Beni Azimane
Download PDF data sheet
Photo coming soon

Statistics
Type: Hardfill
Purpose(s): Flood Control / Irrigation / Water Supply
Reservoir capacity: 44 m3x106
Height: 70 metres
Length: 684 metres
Volume of RCC: 800 m3x103
Total volume: unknown
Construction Dates
Start of Project: 01/22 (January 2022)
Start of RCC: 10/22 (October 2022)
End of RCC: 01/26 (January 2026)
End of Project: 10/26 (October 2026)
Country: Morocco
River: Kert
DMS Co-ordinates: 34˚52'37.24"N, 3˚37'2.16"W
DD Co-ordinates: 34.87701, -3.617267
Facings
Upstream
| Slope | Type |
|---|---|
| 0.50 | Traditional concrete against formwork [stepped face] |
Downstream
| Slope | Type |
|---|---|
| 0.90 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.90 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | |