NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
TukaiheChinaDatang International Power Generation Co. Ltd.H Lixian7804/0412/05- /06- /0759300255570V(3') (3') (3')300300065
93
110
113
(S)
Yangjiayuan
[A]
ChinaH WTongxinhe78- /07- /08- /09- /1068              
Enlarged CotterAustraliaACTEW WaterWCotter7810/0908/1112/1205/1382350369400V(3')0.75(3')0.75(3')*300300
400
70120(F)

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: China

Owner: Datang International Power Generation Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Lixian

Reservoir capacity: 78 m3x106

Construction Dates

Start of Project: 04/04

Start of RCC: 04/04

End of RCC: -/06

End of Project: -/07

Specifications

Height: 59 metres

Length: 300 metres

Volume of RCC: 255 m3x103

Total volume: 570 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
 RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
 RCC against formwork (GEVR/GE-RCC)

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
65
93
Pozzolan (kg/m3)Pozzolan Type
110Ground-granulated blast-furnace slag
113 
Tukaihe completed
Tukaihe completed

Full Dam Information

Details

Country: China

Owner: -

Type: Thin Arch

Purpose(s): Hydropower / Water Supply

River: Tongxinhe

Reservoir capacity: 78 m3x106

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/09

End of Project: -/10

Specifications

Height: 68 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Yangjiayuan completed
Yangjiayuan completed

Full Dam Information

Details

Country: Australia

Owner: ACTEW Water

Type: Gravity

Purpose(s): Water Supply

River: Cotter

Reservoir capacity: 78 m3x106

Construction Dates

Start of Project: 10/09

Start of RCC: 10/09

End of RCC: 12/12

End of Project: 05/13

Specifications

Height: 82 metres

Length: 350 metres

Volume of RCC: 369 m3x103

Total volume: 400 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300
 400

Cementitious material

Cement (kg/m3)
70
Pozzolan (kg/m3)Pozzolan Type
120Low-lime flyash (ASTM Class F)
  
Enlarged Cotter completed
Enlarged Cotter completed

 

Search again