Yunlonghe Nº3

Download PDF data sheet
Yunlonghe Nº3 completed
Yunlonghe Nº3 completed

Particulars

Owner: Engshi Yuefeng Yunlong River Hydropower Development Co. Ltd.

Designer: Changjiang Investigation, Programming and Design Institute

Contractor: Gezhouba Constrution Group Corporation

Statistics

Type: Thin Arch

Purpose(s): Hydropower

Reservoir capacity: 44 m3x106

Height: 135 metres

Length: 119 metres

Volume of RCC: 182 m3x103

Total volume: 207 m3x103

Construction Dates

Start of Project: 03/06 (March 2006)

Start of RCC: 04/07 (April 2007)

End of RCC: 04/09 (April 2009)

End of Project: /09 ( 2009)

Country: China

River: Yunlong

DMS Co-ordinates: unknown

DD Co-ordinates: unknown

Facings

Upstream

SlopeType
curveRCC against formwork (GEVR/GE-RCC)

Downstream

SlopeType
curveRCC against formwork (GEVR/GE-RCC)

Spillway

SlopeType
 RCC against formwork (GEVR/GE-RCC)

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type