SEARCHING
... please wait

Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
PleikrongVietnamEVN (Electrictie de Vietnam)HPo Ko104811/0502/0512/06- /0771495326450V(1)0.80(1)0.80(1)30030080210(N)
A VuongVietnamEVN (Electrictie de Vietnam)HVugia Thubon 34008/0301/0610/0711/0883240260350V(1)0.80(1)1.00(1)30030090150(N)
Dinh BinhVietnamMinistry of Agriculture and Rural Development (MARD)F H I WKon22605/0208/0512/0712/0855571183430V(11)0.75(3')ogee(12)30090070
126
175
141
(F)
Se San 4VietnamEVN (Electrictie de Vietnam)HPoko89312/0403/05- /08- /09748347531300V(1)0.80(1)0.80(1)30030080160(N)
Binh DienVietnamHHuu Trach424- /06- /07- /08- /0964 300            
Sông Côn 2VietnamH 30- /06- /07- /09- /1048              
Son LaVietnamEVN (Electrictie de Vietnam)F HSond Da (Black river)926004/0401/0808/1012/1213896226774800V(3')0.73(3')*separate 30030060160(F)
Ban VeVietnamEVN (Electrictie de Vietnam)HCa150008/0402/0710/1012/1113648015201750v
0.30
(3')0.85(3')*0.80(12)30030080120(N)
Dong Nai 3VietnamEVN (Electrictie de Vietnam)F HDong Nai169012/0405/0812/1010/1110859411381235V(1)0.75(1)*0.75(1)300300750(-) -
Dong Nai 4VietnamEVN (Electrictie de Vietnam)HDong Nai33712/0403/0906/11- /1212848113051370V(1)0.80(1)0.80(1)30030085115(N)
Dak Mi 4Vietnam(IDICO) Urban and Industrial Development Zone Investment CompanyHVu Gia31304/0701/0808/1104/1290472720800V(3')0.48
0.80
(3')*
(3')*
0.80(1)30030095125(N)
Song Tranh 2VietnamEVN (Electrictie de Vietnam)HSong Tranh73303/0504/0808/1112/129664010321315V(3')0.80(1)0.75(1)30030070110(N)
Dong Nai 2VietnamTrung Nam Power Jointstock CompanyHDong Nai28104/0912/1005/1203/13804297861025      30030080
90
120
110
(N)
Ban ChatVietnamEVN (Electrictie de Vietnam)HNam Mu213801/0608/0908/1212/1313042516002V(3')0.80(3')*separate 30030060160(F)
Nuoc TrongVietnamMARD (Ministry of Agriculture and Rural Development)H ITra Kluc290- /0807/0912/12- /1369454450600V(3')    300300125
80
218
230
(N)
Dak DrinhVietnamPetro VietnamHDak Drinh24901/0909/1112/1212/13100466788  (3') (3')* (12)30030080115(N)
Huong DienVietnamFPT CorporationHBo821- /10- /11- /12- /1383 260400        90100(N)
Song Bung 4VietnamEVN (Electrictie de Vietnam)HVu Gia511- /1006/1203/14- /141103458709540.40 0.80   30030080
60
120
140
(N) &
(F)
Dong Nai 5VietnamHDong Nai - /10- /12- /14- /1572              
Lai ChauVietnamEVN (Electrictie de Vietnam)HSong Da (Black River)121506/1003/1305/1507/1713162018842500V(3')0.75(3')*0.75(12)30030060160(F)
Trung SonVietnamEVN (Electrictie de Vietnam)F HMa34911/1204/1408/1602/17884987701140V
0.35
(3')
(3')*
0.65(3')*0.65(12)30030060
70
140
150
(N)

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Vietnam

Owner: EVN (Electrictie de Vietnam)

Type: Gravity

Purpose(s): Hydropower

River: Po Ko

Reservoir capacity: 1048 m3x106

Construction Dates

Start of Project: 11/05

Start of RCC: 11/05

End of RCC: 12/06

End of Project: -/07

Specifications

Height: 71 metres

Length: 495 metres

Volume of RCC: 326 m3x103

Total volume: 450 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
210Natural pozzolan (ASTM Class N)
  
Pleikrong completed
Pleikrong completed

Full Dam Information

Details

Country: Vietnam

Owner: EVN (Electrictie de Vietnam)

Type: Gravity

Purpose(s): Hydropower

River: Vugia Thubon

Reservoir capacity: 340 m3x106

Construction Dates

Start of Project: 08/03

Start of RCC: 08/03

End of RCC: 10/07

End of Project: 11/08

Specifications

Height: 83 metres

Length: 240 metres

Volume of RCC: 260 m3x103

Total volume: 350 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
1.00Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
150Natural pozzolan (ASTM Class N)
  
A Vuong under construction
A Vuong under construction

Full Dam Information

Details

Country: Vietnam

Owner: Ministry of Agriculture and Rural Development (MARD)

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Kon

Reservoir capacity: 226 m3x106

Construction Dates

Start of Project: 05/02

Start of RCC: 05/02

End of RCC: 12/07

End of Project: 12/08

Specifications

Height: 55 metres

Length: 571 metres

Volume of RCC: 183 m3x103

Total volume: 430 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalReinforced conventional concrete cast before RCC placement
Downstream
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
ogeeReinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300900

Cementitious material

Cement (kg/m3)
70
126
Pozzolan (kg/m3)Pozzolan Type
175Low-lime flyash (ASTM Class F)
141 
Dinh Binh completed
Dinh Binh completed

Full Dam Information

Details

Country: Vietnam

Owner: EVN (Electrictie de Vietnam)

Type: Gravity

Purpose(s): Hydropower

River: Poko

Reservoir capacity: 893 m3x106

Construction Dates

Start of Project: 12/04

Start of RCC: 12/04

End of RCC: -/08

End of Project: -/09

Specifications

Height: 74 metres

Length: 834 metres

Volume of RCC: 753 m3x103

Total volume: 1300 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
160Natural pozzolan (ASTM Class N)
  
Se San 4 completed
Se San 4 completed

Full Dam Information

Details

Country: Vietnam

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Huu Trach

Reservoir capacity: 424 m3x106

Construction Dates

Start of Project: -/06

Start of RCC: -/06

End of RCC: -/08

End of Project: -/09

Specifications

Height: 64 metres

Length: -

Volume of RCC: 300 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Binh Dien on Google Earth
Binh Dien on Google Earth

Full Dam Information

Details

Country: Vietnam

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: -

Reservoir capacity: 30 m3x106

Construction Dates

Start of Project: -/06

Start of RCC: -/06

End of RCC: -/09

End of Project: -/10

Specifications

Height: 48 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Vietnam

Owner: EVN (Electrictie de Vietnam)

Type: Gravity

Purpose(s): Flood Control / Hydropower

River: Sond Da (Black river)

Reservoir capacity: 9260 m3x106

Construction Dates

Start of Project: 04/04

Start of RCC: 04/04

End of RCC: 08/10

End of Project: 12/12

Specifications

Height: 138 metres

Length: 962 metres

Volume of RCC: 2677 m3x103

Total volume: 4800 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.73RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
separate 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
160Low-lime flyash (ASTM Class F)
  
Son La completed
Son La completed

Full Dam Information

Details

Country: Vietnam

Owner: EVN (Electrictie de Vietnam)

Type: Gravity

Purpose(s): Hydropower

River: Ca

Reservoir capacity: 1500 m3x106

Construction Dates

Start of Project: 08/04

Start of RCC: 08/04

End of RCC: 10/10

End of Project: 12/11

Specifications

Height: 136 metres

Length: 480 metres

Volume of RCC: 1520 m3x103

Total volume: 1750 m3x103

Construction Methods

Facings

Upstream
SlopeType
vRCC against formwork (GEVR/GE-RCC)
0.30 
Downstream
SlopeType
0.85RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
120Natural pozzolan (ASTM Class N)
  
Ban Ve under construction
Ban Ve under construction

Full Dam Information

Details

Country: Vietnam

Owner: EVN (Electrictie de Vietnam)

Type: Gravity

Purpose(s): Flood Control / Hydropower

River: Dong Nai

Reservoir capacity: 1690 m3x106

Construction Dates

Start of Project: 12/04

Start of RCC: 12/04

End of RCC: 12/10

End of Project: 10/11

Specifications

Height: 108 metres

Length: 594 metres

Volume of RCC: 1138 m3x103

Total volume: 1235 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.75Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
75
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
Dong Nai 3 completed
Dong Nai 3 completed

Full Dam Information

Details

Country: Vietnam

Owner: EVN (Electrictie de Vietnam)

Type: Gravity

Purpose(s): Hydropower

River: Dong Nai

Reservoir capacity: 337 m3x106

Construction Dates

Start of Project: 12/04

Start of RCC: 12/04

End of RCC: 06/11

End of Project: -/12

Specifications

Height: 128 metres

Length: 481 metres

Volume of RCC: 1305 m3x103

Total volume: 1370 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
85
Pozzolan (kg/m3)Pozzolan Type
115Natural pozzolan (ASTM Class N)
  
Dong Nai 4 completed
Dong Nai 4 completed

Full Dam Information

Details

Country: Vietnam

Owner: (IDICO) Urban and Industrial Development Zone Investment Company

Type: Gravity

Purpose(s): Hydropower

River: Vu Gia

Reservoir capacity: 313 m3x106

Construction Dates

Start of Project: 04/07

Start of RCC: 04/07

End of RCC: 08/11

End of Project: 04/12

Specifications

Height: 90 metres

Length: 472 metres

Volume of RCC: 720 m3x103

Total volume: 800 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.48RCC against formwork (GEVR/GE-RCC)  [stepped face]
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
95
Pozzolan (kg/m3)Pozzolan Type
125Natural pozzolan (ASTM Class N)
  
Dak Mi 4 completed
Dak Mi 4 completed

Full Dam Information

Details

Country: Vietnam

Owner: EVN (Electrictie de Vietnam)

Type: Gravity

Purpose(s): Hydropower

River: Song Tranh

Reservoir capacity: 733 m3x106

Construction Dates

Start of Project: 03/05

Start of RCC: 03/05

End of RCC: 08/11

End of Project: 12/12

Specifications

Height: 96 metres

Length: 640 metres

Volume of RCC: 1032 m3x103

Total volume: 1315 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
70
Pozzolan (kg/m3)Pozzolan Type
110Natural pozzolan (ASTM Class N)
  
Song Tranh 2 completed
Song Tranh 2 completed

Full Dam Information

Details

Country: Vietnam

Owner: Trung Nam Power Jointstock Company

Type: Gravity

Purpose(s): Hydropower

River: Dong Nai

Reservoir capacity: 281 m3x106

Construction Dates

Start of Project: 04/09

Start of RCC: 04/09

End of RCC: 05/12

End of Project: 03/13

Specifications

Height: 80 metres

Length: 429 metres

Volume of RCC: 786 m3x103

Total volume: 1025 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
80
90
Pozzolan (kg/m3)Pozzolan Type
120Natural pozzolan (ASTM Class N)
110 
Dong Nai 2 on Google Earth
Dong Nai 2 on Google Earth

Full Dam Information

Details

Country: Vietnam

Owner: EVN (Electrictie de Vietnam)

Type: Gravity

Purpose(s): Hydropower

River: Nam Mu

Reservoir capacity: 2138 m3x106

Construction Dates

Start of Project: 01/06

Start of RCC: 01/06

End of RCC: 08/12

End of Project: 12/13

Specifications

Height: 130 metres

Length: 425 metres

Volume of RCC: 1600 m3x103

Total volume: 2 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
separate 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
160Low-lime flyash (ASTM Class F)
  
Ban Chat completed
Ban Chat completed

Full Dam Information

Details

Country: Vietnam

Owner: MARD (Ministry of Agriculture and Rural Development)

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Tra Kluc

Reservoir capacity: 290 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: 12/12

End of Project: -/13

Specifications

Height: 69 metres

Length: 454 metres

Volume of RCC: 450 m3x103

Total volume: 600 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
125
80
Pozzolan (kg/m3)Pozzolan Type
218Natural pozzolan (ASTM Class N)
230 
Photo coming soon

Full Dam Information

Details

Country: Vietnam

Owner: Petro Vietnam

Type: Gravity

Purpose(s): Hydropower

River: Dak Drinh

Reservoir capacity: 249 m3x106

Construction Dates

Start of Project: 01/09

Start of RCC: 01/09

End of RCC: 12/12

End of Project: 12/13

Specifications

Height: 100 metres

Length: 466 metres

Volume of RCC: 788 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
 RCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
 RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
 Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
115Natural pozzolan (ASTM Class N)
  
Dak Drinh completed
Dak Drinh completed

Full Dam Information

Details

Country: Vietnam

Owner: FPT Corporation

Type: Gravity

Purpose(s): Hydropower

River: Bo

Reservoir capacity: 821 m3x106

Construction Dates

Start of Project: -/10

Start of RCC: -/10

End of RCC: -/12

End of Project: -/13

Specifications

Height: 83 metres

Length: -

Volume of RCC: 260 m3x103

Total volume: 400 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
100Natural pozzolan (ASTM Class N)
  
Huong Dien completed
Huong Dien completed

Full Dam Information

Details

Country: Vietnam

Owner: EVN (Electrictie de Vietnam)

Type: Gravity

Purpose(s): Hydropower

River: Vu Gia

Reservoir capacity: 511 m3x106

Construction Dates

Start of Project: -/10

Start of RCC: -/10

End of RCC: 03/14

End of Project: -/14

Specifications

Height: 110 metres

Length: 345 metres

Volume of RCC: 870 m3x103

Total volume: 954 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.40 
Downstream
SlopeType
0.80 
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
80
60
Pozzolan (kg/m3)Pozzolan Type
120Natural pozzolan (ASTM Class N)  &
140Low-lime flyash (ASTM Class F)
Song Bung 4 completed
Song Bung 4 completed

Full Dam Information

Details

Country: Vietnam

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Dong Nai

Reservoir capacity: -

Construction Dates

Start of Project: -/10

Start of RCC: -/10

End of RCC: -/14

End of Project: -/15

Specifications

Height: 72 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Dong Nai 5 on Google Earth
Dong Nai 5 on Google Earth

Full Dam Information

Details

Country: Vietnam

Owner: EVN (Electrictie de Vietnam)

Type: Gravity

Purpose(s): Hydropower

River: Song Da (Black River)

Reservoir capacity: 1215 m3x106

Construction Dates

Start of Project: 06/10

Start of RCC: 06/10

End of RCC: 05/15

End of Project: 07/17

Specifications

Height: 131 metres

Length: 620 metres

Volume of RCC: 1884 m3x103

Total volume: 2500 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.75Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
160Low-lime flyash (ASTM Class F)
  
Lai Chau completed
Lai Chau completed

Full Dam Information

Details

Country: Vietnam

Owner: EVN (Electrictie de Vietnam)

Type: Gravity

Purpose(s): Flood Control / Hydropower

River: Ma

Reservoir capacity: 349 m3x106

Construction Dates

Start of Project: 11/12

Start of RCC: 11/12

End of RCC: 08/16

End of Project: 02/17

Specifications

Height: 88 metres

Length: 498 metres

Volume of RCC: 770 m3x103

Total volume: 1140 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
0.35RCC against formwork (GEVR/GE-RCC)  [stepped face]
Downstream
SlopeType
0.65RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.65Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
60
70
Pozzolan (kg/m3)Pozzolan Type
140Natural pozzolan (ASTM Class N)
150 
Trung Son under construction
Trung Son under construction

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates