SEARCHING
... please wait

Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
R'milTunisiaMinistre de l’AgricultureIR’mil4408/9910/0005/0111/011826064160V(15)0.90(16)0.90(12)*3003001000(-) -
Moula
[H-F]
TunisiaMinistère de l’AgricultureWBou Terfess2602/03- /08- /1011/1181324422450V(3') (3')* (3')*3003001200(-) -
Sarrath
[H-F]
TunisiaMinistre de l’AgricultureIOued Sarrath21- /08- /12- /1411/1536820 3350.70 0.70 0.70      
Mellègue Amount
[H-F]
TunisiaMinistère de l’AgricultureIOued Mellègue195- /16- /17- /19- /2068430500 0.60 0.60 0.60   900(-) -

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Tunisia

Owner: Ministre de l’Agriculture

Type: Gravity

Purpose(s): Irrigation

River: R’mil

Reservoir capacity: 44 m3x106

Construction Dates

Start of Project: 08/99

Start of RCC: 08/99

End of RCC: 05/01

End of Project: 11/01

Specifications

Height: 18 metres

Length: 260 metres

Volume of RCC: 64 m3x103

Total volume: 160 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC supported by fill shoulders
Downstream
SlopeType
0.90Mechanically compacted unformed face of RCC
Spillway
SlopeType
0.90Reinforced conventional concrete cast after RCC placement  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
100
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
R'mil completed
R'mil completed

Full Dam Information

Details

Country: Tunisia

Owner: Ministère de l’Agriculture

Type: Hardfill

Purpose(s): Water Supply

River: Bou Terfess

Reservoir capacity: 26 m3x106

Construction Dates

Start of Project: 02/03

Start of RCC: 02/03

End of RCC: -/10

End of Project: 11/11

Specifications

Height: 81 metres

Length: 324 metres

Volume of RCC: 422 m3x103

Total volume: 450 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
 RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
 RCC against formwork (GEVR/GE-RCC)  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
120
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
Moula completed
Moula completed

Full Dam Information

Details

Country: Tunisia

Owner: Ministre de l’Agriculture

Type: Hardfill

Purpose(s): Irrigation

River: Oued Sarrath

Reservoir capacity: 21 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/14

End of Project: 11/15

Specifications

Height: 36 metres

Length: 820 metres

Volume of RCC: -

Total volume: 335 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.70 
Downstream
SlopeType
0.70 
Spillway
SlopeType
0.70 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Sarrath completed
Sarrath completed

Full Dam Information

Details

Country: Tunisia

Owner: Ministère de l’Agriculture

Type: Hardfill

Purpose(s): Irrigation

River: Oued Mellègue

Reservoir capacity: 195 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/19

End of Project: -/20

Specifications

Height: 68 metres

Length: 430 metres

Volume of RCC: 500 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
0.60 
Downstream
SlopeType
0.60 
Spillway
SlopeType
0.60 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
Photo coming soon

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates