Tamellast

Download PDF data sheet
Tamellast completed
Tamellast completed

Particulars

Owner: Direction des Aménagements Hydrauliques

Designer: CID

Contractor: SDIMEC

Statistics

Type: Gravity

Purpose(s): unknown

Reservoir capacity: 1 m3x106

Height: 19 metres

Length: unknown

Volume of RCC: 27 m3x103

Total volume: unknown

Construction Dates

Start of Project: /11 ( 2011)

Start of RCC: /12 ( 2012)

End of RCC: /13 ( 2013)

End of Project: /14 ( 2014)

Country: Morocco

River: unknown

DMS Co-ordinates: 30˚26'13.25"N, 9˚31'19.28"W

DD Co-ordinates: 30.437014, -9.522022

Facings

Upstream

SlopeType
VerticalTraditional concrete against precast concrete panels

Downstream

SlopeType
1.00Traditional concrete against formwork  [stepped face]

Spillway

SlopeType
1.00Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type