SEARCHING
... please wait

Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Shapai
[A]
ChinaSichuan Minjiang Hydropower Co. Ltd.HCaopohe1806/9703/0005/0204/03130250380383V
0.10
(3')0.21(3)crest
0.21
(1)300300108
89
72
89
(F)
BaiseChinaGuangxi-Youjiang Hydraulic Development Co.Ltd.F H I N WYoujiang566012/0112/0204/0607/0613072019952672V(9)0.80(1)0.80(1)300300080
50
132
110
(F)
HongkouChinaFujian Hongkou Hydropower Co. Ltd.H WHuotong450- /05- /06- /07- /08130341681745           
Ban ChatVietnamEVN (Electrictie de Vietnam)HNam Mu213801/0608/0908/1212/1313042516002V(3')0.80(3')*separate 30030060160(F)

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: China

Owner: Sichuan Minjiang Hydropower Co. Ltd.

Type: Thin Arch

Purpose(s): Hydropower

River: Caopohe

Reservoir capacity: 18 m3x106

Construction Dates

Start of Project: 06/97

Start of RCC: 06/97

End of RCC: 05/02

End of Project: 04/03

Specifications

Height: 130 metres

Length: 250 metres

Volume of RCC: 380 m3x103

Total volume: 383 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
0.10 
Downstream
SlopeType
0.21RCC against formwork
Spillway
SlopeType
crestTraditional concrete against formwork
0.21 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
108
89
Pozzolan (kg/m3)Pozzolan Type
72Low-lime flyash (ASTM Class F)
89 
Shapai completed
Shapai completed

Full Dam Information

Details

Country: China

Owner: Guangxi-Youjiang Hydraulic Development Co.Ltd.

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Navigation / Water Supply

River: Youjiang

Reservoir capacity: 5660 m3x106

Construction Dates

Start of Project: 12/01

Start of RCC: 12/01

End of RCC: 04/06

End of Project: 07/06

Specifications

Height: 130 metres

Length: 720 metres

Volume of RCC: 1995 m3x103

Total volume: 2672 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against precast concrete panels with hot poured membrane
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
80
50
Pozzolan (kg/m3)Pozzolan Type
132Low-lime flyash (ASTM Class F)
110 
Baise completed
Baise completed

Full Dam Information

Details

Country: China

Owner: Fujian Hongkou Hydropower Co. Ltd.

Type: Gravity

Purpose(s): Hydropower / Water Supply

River: Huotong

Reservoir capacity: 450 m3x106

Construction Dates

Start of Project: -/05

Start of RCC: -/05

End of RCC: -/07

End of Project: -/08

Specifications

Height: 130 metres

Length: 341 metres

Volume of RCC: 681 m3x103

Total volume: 745 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Hongkou completed
Hongkou completed

Full Dam Information

Details

Country: Vietnam

Owner: EVN (Electrictie de Vietnam)

Type: Gravity

Purpose(s): Hydropower

River: Nam Mu

Reservoir capacity: 2138 m3x106

Construction Dates

Start of Project: 01/06

Start of RCC: 01/06

End of RCC: 08/12

End of Project: 12/13

Specifications

Height: 130 metres

Length: 425 metres

Volume of RCC: 1600 m3x103

Total volume: 2 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
separate 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
160Low-lime flyash (ASTM Class F)
  
Ban Chat completed
Ban Chat completed

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates