SEARCHING
... please wait

Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Randleman Lake USAPiedmont Triad Regional Water AuthorityR WDeep8407/0104/0207/0201/03312807076V(1)0.75(1)*0.75(1)*30030089104(F)
Huilong PSS - Upper damChinaHenan Electric Power CorporationH 106/0111/0211/03- /05542087376V(3')0.75(3')none 300300  (F)
MosquitãoBrazilConcessionária Mosquitão S/AH 19- /04- /05- /06- /07322365776           
Engenheiro Henrique KotzianBrazilBME EnergiaHIvaí9- /06- /07- /0804/09402265876           
BalkusanTurkeyKaren EnergyHBalkusan15- /09- /10- /11- /12481896076V(1)0.75(1)*0.75(12)30012007550 

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: USA

Owner: Piedmont Triad Regional Water Authority

Type: Gravity

Purpose(s): Recreation / Water Supply

River: Deep

Reservoir capacity: 84 m3x106

Construction Dates

Start of Project: 07/01

Start of RCC: 07/01

End of RCC: 07/02

End of Project: 01/03

Specifications

Height: 31 metres

Length: 280 metres

Volume of RCC: 70 m3x103

Total volume: 76 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.75Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.75Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
89
Pozzolan (kg/m3)Pozzolan Type
104Low-lime flyash (ASTM Class F)
  
Randleman Lake completed
Randleman Lake completed

Full Dam Information

Details

Country: China

Owner: Henan Electric Power Corporation

Type: Gravity

Purpose(s): Hydropower

River: -

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 06/01

Start of RCC: 06/01

End of RCC: 11/03

End of Project: -/05

Specifications

Height: 54 metres

Length: 208 metres

Volume of RCC: 73 m3x103

Total volume: 76 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
none 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Huilong PSS - Upper dam completed
Huilong PSS - Upper dam completed

Full Dam Information

Details

Country: Brazil

Owner: Concessionária Mosquitão S/A

Type: Gravity

Purpose(s): Hydropower

River: -

Reservoir capacity: 19 m3x106

Construction Dates

Start of Project: -/04

Start of RCC: -/04

End of RCC: -/06

End of Project: -/07

Specifications

Height: 32 metres

Length: 236 metres

Volume of RCC: 57 m3x103

Total volume: 76 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Mosquitão completed
Mosquitão completed

Full Dam Information

Details

Country: Brazil

Owner: BME Energia

Type: Gravity

Purpose(s): Hydropower

River: Ivaí

Reservoir capacity: 9 m3x106

Construction Dates

Start of Project: -/06

Start of RCC: -/06

End of RCC: -/08

End of Project: 04/09

Specifications

Height: 40 metres

Length: 226 metres

Volume of RCC: 58 m3x103

Total volume: 76 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Engenheiro Henrique Kotzian completed
Engenheiro Henrique Kotzian completed

Full Dam Information

Details

Country: Turkey

Owner: Karen Energy

Type: Gravity

Purpose(s): Hydropower

River: Balkusan

Reservoir capacity: 15 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/11

End of Project: -/12

Specifications

Height: 48 metres

Length: 189 metres

Volume of RCC: 60 m3x103

Total volume: 76 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.75Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.75Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
3001200

Cementitious material

Cement (kg/m3)
75
Pozzolan (kg/m3)Pozzolan Type
50 
  
Balkusan on Google Earth
Balkusan on Google Earth

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates