Dayakou
Download PDF data sheet
Dayakou on Google Earth

Particulars
Owner: Guangdong Yuedian Group Co., Ltd
Designer: Kunming Engineering Corporation Ltd.
Contractor: SinoHydro Construction Bureau Nº14 Co. Ltd.
Statistics
Type: Thin Arch
Purpose(s): Hydropower
Reservoir capacity: 170 m3x106
Height: 99 metres
Length: 300 metres
Volume of RCC: unknown
Total volume: 210 m3x103
Construction Dates
Start of Project: —/13 (— 2013)
Start of RCC: —/14 (— 2014)
End of RCC: —/15 (— 2015)
End of Project: —/16 (— 2016)
Country: China
River: Nanpeng
DMS Co-ordinates: 23˚41'7.13"N, 98˚56'26.92"E
DD Co-ordinates: 23.685314, 98.940811
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
