC: 10/07
End of RCC: 05/12
End of Project: 11/14
Specifications
Height: 108 metres
Length: 493 metres
Volume of RCC: 830 m3x103
Total volume: 900 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 45 |
| 61 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 85 | Low-lime flyash (ASTM Class F) |
| 91 |

Details
Country: Turkey
Owner: MEM Enerji Elektrik Üretim Sanayi ve Ticaret A.Ş
Type: Gravity
Purpose(s): Hydropower
River: Göksu
Reservoir capacity: 18 m3x106
Construction Dates
Start of Project: 02/10
Start of RCC: 02/10
End of RCC: 05/12
End of Project: 07/12
Specifications
Height: 69 metres
Length: 118 metres
Volume of RCC: 96 m3x103
Total volume: 122 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.067 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast before RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 55 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 55 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: Comal County, Texas
Type: Gravity
Purpose(s): Flood Control
River: Dry Comal Creek
Reservoir capacity: 4 m3x106
Construction Dates
Start of Project: 10/11
Start of RCC: 10/11
End of RCC: 08/12
End of Project: 12/12
Specifications
Height: 26 metres
Length: 457 metres
Volume of RCC: 62 m3x103
Total volume: 67 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | High-lime flyash (ASTM Class C) |

Details
Country: Vietnam
Owner: EVN (Electrictie de Vietnam)
Type: Gravity
Purpose(s): Hydropower
River: Nam Mu
Reservoir capacity: 2138 m3x106
Construction Dates
Start of Project: 01/06
Start of RCC: 01/06
End of RCC: 08/12
End of Project: 12/13
Specifications
Height: 130 metres
Length: 425 metres
Volume of RCC: 1600 m3x103
Total volume: 2 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| separate |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 160 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: San Diego County Water Authority and City of San Diego
Type: Gravity
Purpose(s): Water Supply
River: San Diego
Reservoir capacity: 299 m3x106
Construction Dates
Start of Project: 06/09
Start of RCC: 06/09
End of RCC: 09/12
End of Project: 09/14
Specifications
Height: 103 metres
Length: 474 metres
Volume of RCC: 459 m3x103
Total volume: 465 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork with external geomembrane (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.78 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.78 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 86 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 127 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: MCK Elektrik Uretim A.S.
Type: Gravity
Purpose(s): Hydropower / Irrigation
River: Emet
Reservoir capacity: 6 m3x106
Construction Dates
Start of Project: 05/10
Start of RCC: 05/10
End of RCC: 09/12
End of Project: 01/13
Specifications
Height: 39 metres
Length: 313 metres
Volume of RCC: 180 m3x103
Total volume: 210 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork with external geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 40 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: Akköy Energy A.S.
Type: Gravity
Purpose(s): Hydropower
River: Karaovacik
Reservoir capacity: 14 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: 09/12
End of Project: -/13
Specifications
Height: 60 metres
Length: 260 metres
Volume of RCC: 226 m3x103
Total volume: 306 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 85 | Natural pozzolan (ASTM Class N) |

Details
Country: Australia
Owner: Icon Water (formerly ACTEW Corp.)
Type: Gravity
Purpose(s): Water Supply
River: Cotter
Reservoir capacity: 78 m3x106
Construction Dates
Start of Project: 10/09
Start of RCC: 10/09
End of RCC: 12/12
End of Project: 08/13
Specifications
Height: 87 metres
Length: 350 metres
Volume of RCC: 369 m3x103
Total volume: 400 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
| 400 | 400 |
Cementitious material
| Cement (kg/m3) |
|---|
| 75 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 120 | Low-lime flyash (ASTM Class F) |

Details
Country: Laos
Owner: Nam Ngum 5 Power Company Ltd. (15% Électricité du Laos - Generation Company Ltd., 85% Power)
Type: Thin Arch
Purpose(s): Hydropower
River: Nam Ting
Reservoir capacity: 314 m3x106
Construction Dates
Start of Project: 10/08
Start of RCC: 10/08
End of RCC: 12/12
End of Project: 12/12
Specifications
Height: 101 metres
Length: 235 metres
Volume of RCC: 298 m3x103
Total volume: 421 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Vietnam
Owner: Petro Vietnam
Type: Gravity
Purpose(s): Hydropower
River: Dak Drinh
Reservoir capacity: 249 m3x106
Construction Dates
Start of Project: 01/09
Start of RCC: 01/09
End of RCC: 12/12
End of Project: 12/13
Specifications
Height: 100 metres
Length: 466 metres
Volume of RCC: 788 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 115 | Natural pozzolan (ASTM Class N) |

Details
Country: Pakistan
Owner: WAPDA (Water and Power Development Authority) and CTGC (China Three Gorges Corp.)
Type: Gravity
Purpose(s): Hydropower
River: Duber Khwar
Reservoir capacity: -
Construction Dates
Start of Project: 06/03
Start of RCC: 06/03
End of RCC: -/12
End of Project: 01/14
Specifications
Height: 41 metres
Length: 202 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Yunnan Jinsha River Hydropower Co. Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation / Recreation / Water Supply
River: Jinsha
Reservoir capacity: 558 m3x106
Construction Dates
Start of Project: 08/07
Start of RCC: 08/07
End of RCC: -/12
End of Project: -/13
Specifications
Height: 119 metres
Length: 768 metres
Volume of RCC: 2840 m3x103
Total volume: 3853 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 96 |
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 96 | Low-lime flyash (ASTM Class F) |
| 90 |

Details
Country: Pakistan
Owner: WAPDA (Water and Power Development Authority) and CTGC (China Three Gorges Corp.)
Type: Gravity
Purpose(s): Hydropower
River: Allai Khwar
Reservoir capacity: -
Construction Dates
Start of Project: 01/05
Start of RCC: 01/05
End of RCC: -/12
End of Project: 03/13
Specifications
Height: 51 metres
Length: 88 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Shankouyan Hydro Project Development Co.
Type: Thin Arch
Purpose(s): Hydropower
River: Yuanhe
Reservoir capacity: 105 m3x106
Construction Dates
Start of Project: 11/07
Start of RCC: 11/07
End of RCC: -/12
End of Project: -/13
Specifications
Height: 99 metres
Length: 268 metres
Volume of RCC: -
Total volume: 272 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: -
Reservoir capacity: -
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/12
End of Project: -/12
Specifications
Height: 16 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Gabon
Owner: Ministries of Mining, Energy, Oil and Water Resources
Type: Gravity
Purpose(s): Hydropower
River: Ogooué
Reservoir capacity: -
Construction Dates
Start of Project: 11/08
Start of RCC: 11/08
End of RCC: -/12
End of Project: 08/13
Specifications
Height: 37 metres
Length: 300 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 105 |
| 96 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 70 | Low-lime flyash (ASTM Class F) |
| 64 |

Details
Country: China
Owner: Wujiang Hydroelectric Development Corporation
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation
River: Wu
Reservoir capacity: 910 m3x106
Construction Dates
Start of Project: 05/06
Start of RCC: 05/06
End of RCC: -/12
End of Project: -/13
Specifications
Height: 101 metres
Length: 631 metres
Volume of RCC: 1510 m3x103
Total volume: 1980 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
| 0.15 |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Guizhou Water-investment Hydropower Development Co., Ltd
Type: Thin Arch
Purpose(s): Hydropower
River: Masha
Reservoir capacity: 61 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/12
End of Project: -/13
Specifications
Height: 81 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): unknown
River: Milanhe
Reservoir capacity: 41 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/12
End of Project: -/13
Specifications
Height: 83 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Yalong River Hydropower Development Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Yalong
Reservoir capacity: 760 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/12
End of Project: -/13
Specifications
Height: 168 metres
Length: 516 metres
Volume of RCC: 2970 m3x103
Total volume: 3020 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | |
| 0.30 |
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
| 0.70 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 72 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 88 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): unknown
River: Hanjiang
Reservoir capacity: -
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/12
End of Project: -/14
Specifications
Height: 58 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: SAMAE (Serviço Autônomo Municipal de Água e Esgoto)
Type: Gravity
Purpose(s): Water Supply
River: Marrecas
Reservoir capacity: 33 m3x106
Construction Dates
Start of Project: 03/10
Start of RCC: 03/10
End of RCC: -/12
End of Project: 12/12
Specifications
Height: 35 metres
Length: 430 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Zunyi Water Conservancy Bureau
Type: Gravity
Purpose(s): unknown
River: Ren
Reservoir capacity: 99 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/12
End of Project: -/12
Specifications
Height: 60 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Ximeng Fubian Hydropower Development Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Nankang
Reservoir capacity: 31 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/12
End of Project: -/12
Specifications
Height: 68 metres
Length: 179 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: CTG Brasil
Type: Gravity
Purpose(s): Hydropower
River: Sapucai
Reservoir capacity: 18 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/12
End of Project: 07/13
Specifications
Height: 15 metres
Length: 482 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Rio Canoas Energia S.A.
Type: Gravity
Purpose(s): Hydropower
River: Canoas
Reservoir capacity: 296 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/12
End of Project: 09/13
Specifications
Height: 42 metres
Length: 517 metres
Volume of RCC: 264 m3x103
Total volume: 382 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Hardfill
Purpose(s): Hydropower
River: Kizilirmak
Reservoir capacity: 41 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/12
End of Project: -/13
Specifications
Height: 42 metres
Length: 251 metres
Volume of RCC: 160 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Hydropower
River: Robozik
Reservoir capacity: 44 m3x106
Construction Dates
Start of Project: 09/08
Start of RCC: 09/08
End of RCC: -/12
End of Project: -/13
Specifications
Height: 39 metres
Length: 173 metres
Volume of RCC: 60 m3x103
Total volume: 64 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 1200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 77 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 63 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: CJ Hydro - Geraçao de Energia S.A
Type: Gravity
Purpose(s): Hydropower
River: Turvo
Reservoir capacity: 6 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/12
End of Project: -/13
Specifications
Height: 22 metres
Length: 237 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Companhia de Gestão dos Recursos Hídricos
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: -
Reservoir capacity: 21 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/12
End of Project: -/13
Specifications
Height: 28 metres
Length: 310 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Centrais Hidrelétricas Grapon S/A
Type: Gravity
Purpose(s): Hydropower
River: Pomba
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/12
End of Project: -/13
Specifications
Height: 32 metres
Length: 273 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Vietnam
Owner: FPT Corporation
Type: Gravity
Purpose(s): Hydropower
River: Bo
Reservoir capacity: 821 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/12
End of Project: -/13
Specifications
Height: 83 metres
Length: -
Volume of RCC: 260 m3x103
Total volume: 400 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Pezzi Energética S.A.
Type: Gravity
Purpose(s): Hydropower
River: das Antas
Reservoir capacity: 24 m3x106
Construction Dates
Start of Project: -/11
Start of RCC: -/11
End of RCC: -/12
End of Project: -/13
Specifications
Height: 42 metres
Length: 238 metres
Volume of RCC: 44 m3x103
Total volume: 80 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 76 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 19 | Natural pozzolan (ASTM Class N) |

Details
Country: Brazil
Owner: Serra dos Cavalinhos II Energética S.A.
Type: Gravity
Purpose(s): Hydropower
River: das Antas
Reservoir capacity: 8 m3x106
Construction Dates
Start of Project: -/11
Start of RCC: -/11
End of RCC: -/12
End of Project: -/13
Specifications
Height: 42 metres
Length: 123 metres
Volume of RCC: 33 m3x103
Total volume: 80 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 72 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 18 | Natural pozzolan (ASTM Class N) |

Details
Country: South Africa
Owner: TCTA (Trans Caledon Tunnel Authority)
Type: Gravity
Purpose(s): Water Supply
River: Mooi
Reservoir capacity: 140 m3x106
Construction Dates
Start of Project: 03/11
Start of RCC: 03/11
End of RCC: 05/13
End of Project: 05/14
Specifications
Height: 39 metres
Length: 300 metres
Volume of RCC: 96 m3x103
Total volume: 114 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 50 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 110 | Low-lime flyash (ASTM Class F) |

Details
Country: Malaysia
Owner: SEB (Sarawak Energy Bhd)
Type: Gravity
Purpose(s): Hydropower
River: Murum
Reservoir capacity: 12043 m3x106
Construction Dates
Start of Project: 10/08
Start of RCC: 10/08
End of RCC: 07/13
End of Project: -/15
Specifications
Height: 146 metres
Length: 440 metres
Volume of RCC: 1520 m3x103
Total volume: 1660 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
| 0.20 | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork [stepped face] |
| 0.80 |
Spillway
| Slope | Type |
|---|---|
| 0.70 | |
| 0.80 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 88 |
| 65 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 88 | Low-lime flyash (ASTM Class F) |
| 72 |

Details
Country: USA
Owner: American Municipal Partners (AMP)
Type: Hardfill
Purpose(s): Hydropower
River: Ohio
Reservoir capacity: -
Construction Dates
Start of Project: 05/09
Start of RCC: 05/09
End of RCC: 08/13
End of Project: 09/16
Specifications
Height: 35 metres
Length: 158 metres
Volume of RCC: 113 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.80 | RCC against precast concrete blocks |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| separate |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 230 | 230 |
Cementitious material
| Cement (kg/m3) |
|---|
| 118 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 64 | Low-lime flyash (ASTM Class F) |

Details
Country: South Africa
Owner: Department of Water & Sanitation
Type: Gravity
Purpose(s): Water Supply
River: Steelpoort
Reservoir capacity: 347 m3x106
Construction Dates
Start of Project: 07/07
Start of RCC: 07/07
End of RCC: 11/13
End of Project: 03/14
Specifications
Height: 85 metres
Length: 1015 metres
Volume of RCC: 769 m3x103
Total volume: 1012 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 1200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 62 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 145 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: American Municipal Partners (AMP)
Type: Hardfill
Purpose(s): Hydropower
River: Ohio
Reservoir capacity: -
Construction Dates
Start of Project: 04/11
Start of RCC: 04/11
End of RCC: 12/13
End of Project: 04/16
Specifications
Height: 28 metres
Length: 84 metres
Volume of RCC: 56 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.80 | RCC against precast concrete blocks |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| separate |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 230 | 230 |
Cementitious material
| Cement (kg/m3) |
|---|
| 116 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 62 | Low-lime flyash (ASTM Class F) |

Details
Country: Myanmar
Owner: Department of Hydroelectric Power - Ministry of Electric Power
Type: Gravity
Purpose(s): Hydropower
River: Paung Laung
Reservoir capacity: 1285 m3x106
Construction Dates
Start of Project: 01/06
Start of RCC: 01/06
End of RCC: 12/13
End of Project: -/14
Specifications
Height: 103 metres
Length: 537 metres
Volume of RCC: 936 m3x103
Total volume: 1100 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 140 | Natural pozzolan (ASTM Class N) |

Details
Country: China
Owner: Department of Water Resources, Xinjiang Province
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: E’erqisi
Reservoir capacity: 2419 m3x106
Construction Dates
Start of Project: -/07
Start of RCC: -/07
End of RCC: -/13
End of Project: -/14
Specifications
Height: 122 metres
Length: 1489 metres
Volume of RCC: 2520 m3x103
Total volume: 2890 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
| 0.75 |
Spillway
| Slope | Type |
|---|---|
| 0.75 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: China
Owner: Guizhou Qianyuan Power Company
Type: Gravity
Purpose(s): Hydropower
River: Beipan
Reservoir capacity: 137 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/13
End of Project: -/14
Specifications
Height: 109 metres
Length: 250 metres
Volume of RCC: -
Total volume: 591 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Luntan Hydraulic Engineering Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Yangcunshui
Reservoir capacity: 180 m3x106
Construction Dates
Start of Project: 12/08
Start of RCC: 12/08
End of RCC: -/13
End of Project: -/14
Specifications
Height: 90 metres
Length: 218 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Iriri
Reservoir capacity: 270 m3x106
Construction Dates
Start of Project: 05/10
Start of RCC: 05/10
End of RCC: -/13
End of Project: -/13
Specifications
Height: 90 metres
Length: 202 metres
Volume of RCC: 270 m3x103
Total volume: 380 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Brazil
Owner: CERTEL
Type: Gravity
Purpose(s): Hydropower
River: Forqueta
Reservoir capacity: -
Construction Dates
Start of Project: -/11
Start of RCC: -/11
End of RCC: -/13
End of Project: -/13
Specifications
Height: 23 metres
Length: 190 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Chile
Owner: Colbún SA
Type: Gravity
Purpose(s): Hydropower
River: BioBio
Reservoir capacity: -
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/13
End of Project: -/14
Specifications
Height: 63 metres
Length: 125 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: China Huadian Corporation
Type: Thin Arch
Purpose(s): Hydropower / Water Supply
River: Muli
Reservoir capacity: 190 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/13
End of Project: -/14
Specifications
Height: 132 metres
Length: 211 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): unknown
River: Chuanjiang
Reservoir capacity: 98 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/13
End of Project: -/14
Specifications
Height: 83 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): unknown
River: Houhe
Reservoir capacity: 119 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/13
End of Project: -/14
Specifications
Height: 93 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Guizhou Qianyuan Power Co. Ltd.
Type: Thin Arch
Purpose(s): Hydropower
River: Beipan
Reservoir capacity: 85 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/13
End of Project: -/15
Specifications
Height: 119 metres
Length: 205 metres
Volume of RCC: 199 m3x103
Total volume: 267 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| curve | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| curve | RCC against formwork |
Spillway
| Slope | Type |
|---|---|
| ogee | RCC against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Eletrosul Centrais Elétricas SA
Type: Gravity
Purpose(s): Hydropower
River: Caveiras
Reservoir capacity: 23 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/13
End of Project: 11/13
Specifications
Height: 29 metres
Length: 170 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: HydroChina Co.
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Furong
Reservoir capacity: 57 m3x106
Construction Dates
Start of Project: 10/11
Start of RCC: 10/11
End of RCC: -/13
End of Project: -/13
Specifications
Height: 59 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Eletrosul Centrais Elétricas S/A
Type: Gravity
Purpose(s): Hydropower / Water Supply
River: Braço do Norte
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/13
End of Project: -/13
Specifications
Height: 25 metres
Length: 117 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Peru
Owner: Empresa de Generacion Huanza
Type: Gravity
Purpose(s): Hydropower
River: Pallca
Reservoir capacity: -
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/13
End of Project: -/14
Specifications
Height: 38 metres
Length: -
Volume of RCC: 85 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): unknown
River: -
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/11
Start of RCC: -/11
End of RCC: -/13
End of Project: -/14
Specifications
Height: 19 metres
Length: -
Volume of RCC: 27 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 1.00 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 1.00 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Chengde Shuangfengsi Project Bureau
Type: Gravity
Purpose(s): Hydropower
River: Luanhe
Reservoir capacity: 137 m3x106
Construction Dates
Start of Project: -/11
Start of RCC: -/11
End of RCC: -/13
End of Project: -/14
Specifications
Height: 50 metres
Length: 535 metres
Volume of RCC: -
Total volume: 550 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Cambodia
Owner: Ministry of Mines and Energy
Type: Gravity
Purpose(s): Hydropower
River: Russei Chrum
Reservoir capacity: 62 m3x106
Construction Dates
Start of Project: -/11
Start of RCC: -/11
End of RCC: -/13
End of Project: -/14
Specifications
Height: 59 metres
Length: 325 metres
Volume of RCC: 170 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Guodian Haikong Hongling water construction Co. Ltd.
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Dabian
Reservoir capacity: 662 m3x106
Construction Dates
Start of Project: -/11
Start of RCC: -/11
End of RCC: -/13
End of Project: -/14
Specifications
Height: 92 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Nei Mongol (Inner Mongolia) Electricity Corporation
Type: Gravity
Purpose(s): Hydropower
River: Halasxinegou
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/13
End of Project: -/14
Specifications
Height: 58 metres
Length: 308 metres
Volume of RCC: 205 m3x103
Total volume: 717 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Panama
Owner: Fountain Hydro Power Corp.
Type: Gravity
Purpose(s): Hydropower
River: Chiriqui Viejo
Reservoir capacity: -
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/13
End of Project: -/14
Specifications
Height: 56 metres
Length: 406 metres
Volume of RCC: 87 m3x103
Total volume: 272 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Flood Control / Irrigation
River: Manavgat
Reservoir capacity: 104 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: 01/14
End of Project: 05/14
Specifications
Height: 78 metres
Length: 448 metres
Volume of RCC: 620 m3x103
Total volume: 677 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.15 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 110 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 90 | Natural pozzolan (ASTM Class N) |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Bembo
Reservoir capacity: 11 m3x106
Construction Dates
Start of Project: 09/08
Start of RCC: 09/08
End of RCC: 02/14
End of Project: 11/14
Specifications
Height: 69 metres
Length: 210 metres
Volume of RCC: 162 m3x103
Total volume: 202 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 1200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 80 | Natural pozzolan (ASTM Class N) |

Details
Country: Turkey
Owner: Kalehan Energy Üretim ve Ticaret A.S.
Type: Hardfill
Purpose(s): Hydropower
River: Murat
Reservoir capacity: 369 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: 03/14
End of Project: 03/15
Specifications
Height: 97 metres
Length: 361 metres
Volume of RCC: 1480 m3x103
Total volume: 1661 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.70 | RCC against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 40 | Milled sand |

Details
Country: Vietnam
Owner: EVN (Electrictie de Vietnam)
Type: Gravity
Purpose(s): Hydropower
River: Vu Gia
Reservoir capacity: 511 m3x106
Construction Dates
Start of Project: 09/10
Start of RCC: 09/10
End of RCC: 04/14
End of Project: 01/15
Specifications
Height: 114 metres
Length: 345 metres
Volume of RCC: 963 m3x103
Total volume: 1170 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | |
| 0.40 |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 120 | Natural pozzolan (ASTM Class N) & |
| 140 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: American Municipal Partners (AMP)
Type: Hardfill
Purpose(s): Hydropower
River: Ohio
Reservoir capacity: -
Construction Dates
Start of Project: 12/11
Start of RCC: 12/11
End of RCC: 04/14
End of Project: 02/16
Specifications
Height: 20 metres
Length: 66 metres
Volume of RCC: 49 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.80 | RCC against precast concrete blocks |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| separate |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 230 | 230 |
Cementitious material
| Cement (kg/m3) |
|---|
| 116 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 62 | Low-lime flyash (ASTM Class F) |

Details
Country: Iran
Owner: Fars Water Authority
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Cheshmeh Ashegh
Reservoir capacity: 62 m3x106
Construction Dates
Start of Project: 06/10
Start of RCC: 06/10
End of RCC: 05/14
End of Project: 03/17
Specifications
Height: 60 metres
Length: 375 metres
Volume of RCC: 130 m3x103
Total volume: 250 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 600 - |
| 900 |
Cementitious material
| Cement (kg/m3) |
|---|
| 120 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 80 | Natural pozzolan (ASTM Class N) |

Details
Country: China
Owner: Datang Huarui Investment Group Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation / Recreation
River: Jinsha
Reservoir capacity: 2263 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: 05/14
End of Project: -/16
Specifications
Height: 159 metres
Length: 1250 metres
Volume of RCC: 6473 m3x103
Total volume: 9364 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
| 0.10 |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 53 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 99 | Low-lime flyash (ASTM Class F) |

Details
Country: Oman
Owner: Ministry of Rural Municipalities and Water Resources
Type: Hardfill
Purpose(s): Flood Control
River: Wadi Umti
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 04/13
Start of RCC: 04/13
End of RCC: 07/14
End of Project: 07/14
Specifications
Height: 16 metres
Length: 145 metres
Volume of RCC: 34 m3x103
Total volume: 58 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.70 | Reinforced conventional concrete cast after RCC placement |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Reinforced conventional concrete cast after RCC placement |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: South Korea
Owner: Kwater (Korean Water Resources Corporation)
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Hantan
Reservoir capacity: 270 m3x106
Construction Dates
Start of Project: 02/09
Start of RCC: 02/09
End of RCC: 07/14
End of Project: 12/14
Specifications
Height: 84 metres
Length: 690 metres
Volume of RCC: 650 m3x103
Total volume: 709 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Ministry of Land, Infrastructure, Transport and Tourism
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation
River: Iwaki
Reservoir capacity: 141 m3x106
Construction Dates
Start of Project: 10/08
Start of RCC: 10/08
End of RCC: 08/14
End of Project: 03/16
Specifications
Height: 97 metres
Length: 342 metres
Volume of RCC: 500 m3x103
Total volume: 717 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 1.00 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.74 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.74 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | Low-lime flyash (ASTM Class F) |

Details
Country: Panama
Owner: Hidroécología Teribe (HET) S.A.
Type: Gravity
Purpose(s): Hydropower
River: Bonyic
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/11
Start of RCC: -/11
End of RCC: 08/14
End of Project: -/15
Specifications
Height: 37 metres
Length: 165 metres
Volume of RCC: -
Total volume: 88 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: USA
Owner: American Municipal Partners (AMP)
Type: Hardfill
Purpose(s): Hydropower
River: Ohio
Reservoir capacity: -
Construction Dates
Start of Project: 12/11
Start of RCC: 12/11
End of RCC: 10/14
End of Project: 07/17
Specifications
Height: 33 metres
Length: 153 metres
Volume of RCC: 120 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.80 | RCC against precast concrete blocks |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| separate |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 230 | 230 |
Cementitious material
| Cement (kg/m3) |
|---|
| 118 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 64 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: Darenhes A.S.
Type: Hardfill
Purpose(s): Hydropower
River: PeriSuyu
Reservoir capacity: 358 m3x106
Construction Dates
Start of Project: 11/10
Start of RCC: 11/10
End of RCC: 10/14
End of Project: -/15
Specifications
Height: 88 metres
Length: 500 metres
Volume of RCC: 760 m3x103
Total volume: 838 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 1200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 120 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Greece
Owner: Trikala Prefecture
Type: Hardfill
Purpose(s): Irrigation
River: Lithaios
Reservoir capacity: -
Construction Dates
Start of Project: 06/03
Start of RCC: 06/03
End of RCC: 12/14
End of Project: 07/20
Specifications
Height: 32 metres
Length: 526 metres
Volume of RCC: 160 m3x103
Total volume: 220 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.80 | Reinforced concrete cast against precast units or slip-formed facing elements |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 50 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 10 | Natural pozzolan (ASTM Class N) |

Details
Country: China
Owner: China Three Gorges Corporation
Type: Gravity
Purpose(s): Hydropower
River: Jinsha
Reservoir capacity: 52 m3x106
Construction Dates
Start of Project: -/06
Start of RCC: -/06
End of RCC: -/14
End of Project: -/16
Specifications
Height: 162 metres
Length: 909 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Yalongjiang Valley Hydropower Development
Type: Gravity
Purpose(s): Hydropower
River: Yalong
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/14
End of Project: -/16
Specifications
Height: 71 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Yunnan Huadian Hydropower Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Jingsha
Reservoir capacity: 1718 m3x106
Construction Dates
Start of Project: 01/07
Start of RCC: 01/07
End of RCC: -/14
End of Project: -/15
Specifications
Height: 140 metres
Length: 622 metres
Volume of RCC: -
Total volume: 1920 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | |
| 0.20 |
Downstream
| Slope | Type |
|---|---|
| 0.75 |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: Akköy Energy A.S.
Type: Gravity
Purpose(s): Hydropower
River: Gevne
Reservoir capacity: 109 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/14
End of Project: -/15
Specifications
Height: 113 metres
Length: 300 metres
Volume of RCC: 490 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Greece
Owner: Ministry of Rural Development and Food
Type: Hardfill
Purpose(s): Irrigation
River: Filiatrinos
Reservoir capacity: 8 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/14
End of Project: -/16
Specifications
Height: 55 metres
Length: 246 metres
Volume of RCC: 370 m3x103
Total volume: 430 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork with external geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| 0.80 | RCC against precast concrete blocks |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 350 | 350 |
Cementitious material
| Cement (kg/m3) |
|---|
| 51 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 24 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Chapecó
Reservoir capacity: -
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/14
End of Project: -/14
Specifications
Height: 20 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: Pelin Energy
Type: Gravity
Purpose(s): Hydropower / Irrigation
River: Kura
Reservoir capacity: 148 m3x106
Construction Dates
Start of Project: 01/10
Start of RCC: 01/10
End of RCC: -/14
End of Project: 02/15
Specifications
Height: 159 metres
Length: 230 metres
Volume of RCC: 637 m3x103
Total volume: 780 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Tunisia
Owner: Ministre de l’Agriculture
Type: Hardfill
Purpose(s): Irrigation
River: Oued Sarrath
Reservoir capacity: 21 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/14
End of Project: 11/15
Specifications
Height: 36 metres
Length: 820 metres
Volume of RCC: -
Total volume: 335 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.70 |
Downstream
| Slope | Type |
|---|---|
| 0.70 |
Spillway
| Slope | Type |
|---|---|
| 0.70 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower
River: Hanshuinanhe
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/14
End of Project: -/15
Specifications
Height: 98 metres
Length: -
Volume of RCC: -
Total volume: 205 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Flood Control
River: Bağ
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/14
End of Project: -/14
Specifications
Height: 31 metres
Length: 118 metres
Volume of RCC: 30 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Ecuador
Owner: CELEC (Corporatión Eléctrica del Ecuador)
Type: Gravity
Purpose(s): Hydropower
River: Mauduriacu
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: 12/11
Start of RCC: 12/11
End of RCC: -/14
End of Project: 03/15
Specifications
Height: 61 metres
Length: 245 metres
Volume of RCC: 114 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.25 |
Downstream
| Slope | Type |
|---|---|
| 0.75 |
Spillway
| Slope | Type |
|---|---|
| 0.75 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Natural pozzolan (ASTM Class N) | |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Hardfill
Purpose(s): Hydropower / Irrigation / Water Supply
River: Zamanti
Reservoir capacity: 195 m3x106
Construction Dates
Start of Project: -/11
Start of RCC: -/11
End of RCC: -/14
End of Project: 06/15
Specifications
Height: 37 metres
Length: 842 metres
Volume of RCC: 1890 m3x103
Total volume: 1943 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.76 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.76 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 1200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Hydropower
River: Ortasu
Reservoir capacity: 20 m3x106
Construction Dates
Start of Project: 09/08
Start of RCC: 09/08
End of RCC: -/14
End of Project: -/15
Specifications
Height: 53 metres
Length: 431 metres
Volume of RCC: 392 m3x103
Total volume: 460 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 600 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Hydropower
River: Robozik
Reservoir capacity: 13 m3x106
Construction Dates
Start of Project: 09/08
Start of RCC: 09/08
End of RCC: -/14
End of Project: -/15
Specifications
Height: 66 metres
Length: 165 metres
Volume of RCC: 131 m3x103
Total volume: 138 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 1200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 77 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 63 | Natural pozzolan (ASTM Class N) |

Details
Country: China
Owner: Xian Water Affair Group
Type: Thin Arch
Purpose(s): Hydropower
River: Bahe
Reservoir capacity: 53 m3x106
Construction Dates
Start of Project: -/11
Start of RCC: -/11
End of RCC: -/14
End of Project: -/15
Specifications
Height: 99 metres
Length: 352 metres
Volume of RCC: 370 m3x103
Total volume: 478 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Helong Electricity Corporation
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Recreation / Water Supply
River: Hailanhe
Reservoir capacity: 21 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/14
End of Project: -/15
Specifications
Height: 41 metres
Length: 271 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.73 | RCC against precast concrete blocks |
Spillway
| Slope | Type |
|---|---|
| conduit |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 2000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: Derin Enerji Uretim San. Ve Tic. A.S.
Type: Gravity
Purpose(s): Hydropower
River: Kökün
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/14
End of Project: -/15
Specifications
Height: 45 metres
Length: 162 metres
Volume of RCC: 400 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): unknown
River: Daoliu
Reservoir capacity: 123 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/14
End of Project: -/15
Specifications
Height: 60 metres
Length: 187 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: Peker Energy Inc
Type: Gravity
Purpose(s): Hydropower
River: Büyük Menderes
Reservoir capacity: 15 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/14
End of Project: -/15
Specifications
Height: 61 metres
Length: 145 metres
Volume of RCC: 150 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Una
Reservoir capacity: 303 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/14
End of Project: -/15
Specifications
Height: 66 metres
Length: 1015 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: 20 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/14
End of Project: -/15
Specifications
Height: 72 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): unknown
River: Tlit
Reservoir capacity: -
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/14
End of Project: -/15
Specifications
Height: 18 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Lesotho
Owner: Government of the Kingdom of Lesotho/Metolong Authority
Type: Gravity
Purpose(s): Water Supply
River: South Phuthiatsana
Reservoir capacity: 64 m3x106
Construction Dates
Start of Project: 09/11
Start of RCC: 09/11
End of RCC: 02/15
End of Project: 08/16
Specifications
Height: 83 metres
Length: 278 metres
Volume of RCC: 280 m3x103
Total volume: 314 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 110 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: Ozdogan Enerji
Type: Gravity
Purpose(s): Hydropower
River: Oltu
Reservoir capacity: 308 m3x106
Construction Dates
Start of Project: 04/11
Start of RCC: 04/11
End of RCC: 02/15
End of Project: 10/15
Specifications
Height: 177 metres
Length: 405 metres
Volume of RCC: 1650 m3x103
Total volume: 1900 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 50 |
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 110 | Low-lime flyash (ASTM Class F) |
| 120 |

Details
Country: Turkey
Owner: Bereket Energy
Type: Hardfill
Purpose(s): Hydropower
River: Zamanti
Reservoir capacity: 109 m3x106
Construction Dates
Start of Project: 04/11
Start of RCC: 04/11
End of RCC: 03/15
End of Project: -/16
Specifications
Height: 133 metres
Length: 200 metres
Volume of RCC: 749 m3x103
Total volume: 900 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.30 | Traditional concrete against formwork |
| 1.00 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.60 | Traditional concrete against formwork |
| 1.00 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 50 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 50 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: EBD En. Ür. ve Tic. A.S.
Type: Arch-Gravity
Purpose(s): Hydropower
River: Kura
Reservoir capacity: 20 m3x106
Construction Dates
Start of Project: 10/12
Start of RCC: 10/12
End of RCC: 04/15
End of Project: 11/15
Specifications
Height: 70 metres
Length: 250 metres
Volume of RCC: 248 m3x103
Total volume: 252 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.15 | RCC against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 130 | Natural pozzolan (ASTM Class N) |

Details
Country: Vietnam
Owner: EVN (Electrictie de Vietnam)
Type: Gravity
Purpose(s): Hydropower
River: Song Da (Black River)
Reservoir capacity: 1215 m3x106
Construction Dates
Start of Project: 06/10
Start of RCC: 06/10
End of RCC: 05/15
End of Project: 07/17
Specifications
Height: 131 metres
Length: 620 metres
Volume of RCC: 1884 m3x103
Total volume: 2500 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 160 | Low-lime flyash (ASTM Class F) |

Details
Country: India
Owner: NHPC Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Teesta
Reservoir capacity: 37 m3x106
Construction Dates
Start of Project: 05/06
Start of RCC: 05/06
End of RCC: 05/15
End of Project: 08/16
Specifications
Height: 45 metres
Length: 196 metres
Volume of RCC: 167 m3x103
Total volume: 170 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.40 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| separate |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 135 | Low-lime flyash (ASTM Class F) |

Details
Country: Peru
Owner: IC Power
Type: Gravity
Purpose(s): Hydropower
River: Mantaro
Reservoir capacity: 37 m3x106
Construction Dates
Start of Project: 11/12
Start of RCC: 11/12
End of RCC: 06/15
End of Project: -/16
Specifications
Height: 89 metres
Length: 270 metres
Volume of RCC: 250 m3x103
Total volume: 450 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 600 |
Cementitious material
| Cement (kg/m3) |
|---|
| 115 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 23 | |

Details
Country: Japan
Owner: Fukuoka Prefecture
Type: Gravity
Purpose(s): Flood Control / Navigation / Water Supply
River: Naka
Reservoir capacity: 40 m3x106
Construction Dates
Start of Project: 06/12
Start of RCC: 06/12
End of RCC: 07/15
End of Project: 03/18
Specifications
Height: 103 metres
Length: 556 metres
Volume of RCC: 634 m3x103
Total volume: 935 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 1.00 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.76 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 104 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 26 | Low-lime flyash (ASTM Class F) |

Details
Country: Laos
Owner: Xekaman Power Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Xe Kaman
Reservoir capacity: 3120 m3x106
Construction Dates
Start of Project: 03/12
Start of RCC: 03/12
End of RCC: 07/15
End of Project: 12/16
Specifications
Height: 120 metres
Length: 335 metres
Volume of RCC: 870 m3x103
Total volume: 1065 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Downstream
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 130 | Low-lime flyash (ASTM Class F) |

Details
Country: Algeria
Owner: ANBT (Agence Nationale des Barrages et Transfert)
Type: Arch-Gravity
Purpose(s): Irrigation / Water Supply
River: Djen Djen
Reservoir capacity: 294 m3x106
Construction Dates
Start of Project: 03/10
Start of RCC: 03/10
End of RCC: 08/15
End of Project: 12/15
Specifications
Height: 121 metres
Length: 366 metres
Volume of RCC: 975 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Downstream
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Spillway
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 45 | Ground-granulated blast-furnace slag |

Details
Country: USA
Owner: Cullman Utilities Board
Type: Gravity
Purpose(s): Water Supply
River: Duck
Reservoir capacity: 31 m3x106
Construction Dates
Start of Project: 01/14
Start of RCC: 01/14
End of RCC: 09/15
End of Project: -/16
Specifications
Height: 41 metres
Length: 90 metres
Volume of RCC: 121 m3x103
Total volume: 128 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
| RCC against formwork |
Downstream
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 1.00 | Traditional concrete against formwork (GEVR/GE-RCC) [stepped face] |
| RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 107 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 55 | Low-lime flyash (ASTM Class F) |

Details
Country: Malaysia
Owner: Tenaga Nasional Berhad (TNB)
Type: Gravity
Purpose(s): Hydropower
River: Bertam, Telom and Lemoi
Reservoir capacity: 18 m3x106
Construction Dates
Start of Project: 03/11
Start of RCC: 03/11
End of RCC: 09/15
End of Project: 07/16
Specifications
Height: 90 metres
Length: 513 metres
Volume of RCC: 731 m3x103
Total volume: 747 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork with external geomembrane (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 400 | 2400 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| 95 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |
| 0 |

Details
Country: Ethiopia
Owner: Ethiopian Electric Power (EEP)
Type: Gravity
Purpose(s): Hydropower
River: Omo
Reservoir capacity: 14690 m3x106
Construction Dates
Start of Project: 04/08
Start of RCC: 04/08
End of RCC: 10/15
End of Project: -/16
Specifications
Height: 246 metres
Length: 630 metres
Volume of RCC: 6200 m3x103
Total volume: 6400 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.25 | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 1.00 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 1.00 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 400 | 400 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 to |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 45 to | Ground-granulated blast-furnace slag |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Rkiza
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/15
End of Project: -/15
Specifications
Height: 26 metres
Length: 500 metres
Volume of RCC: 55 m3x103
Total volume: 60 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.85 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.85 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: China Power International Development
Type: Gravity
Purpose(s): Hydropower
River: Yuan
Reservoir capacity: 1384 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/15
End of Project: -/16
Specifications
Height: 82 metres
Length: 649 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: Aksa Energy Production Trade and Industry Co. Inc.
Type: Gravity
Purpose(s): Hydropower
River: Göksu
Reservoir capacity: 63 m3x106
Construction Dates
Start of Project: 01/07
Start of RCC: 01/07
End of RCC: -/15
End of Project: -/17
Specifications
Height: 70 metres
Length: 235 metres
Volume of RCC: 232 m3x103
Total volume: 260 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.07 | RCC against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| separate |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 50 to | Low-lime flyash (ASTM Class F) |

Details
Country: Laos
Owner: EDL (Electricite du Laos)
Type: Gravity
Purpose(s): Hydropower
River: Nam Ou
Reservoir capacity: 335 m3x106
Construction Dates
Start of Project: -/11
Start of RCC: -/11
End of RCC: -/15
End of Project: 05/16
Specifications
Height: 74 metres
Length: 445 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: ANEEL (Agência Nacional de Energia Elétrica)
Type: Gravity
Purpose(s): Hydropower
River: Teles Pires
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 07/11
Start of RCC: 07/11
End of RCC: -/15
End of Project: 09/16
Specifications
Height: 67 metres
Length: 360 metres
Volume of RCC: 500 m3x103
Total volume: 1020 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Huaneng Guoduo Hydropower Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Zha Qu
Reservoir capacity: 80 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/15
End of Project: -/16
Specifications
Height: 83 metres
Length: 236 metres
Volume of RCC: -
Total volume: 550 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: Değirmenüstü Energy
Type: Gravity
Purpose(s): Hydropower
River: Köprüçay
Reservoir capacity: 43 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/15
End of Project: -/16
Specifications
Height: 90 metres
Length: 235 metres
Volume of RCC: 330 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Yangılı
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/15
End of Project: -/15
Specifications
Height: 38 metres
Length: 270 metres
Volume of RCC: 71 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Gelenalan
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/15
End of Project: -/15
Specifications
Height: 39 metres
Length: 330 metres
Volume of RCC: 69 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Hasanderesi
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/15
End of Project: -/15
Specifications
Height: 40 metres
Length: 241 metres
Volume of RCC: 69 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 35 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: CPFL Renovaveis
Type: Hardfill
Purpose(s): Hydropower
River: Preto
Reservoir capacity: 38 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/15
End of Project: 04/16
Specifications
Height: 30 metres
Length: 180 metres
Volume of RCC: 45 m3x103
Total volume: 65 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 1.25 |
Downstream
| Slope | Type |
|---|---|
| 1.25 |
Spillway
| Slope | Type |
|---|---|
| 1.25 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Laos
Owner: EDL (Electricite du Laos)
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Nam Khan
Reservoir capacity: 249 m3x106
Construction Dates
Start of Project: 12/12
Start of RCC: 12/12
End of RCC: -/15
End of Project: 06/16
Specifications
Height: 67 metres
Length: 154 metres
Volume of RCC: 125 m3x103
Total volume: 145 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: ENEL Green Power Fazenda S.A.
Type: Gravity
Purpose(s): Hydropower
River: dos Apiacás
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/15
End of Project: 09/16
Specifications
Height: 21 metres
Length: 503 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: ENEL Green Power Salto Apiacás S.A
Type: Gravity
Purpose(s): Hydropower
River: dos Apiacás
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/15
End of Project: -/16
Specifications
Height: 17 metres
Length: 486 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Panama
Owner: Corporacion de Energia del Istmo Ltd. S.A.
Type: Gravity
Purpose(s): Hydropower
River: San Pablo
Reservoir capacity: 39 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/15
End of Project: -/16
Specifications
Height: 41 metres
Length: 371 metres
Volume of RCC: 77 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.85 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.85 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: China
Owner: Yunxi Shuishimen Reservoir Bureau
Type: Thin Arch
Purpose(s): Flood Control / Hydropower / Water Supply
River: Tianhe
Reservoir capacity: 37 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/15
End of Project: -/16
Specifications
Height: 86 metres
Length: -
Volume of RCC: -
Total volume: 150 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Guangdong Yuedian Group Co., Ltd
Type: Thin Arch
Purpose(s): Hydropower
River: Nanpeng
Reservoir capacity: 170 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/15
End of Project: -/16
Specifications
Height: 99 metres
Length: 300 metres
Volume of RCC: -
Total volume: 210 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): unknown
River: Xinchanghe
Reservoir capacity: 14 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/15
End of Project: -/16
Specifications
Height: 57 metres
Length: 145 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Itamarati Norte S.A.
Type: Gravity
Purpose(s): Hydropower
River: Jubinha
Reservoir capacity: 480 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/15
End of Project: -/15
Specifications
Height: 21 metres
Length: 1540 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Itamarati Norte S.A.
Type: Gravity
Purpose(s): Hydropower
River: Juba
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/15
End of Project: -/15
Specifications
Height: 26 metres
Length: 570 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Japan
Owner: Hokkaido Prefecture
Type: Hardfill
Purpose(s): Flood Control / Irrigation / Water Supply
River: Atsuma
Reservoir capacity: 106 m3x106
Construction Dates
Start of Project: 10/14
Start of RCC: 10/14
End of RCC: 06/16
End of Project: 03/18
Specifications
Height: 47 metres
Length: 516 metres
Volume of RCC: 354 m3x103
Total volume: 490 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Pakistan
Owner: Neelum Jhelum Hydropower Company
Type: Gravity
Purpose(s): Hydropower
River: Neelum
Reservoir capacity: 8 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: 08/16
End of Project: 11/17
Specifications
Height: 47 metres
Length: 125 metres
Volume of RCC: -
Total volume: 156 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 154 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 51 | Ground-granulated blast-furnace slag |

Details
Country: Vietnam
Owner: EVN (Electrictie de Vietnam)
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Ma
Reservoir capacity: 349 m3x106
Construction Dates
Start of Project: 11/12
Start of RCC: 11/12
End of RCC: 08/16
End of Project: 02/17
Specifications
Height: 88 metres
Length: 498 metres
Volume of RCC: 770 m3x103
Total volume: 1140 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
| 0.35 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Downstream
| Slope | Type |
|---|---|
| 0.65 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.65 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 140 | Natural pozzolan (ASTM Class N) |
| 150 |

Details
Country: Turkey
Owner: Kalehan Energy Üretim ve Ticaret A.S.
Type: Gravity
Purpose(s): Hydropower
River: Murat
Reservoir capacity: 784 m3x106
Construction Dates
Start of Project: 06/12
Start of RCC: 06/12
End of RCC: 09/16
End of Project: 04/18
Specifications
Height: 150 metres
Length: 516 metres
Volume of RCC: 2224 m3x103
Total volume: 2414 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.25 | RCC against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 40 | Milled sand |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Sarma
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 01/13
Start of RCC: 01/13
End of RCC: 10/16
End of Project: -/17
Specifications
Height: 66 metres
Length: 148 metres
Volume of RCC: 85 m3x103
Total volume: 130 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Ardil
Reservoir capacity: 11 m3x106
Construction Dates
Start of Project: 03/13
Start of RCC: 03/13
End of RCC: 12/16
End of Project: 02/17
Specifications
Height: 54 metres
Length: 266 metres
Volume of RCC: 108 m3x103
Total volume: 158 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 600 |
Cementitious material
| Cement (kg/m3) |
|---|
| 75 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 75 | |

Details
Country: Turkey
Owner: Limak Energy
Type: Gravity
Purpose(s): Hydropower
River: Sakarya
Reservoir capacity: 50 m3x106
Construction Dates
Start of Project: -/11
Start of RCC: -/11
End of RCC: 12/16
End of Project: 06/17
Specifications
Height: 95 metres
Length: 270 metres
Volume of RCC: 535 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Lebanon
Owner: Ministry of Energy and Water
Type: Gravity
Purpose(s): Water Supply
River: Boqaata
Reservoir capacity: 6 m3x106
Construction Dates
Start of Project: 07/12
Start of RCC: 07/12
End of RCC: 12/16
End of Project: 12/21
Specifications
Height: 72 metres
Length: 222 metres
Volume of RCC: 200 m3x103
Total volume: 255 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Reinforced conventional concrete cast after RCC placement |
| 0.80 |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Hydropower
River: Ortasu
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/16
End of Project: -/18
Specifications
Height: 77 metres
Length: 431 metres
Volume of RCC: 800 m3x103
Total volume: 887 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 95 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 45 | Natural pozzolan (ASTM Class N) |

Details
Country: Vietnam
Owner: Vinacomin
Type: Gravity
Purpose(s): Hydropower
River: Dong Nai
Reservoir capacity: -
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/16
End of Project: -/18
Specifications
Height: 72 metres
Length: 471 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Hydropower / Irrigation
River: Gökırmak
Reservoir capacity: 66 m3x106
Construction Dates
Start of Project: -/99
Start of RCC: -/99
End of RCC: -/16
End of Project: -/17
Specifications
Height: 73 metres
Length: 280 metres
Volume of RCC: 330 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.90 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 75 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 50 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Hydropower
River: Bembo
Reservoir capacity: 8 m3x106
Construction Dates
Start of Project: 09/08
Start of RCC: 09/08
End of RCC: -/16
End of Project: -/17
Specifications
Height: 78 metres
Length: 176 metres
Volume of RCC: 186 m3x103
Total volume: 209 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 1200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 80 | Natural pozzolan (ASTM Class N) |

Details
Country: China
Owner: Guilin Dayu Water Conservancy, Infrastructure, Construction and Investment Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Xiaorong
Reservoir capacity: 163 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/16
End of Project: -/17
Specifications
Height: 90 metres
Length: 255 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Norte Energia S.A.
Type: Gravity
Purpose(s): Hydropower
River: Xingu
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: -/11
Start of RCC: -/11
End of RCC: -/16
End of Project: -/20
Specifications
Height: 74 metres
Length: 680 metres
Volume of RCC: 63 m3x103
Total volume: 2208 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
| 1.20 |
Spillway
| Slope | Type |
|---|---|
| separate |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Projeto Transposição das Águas do Rio São Francisco
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: -
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/16
End of Project: -/16
Specifications
Height: 18 metres
Length: 196 metres
Volume of RCC: 52 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Xiamen Water Resources Bureau
Type: Gravity
Purpose(s): Hydropower
River: Lianhuaxi
Reservoir capacity: 33 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/16
End of Project: -/17
Specifications
Height: 30 metres
Length: 333 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Jialingjiang
Reservoir capacity: 11 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/16
End of Project: -/17
Specifications
Height: 51 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Kelebek
Reservoir capacity: 23 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/16
End of Project: -/17
Specifications
Height: 62 metres
Length: 193 metres
Volume of RCC: 74 m3x103
Total volume: 97 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 120 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Nujiang
Reservoir capacity: 1288 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/16
End of Project: -/18
Specifications
Height: 165 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Costa Rica
Owner: ICE (Instituto Costarricense de Electricidad - Costa Rican Institute of Electricity)
Type: Gravity
Purpose(s): Hydropower
River: Tárcoles
Reservoir capacity: 450 m3x106
Construction Dates
Start of Project: -/11
Start of RCC: -/11
End of RCC: -/16
End of Project: -/17
Specifications
Height: 48 metres
Length: 130 metres
Volume of RCC: 180 m3x103
Total volume: 200 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 2500 |
Cementitious material
| Cement (kg/m3) |
|---|
| 95 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 96 | Natural pozzolan (ASTM Class N) |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Hardfill
Purpose(s): Irrigation
River: Uzundere
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/16
End of Project: -/16
Specifications
Height: 19 metres
Length: 170 metres
Volume of RCC: 240 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 48 | Low-lime flyash (ASTM Class F) |

Details
Country: Peru
Owner: -
Type: Gravity
Purpose(s): unknown
River: Asana
Reservoir capacity: -
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/16
End of Project: -/16
Specifications
Height: 25 metres
Length: 67 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.15 |
Downstream
| Slope | Type |
|---|---|
| 0.75 |
Spillway
| Slope | Type |
|---|---|
| 0.75 | [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Ormanlik
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/16
End of Project: 10/17
Specifications
Height: 49 metres
Length: 265 metres
Volume of RCC: 114 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: DR Congo
Owner: SNEL
Type: Gravity
Purpose(s): Hydropower
River: -
Reservoir capacity: -
Construction Dates
Start of Project: 05/12
Start of RCC: 05/12
End of RCC: -/16
End of Project: -/17
Specifications
Height: 20 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: COMPESA (Companhia Pernambucana de Saneamento )
Type: -
Purpose(s): Irrigation / Water Supply
River: Siriji
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/16
End of Project: -/17
Specifications
Height: 20 metres
Length: 100 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Serra dos Cavalinhos I Energética S.A.
Type: -
Purpose(s): Hydropower
River: das Antas
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/16
End of Project: -/17
Specifications
Height: 30 metres
Length: 204 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: İsabeyli Deresi
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/16
End of Project: -/17
Specifications
Height: 42 metres
Length: 148 metres
Volume of RCC: 70 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Limontozu
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/16
End of Project: -/17
Specifications
Height: 46 metres
Length: 63 metres
Volume of RCC: 269 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Water Supply
River: Camibogazi
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/16
End of Project: -/17
Specifications
Height: 50 metres
Length: 295 metres
Volume of RCC: 142 m3x103
Total volume: 173 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.05 | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 98 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 52 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Qiduxi
Reservoir capacity: 24 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/16
End of Project: -/17
Specifications
Height: 54 metres
Length: 246 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Dangjiahe
Reservoir capacity: 14 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/16
End of Project: -/17
Specifications
Height: 68 metres
Length: 176 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Datang Investment Group Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Furong (Pangu)
Reservoir capacity: 90 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/16
End of Project: -/17
Specifications
Height: 85 metres
Length: 211 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: SPIC Guizhou Jinyuan Hydroelectirc Powerplant
Type: Thin Arch
Purpose(s): Hydropower
River: Niulan
Reservoir capacity: 263 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/16
End of Project: -/17
Specifications
Height: 136 metres
Length: 459 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: DR Congo
Owner: RandGold
Type: Hardfill
Purpose(s): Hydropower
River: Kibali
Reservoir capacity: 6 m3x106
Construction Dates
Start of Project: 11/14
Start of RCC: 11/14
End of RCC: -/16
End of Project: -/17
Specifications
Height: 21 metres
Length: 255 metres
Volume of RCC: 33 m3x103
Total volume: 40 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork with external geomembrane (GEVR/GE-RCC) [stepped face] |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Turkey
Owner: EBD Enerji Üretim. ve Tic. A.S.
Type: Arch-Gravity
Purpose(s): Hydropower
River: Kura
Reservoir capacity: 73 m3x106
Construction Dates
Start of Project: 03/15
Start of RCC: 03/15
End of RCC: 02/17
End of Project: 04/17
Specifications
Height: 100 metres
Length: 404 metres
Volume of RCC: 640 m3x103
Total volume: 680 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.60 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.60 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 85 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 130 | Natural pozzolan (ASTM Class N) |

Details
Country: Honduras
Owner: ENEE (Empresa Nacional de Energia Eléctrica)
Type: Gravity
Purpose(s): Hydropower
River: Patuca
Reservoir capacity: 208 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: 02/17
End of Project: 12/20
Specifications
Height: 54 metres
Length: 160 metres
Volume of RCC: 120 m3x103
Total volume: 160 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 107 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 57 | Natural pozzolan (ASTM Class N) |

Details
Country: Angola
Owner: Ministry of Energy and Water/GAMEK
Type: Gravity
Purpose(s): Hydropower
River: Kwanza
Reservoir capacity: 5482 m3x106
Construction Dates
Start of Project: 07/12
Start of RCC: 07/12
End of RCC: 03/17
End of Project: 06/18
Specifications
Height: 132 metres
Length: 1075 metres
Volume of RCC: 2646 m3x103
Total volume: 2766 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.10 |
Downstream
| Slope | Type |
|---|---|
| 0.85 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.85 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Jordan
Owner: Jordan Valley Authority, Ministry of Water and Irrigation
Type: Gravity
Purpose(s): Groundwater Recharge / Water Supply
River: Ibn Hammad
Reservoir capacity: 4 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: 07/17
End of Project: -/22
Specifications
Height: 56 metres
Length: 160 metres
Volume of RCC: 160 m3x103
Total volume: 160 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.30 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |
| 0 |

Details
Country: Spain
Owner: Confederación Hidrográfica del Ebro, Ministerio de Agricultura Alimentación y Medio Ambiente
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Cidacos
Reservoir capacity: 47 m3x106
Construction Dates
Start of Project: 07/08
Start of RCC: 07/08
End of RCC: 07/17
End of Project: 09/18
Specifications
Height: 103 metres
Length: 376 metres
Volume of RCC: 698 m3x103
Total volume: 765 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 140 | Low-lime flyash (ASTM Class F) |

Details
Country: Albania
Owner: Diteko Sh.p.k
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Okshtuni
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: 08/15
Start of RCC: 08/15
End of RCC: 10/17
End of Project: 02/18
Specifications
Height: 65 metres
Length: 253 metres
Volume of RCC: 141 m3x103
Total volume: 194 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Reinforced conventional concrete cast after RCC placement |
| 0.15 |
Downstream
| Slope | Type |
|---|---|
| 0.90 | Reinforced conventional concrete cast after RCC placement [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.90 | Reinforced conventional concrete cast after RCC placement [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 115 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Japan
Owner: Ministry of Land, Infrastructure, Transport and Tourism
Type: Hardfill
Purpose(s): Flood Control / Navigation / Water Supply
River: Sanru
Reservoir capacity: 50 m3x106
Construction Dates
Start of Project: 08/14
Start of RCC: 08/14
End of RCC: 10/17
End of Project: 03/19
Specifications
Height: 46 metres
Length: 350 metres
Volume of RCC: 375 m3x103
Total volume: 500 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: China
Owner: China Datang Corporation
Type: Thin Arch
Purpose(s): Hydropower
River: Gexiang
Reservoir capacity: 279 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/17
End of Project: -/18
Specifications
Height: 168 metres
Length: 413 metres
Volume of RCC: 760 m3x103
Total volume: 1020 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 66 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Low-lime flyash (ASTM Class F) |

Details
Country: Sri Lanka
Owner: Ministry of Irrigation and Water Resources Management
Type: Gravity
Purpose(s): Irrigation
River: Amban Ganga
Reservoir capacity: 521 m3x106
Construction Dates
Start of Project: 01/07
Start of RCC: 01/07
End of RCC: -/17
End of Project: 07/18
Specifications
Height: 65 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Hardfill
Purpose(s): Flood Control / Irrigation / Water Supply
River: Ansegmir
Reservoir capacity: 50 m3x106
Construction Dates
Start of Project: 10/10
Start of RCC: 10/10
End of RCC: -/17
End of Project: -/18
Specifications
Height: 61 metres
Length: 320 metres
Volume of RCC: 380 m3x103
Total volume: 405 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.50 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| 70 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |
| 0 |

Details
Country: Sri Lanka
Owner: Ministry of Irrigation and Water Resources Management
Type: Gravity
Purpose(s): Hydropower / Irrigation
River: Mathatilla Oya
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/11
Start of RCC: -/11
End of RCC: -/17
End of Project: -/18
Specifications
Height: 50 metres
Length: 165 metres
Volume of RCC: 40 m3x103
Total volume: 50 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 95 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 95 | Low-lime flyash (ASTM Class F) |

Details
Country: Algeria
Owner: ANBT (Agence Nationale des Barrages et Transfert)
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Mellegue
Reservoir capacity: 155 m3x106
Construction Dates
Start of Project: 10/11
Start of RCC: 10/11
End of RCC: -/17
End of Project: -/18
Specifications
Height: 51 metres
Length: 900 metres
Volume of RCC: 245 m3x103
Total volume: 320 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 110 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Argentina
Owner: Provincia de Catamarca
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Albigasta
Reservoir capacity: 38 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/17
End of Project: -/19
Specifications
Height: 64 metres
Length: 380 metres
Volume of RCC: -
Total volume: 279 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Hardfill
Purpose(s): Flood Control / Irrigation / Water Supply
River: Beht
Reservoir capacity: 510 m3x106
Construction Dates
Start of Project: 05/10
Start of RCC: 05/10
End of RCC: -/17
End of Project: -/18
Specifications
Height: 98 metres
Length: 383 metres
Volume of RCC: 900 m3x103
Total volume: 930 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.50 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 55 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 25 | Natural pozzolan (ASTM Class N) |

Details
Country: Ecuador
Owner: Celec Ererjubones Cp
Type: Gravity
Purpose(s): Hydropower
River: Jubones
Reservoir capacity: 14 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/17
End of Project: 08/18
Specifications
Height: 78 metres
Length: 209 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Huaneng Lancang River Hydropower Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Lancang (Mekong)
Reservoir capacity: 272 m3x106
Construction Dates
Start of Project: 06/10
Start of RCC: 06/10
End of RCC: -/17
End of Project: -/18
Specifications
Height: 138 metres
Length: 247 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Asif N Talaght
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/17
End of Project: -/18
Specifications
Height: 44 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Irrigation / Water Supply
River: -
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/17
End of Project: -/18
Specifications
Height: 58 metres
Length: 269 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Companhia Energetica Sinop-CES
Type: Gravity
Purpose(s): Hydropower
River: Teles Pires
Reservoir capacity: -
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/17
End of Project: -/19
Specifications
Height: 17 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Water Supply
River: Çırçıp
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/17
End of Project: -/17
Specifications
Height: 36 metres
Length: 110 metres
Volume of RCC: 20 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: Enerji S.A.
Type: Gravity
Purpose(s): Hydropower
River: Buyuk Cay
Reservoir capacity: -
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/17
End of Project: -/18
Specifications
Height: 150 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: PCH Senhora do Porto S.A
Type: Gravity
Purpose(s): Hydropower
River: Guanhães
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/17
End of Project: -/18
Specifications
Height: 41 metres
Length: 167 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Golkum
Reservoir capacity: 15 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/17
End of Project: -/18
Specifications
Height: 54 metres
Length: 229 metres
Volume of RCC: 127 m3x103
Total volume: 161 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 60 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Ximihe
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/17
End of Project: -/18
Specifications
Height: 88 metres
Length: 147 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Nicaragua
Owner: Hidroelectlea Piedra Puntuda and Energia Tropical Sostearble Cerro Frio S.A.
Type: Gravity
Purpose(s): Hydropower
River: Río Mico
Reservoir capacity: -
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/17
End of Project: -/18
Specifications
Height: 23 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against precast concrete panels |
| 1.00 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
| 1.00 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Muling Fendou Reservoir Construction office
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Mulenghe
Reservoir capacity: 191 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/17
End of Project: -/18
Specifications
Height: 46 metres
Length: 406 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Dashahe
Reservoir capacity: 196 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/17
End of Project: -/18
Specifications
Height: 74 metres
Length: 296 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower / Irrigation / Water Supply
River: Mabie
Reservoir capacity: 99 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/17
End of Project: -/18
Specifications
Height: 108 metres
Length: 182 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Japan
Owner: Fukuoka Prefecture
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Harai
Reservoir capacity: 29 m3x106
Construction Dates
Start of Project: 07/14
Start of RCC: 07/14
End of RCC: 03/18
End of Project: 03/19
Specifications
Height: 81 metres
Length: 295 metres
Volume of RCC: 372 m3x103
Total volume: 419 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.60 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.77 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.77 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 36 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Yunnan Huaneng Lancang River Hydropower Co.,Ltd.
Type: Gravity
Purpose(s): Hydropower / Irrigation / Recreation
River: Lancang (Mekong)
Reservoir capacity: 1613 m3x106
Construction Dates
Start of Project: 01/10
Start of RCC: 01/10
End of RCC: 04/18
End of Project: 06/19
Specifications
Height: 203 metres
Length: 464 metres
Volume of RCC: 2753 m3x103
Total volume: 3670 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 82 |
| 67 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Low-lime flyash (ASTM Class F) |
| 100 |

Details
Country: Laos
Owner: Nam Ngiep 1 Power Company
Type: Gravity
Purpose(s): Hydropower
River: Nam Ngiep
Reservoir capacity: 1192 m3x106
Construction Dates
Start of Project: 09/14
Start of RCC: 09/14
End of RCC: 04/18
End of Project: 08/19
Specifications
Height: 167 metres
Length: 540 metres
Volume of RCC: 2288 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 2400 - |
| 3600 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 120 | Low-lime flyash (ASTM Class F) |
| 70 |

Details
Country: Namibia
Owner: Ministry of Agriculture, Water and Forestry
Type: Gravity
Purpose(s): Irrigation
River: Fish
Reservoir capacity: 857 m3x106
Construction Dates
Start of Project: 09/13
Start of RCC: 09/13
End of RCC: 05/18
End of Project: 04/19
Specifications
Height: 83 metres
Length: 520 metres
Volume of RCC: 836 m3x103
Total volume: 1043 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 65 |
| 65 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 120 | Low-lime flyash (ASTM Class F) |
| 45 |

Details
Country: Canada
Owner: NALCOR
Type: Gravity
Purpose(s): Hydropower
River: Churchill
Reservoir capacity: -
Construction Dates
Start of Project: 08/15
Start of RCC: 08/15
End of RCC: 09/18
End of Project: 07/19
Specifications
Height: 39 metres
Length: 450 metres
Volume of RCC: 208 m3x103
Total volume: 243 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 & |
| 1500 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 140 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: -
Type: Arch-Gravity
Purpose(s): unknown
River: Ziwuhe
Reservoir capacity: 710 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: 12/18
End of Project: 06/19
Specifications
Height: 142 metres
Length: 472 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Laos
Owner: XPCL (Xayaburi Power Company Ltd.)
Type: Gravity
Purpose(s): Hydropower
River: Mekong
Reservoir capacity: -
Construction Dates
Start of Project: 03/12
Start of RCC: 03/12
End of RCC: 12/18
End of Project: 10/19
Specifications
Height: 40 metres
Length: 109 metres
Volume of RCC: 82 m3x103
Total volume: 85 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Mechanically compacted unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Low-lime flyash (ASTM Class F) |

Details
Country: Iran
Owner: Iran Water & Power Resources Development Company (IWPC)
Type: Hardfill
Purpose(s): Flood Control / Irrigation
River: Javeh Roud
Reservoir capacity: 95 m3x106
Construction Dates
Start of Project: 03/09
Start of RCC: 03/09
End of RCC: -/18
End of Project: 07/19
Specifications
Height: 86 metres
Length: 301 metres
Volume of RCC: 680 m3x103
Total volume: 750 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.90 | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 1.20 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 1.20 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 94 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 31 | Natural pozzolan (ASTM Class N) |

Details
Country: China
Owner: Huaneng Lancang River Hydropower Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Lancang (Mekong)
Reservoir capacity: 262 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/18
End of Project: -/19
Specifications
Height: 107 metres
Length: 232 metres
Volume of RCC: -
Total volume: 112 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Sri Lanka
Owner: Ministry of Irrigation and Water Resources Management
Type: Gravity
Purpose(s): Hydropower / Irrigation
River: Dulgolla Oya
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/11
Start of RCC: -/11
End of RCC: -/18
End of Project: -/19
Specifications
Height: 35 metres
Length: 174 metres
Volume of RCC: 30 m3x103
Total volume: 40 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 95 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 95 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Huaneng Lancang River Hydropower Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Lancang (Mekong)
Reservoir capacity: 75 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/18
End of Project: -/19
Specifications
Height: 75 metres
Length: 346 metres
Volume of RCC: -
Total volume: 1100 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Shangcunxi
Reservoir capacity: 123 m3x106
Construction Dates
Start of Project: -/11
Start of RCC: -/11
End of RCC: -/18
End of Project: -/19
Specifications
Height: 89 metres
Length: 338 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: São Roque Energética S.A.
Type: Gravity
Purpose(s): Hydropower
River: Canoas
Reservoir capacity: -
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/18
End of Project: -/19
Specifications
Height: 68 metres
Length: 151 metres
Volume of RCC: 100 m3x103
Total volume: 583 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
| 0.75 |
Spillway
| Slope | Type |
|---|---|
| 0.75 | [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Hydropower
River: Ortasu
Reservoir capacity: 6 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/18
End of Project: -/20
Specifications
Height: 51 metres
Length: 188 metres
Volume of RCC: 144 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork (GEVR/GE-RCC) |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 95 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 45 | Natural pozzolan (ASTM Class N) |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Ortasu Creek
Reservoir capacity: 16 m3x106
Construction Dates
Start of Project: 09/08
Start of RCC: 09/08
End of RCC: -/18
End of Project: -/20
Specifications
Height: 76 metres
Length: 268 metres
Volume of RCC: 518 m3x103
Total volume: 540 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 95 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 45 | Natural pozzolan (ASTM Class N) |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Hardfill
Purpose(s): Groundwater Recharge / Irrigation
River: Ifegh
Reservoir capacity: 14 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/18
End of Project: -/19
Specifications
Height: 56 metres
Length: 183 metres
Volume of RCC: 124 m3x103
Total volume: 146 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.65 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.65 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.65 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 56 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 24 | Natural pozzolan (ASTM Class N) |

Details
Country: China
Owner: -
Type: Hardfill
Purpose(s): unknown
River: -
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/18
End of Project: -/19
Specifications
Height: 62 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: China Power Investment Corporation
Type: Thin Arch
Purpose(s): Hydropower
River: Qingshuihe
Reservoir capacity: 13 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/18
End of Project: -/19
Specifications
Height: 75 metres
Length: 166 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): unknown
River: Mandian
Reservoir capacity: 12340 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/18
End of Project: -/19
Specifications
Height: 78 metres
Length: 231 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Changlehe
Reservoir capacity: 133 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/18
End of Project: -/19
Specifications
Height: 101 metres
Length: 355 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Pakistan
Owner: WAPDA (Water and Power Development Authority) and MIRA Power Ltd. (a subsidiary of KOSEP)
Type: Gravity
Purpose(s): Hydropower
River: Poonch
Reservoir capacity: 22 m3x106
Construction Dates
Start of Project: 09/14
Start of RCC: 09/14
End of RCC: -/18
End of Project: 02/20
Specifications
Height: 35 metres
Length: 238 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Guangxi Datengxia Gorge Water Conservancy Development Co. .Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation / Water Supply
River: Xijiang
Reservoir capacity: 3479 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/18
End of Project: 07/20
Specifications
Height: 80 metres
Length: -
Volume of RCC: -
Total volume: 7100 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Laos
Owner: Don Sahong Power Company (Mega First Corporation Berhad and Électricité du Laos)
Type: Gravity
Purpose(s): Hydropower
River: Mekong
Reservoir capacity: 24 m3x106
Construction Dates
Start of Project: 10/15
Start of RCC: 10/15
End of RCC: -/18
End of Project: 12/19
Specifications
Height: 26 metres
Length: 6800 metres
Volume of RCC: 566 m3x103
Total volume: 609 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.30 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 2400 |
Cementitious material
| Cement (kg/m3) |
|---|
| 55 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 103 | Low-lime flyash (ASTM Class F) |

Details
Country: Brazil
Owner: CERB (Companhia de Engenharia Ambienytal e Recursos Hídricos da Bahia)
Type: Gravity
Purpose(s): Water Supply
River: Colonia
Reservoir capacity: 62 m3x106
Construction Dates
Start of Project: 09/15
Start of RCC: 09/15
End of RCC: -/18
End of Project: 09/18
Specifications
Height: 21 metres
Length: 195 metres
Volume of RCC: 30 m3x103
Total volume: 34 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Peru
Owner: -
Type: Hardfill
Purpose(s): unknown
River: Asana
Reservoir capacity: -
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/18
End of Project: -/18
Specifications
Height: 48 metres
Length: 214 metres
Volume of RCC: 216 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.75 |
Downstream
| Slope | Type |
|---|---|
| 0.75 |
Spillway
| Slope | Type |
|---|---|
| 0.75 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Quevedos Energética S.A
Type: Gravity
Purpose(s): Hydropower
River: Toropi
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/18
End of Project: -/19
Specifications
Height: 23 metres
Length: 206 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: PCH Jacaré S.A.
Type: Gravity
Purpose(s): Hydropower
River: Guanhães
Reservoir capacity: 14 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/18
End of Project: -/19
Specifications
Height: 33 metres
Length: 121 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Zhuangli reservoir construction and management office
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Shizihe
Reservoir capacity: 133 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/18
End of Project: -/19
Specifications
Height: 44 metres
Length: 49 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Water Supply
River: Circip
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/18
End of Project: -/19
Specifications
Height: 30 metres
Length: 213 metres
Volume of RCC: 48 m3x103
Total volume: 59 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 1200 |
Cementitious material
| Cement (kg/m3) |
|---|
| 98 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 52 | |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Beyler
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/18
End of Project: -/19
Specifications
Height: 39 metres
Length: 249 metres
Volume of RCC: 170 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 1.00 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 330 | 330 |
Cementitious material
| Cement (kg/m3) |
|---|
| 93 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 62 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: Aksa Energy Production Trade and Industry Co. Inc.
Type: Gravity
Purpose(s): Hydropower
River: Göksu
Reservoir capacity: 27 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/18
End of Project: -/19
Specifications
Height: 47 metres
Length: 153 metres
Volume of RCC: 49 m3x103
Total volume: 68 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Slip-formed/extruded facing elements |
Downstream
| Slope | Type |
|---|---|
| Slip-formed/extruded facing elements |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 65 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 50 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): unknown
River: Gouhe
Reservoir capacity: 160 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/18
End of Project: -/19
Specifications
Height: 52 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Cemig Geração e Transmissão SA and Itaocara Energia Ltda
Type: Gravity
Purpose(s): Hydropower
River: Paraiba do Sul
Reservoir capacity: 1700 m3x106
Construction Dates
Start of Project: 01/16
Start of RCC: 01/16
End of RCC: -/18
End of Project: -/19
Specifications
Height: 50 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Melen
Reservoir capacity: 693 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: 03/19
End of Project: -/25
Specifications
Height: 124 metres
Length: 944 metres
Volume of RCC: 1871 m3x103
Total volume: 2096 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.15 | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork (GEVR/GE-RCC) |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 60 | Low-lime flyash (ASTM Class F) |

Details
Country: Japan
Owner: Ministry of Land, Infrastructure, Transport and Tourism
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Navigation / Water Supply
River: Agatsuma
Reservoir capacity: 108 m3x106
Construction Dates
Start of Project: 08/14
Start of RCC: 08/14
End of RCC: 05/19
End of Project: 10/19
Specifications
Height: 116 metres
Length: 291 metres
Volume of RCC: 575 m3x103
Total volume: 911 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.15 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.08 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | Low-lime flyash (ASTM Class F) |

Details
Country: Algeria
Owner: ANBT (Agence Nationale des Barrages et Transferts)
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: -
Reservoir capacity: 18 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: 07/19
End of Project: 01/23
Specifications
Height: 77 metres
Length: 177 metres
Volume of RCC: 250 m3x103
Total volume: 330 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.89 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.89 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 110 |
| 77 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | Low-lime flyash (ASTM Class F) |
| 33 |

Details
Country: Brazil
Owner: PCH Águas do Rio Irani Energética SPE Ltda.
Type: Gravity
Purpose(s): Hydropower
River: Irani
Reservoir capacity: 11 m3x106
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: 07/19
End of Project: -/20
Specifications
Height: 34 metres
Length: 235 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Ayvali
Reservoir capacity: 988 m3x106
Construction Dates
Start of Project: 06/14
Start of RCC: 06/14
End of RCC: 08/19
End of Project: 11/19
Specifications
Height: 43 metres
Length: 157 metres
Volume of RCC: 37 m3x103
Total volume: 46 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 66 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 44 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Uludere
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 03/17
Start of RCC: 03/17
End of RCC: 09/19
End of Project: 08/20
Specifications
Height: 52 metres
Length: 122 metres
Volume of RCC: 55 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 75 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 50 | |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Suludere
Reservoir capacity: 9 m3x106
Construction Dates
Start of Project: 03/16
Start of RCC: 03/16
End of RCC: 09/19
End of Project: 10/19
Specifications
Height: 69 metres
Length: 212 metres
Volume of RCC: 130 m3x103
Total volume: 185 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 75 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 45 | Low-lime flyash (ASTM Class F) |

Details
Country: Laos
Owner: Xe-Pian Xe Namnoy Power Company
Type: Gravity
Purpose(s): Hydropower
River: Xepian
Reservoir capacity: 1043 m3x106
Construction Dates
Start of Project: 10/18
Start of RCC: 10/18
End of RCC: 10/19
End of Project: -/19
Specifications
Height: 56 metres
Length: 430 metres
Volume of RCC: 170 m3x103
Total volume: 200 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
| [stepped face] |
Spillway
| Slope | Type |
|---|---|
| none |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: Jordan
Owner: Jordan Valley Authority, Ministry of Water and Irrigation
Type: Gravity
Purpose(s): Groundwater Recharge
River: Wala
Reservoir capacity: 26 m3x106
Construction Dates
Start of Project: 09/17
Start of RCC: 09/17
End of RCC: 10/19
End of Project: 07/20
Specifications
Height: 67 metres
Length: 300 metres
Volume of RCC: 80 m3x103
Total volume: 82 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.30 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 98 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 52 | Natural pozzolan (ASTM Class N) |

Details
Country: Japan
Owner: Ministry of Land, Infrastructure, Transport and Tourism
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Navigation / Water Supply
River: Nukapira
Reservoir capacity: 46 m3x106
Construction Dates
Start of Project: -/73
Start of RCC: -/73
End of RCC: -/19
End of Project: -/21
Specifications
Height: 57 metres
Length: 600 metres
Volume of RCC: -
Total volume: 180 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.78 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Estado
Type: Gravity
Purpose(s): Water Supply
River: Taquarembó
Reservoir capacity: -
Construction Dates
Start of Project: 05/08
Start of RCC: 05/08
End of RCC: -/19
End of Project: -/20
Specifications
Height: 33 metres
Length: 330 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Afghanistan
Owner: Ministry of Energy and Water
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Shakardar
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/19
End of Project: 04/21
Specifications
Height: 78 metres
Length: 303 metres
Volume of RCC: 270 m3x103
Total volume: 337 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.20 |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 105 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 45 | Natural pozzolan (ASTM Class N) |

Details
Country: Iran
Owner: Kerman Water Authority
Type: Gravity
Purpose(s): Groundwater Recharge / Irrigation / Water Supply
River: Gharanghou
Reservoir capacity: 44 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/19
End of Project: -/20
Specifications
Height: 44 metres
Length: 352 metres
Volume of RCC: 106 m3x103
Total volume: 147 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Iran
Owner: Sistan & Baluchestan Water Authority
Type: Gravity
Purpose(s): unknown
River: Barisan (nahang)
Reservoir capacity: 103 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/19
End of Project: -/21
Specifications
Height: 60 metres
Length: 326 metres
Volume of RCC: -
Total volume: 330 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Sanchahe
Reservoir capacity: 1089 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/19
End of Project: -/21
Specifications
Height: 163 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Mexico
Owner: CNA (Comisión Nacional del Agua)
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Mayo
Reservoir capacity: 478 m3x106
Construction Dates
Start of Project: 02/14
Start of RCC: 02/14
End of RCC: -/19
End of Project: 08/20
Specifications
Height: 73 metres
Length: 232 metres
Volume of RCC: 600 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Costa Rica
Owner: Hidrotárcoles
Type: Gravity
Purpose(s): Hydropower
River: Tárcoles
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/19
End of Project: -/20
Specifications
Height: 49 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: -
Reservoir capacity: 346 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/19
End of Project: -/20
Specifications
Height: 60 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Youjiang
Reservoir capacity: 536 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/19
End of Project: -/20
Specifications
Height: 105 metres
Length: 365 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Tunisia
Owner: Ministère de l’Agriculture
Type: Hardfill
Purpose(s): Hydropower / Irrigation
River: Oued Mellègue
Reservoir capacity: 195 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/19
End of Project: -/20
Specifications
Height: 68 metres
Length: 430 metres
Volume of RCC: 500 m3x103
Total volume: 560 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.60 |
Downstream
| Slope | Type |
|---|---|
| 0.60 |
Spillway
| Slope | Type |
|---|---|
| 0.60 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: China
Owner: Yalong River Hydropower Development Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Hongdu
Reservoir capacity: 100 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/19
End of Project: -/20
Specifications
Height: 121 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: China Yangzi River Three Gorges Group
Type: Gravity
Purpose(s): Hydropower
River: Jinsha (Yangtze)
Reservoir capacity: 7400 m3x106
Construction Dates
Start of Project: 04/18
Start of RCC: 04/18
End of RCC: -/19
End of Project: 06/19
Specifications
Height: 96 metres
Length: 163 metres
Volume of RCC: 466 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Companhia de Gestão dos Recursos Hídricos
Type: Gravity
Purpose(s): Water Supply
River: Germinal
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/19
End of Project: 08/20
Specifications
Height: 28 metres
Length: 210 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Pesqueiro Energia S/A
Type: Gravity
Purpose(s): Hydropower
River: Jaguariaiva
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/18
Start of RCC: -/18
End of RCC: -/19
End of Project: -/20
Specifications
Height: 16 metres
Length: 217 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Ministério da Integração Nacional
Type: Gravity
Purpose(s): Water Supply
River: dos Negreiros
Reservoir capacity: 24 m3x106
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: -/19
End of Project: -/20
Specifications
Height: 37 metres
Length: 246 metres
Volume of RCC: 56 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Hardfill
Purpose(s): Hydropower
River: Botan
Reservoir capacity: 614 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: 01/20
End of Project: 03/20
Specifications
Height: 165 metres
Length: 492 metres
Volume of RCC: 4741 m3x103
Total volume: 4800 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: -
Reservoir capacity: 96 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: 03/20
End of Project: 01/21
Specifications
Height: 76 metres
Length: 173 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Zambia
Owner: Kafue Gorge Lower Power Development Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Kafue
Reservoir capacity: 83 m3x106
Construction Dates
Start of Project: 01/16
Start of RCC: 01/16
End of RCC: 04/20
End of Project: -/20
Specifications
Height: 131 metres
Length: 375 metres
Volume of RCC: 1290 m3x103
Total volume: 1390 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 112 | Low-lime flyash (ASTM Class F) |

Details
Country: Nigeria
Owner: Federal Ministry of Power, Nigeria
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Kaduna
Reservoir capacity: 11400 m3x106
Construction Dates
Start of Project: 09/13
Start of RCC: 09/13
End of RCC: 08/20
End of Project: 10/21
Specifications
Height: 101 metres
Length: 1090 metres
Volume of RCC: 1920 m3x103
Total volume: 2400 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 59 |
| 69 94 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 76 | Low-lime flyash (ASTM Class F) |
| 69 76 |

Details
Country: Honduras
Owner: Energias Limpias del Yaguala SA de CV
Type: Arch-Gravity
Purpose(s): Hydropower
River: Yaguala
Reservoir capacity: 72 m3x106
Construction Dates
Start of Project: 01/18
Start of RCC: 01/18
End of RCC: 11/20
End of Project: 01/21
Specifications
Height: 93 metres
Length: 273 metres
Volume of RCC: 249 m3x103
Total volume: 305 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.04 | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.40 | RCC against formwork (GEVR/GE-RCC) |
| 0.67 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| 0.40 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Hardfill
Purpose(s): Flood Control / Irrigation / Water Supply
River: Ouaar
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: 04/10
Start of RCC: 04/10
End of RCC: -/20
End of Project: -/20
Specifications
Height: 68 metres
Length: 370 metres
Volume of RCC: 580 m3x103
Total volume: 610 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.50 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |
| 0 |

Details
Country: Turkey
Owner: Kalehan Energy Üretim ve Ticaret A.S.
Type: Gravity
Purpose(s): Hydropower
River: Murat
Reservoir capacity: 556 m3x106
Construction Dates
Start of Project: 03/13
Start of RCC: 03/13
End of RCC: -/20
End of Project: 04/21
Specifications
Height: 125 metres
Length: 346 metres
Volume of RCC: 1192 m3x103
Total volume: 1342 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.25 | RCC against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork |
Spillway
| Slope | Type |
|---|---|
| separate |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 40 | Milled sand |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Water Supply
River: Mudurnu
Reservoir capacity: 143 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/20
End of Project: -/23
Specifications
Height: 98 metres
Length: 357 metres
Volume of RCC: 800 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
| 0.35 |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 63 |
| 83 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 63 | |
| 83 |

Details
Country: Japan
Owner: Iwate Prefecture
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Yana
Reservoir capacity: 19 m3x106
Construction Dates
Start of Project: 12/14
Start of RCC: 12/14
End of RCC: -/20
End of Project: 03/21
Specifications
Height: 77 metres
Length: 243 metres
Volume of RCC: -
Total volume: 213 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Büyükdere
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/20
End of Project: -/21
Specifications
Height: 51 metres
Length: 174 metres
Volume of RCC: 110 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Vietnam
Owner: Ministry of Agriculture and Rural Development
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Cai
Reservoir capacity: 219 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/20
End of Project: -/21
Specifications
Height: 67 metres
Length: 603 metres
Volume of RCC: 510 m3x103
Total volume: 640 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): unknown
River: Junshui
Reservoir capacity: 117 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/20
End of Project: -/21
Specifications
Height: 76 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Guinea
Owner: Ministry of Energy and Hydraulics
Type: Gravity
Purpose(s): Hydropower
River: Konkouré
Reservoir capacity: 6300 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/20
End of Project: -/21
Specifications
Height: 116 metres
Length: 1200 metres
Volume of RCC: -
Total volume: 3 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: El Salvador
Owner: Comisión Ejecutiva Hidroeléctrica del Rio Lempa (CEL)
Type: Hardfill
Purpose(s): Hydropower
River: Torola
Reservoir capacity: -
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/20
End of Project: 10/23
Specifications
Height: 88 metres
Length: 324 metres
Volume of RCC: 375 m3x103
Total volume: 450 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | RCC against precast concrete panels (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against precast concrete panels (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| 0.80 | RCC against precast concrete panels (GEVR/GE-RCC) |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 94 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 63 | Natural pozzolan (ASTM Class N) |

Details
Country: China
Owner: -
Type: Hardfill
Purpose(s): unknown
River: Shigaoqiao
Reservoir capacity: 11 m3x106
Construction Dates
Start of Project: -/19
Start of RCC: -/19
End of RCC: -/20
End of Project: -/20
Specifications
Height: 33 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: Limak Energy
Type: Gravity
Purpose(s): Hydropower
River: Sakarya
Reservoir capacity: 77 m3x106
Construction Dates
Start of Project: -/19
Start of RCC: -/19
End of RCC: -/20
End of Project: -/20
Specifications
Height: 67 metres
Length: 135 metres
Volume of RCC: 105 m3x103
Total volume: 115 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: -
Type: Gravity
Purpose(s): unknown
River: -
Reservoir capacity: -
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: -/20
End of Project: -/21
Specifications
Height: 35 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: USA
Owner: US Army Corps of Engineers - Nashville District
Type: Gravity
Purpose(s): Flood Control / Hydropower / Recreation / Water Supply
River: Caney Fork
Reservoir capacity: 940 m3x106
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: -/20
End of Project: -/21
Specifications
Height: 40 metres
Length: 293 metres
Volume of RCC: 99 m3x103
Total volume: 122 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork [stepped face] |
| 0.83 |
Spillway
| Slope | Type |
|---|---|
| 0.83 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 93 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 93 | Low-lime flyash (ASTM Class F) |

Details
Country: Nicaragua
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Bambana
Reservoir capacity: -
Construction Dates
Start of Project: -/18
Start of RCC: -/18
End of RCC: -/20
End of Project: -/21
Specifications
Height: 20 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against precast concrete panels |
| 1.00 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
| 1.00 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Bela Vista Geracao de Energia S.A.
Type: Gravity
Purpose(s): Hydropower
River: Chapim
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/00
End of Project: -/00
Specifications
Height: 21 metres
Length: 393 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: China Southern Power Grid
Type: Gravity
Purpose(s): Hydropower
River: -
Reservoir capacity: 41 m3x106
Construction Dates
Start of Project: -/18
Start of RCC: -/18
End of RCC: -/20
End of Project: -/21
Specifications
Height: 60 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: China Southern Power Grid
Type: Gravity
Purpose(s): Hydropower
River: -
Reservoir capacity: 45 m3x106
Construction Dates
Start of Project: -/18
Start of RCC: -/18
End of RCC: -/20
End of Project: -/21
Specifications
Height: 85 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: Limak Energy
Type: Gravity
Purpose(s): Hydropower
River: Sakarya
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: -/19
Start of RCC: -/19
End of RCC: -/20
End of Project: -/21
Specifications
Height: 56 metres
Length: 275 metres
Volume of RCC: 216 m3x103
Total volume: 230 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Peru
Owner: Anglo American (Quellaveco copper mine)
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: -
Construction Dates
Start of Project: -/19
Start of RCC: -/19
End of RCC: -/20
End of Project: -/21
Specifications
Height: 40 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork with external geomembrane |
| 0.10 |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Laos
Owner: Chaleun Sekong Energy Co Ltd (CSE)
Type: Gravity
Purpose(s): Hydropower
River: Nam Kong
Reservoir capacity: 471 m3x106
Construction Dates
Start of Project: 11/17
Start of RCC: 11/17
End of RCC: 02/21
End of Project: 11/21
Specifications
Height: 65 metres
Length: 500 metres
Volume of RCC: 347 m3x103
Total volume: 400 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 75 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 113 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: China Huadian Group Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Yaluzangbu (Brahmaputra)
Reservoir capacity: 55 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: 04/21
End of Project: -/23
Specifications
Height: 118 metres
Length: 385 metres
Volume of RCC: 937 m3x103
Total volume: 1442 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 93 |
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 93 | |
| 100 |

Details
Country: DR Congo
Owner: Sicomines
Type: Thin Arch
Purpose(s): Hydropower
River: Lualaba
Reservoir capacity: -
Construction Dates
Start of Project: 11/17
Start of RCC: 11/17
End of RCC: 07/21
End of Project: 11/21
Specifications
Height: 142 metres
Length: -
Volume of RCC: 620 m3x103
Total volume: 770 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Vietnam
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Song An Lao
Reservoir capacity: 90 m3x106
Construction Dates
Start of Project: 02/19
Start of RCC: 02/19
End of RCC: 08/21
End of Project: 06/22
Specifications
Height: 68 metres
Length: 378 metres
Volume of RCC: 353 m3x103
Total volume: 456 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: UAE
Owner: DEWA
Type: Gravity
Purpose(s): Hydropower
River: -
Reservoir capacity: -
Construction Dates
Start of Project: 12/19
Start of RCC: 12/19
End of RCC: 09/21
End of Project: -/24
Specifications
Height: 38 metres
Length: 184 metres
Volume of RCC: 41 m3x103
Total volume: 45 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| RCC against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| RCC against precast concrete panels |
Spillway
| Slope | Type |
|---|---|
| RCC against precast concrete panels [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 65 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 120 | Low-lime flyash (ASTM Class F) |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Daraa
Reservoir capacity: 247 m3x106
Construction Dates
Start of Project: 05/16
Start of RCC: 05/16
End of RCC: 09/21
End of Project: 06/22
Specifications
Height: 110 metres
Length: 317 metres
Volume of RCC: 833 m3x103
Total volume: 993 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Natural pozzolan (ASTM Class N) | |

Details
Country: Canada
Owner: BC Hydro
Type: Gravity
Purpose(s): Hydropower
River: Peace
Reservoir capacity: 2644 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: 10/21
End of Project: 08/25
Specifications
Height: 71 metres
Length: 800 metres
Volume of RCC: 1740 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) |
Spillway
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 130 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: China Southern Power Grid Co.
Type: Gravity
Purpose(s): Hydropower
River: Moyang
Reservoir capacity: 18 m3x106
Construction Dates
Start of Project: 01/17
Start of RCC: 01/17
End of RCC: 11/21
End of Project: 06/22
Specifications
Height: 101 metres
Length: 477 metres
Volume of RCC: -
Total volume: 652 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 6000 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): unknown
River: -
Reservoir capacity: 37 m3x106
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: 12/21
End of Project: -/22
Specifications
Height: 83 metres
Length: 193 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Northeast China Electric Power
Type: Gravity
Purpose(s): Hydropower
River: Songhua
Reservoir capacity: 10377 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/21
End of Project: -/22
Specifications
Height: 95 metres
Length: 1068 metres
Volume of RCC: -
Total volume: 2700 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Guir
Reservoir capacity: 220 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/21
End of Project: -/21
Specifications
Height: 62 metres
Length: 271 metres
Volume of RCC: 180 m3x103
Total volume: 210 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Natural pozzolan (ASTM Class N) | |

Details
Country: China
Owner: -
Type: Hardfill
Purpose(s): unknown
River: -
Reservoir capacity: 472 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/21
End of Project: -/22
Specifications
Height: 50 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Hydropower
River: -
Reservoir capacity: 219 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/21
End of Project: -/22
Specifications
Height: 90 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Bou Regreg
Reservoir capacity: 507 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/21
End of Project: -/22
Specifications
Height: 106 metres
Length: 345 metres
Volume of RCC: 900 m3x103
Total volume: 1 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Heihe
Reservoir capacity: 403 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/21
End of Project: -/22
Specifications
Height: 123 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Water Supply
River: Şenkale Deresi
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 06/17
Start of RCC: 06/17
End of RCC: -/21
End of Project: -/22
Specifications
Height: 67 metres
Length: 273 metres
Volume of RCC: 148 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Natural pozzolan (ASTM Class N) | |

Details
Country: Brazil
Owner: Rincão dos Albinos Energética S.A.
Type: Gravity
Purpose(s): Hydropower
River: Toropi
Reservoir capacity: 13 m3x106
Construction Dates
Start of Project: -/18
Start of RCC: -/18
End of RCC: -/21
End of Project: 08/22
Specifications
Height: 35 metres
Length: 206 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Mexico
Owner: Peñoles
Type: Gravity
Purpose(s): Water Supply
River: Fuerte
Reservoir capacity: -
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/21
End of Project: -/22
Specifications
Height: 44 metres
Length: 240 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Vietnam
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Song Gianh
Reservoir capacity: -
Construction Dates
Start of Project: 01/90
Start of RCC: 01/90
End of RCC: 04/90
End of Project: 05/90
Specifications
Height: 76 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork with external geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Unformed face of RCC |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| No pozzolan used | |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Bala
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: -/21
End of Project: -/22
Specifications
Height: 47 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Toudgha
Reservoir capacity: 33 m3x106
Construction Dates
Start of Project: 11/17
Start of RCC: 11/17
End of RCC: -/21
End of Project: -/22
Specifications
Height: 68 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.90 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.90 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): Flood Control / Hydropower
River: Qianhe
Reservoir capacity: 160 m3x106
Construction Dates
Start of Project: -/18
Start of RCC: -/18
End of RCC: -/21
End of Project: -/22
Specifications
Height: 132 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Kara Creek
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/21
End of Project: -/23
Specifications
Height: 39 metres
Length: 119 metres
Volume of RCC: 34 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Kırkgöz Creek
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: -/21
End of Project: -/23
Specifications
Height: 28 metres
Length: 142 metres
Volume of RCC: 28 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 |
Downstream
| Slope | Type |
|---|---|
| 0.80 |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 32 | |

Details
Country: Brazil
Owner: CPFL Energias Renovavies S.A.
Type: Gravity
Purpose(s): Hydropower
River: do Peixe
Reservoir capacity: -
Construction Dates
Start of Project: -/18
Start of RCC: -/18
End of RCC: -/21
End of Project: 07/22
Specifications
Height: 32 metres
Length: 300 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Laos
Owner: Nam Theun 1 Power Company
Type: Gravity
Purpose(s): Hydropower
River: Nam Kading, aka Nam Theun
Reservoir capacity: 3009 m3x106
Construction Dates
Start of Project: 08/15
Start of RCC: 08/15
End of RCC: 01/22
End of Project: 08/22
Specifications
Height: 187 metres
Length: 772 metres
Volume of RCC: 4141213 m3x103
Total volume: 4320 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 & |
| 9000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| 130 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 130 | Low-lime flyash (ASTM Class F) |
| 120 |

Details
Country: Ethiopia
Owner: Ethiopian Electric Power (EEP)
Type: Gravity
Purpose(s): Hydropower
River: Blue Nile
Reservoir capacity: 74000 m3x106
Construction Dates
Start of Project: 12/10
Start of RCC: 12/10
End of RCC: 05/22
End of Project: -/24
Specifications
Height: 160 metres
Length: 1790 metres
Volume of RCC: 10100 m3x103
Total volume: 10500 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.22 | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 1.00 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 1.00 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 400 | 400 |
Cementitious material
| Cement (kg/m3) |
|---|
| 67 to |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 23 to | Natural pozzolan (ASTM Class N) |

Details
Country: Japan
Owner: Kagawa Prefecture
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Kaba
Reservoir capacity: 11 m3x106
Construction Dates
Start of Project: 10/14
Start of RCC: 10/14
End of RCC: 05/22
End of Project: 09/24
Specifications
Height: 89 metres
Length: 266 metres
Volume of RCC: 242 m3x103
Total volume: 448 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.40 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.77 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.77 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 1000 |
Cementitious material
| Cement (kg/m3) |
|---|
| 91 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 39 | Low-lime flyash (ASTM Class F) |

Details
Country: Philippines
Owner: Wawa JV Co. Inc. (Prime Infrastructure Capital Inc and San Lorenzo Ruiz Builders and Developers Group)
Type: Hardfill
Purpose(s): Hydropower / Irrigation / Water Supply
River: Tayabasan
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/20
Start of RCC: -/20
End of RCC: 05/22
End of Project: 07/22
Specifications
Height: 24 metres
Length: 114 metres
Volume of RCC: 30 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.40 | RCC against formwork with external geomembrane (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.40 | RCC against formwork (GEVR/GE-RCC) |
| 0.92 |
Spillway
| Slope | Type |
|---|---|
| 0.92 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 120 | Low-lime flyash (ASTM Class F) |

Details
Country: Iran
Owner: Sistan & Balouchestan Water Authority
Type: Hardfill
Purpose(s): Irrigation / Water Supply
River: Kahir
Reservoir capacity: 314 m3x106
Construction Dates
Start of Project: 11/10
Start of RCC: 11/10
End of RCC: 07/22
End of Project: 08/25
Specifications
Height: 55 metres
Length: 383 metres
Volume of RCC: 550 m3x103
Total volume: 730 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: UAE
Owner: DEWA
Type: Gravity
Purpose(s): Hydropower
River: -
Reservoir capacity: -
Construction Dates
Start of Project: 12/19
Start of RCC: 12/19
End of RCC: 08/22
End of Project: -/24
Specifications
Height: 72 metres
Length: 222 metres
Volume of RCC: 170 m3x103
Total volume: 180 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| RCC against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| RCC against precast concrete panels |
Spillway
| Slope | Type |
|---|---|
| none |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 65 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 120 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower / Water Supply
River: Hanshui
Reservoir capacity: 221 m3x106
Construction Dates
Start of Project: 10/18
Start of RCC: 10/18
End of RCC: 11/22
End of Project: 07/23
Specifications
Height: 70 metres
Length: 349 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Assayad
Reservoir capacity: 79 m3x106
Construction Dates
Start of Project: 07/17
Start of RCC: 07/17
End of RCC: 12/22
End of Project: 07/23
Specifications
Height: 77 metres
Length: 830 metres
Volume of RCC: 1400 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Natural pozzolan (ASTM Class N) | |

Details
Country: Tanzania
Owner: TANESCO (Tanzania Electric Supply Company Ltd.)
Type: Gravity
Purpose(s): Hydropower
River: Rufiji
Reservoir capacity: 3680 m3x106
Construction Dates
Start of Project: 12/18
Start of RCC: 12/18
End of RCC: -/22
End of Project: 12/23
Specifications
Height: 134 metres
Length: 1025 metres
Volume of RCC: 1420 m3x103
Total volume: 1940 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 93 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 62 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: Guilin Dayu Water Infrastructure Development Investment Co. Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Lijiang
Reservoir capacity: 188 m3x106
Construction Dates
Start of Project: 11/11
Start of RCC: 11/11
End of RCC: -/22
End of Project: -/23
Specifications
Height: 77 metres
Length: 239 metres
Volume of RCC: -
Total volume: 304 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Iran
Owner: Iran Water & Power Resources Development Company (IWPC)
Type: Arch-Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Zohreh
Reservoir capacity: 2300 m3x106
Construction Dates
Start of Project: -/11
Start of RCC: -/11
End of RCC: -/22
End of Project: 07/23
Specifications
Height: 151 metres
Length: 680 metres
Volume of RCC: 1100 m3x103
Total volume: 1200 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
| 0.70 |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 160 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: China
Owner: -
Type: Thin Arch
Purpose(s): unknown
River: -
Reservoir capacity: 44 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/22
End of Project: -/23
Specifications
Height: 105 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Hydropower / Irrigation
River: Basgöz
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/22
End of Project: -/24
Specifications
Height: 50 metres
Length: 136 metres
Volume of RCC: 126 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 56 | |

Details
Country: China
Owner: Huaneng Lancang River Hydropower Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Langcang (Mekong)
Reservoir capacity: 1338 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/22
End of Project: -/24
Specifications
Height: 158 metres
Length: 508 metres
Volume of RCC: -
Total volume: 3600 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Iran
Owner: Boushehr Water Authority
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Baghan
Reservoir capacity: 32 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/22
End of Project: -/25
Specifications
Height: 58 metres
Length: 311 metres
Volume of RCC: -
Total volume: 220 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Lichuan City Yujiang Valley Hudropower Ltd. Hubei Province
Type: Thin Arch
Purpose(s): Flood Control / Hydropower
River: Yu
Reservoir capacity: 55 m3x106
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: -/22
End of Project: -/22
Specifications
Height: 70 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Guizhou Shuicheng Water-investment Co. Ltd.
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Yuwanghe
Reservoir capacity: 11 m3x106
Construction Dates
Start of Project: 09/16
Start of RCC: 09/16
End of RCC: -/22
End of Project: 11/23
Specifications
Height: 50 metres
Length: 157 metres
Volume of RCC: 106 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Ao
Reservoir capacity: 297 m3x106
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: -/22
End of Project: -/23
Specifications
Height: 91 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Jialing River Tingzikou Water Resources and Hydropower Development Co. Ltd.
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Navigation / Water Supply
River: Jialing
Reservoir capacity: 4067 m3x106
Construction Dates
Start of Project: 11/09
Start of RCC: 11/09
End of RCC: -/22
End of Project: -/25
Specifications
Height: 116 metres
Length: 995 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Iraq
Owner: Ministry of Agriculture and Water Resources in Kurdistan
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Bastora
Reservoir capacity: 215 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/22
End of Project: 10/24
Specifications
Height: 85 metres
Length: 577 metres
Volume of RCC: 1160 m3x103
Total volume: 1223 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
| 0.80 | [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Laos
Owner: Houay LaNge Power Co. Ltd. (JV of China-based Hebei Construction and Investment Group Co., Ltd (HCIG) and CS Energy (Laos))
Type: Gravity
Purpose(s): Hydropower
River: Houaylange
Reservoir capacity: 14 m3x106
Construction Dates
Start of Project: 02/18
Start of RCC: 02/18
End of RCC: -/22
End of Project: 05/23
Specifications
Height: 59 metres
Length: 174 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Karakuz Creek
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/22
End of Project: -/23
Specifications
Height: 46 metres
Length: 125 metres
Volume of RCC: 38 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 83 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 68 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): unknown
River: Tuoxi
Reservoir capacity: 21 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/22
End of Project: -/23
Specifications
Height: 62 metres
Length: 310 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Say
Reservoir capacity: 4 m3x106
Construction Dates
Start of Project: -/18
Start of RCC: -/18
End of RCC: -/22
End of Project: -/23
Specifications
Height: 50 metres
Length: 173 metres
Volume of RCC: 94 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Gök Creek
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/22
End of Project: -/24
Specifications
Height: 33 metres
Length: 195 metres
Volume of RCC: 50 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Gök Creek
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: -/22
End of Project: -/24
Specifications
Height: 31 metres
Length: 228 metres
Volume of RCC: 30 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Hydropower / Irrigation
River: Devrez
Reservoir capacity: 115 m3x106
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: -/22
End of Project: -/23
Specifications
Height: 92 metres
Length: 261 metres
Volume of RCC: 447 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Hardfill
Purpose(s): Irrigation
River: Dokuzsele Creek
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 07/17
Start of RCC: 07/17
End of RCC: -/22
End of Project: -/24
Specifications
Height: 24 metres
Length: 160 metres
Volume of RCC: 42 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Large and medium sized Irrigation District Service Center of Qiannan Prefecture
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Qingshui
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 04/20
Start of RCC: 04/20
End of RCC: -/22
End of Project: -/22
Specifications
Height: 32 metres
Length: 198 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
| 1.00 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| none |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: Ivory Coast
Owner: Ivoirian Hydro Energy
Type: Gravity
Purpose(s): Hydropower
River: Bandama
Reservoir capacity: 105 m3x106
Construction Dates
Start of Project: 10/19
Start of RCC: 10/19
End of RCC: -/22
End of Project: 03/23
Specifications
Height: 24 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Fındıklı Creek
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 06/18
Start of RCC: 06/18
End of RCC: -/22
End of Project: 09/23
Specifications
Height: 35 metres
Length: 229 metres
Volume of RCC: 48 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Laos
Owner: EDL (Electricite du Laos)
Type: Gravity
Purpose(s): Hydropower
River: Nam Ngum
Reservoir capacity: 110 m3x106
Construction Dates
Start of Project: 02/18
Start of RCC: 02/18
End of RCC: 01/23
End of Project: -/24
Specifications
Height: 74 metres
Length: 252 metres
Volume of RCC: 230 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 82 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | |

Details
Country: Cameroon
Owner: EDC (Electricity Development Corporation)
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Lom
Reservoir capacity: 6000 m3x106
Construction Dates
Start of Project: -/19
Start of RCC: -/19
End of RCC: 03/23
End of Project: 09/24
Specifications
Height: 46 metres
Length: 185 metres
Volume of RCC: 175 m3x103
Total volume: 290 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.85 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.85 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 100 | Low-lime flyash (ASTM Class F) |

Details
Country: USA
Owner: Grant County Public Utility District
Type: Gravity
Purpose(s): Hydropower
River: Columbia
Reservoir capacity: -
Construction Dates
Start of Project: 10/21
Start of RCC: 10/21
End of RCC: 03/23
End of Project: 10/23
Specifications
Height: 17 metres
Length: 564 metres
Volume of RCC: 386 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
| 0.75 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| none |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 - |
Cementitious material
| Cement (kg/m3) |
|---|
| 87 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 137 | Low-lime flyash (ASTM Class F) |

Details
Country: Laos
Owner: Nam Sam 3 Power Co. Ltd. (part of Phongsubthavy Group)
Type: Gravity
Purpose(s): Hydropower
River: Nam Xam
Reservoir capacity: 435 m3x106
Construction Dates
Start of Project: 10/19
Start of RCC: 10/19
End of RCC: 04/23
End of Project: 12/23
Specifications
Height: 122 metres
Length: 321 metres
Volume of RCC: 907 m3x103
Total volume: 987 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 140 | Low-lime flyash (ASTM Class F) |

Details
Country: Honduras
Owner: Hidrovolcan
Type: Gravity
Purpose(s): Hydropower
River: Ulua
Reservoir capacity: 242 m3x106
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: 05/23
End of Project: 10/24
Specifications
Height: 83 metres
Length: 440 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Kirkpinarlar
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 10/21
Start of RCC: 10/21
End of RCC: 08/23
End of Project: 10/23
Specifications
Height: 28 metres
Length: 168 metres
Volume of RCC: -
Total volume: 60 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Nishiki
Reservoir capacity: 30 m3x106
Construction Dates
Start of Project: -/10
Start of RCC: -/10
End of RCC: -/23
End of Project: -/24
Specifications
Height: 73 metres
Length: 300 metres
Volume of RCC: -
Total volume: 340 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Gökdelen
Reservoir capacity: 33 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/23
End of Project: -/24
Specifications
Height: 70 metres
Length: 494 metres
Volume of RCC: 614 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 84 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 56 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Kür Çayı
Reservoir capacity: 37 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/23
End of Project: -/24
Specifications
Height: 22 metres
Length: 107 metres
Volume of RCC: 22 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
| 0.70 |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Sagin
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/23
End of Project: -/24
Specifications
Height: 40 metres
Length: 148 metres
Volume of RCC: -
Total volume: 72 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 60 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Degirmen
Reservoir capacity: 8 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/23
End of Project: -/24
Specifications
Height: 65 metres
Length: 384 metres
Volume of RCC: 280 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 113 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 37 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: -
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/23
End of Project: -/24
Specifications
Height: 69 metres
Length: -
Volume of RCC: 204 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control
River: Shirakawa
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: -/18
Start of RCC: -/18
End of RCC: -/23
End of Project: 02/24
Specifications
Height: 87 metres
Length: 197 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Uzun Creek
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/23
End of Project: -/24
Specifications
Height: 42 metres
Length: 59 metres
Volume of RCC: 35 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Akasya
Reservoir capacity: 24 m3x106
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: -/23
End of Project: -/24
Specifications
Height: 59 metres
Length: 227 metres
Volume of RCC: -
Total volume: 189 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 55 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 45 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Kilsuyu Creek
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/18
Start of RCC: -/18
End of RCC: -/23
End of Project: -/24
Specifications
Height: 33 metres
Length: 95 metres
Volume of RCC: -
Total volume: 24 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Inandik
Reservoir capacity: 31 m3x106
Construction Dates
Start of Project: 04/18
Start of RCC: 04/18
End of RCC: -/23
End of Project: -/24
Specifications
Height: 73 metres
Length: 343 metres
Volume of RCC: 271 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.15 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 80 | |

Details
Country: Philippines
Owner: National Irrigation Administration (NIA)
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Jalaur
Reservoir capacity: -
Construction Dates
Start of Project: -/19
Start of RCC: -/19
End of RCC: -/23
End of Project: 07/24
Specifications
Height: 38 metres
Length: 150 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Philippines
Owner: National Irrigation Administration (NIA)
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Jalaur
Reservoir capacity: 229 m3x106
Construction Dates
Start of Project: -/19
Start of RCC: -/19
End of RCC: -/23
End of Project: 07/24
Specifications
Height: 109 metres
Length: 267 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Bolivia
Owner: ENDE Valle Hermoso S.A.
Type: Gravity
Purpose(s): Hydropower
River: Ivirizu
Reservoir capacity: 30 m3x106
Construction Dates
Start of Project: -/18
Start of RCC: -/18
End of RCC: -/23
End of Project: -/24
Specifications
Height: 125 metres
Length: 350 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Maiwan Water Conservancy
Type: Gravity
Purpose(s): Hydropower / Irrigation
River: Nandu
Reservoir capacity: 615 m3x106
Construction Dates
Start of Project: 04/20
Start of RCC: 04/20
End of RCC: 05/24
End of Project: 07/25
Specifications
Height: 79 metres
Length: 377 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Gölecik
Reservoir capacity: 36 m3x106
Construction Dates
Start of Project: 12/16
Start of RCC: 12/16
End of RCC: 06/24
End of Project: -/24
Specifications
Height: 95 metres
Length: 424 metres
Volume of RCC: -
Total volume: 900 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 72 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 48 | Low-lime flyash (ASTM Class F) |

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Leben
Reservoir capacity: 200 m3x106
Construction Dates
Start of Project: 03/21
Start of RCC: 03/21
End of RCC: 06/24
End of Project: -/25
Specifications
Height: 71 metres
Length: 149 metres
Volume of RCC: 207 m3x103
Total volume: 257 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.90 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.90 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 110 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | |

Details
Country: Japan
Owner: Ministry of Land, Infrastructure, Transport and Tourism
Type: Hardfill
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Naruse
Reservoir capacity: 79 m3x106
Construction Dates
Start of Project: 05/18
Start of RCC: 05/18
End of RCC: 08/24
End of Project: 11/26
Specifications
Height: 115 metres
Length: 755 metres
Volume of RCC: 4450 m3x103
Total volume: 4850 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Mexico
Owner: CNA (Comisión Nacional del Agua)
Type: Gravity
Purpose(s): Water Supply
River: Verde
Reservoir capacity: 910 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/24
End of Project: 12/24
Specifications
Height: 80 metres
Length: 271 metres
Volume of RCC: 1100 m3x103
Total volume: 1200 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.83 | RCC against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.83 | RCC against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 60 to |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 50 to | Ground-granulated blast-furnace slag |

Details
Country: Iran
Owner: Fars Water Authority
Type: Hardfill
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Firooz Abad
Reservoir capacity: 146 m3x106
Construction Dates
Start of Project: -/09
Start of RCC: -/09
End of RCC: -/24
End of Project: -/26
Specifications
Height: 88 metres
Length: 230 metres
Volume of RCC: 260 m3x103
Total volume: 285 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.90 | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 1.20 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 1.20 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: Secretaria de Meio Ambiente e dos Recursos Hídricos do Estado do Rio Grande do Norte
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Piranhas
Reservoir capacity: 556 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/24
End of Project: 03/25
Specifications
Height: 35 metres
Length: 989 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Iran
Owner: Gilan Province Water Authority
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Kharshak
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/24
End of Project: -/26
Specifications
Height: 45 metres
Length: 195 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Japan
Owner: Ministry of Land, Infrastructure, Transport and Tourism
Type: Arch-Gravity
Purpose(s): Flood Control
River: Heko
Reservoir capacity: 29 m3x106
Construction Dates
Start of Project: 07/06
Start of RCC: 07/06
End of RCC: -/24
End of Project: -/26
Specifications
Height: 96 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Japan
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Kibishima
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: -/14
Start of RCC: -/14
End of RCC: -/24
End of Project: -/26
Specifications
Height: 84 metres
Length: 270 metres
Volume of RCC: -
Total volume: 328 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Japan
Owner: Ministry of Land, Infrastructure, Transport and Tourism
Type: Gravity
Purpose(s): Flood Control / Irrigation / Navigation
River: Toga
Reservoir capacity: 31 m3x106
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: -/24
End of Project: -/25
Specifications
Height: 112 metres
Length: 232 metres
Volume of RCC: -
Total volume: 570 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
| 0.60 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.69 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.69 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Department of Water Conservancy, Fujian Province
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Aojiang
Reservoir capacity: 297 m3x106
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: -/24
End of Project: -/25
Specifications
Height: 91 metres
Length: 338 metres
Volume of RCC: 300 m3x103
Total volume: 663 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 |
Downstream
| Slope | Type |
|---|---|
| 0.76 |
Spillway
| Slope | Type |
|---|---|
| 0.76 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Beimen
Reservoir capacity: 191 m3x106
Construction Dates
Start of Project: 04/20
Start of RCC: 04/20
End of RCC: -/24
End of Project: 08/25
Specifications
Height: 52 metres
Length: 295 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: -
Reservoir capacity: 544 m3x106
Construction Dates
Start of Project: 06/20
Start of RCC: 06/20
End of RCC: -/24
End of Project: 12/25
Specifications
Height: 106 metres
Length: 596 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Vietnam
Owner: Nexif Energy & Song Giang Hydropower Joint Stock Company
Type: Gravity
Purpose(s): Hydropower / Irrigation
River: Song Cái Nha Trong
Reservoir capacity: -
Construction Dates
Start of Project: -/19
Start of RCC: -/19
End of RCC: -/24
End of Project: -/25
Specifications
Height: 26 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Çat
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/19
Start of RCC: -/19
End of RCC: -/24
End of Project: -/25
Specifications
Height: 42 metres
Length: 325 metres
Volume of RCC: 225 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Hardfill
Purpose(s): unknown
River: -
Reservoir capacity: 10 m3x106
Construction Dates
Start of Project: -/20
Start of RCC: -/20
End of RCC: -/24
End of Project: -/25
Specifications
Height: 40 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Japan
Owner: Ministry of Land, Infrastructure, Transport and Tourism
Type: Hardfill
Purpose(s): Flood Control
River: Honbetsu
Reservoir capacity: 9 m3x106
Construction Dates
Start of Project: -/85
Start of RCC: -/85
End of RCC: -/24
End of Project: -/26
Specifications
Height: 53 metres
Length: 160 metres
Volume of RCC: -
Total volume: 180 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Büyükdere
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: -/24
End of Project: -/26
Specifications
Height: 29 metres
Length: 125 metres
Volume of RCC: 30 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Mexico
Owner: Organismo Servicios de Agua y Drenaje de Monterrey, IPD (SADM)
Type: Gravity
Purpose(s): Water Supply
River: Potosi
Reservoir capacity: 221 m3x106
Construction Dates
Start of Project: -/20
Start of RCC: -/20
End of RCC: -/24
End of Project: -/24
Specifications
Height: 47 metres
Length: 1915 metres
Volume of RCC: 1118 m3x103
Total volume: 1162 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | RCC against formwork |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: Iran
Owner: Sistan and Balouchestan Water Authority
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Simish & Mashkid
Reservoir capacity: 115 m3x106
Construction Dates
Start of Project: 10/17
Start of RCC: 10/17
End of RCC: -/24
End of Project: -/25
Specifications
Height: 36 metres
Length: 1450 metres
Volume of RCC: 650 m3x103
Total volume: 850 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Water Supply
River: Uçarsu
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/18
Start of RCC: -/18
End of RCC: -/24
End of Project: -/25
Specifications
Height: 30 metres
Length: 199 metres
Volume of RCC: 50 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: CELG/Electronorte
Type: Gravity
Purpose(s): Hydropower
River: Arraias
Reservoir capacity: -
Construction Dates
Start of Project: -/21
Start of RCC: -/21
End of RCC: -/24
End of Project: -/25
Specifications
Height: 29 metres
Length: 560 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Hardfill
Purpose(s): unknown
River: Dongyanggou
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: 05/22
Start of RCC: 05/22
End of RCC: -/24
End of Project: -/25
Specifications
Height: 67 metres
Length: 136 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Philippines
Owner: Wawa JV Co. Inc. (Prime Infrastructure Capital Inc and San Lorenzo Ruiz Builders and Developers Group)
Type: Hardfill
Purpose(s): Water Supply
River: Marikina
Reservoir capacity: 120 m3x106
Construction Dates
Start of Project: 06/21
Start of RCC: 06/21
End of RCC: -/24
End of Project: -/25
Specifications
Height: 87 metres
Length: 439 metres
Volume of RCC: 1035 m3x103
Total volume: 1043 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.60 | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3600 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 120 | Low-lime flyash (ASTM Class F) |
| 110 |

Details
Country: Indonesia
Owner: PT. North Sumatra Hydro Energy
Type: Gravity
Purpose(s): Hydropower
River: Batang Toru
Reservoir capacity: 18 m3x106
Construction Dates
Start of Project: 10/21
Start of RCC: 10/21
End of RCC: 03/25
End of Project: -/26
Specifications
Height: 79 metres
Length: 137 metres
Volume of RCC: -
Total volume: 500 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 2000 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Oman
Owner: Ministry of Regional Municipalities and Water Resources
Type: Gravity
Purpose(s): Flood Control
River: Wadi Al Khawd
Reservoir capacity: 78 m3x106
Construction Dates
Start of Project: 09/22
Start of RCC: 09/22
End of RCC: 04/25
End of Project: 11/25
Specifications
Height: 62 metres
Length: 570 metres
Volume of RCC: 654 m3x103
Total volume: 715 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Tong
Reservoir capacity: 113 m3x106
Construction Dates
Start of Project: 06/22
Start of RCC: 06/22
End of RCC: 06/25
End of Project: -/26
Specifications
Height: 69 metres
Length: 288 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Algeria
Owner: Direction de l’Hydralique de la Wilaya de Annaba
Type: Gravity
Purpose(s): Flood Control
River: Oued Bouhdid
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/18
Start of RCC: -/18
End of RCC: 07/25
End of Project: -/25
Specifications
Height: 30 metres
Length: 260 metres
Volume of RCC: -
Total volume: 60 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 |
Downstream
| Slope | Type |
|---|---|
| 0.90 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Greece
Owner: Terna Energiaki
Type: Hardfill
Purpose(s): Hydropower
River: Kapnitsorrema
Reservoir capacity: 7 m3x106
Construction Dates
Start of Project: 06/23
Start of RCC: 06/23
End of RCC: 10/25
End of Project: 12/25
Specifications
Height: 59 metres
Length: 475 metres
Volume of RCC: 765 m3x103
Total volume: 795 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 400 | 400 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: USA
Owner: Denver Water
Type: Arch-Gravity
Purpose(s): Water Supply
River: South Boulder Creek
Reservoir capacity: 147 m3x106
Construction Dates
Start of Project: 04/22
Start of RCC: 04/22
End of RCC: 11/25
End of Project: 12/26
Specifications
Height: 144 metres
Length: 610 metres
Volume of RCC: 568 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Brazil
Owner: SRHS (Secretaria de Recursos Hídricos e de Saneamento)
Type: Gravity
Purpose(s): Flood Control / Water Supply
River: Sem Nome
Reservoir capacity: 6 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/25
End of Project: -/26
Specifications
Height: 38 metres
Length: 325 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: DR Congo
Owner: SNEL (Société Nationale d'Électricité)
Type: Gravity
Purpose(s): Hydropower
River: Lulua
Reservoir capacity: -
Construction Dates
Start of Project: 08/11
Start of RCC: 08/11
End of RCC: -/25
End of Project: -/27
Specifications
Height: 16 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Tersun
Reservoir capacity: 9 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: -/25
End of Project: -/26
Specifications
Height: 51 metres
Length: 236 metres
Volume of RCC: 205 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.05 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Lebanon
Owner: EBML
Type: Arch-Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Ibrahim (Abraham)
Reservoir capacity: 38 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/25
End of Project: -/26
Specifications
Height: 162 metres
Length: 350 metres
Volume of RCC: 1450 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Water Supply
River: Zimari
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/18
Start of RCC: -/18
End of RCC: -/25
End of Project: -/26
Specifications
Height: 37 metres
Length: 126 metres
Volume of RCC: -
Total volume: 80 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation
River: Büyük Creek
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/18
Start of RCC: -/18
End of RCC: -/25
End of Project: -/26
Specifications
Height: 50 metres
Length: 157 metres
Volume of RCC: 94 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: -
Reservoir capacity: 104 m3x106
Construction Dates
Start of Project: -/20
Start of RCC: -/20
End of RCC: -/25
End of Project: -/25
Specifications
Height: 90 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Water Supply
River: Sariçay
Reservoir capacity: 67 m3x106
Construction Dates
Start of Project: 08/19
Start of RCC: 08/19
End of RCC: -/25
End of Project: 07/26
Specifications
Height: 125 metres
Length: 441 metres
Volume of RCC: 1163 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Iran
Owner: Lorestan Water Authority
Type: Thin Arch
Purpose(s): Flood Control / Irrigation / Water Supply
River: Karkheh
Reservoir capacity: 55 m3x106
Construction Dates
Start of Project: -/13
Start of RCC: -/13
End of RCC: -/25
End of Project: -/26
Specifications
Height: 73 metres
Length: 220 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: South Africa
Owner: Department of Water & Sanitation
Type: Gravity
Purpose(s): Water Supply
River: Groot Letaba
Reservoir capacity: -
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: -/25
End of Project: -/26
Specifications
Height: 44 metres
Length: 350 metres
Volume of RCC: 170 m3x103
Total volume: 226 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Niulushi
Reservoir capacity: 66 m3x106
Construction Dates
Start of Project: -/18
Start of RCC: -/18
End of RCC: -/25
End of Project: -/26
Specifications
Height: 80 metres
Length: 391 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Dazhou Major water works construction and management center
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Zhonhe
Reservoir capacity: 128 m3x106
Construction Dates
Start of Project: 12/20
Start of RCC: 12/20
End of RCC: -/25
End of Project: -/26
Specifications
Height: 77 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: USA
Owner: Upper Trinity Regional Water District
Type: Gravity
Purpose(s): Water Supply
River: Sulphur
Reservoir capacity: -
Construction Dates
Start of Project: 00/00
Start of RCC: 00/00
End of RCC: 00/00
End of Project: 00/00
Specifications
Height: 32 metres
Length: 215 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Hardfill
Purpose(s): unknown
River: Qiuluxi
Reservoir capacity: 28 m3x106
Construction Dates
Start of Project: 10/21
Start of RCC: 10/21
End of RCC: -/25
End of Project: -/26
Specifications
Height: 52 metres
Length: 395 metres
Volume of RCC: 329 m3x103
Total volume: 386 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): unknown
River: -
Reservoir capacity: 6 m3x106
Construction Dates
Start of Project: -/22
Start of RCC: -/22
End of RCC: -/25
End of Project: -/26
Specifications
Height: 64 metres
Length: 274 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Ministère de l'Equipement, des Transports, de la Logistique et de l'Eau
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Moulouya
Reservoir capacity: 980 m3x106
Construction Dates
Start of Project: -/22
Start of RCC: -/22
End of RCC: -/25
End of Project: -/26
Specifications
Height: 73 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Hardfill
Purpose(s): Flood Control / Irrigation / Water Supply
River: Kert
Reservoir capacity: 44 m3x106
Construction Dates
Start of Project: 01/22
Start of RCC: 01/22
End of RCC: 01/26
End of Project: 10/26
Specifications
Height: 70 metres
Length: 684 metres
Volume of RCC: 800 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.50 | Traditional concrete against formwork [stepped face] |
Downstream
| Slope | Type |
|---|---|
| 0.90 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.90 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | |

Details
Country: Morocco
Owner: AREP (Regional Project Execution Agency)
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: Assif Ouender
Reservoir capacity: 15 m3x106
Construction Dates
Start of Project: 11/23
Start of RCC: 11/23
End of RCC: 03/26
End of Project: 06/26
Specifications
Height: 45 metres
Length: 300 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
| 0.90 |
Spillway
| Slope | Type |
|---|---|
| 0.90 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Kenya
Owner: Ministry of Water and Sanitation
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Mwache
Reservoir capacity: 136 m3x106
Construction Dates
Start of Project: 04/22
Start of RCC: 04/22
End of RCC: 06/26
End of Project: -/26
Specifications
Height: 84 metres
Length: 526 metres
Volume of RCC: 610 m3x103
Total volume: 620 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
| RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 150 | |

Details
Country: Brazil
Owner: SRHS (Secretaria de Recursos Hídricos e de Saneamento)
Type: Gravity
Purpose(s): Water Supply
River: Una
Reservoir capacity: 17 m3x106
Construction Dates
Start of Project: -/16
Start of RCC: -/16
End of RCC: 06/26
End of Project: -/27
Specifications
Height: 55 metres
Length: 311 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Iran
Owner: Iran Water & Power Development Company (IWPCo)
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Shafaroud
Reservoir capacity: 52 m3x106
Construction Dates
Start of Project: 03/12
Start of RCC: 03/12
End of RCC: 07/24
End of Project: 11/25
Specifications
Height: 101 metres
Length: 300 metres
Volume of RCC: 725 m3x103
Total volume: 740 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | RCC against formwork (GEVR/GE-RCC) |
| 0.50 |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Kheng Grou
Reservoir capacity: 1070 m3x106
Construction Dates
Start of Project: 04/22
Start of RCC: 04/22
End of RCC: 08/26
End of Project: -/26
Specifications
Height: 79 metres
Length: 196 metres
Volume of RCC: 550 m3x103
Total volume: 55 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 1.00 | Traditional concrete against precast concrete panels |
Spillway
| Slope | Type |
|---|---|
| 1.00 | Reinforced concrete cast against precast units or slip-formed facing elements |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 3000 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Iran
Owner: Bushehr Water Company
Type: Gravity
Purpose(s): Flood Control / Irrigation
River: Bahoosh
Reservoir capacity: 9 m3x106
Construction Dates
Start of Project: -/12
Start of RCC: -/12
End of RCC: -/26
End of Project: -/28
Specifications
Height: 37 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Zimbabwe
Owner: Zimbabwe National Water Authority (Zinwa)
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Gwayi
Reservoir capacity: 634 m3x106
Construction Dates
Start of Project: 09/04
Start of RCC: 09/04
End of RCC: -/26
End of Project: -/27
Specifications
Height: 72 metres
Length: 305 metres
Volume of RCC: -
Total volume: 300 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 60 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 140 | Low-lime flyash (ASTM Class F) |

Details
Country: China
Owner: China Nuclear (Guodian Zhangzhou) Energy
Type: Gravity
Purpose(s): Hydropower
River: -
Reservoir capacity: 21 m3x106
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: -/26
End of Project: -/27
Specifications
Height: 68 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Iran
Owner: Boushehr Regional Water Company
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
River: Dashte Palang
Reservoir capacity: 151 m3x106
Construction Dates
Start of Project: 07/13
Start of RCC: 07/13
End of RCC: -/26
End of Project: -/28
Specifications
Height: 63 metres
Length: 800 metres
Volume of RCC: 540 m3x103
Total volume: 690 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Guizhou Water Conservancy Investment Group Co, Ltd
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Guanyinsi
Reservoir capacity: 121 m3x106
Construction Dates
Start of Project: 12/21
Start of RCC: 12/21
End of RCC: -/26
End of Project: -/27
Specifications
Height: 109 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Lancang (Mekong)
Reservoir capacity: -
Construction Dates
Start of Project: 10/21
Start of RCC: 10/21
End of RCC: -/26
End of Project: -/27
Specifications
Height: 158 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Qingshui
Reservoir capacity: 210 m3x106
Construction Dates
Start of Project: 12/21
Start of RCC: 12/21
End of RCC: -/26
End of Project: -/27
Specifications
Height: 96 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Degimendere
Reservoir capacity: 16 m3x106
Construction Dates
Start of Project: -/17
Start of RCC: -/17
End of RCC: -/26
End of Project: -/27
Specifications
Height: 89 metres
Length: 396 metres
Volume of RCC: 430 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Nicaragua
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Río Mico
Reservoir capacity: -
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/00
End of Project: -/00
Specifications
Height: 49 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against precast concrete panels |
| 1.00 | Traditional concrete against precast concrete panels |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
| 1.00 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Construction Headquarters of Heibaoshan Reservoir Project in Wanyuan City
Type: Hardfill
Purpose(s): Irrigation / Water Supply
River: Dayan
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/22
Start of RCC: -/22
End of RCC: -/26
End of Project: -/27
Specifications
Height: 60 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Hydropower / Irrigation
River: Derna
Reservoir capacity: 85 m3x106
Construction Dates
Start of Project: -/22
Start of RCC: -/22
End of RCC: -/26
End of Project: -/27
Specifications
Height: 95 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Canada
Owner: Matteus West and Squamish Nation
Type: Gravity
Purpose(s): Flood Control
River: Cheekye
Reservoir capacity: -
Construction Dates
Start of Project: 10/23
Start of RCC: 10/23
End of RCC: -/26
End of Project: 10/26
Specifications
Height: 25 metres
Length: 200 metres
Volume of RCC: 55 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Uzbekistan
Owner: JSC Uzbekgidroenergo
Type: Gravity
Purpose(s): Hydropower
River: Chatkal
Reservoir capacity: 5 m3x106
Construction Dates
Start of Project: -/23
Start of RCC: -/23
End of RCC: -/26
End of Project: -/27
Specifications
Height: 60 metres
Length: 270 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: AREP (Regional Project Execution Agency)
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: Boujir
Reservoir capacity: 12 m3x106
Construction Dates
Start of Project: 07/24
Start of RCC: 07/24
End of RCC: -/26
End of Project: -/27
Specifications
Height: 25 metres
Length: 416 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.20 |
Downstream
| Slope | Type |
|---|---|
| 0.80 |
Spillway
| Slope | Type |
|---|---|
| 0.80 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Ethiopia
Owner: Ethiopian Electric Power (EEP)
Type: Gravity
Purpose(s): Hydropower
River: Omo
Reservoir capacity: 6900 m3x106
Construction Dates
Start of Project: 09/13
Start of RCC: 09/13
End of RCC: 02/27
End of Project: 05/28
Specifications
Height: 201 metres
Length: 1020 metres
Volume of RCC: 7350 m3x103
Total volume: 7725 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | RCC against formwork (GEVR/GE-RCC) |
| 0.35 |
Downstream
| Slope | Type |
|---|---|
| 0.70 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| separate |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 1500 |
Cementitious material
| Cement (kg/m3) |
|---|
| 130 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 25 | Natural pozzolan (ASTM Class N) |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Gravity
Purpose(s): Hydropower / Irrigation
River: Aras
Reservoir capacity: 1295 m3x106
Construction Dates
Start of Project: 04/22
Start of RCC: 04/22
End of RCC: 11/27
End of Project: 09/28
Specifications
Height: 113 metres
Length: 270 metres
Volume of RCC: 718 m3x103
Total volume: 750 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Lakhdar
Reservoir capacity: 150 m3x106
Construction Dates
Start of Project: -/23
Start of RCC: -/23
End of RCC: -/27
End of Project: -/27
Specifications
Height: 110 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Saudi Arabia
Owner: Saudi Arabia's Public Investment Fund (PIF)
Type: Gravity
Purpose(s): Recreation
River: -
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/23
Start of RCC: -/23
End of RCC: -/27
End of Project: -/28
Specifications
Height: 38 metres
Length: 700 metres
Volume of RCC: -
Total volume: 800 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Saudi Arabia
Owner: Saudi Arabia's Public Investment Fund (PIF)
Type: Gravity
Purpose(s): Recreation
River: -
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: -/23
Start of RCC: -/23
End of RCC: -/27
End of Project: -/28
Specifications
Height: 145 metres
Length: 475 metres
Volume of RCC: -
Total volume: 2345 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Indonesia
Owner: PUPR (Public Works and Public Housing Ministry)
Type: Hardfill
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
River: Cibeet
Reservoir capacity: 83 m3x106
Construction Dates
Start of Project: 09/23
Start of RCC: 09/23
End of RCC: -/27
End of Project: -/28
Specifications
Height: 47 metres
Length: 960 metres
Volume of RCC: 371 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.90 |
Downstream
| Slope | Type |
|---|---|
| 0.90 |
Spillway
| Slope | Type |
|---|---|
| 0.90 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 250 | 750 |
Cementitious material
| Cement (kg/m3) |
|---|
| 106 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Italy
Owner: Consorzio di Bonifica della Sardegna Meridionale
Type: Gravity
Purpose(s): Irrigation / Water Supply
River: Monti Nieddu
Reservoir capacity: 35 m3x106
Construction Dates
Start of Project: 01/98
Start of RCC: 01/98
End of RCC: -/28
End of Project: -/28
Specifications
Height: 88 metres
Length: 360 metres
Volume of RCC: 333 m3x103
Total volume: 449 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.05 | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.75 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |

Details
Country: Myanmar
Owner: Department of Hydroelectric Power - Ministry of Electric Power
Type: Gravity
Purpose(s): Hydropower
River: Myitnge
Reservoir capacity: 341 m3x106
Construction Dates
Start of Project: -/15
Start of RCC: -/15
End of RCC: -/28
End of Project: -/29
Specifications
Height: 102 metres
Length: 266 metres
Volume of RCC: 532 m3x103
Total volume: 580 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Water Supply
River: Bahe
Reservoir capacity: 141 m3x106
Construction Dates
Start of Project: 04/22
Start of RCC: 04/22
End of RCC: -/28
End of Project: -/29
Specifications
Height: 71 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Angola
Owner: Ministry of Energy and Water
Type: Gravity
Purpose(s): Hydropower
River: Kwanza
Reservoir capacity: 436 m3x106
Construction Dates
Start of Project: 08/17
Start of RCC: 08/17
End of RCC: -/28
End of Project: 03/29
Specifications
Height: 116 metres
Length: 533 metres
Volume of RCC: 1075 m3x103
Total volume: 1450 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
| 0.85 | Reinforced conventional concrete cast after RCC placement [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.85 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 2400 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | |

Details
Country: Japan
Owner: Kansai Electric Power
Type: Gravity
Purpose(s): Flood Control / Hydropower
River: Kiso
Reservoir capacity: 131 m3x106
Construction Dates
Start of Project: -/22
Start of RCC: -/22
End of RCC: -/28
End of Project: -/30
Specifications
Height: 118 metres
Length: 341 metres
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: China
Owner: Yalong River Hydropower Development Co. Ltd.
Type: Gravity
Purpose(s): Hydropower
River: Yalong
Reservoir capacity: 234 m3x106
Construction Dates
Start of Project: 01/24
Start of RCC: 01/24
End of RCC: -/28
End of Project: -/29
Specifications
Height: 128 metres
Length: -
Volume of RCC: -
Total volume: 2560 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Iran
Owner: Khuzestan Province Power & Water Authority
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
River: Harkesh
Reservoir capacity: 38 m3x106
Construction Dates
Start of Project: -/18
Start of RCC: -/18
End of RCC: -/29
End of Project: -/31
Specifications
Height: 57 metres
Length: 350 metres
Volume of RCC: -
Total volume: 240 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|