Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
El ZapotilloMexicoCNA (Comisión Nacional del Agua)WVerde910- /0911/11- /16- /1713227111001200V(3')0.83(3)*0.83(3)*30030060 to  8050 to  70(S)
LaúcaAngolaMinistry of Energy and Water/GAMEKHKwanza548207/1209/1403/1706/18132107526462766V
0.10
(1)0.85(1)0.85(12)300300900(-) -

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Mexico

Owner: CNA (Comisión Nacional del Agua)

Type: Gravity

Purpose(s): Water Supply

River: Verde

Reservoir capacity: 910 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/16

End of Project: -/17

Specifications

Height: 132 metres

Length: 271 metres

Volume of RCC: 1100 m3x103

Total volume: 1200 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.83RCC against formwork  [stepped face]
Spillway
SlopeType
0.83RCC against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
60  to
Pozzolan (kg/m3)Pozzolan Type
50  toGround-granulated blast-furnace slag
  
El Zapotillo under construction
El Zapotillo under construction

Full Dam Information

Details

Country: Angola

Owner: Ministry of Energy and Water/GAMEK

Type: Gravity

Purpose(s): Hydropower

River: Kwanza

Reservoir capacity: 5482 m3x106

Construction Dates

Start of Project: 07/12

Start of RCC: 07/12

End of RCC: 03/17

End of Project: 06/18

Specifications

Height: 132 metres

Length: 1075 metres

Volume of RCC: 2646 m3x103

Total volume: 2766 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.10 
Downstream
SlopeType
0.85Traditional concrete against formwork
Spillway
SlopeType
0.85Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
Laúca under construction
Laúca under construction

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates