Assif Ouender
Download PDF data sheet
Photo coming soon

Particulars
Owner: AREP (Regional Project Execution Agency)
Designer: Novec
Contractor: STAM (Société des travaux agricoles du Maroc)
Statistics
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
Reservoir capacity: 15 m3x106
Height: 45 metres
Length: 300 metres
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: 11/23 (November 2023)
Start of RCC: —/25 (— 2025)
End of RCC: 03/26 (March 2026)
End of Project: 06/26 (June 2026)
Country: Morocco
River: Assif Ouender
DMS Co-ordinates: 29˚21'57.34"N, 10˚8'32.19"W
DD Co-ordinates: 29.365929, -10.142275
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical |
Downstream
| Slope | Type |
|---|---|
| 0.90 |
Spillway
| Slope | Type |
|---|---|
| 0.90 |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|