NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Al WehdahJordan/SyriaJordan Valley Authority, Ministry of Water and IrrigationWYarmouk11006/0302/0507/0612/0710348514261478V
0.60
(3')0.80(3')*0.80 30030070
60
60
60
(F)
WuyiChinaDina99- /05- /07- /10- /12103              
KöprüTurkeyEnerjisa En. Ut. A.S.HGöksu4707/0912/1004/12- /121034138801050V
0.60
(1)0.80(1)0.80(12)3003008545(F)
San Vicente Dam RaiseUSASan Diego County Water Authority and City of San DiegoWSan Diego29906/0908/1109/1209/14103474459465V(4')0.78(3')*0.78(3')*30030086127(F)
Upper Paung LaungMyanmarDepartment of Hydroelectric Power - Ministry of Electric PowerHPaung Laung130001/0601/1112/13- /141035309361100V(3')0.80(3')*0.80(12)30030090140(N)
WacunChinaYujiang536- /08- /10- /13- /15103              
GokayamaJapanFukuoka PrefectureF N WNaka4006/1206/1407/1503/18103556634935V
1.00
(1)
(1)
0.76(1)0.76(1)250100010426(F)
EncisoSpainConfederación Hidrográfica del Ebro, Ministerio de Agricultura Alimentación y Medio AmbienteI WCidacos47- /0808/1407/1709/18103376694743V(1)0.80(1)*0.80(1)*30030060140(F)
Asagi (Lower) KaleköyTurkeyKalehan Energy Üretim ve Ticaret A.S.HMurat43203/13- /15- /1704/18103346119213420.25(7)0.80(1)  3003001300(M)

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Jordan/Syria

Owner: Jordan Valley Authority, Ministry of Water and Irrigation

Type: Gravity

Purpose(s): Water Supply

River: Yarmouk

Reservoir capacity: 110 m3x106

Construction Dates

Start of Project: 06/03

Start of RCC: 06/03

End of RCC: 07/06

End of Project: 12/07

Specifications

Height: 103 metres

Length: 485 metres

Volume of RCC: 1426 m3x103

Total volume: 1478 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
0.60 
Downstream
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.80 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
70
60
Pozzolan (kg/m3)Pozzolan Type
60Low-lime flyash (ASTM Class F)
60 
Al Wehdah under construction
Al Wehdah under construction

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): unknown

River: Dina

Reservoir capacity: 99 m3x106

Construction Dates

Start of Project: -/05

Start of RCC: -/05

End of RCC: -/10

End of Project: -/12

Specifications

Height: 103 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Wuyi completed
Wuyi completed

Full Dam Information

Details

Country: Turkey

Owner: Enerjisa En. Ut. A.S.

Type: Gravity

Purpose(s): Hydropower

River: Göksu

Reservoir capacity: 47 m3x106

Construction Dates

Start of Project: 07/09

Start of RCC: 07/09

End of RCC: 04/12

End of Project: -/12

Specifications

Height: 103 metres

Length: 413 metres

Volume of RCC: 880 m3x103

Total volume: 1050 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.60 
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
85
Pozzolan (kg/m3)Pozzolan Type
45Low-lime flyash (ASTM Class F)
  
Köprü completed
Köprü completed

Full Dam Information

Details

Country: USA

Owner: San Diego County Water Authority and City of San Diego

Type: Gravity

Purpose(s): Water Supply

River: San Diego

Reservoir capacity: 299 m3x106

Construction Dates

Start of Project: 06/09

Start of RCC: 06/09

End of RCC: 09/12

End of Project: 09/14

Specifications

Height: 103 metres

Length: 474 metres

Volume of RCC: 459 m3x103

Total volume: 465 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork with external geomembrane (GEVR/GE-RCC)
Downstream
SlopeType
0.78RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.78RCC against formwork (GEVR/GE-RCC)  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
86
Pozzolan (kg/m3)Pozzolan Type
127Low-lime flyash (ASTM Class F)
  
San Vicente Dam Raise completed
San Vicente Dam Raise completed

Full Dam Information

Details

Country: Myanmar

Owner: Department of Hydroelectric Power - Ministry of Electric Power

Type: Gravity

Purpose(s): Hydropower

River: Paung Laung

Reservoir capacity: 1300 m3x106

Construction Dates

Start of Project: 01/06

Start of RCC: 01/06

End of RCC: 12/13

End of Project: -/14

Specifications

Height: 103 metres

Length: 530 metres

Volume of RCC: 936 m3x103

Total volume: 1100 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
140Natural pozzolan (ASTM Class N)
  
Upper Paung Laung completed
Upper Paung Laung completed

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): unknown

River: Yujiang

Reservoir capacity: 536 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/13

End of Project: -/15

Specifications

Height: 103 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Wacun completed
Wacun completed

Full Dam Information

Details

Country: Japan

Owner: Fukuoka Prefecture

Type: Gravity

Purpose(s): Flood Control / Navigation / Water Supply

River: Naka

Reservoir capacity: 40 m3x106

Construction Dates

Start of Project: 06/12

Start of RCC: 06/12

End of RCC: 07/15

End of Project: 03/18

Specifications

Height: 103 metres

Length: 556 metres

Volume of RCC: 634 m3x103

Total volume: 935 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
1.00Traditional concrete against formwork
Downstream
SlopeType
0.76Traditional concrete against formwork
Spillway
SlopeType
0.76Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
2501000

Cementitious material

Cement (kg/m3)
104
Pozzolan (kg/m3)Pozzolan Type
26Low-lime flyash (ASTM Class F)
  
Gokayama completed
Gokayama completed

Full Dam Information

Details

Country: Spain

Owner: Confederación Hidrográfica del Ebro, Ministerio de Agricultura Alimentación y Medio Ambiente

Type: Gravity

Purpose(s): Irrigation / Water Supply

River: Cidacos

Reservoir capacity: 47 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: 07/17

End of Project: 09/18

Specifications

Height: 103 metres

Length: 376 metres

Volume of RCC: 694 m3x103

Total volume: 743 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
140Low-lime flyash (ASTM Class F)
  
Enciso completed
Enciso completed

Full Dam Information

Details

Country: Turkey

Owner: Kalehan Energy Üretim ve Ticaret A.S.

Type: Gravity

Purpose(s): Hydropower

River: Murat

Reservoir capacity: 432 m3x106

Construction Dates

Start of Project: 03/13

Start of RCC: 03/13

End of RCC: -/17

End of Project: 04/18

Specifications

Height: 103 metres

Length: 346 metres

Volume of RCC: 1192 m3x103

Total volume: 1342 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.25RCC against precast concrete panels
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
130
Pozzolan (kg/m3)Pozzolan Type
0Milled sand
  
Photo coming soon

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates