SEARCHING
... please wait

Saladillo

Download PDF data sheet
Photo coming soon

Particulars

Owner: Provincia de San Luis

Designer: Jamie Lande & Asociados

Contractor: Rovella Carranza - Sapem - UTE

Statistics

Type: Gravity

Purpose(s): Water Supply

Reservoir capacity: unknown

Height: 75 metres

Length: 215 metres

Volume of RCC: 210 m3x103

Total volume: 249 m3x103

Construction Dates

Start of Project: 02/09 (February 2009)

Start of RCC: 09/09 (September 2009)

End of RCC: 09/10 (September 2010)

End of Project: 01/11 (January 2011)

Country: Argentina

River: Quinto

DMS Co-ordinates: unknown

DD Co-ordinates: unknown

Facings

Upstream

SlopeType
 Traditional concrete against precast concrete panels

Downstream

SlopeType
 Traditional concrete against precast concrete panels

Spillway

SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type