Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
SpitskopSouth AfricaDepartment of Water & SanitationIHarts6105/8809/8806/8911/89151001736V(1)
(15)
0.70(15)0.70(1)*2502509192(F)
Amatisteros IIISpainJunta de AndaluciaFBelén1- /9109/9112/91- /92157545V(3)0.75(3)*0.75(3)30030073109(F)
Grand Falls spillwayCanadaAbitibi-Price Inc.HExploits 08/9609/9609/9612/9615180711V(1)0.67(1)*0.67(1)*20020013075(F)
Nam Leuk spillwayLaosEDL Generation Public Co. LtdHNam Leuk185- /98- /98- /99- /001560             
Itiquira IBrazilItiquira Energética SAHItiquira - /00- /01- /02- /0315 22            
Ghatghar PPS - Upper damIndiaGoMWRD (Government of Maharashtra Water Resources Department)HPravara612/0105/0301/0406/04155033540V(3')0.78(3')*0.78(3')*30030088132(F)
Pedra do GarrafãoBrazilHItabapoana - /07- /07- /0805/0915110             
IbiramaBrazilIbirama Energética SAH 1- /09- /09- /10- /1015145             
Ninho da ÁguiaBrazilCPFL RenovaveisHSanto Antônio1- /09- /09- /10- /101594 14V 0.75 0.75      
Ahl LafouimMoroccoDirection des Aménagements HydrauliquesWAhl Lafouim3- /09- /10- /11- /12159520240.20(5)0.80(1)*0.80(1)*     
RetiroBrazilCTG BrasilHSapucai18- /10- /11- /1207/1315482             
Sharab GarodIranKohgiloye-Boyerahmad Water AuthorityISharab Garod1- /12- /14- /20- /221575 12           

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: South Africa

Owner: Department of Water & Sanitation

Type: Gravity

Purpose(s): Irrigation

River: Harts

Reservoir capacity: 61 m3x106

Construction Dates

Start of Project: 05/88

Start of RCC: 05/88

End of RCC: 06/89

End of Project: 11/89

Specifications

Height: 15 metres

Length: 100 metres

Volume of RCC: 17 m3x103

Total volume: 36 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
 RCC supported by fill shoulders
Downstream
SlopeType
0.70RCC supported by fill shoulders
Spillway
SlopeType
0.70Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
250250

Cementitious material

Cement (kg/m3)
91
Pozzolan (kg/m3)Pozzolan Type
92Low-lime flyash (ASTM Class F)
  
Spitskop completed
Spitskop completed

Full Dam Information

Details

Country: Spain

Owner: Junta de Andalucia

Type: Gravity

Purpose(s): Flood Control

River: Belén

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/91

Start of RCC: -/91

End of RCC: 12/91

End of Project: -/92

Specifications

Height: 15 metres

Length: 75 metres

Volume of RCC: 4 m3x103

Total volume: 5 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork
Downstream
SlopeType
0.75RCC against formwork  [stepped face]
Spillway
SlopeType
0.75RCC against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
73
Pozzolan (kg/m3)Pozzolan Type
109Low-lime flyash (ASTM Class F)
  
Amatisteros III completed
Amatisteros III completed

Full Dam Information

Details

Country: Canada

Owner: Abitibi-Price Inc.

Type: Gravity

Purpose(s): Hydropower

River: Exploits

Reservoir capacity: -

Construction Dates

Start of Project: 08/96

Start of RCC: 08/96

End of RCC: 09/96

End of Project: 12/96

Specifications

Height: 15 metres

Length: 180 metres

Volume of RCC: 7 m3x103

Total volume: 11 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.67Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.67Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
200200

Cementitious material

Cement (kg/m3)
130
Pozzolan (kg/m3)Pozzolan Type
75Low-lime flyash (ASTM Class F)
  
Grand Falls spillway completed
Grand Falls spillway completed

Full Dam Information

Details

Country: Laos

Owner: EDL Generation Public Co. Ltd

Type: Gravity

Purpose(s): Hydropower

River: Nam Leuk

Reservoir capacity: 185 m3x106

Construction Dates

Start of Project: -/98

Start of RCC: -/98

End of RCC: -/99

End of Project: -/00

Specifications

Height: 15 metres

Length: 60 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Brazil

Owner: Itiquira Energética SA

Type: Gravity

Purpose(s): Hydropower

River: Itiquira

Reservoir capacity: -

Construction Dates

Start of Project: -/00

Start of RCC: -/00

End of RCC: -/02

End of Project: -/03

Specifications

Height: 15 metres

Length: -

Volume of RCC: 22 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Itiquira I on Google Earth
Itiquira I on Google Earth

Full Dam Information

Details

Country: India

Owner: GoMWRD (Government of Maharashtra Water Resources Department)

Type: Gravity

Purpose(s): Hydropower

River: Pravara

Reservoir capacity: 6 m3x106

Construction Dates

Start of Project: 12/01

Start of RCC: 12/01

End of RCC: 01/04

End of Project: 06/04

Specifications

Height: 15 metres

Length: 503 metres

Volume of RCC: 35 m3x103

Total volume: 40 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.78RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.78RCC against formwork (GEVR/GE-RCC)  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
88
Pozzolan (kg/m3)Pozzolan Type
132Low-lime flyash (ASTM Class F)
  
Ghatghar PPS - Upper dam completed
Ghatghar PPS - Upper dam completed

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Itabapoana

Reservoir capacity: -

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/08

End of Project: 05/09

Specifications

Height: 15 metres

Length: 110 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Pedra do Garrafão completed
Pedra do Garrafão completed

Full Dam Information

Details

Country: Brazil

Owner: Ibirama Energética SA

Type: Gravity

Purpose(s): Hydropower

River: -

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/10

End of Project: -/10

Specifications

Height: 15 metres

Length: 145 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Brazil

Owner: CPFL Renovaveis

Type: Gravity

Purpose(s): Hydropower

River: Santo Antônio

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/10

End of Project: -/10

Specifications

Height: 15 metres

Length: 94 metres

Volume of RCC: -

Total volume: 14 m3x103

Construction Methods

Facings

Upstream
SlopeType
Vertical 
Downstream
SlopeType
0.75 
Spillway
SlopeType
0.75 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Ninho da Águia completed
Ninho da Águia completed

Full Dam Information

Details

Country: Morocco

Owner: Direction des Aménagements Hydrauliques

Type: Gravity

Purpose(s): Water Supply

River: Ahl Lafouim

Reservoir capacity: 3 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/11

End of Project: -/12

Specifications

Height: 15 metres

Length: 95 metres

Volume of RCC: 20 m3x103

Total volume: 24 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.20Traditional concrete against precast concrete panels
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Brazil

Owner: CTG Brasil

Type: Gravity

Purpose(s): Hydropower

River: Sapucai

Reservoir capacity: 18 m3x106

Construction Dates

Start of Project: -/10

Start of RCC: -/10

End of RCC: -/12

End of Project: 07/13

Specifications

Height: 15 metres

Length: 482 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Retiro completed
Retiro completed

Full Dam Information

Details

Country: Iran

Owner: Kohgiloye-Boyerahmad Water Authority

Type: Gravity

Purpose(s): Irrigation

River: Sharab Garod

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/12

Start of RCC: -/12

End of RCC: -/20

End of Project: -/22

Specifications

Height: 15 metres

Length: 75 metres

Volume of RCC: -

Total volume: 12 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Sharab Garod on Google Earth
Sharab Garod on Google Earth

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates