Cannelton

Download PDF data sheet
Cannelton completed
Cannelton completed

Particulars

Owner: American Municipal Partners (AMP)

Designer: MWH-Stantec

Contractor: Walsh Construction

Statistics

Type: Hardfill

Purpose(s): Hydropower

Reservoir capacity: unknown

Height: 35 metres

Length: 158 metres

Volume of RCC: 113 m3x103

Total volume: unknown

Construction Dates

Start of Project: 05/09 (May 2009)

Start of RCC: 06/12 (June 2012)

End of RCC: 08/13 (August 2013)

End of Project: 09/16 (September 2016)

Country: USA

River: Ohio

DMS Co-ordinates: 37˚53'40.43"N, 86˚42'2.99"W

DD Co-ordinates: 37.894566, -86.700829

Facings

Upstream

SlopeType
0.80RCC against precast concrete blocks

Downstream

SlopeType
0.80RCC against precast concrete blocks

Spillway

SlopeType
separate 

Placement

Layers (mm)Lifts (mm)
230230

Cementitious material

Cement (kg/m3)
118
Pozzolan (kg/m3)Pozzolan Type
64