Sanliping

Download PDF data sheet
Sanliping completed
Sanliping completed

Particulars

Owner: Hubei Energy Group Co. Ltd.

Designer: unknown

Contractor: unknown

Statistics

Type: Thin Arch

Purpose(s): Flood Control / Hydropower

Reservoir capacity: 499 m3x106

Height: 133 metres

Length: 185 metres

Volume of RCC: unknown

Total volume: 400 m3x103

Construction Dates

Start of Project: /07 ( 2007)

Start of RCC: 05/08 (May 2008)

End of RCC: /11 ( 2011)

End of Project: /12 ( 2012)

Country: China

River: Nanhe

DMS Co-ordinates: unknown

DD Co-ordinates: unknown

Facings

Upstream

SlopeType
 Traditional concrete against formwork

Downstream

SlopeType
 Traditional concrete against formwork

Spillway

SlopeType
 Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type