Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
SpitskopSouth AfricaDepartment of Water & SanitationIHarts6105/8809/8806/8911/89151001736V(1)
(15)
0.70(15)0.70(1)*2502509192(F)
Grand Falls spillwayCanadaAbitibi-Price Inc.HExploits 08/9609/9609/9612/9615180711V(1)0.67(1)*0.67(1)*20020013075(F)
Ghatghar (Upper dam)IndiaGoMWRD (Government of Maharashtra Water Resources Department)HPravara612/0105/0301/0406/04155033540V(3')0.78(3')*0.78(3')*30030088132(F)
Barra dos CoqueirosBrazilGerdauH WClaro 08/07- /08- /0907/1015              
Ahl LafouimMoroccoW 3- /09- /10- /11- /1215 20240.20(5)0.80(1)*0.80(1)*     
LaananatMoroccoW 1- /09- /10- /11- /1215 18200.20(5)0.80(1)*0.80(1)*     
Sharab GarodIranKohgiloye-Boyerahmad Water CompanyISharab Garod1- /12- /14- /15- /161575 12           

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: South Africa

Owner: Department of Water & Sanitation

Type: Gravity

Purpose(s): Irrigation

River: Harts

Reservoir capacity: 61 m3x106

Construction Dates

Start of Project: 05/88

Start of RCC: 05/88

End of RCC: 06/89

End of Project: 11/89

Specifications

Height: 15 metres

Length: 100 metres

Volume of RCC: 17 m3x103

Total volume: 36 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
 RCC supported by fill shoulders
Downstream
SlopeType
0.70RCC supported by fill shoulders
Spillway
SlopeType
0.70Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
250250

Cementitious material

Cement (kg/m3)
91
Pozzolan (kg/m3)Pozzolan Type
92Low-lime flyash (ASTM Class F)
  
Spitskop completed
Spitskop completed

Full Dam Information

Details

Country: Canada

Owner: Abitibi-Price Inc.

Type: Gravity

Purpose(s): Hydropower

River: Exploits

Reservoir capacity: -

Construction Dates

Start of Project: 08/96

Start of RCC: 08/96

End of RCC: 09/96

End of Project: 12/96

Specifications

Height: 15 metres

Length: 180 metres

Volume of RCC: 7 m3x103

Total volume: 11 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.67Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.67Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
200200

Cementitious material

Cement (kg/m3)
130
Pozzolan (kg/m3)Pozzolan Type
75Low-lime flyash (ASTM Class F)
  
Grand Falls spillway completed
Grand Falls spillway completed

Full Dam Information

Details

Country: India

Owner: GoMWRD (Government of Maharashtra Water Resources Department)

Type: Gravity

Purpose(s): Hydropower

River: Pravara

Reservoir capacity: 6 m3x106

Construction Dates

Start of Project: 12/01

Start of RCC: 12/01

End of RCC: 01/04

End of Project: 06/04

Specifications

Height: 15 metres

Length: 503 metres

Volume of RCC: 35 m3x103

Total volume: 40 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.78RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.78RCC against formwork (GEVR/GE-RCC)  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
88
Pozzolan (kg/m3)Pozzolan Type
132Low-lime flyash (ASTM Class F)
  
Ghatghar (Upper dam) completed
Ghatghar (Upper dam) completed

Full Dam Information

Details

Country: Brazil

Owner: Gerdau

Type: Gravity

Purpose(s): Hydropower / Water Supply

River: Claro

Reservoir capacity: -

Construction Dates

Start of Project: 08/07

Start of RCC: 08/07

End of RCC: -/09

End of Project: 07/10

Specifications

Height: 15 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Barra dos Coqueiros on Google Earth
Barra dos Coqueiros on Google Earth

Full Dam Information

Details

Country: Morocco

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: -

Reservoir capacity: 3 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/11

End of Project: -/12

Specifications

Height: 15 metres

Length: -

Volume of RCC: 20 m3x103

Total volume: 24 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.20Traditional concrete against precast concrete panels
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Morocco

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: -

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/11

End of Project: -/12

Specifications

Height: 15 metres

Length: -

Volume of RCC: 18 m3x103

Total volume: 20 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.20Traditional concrete against precast concrete panels
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Iran

Owner: Kohgiloye-Boyerahmad Water Company

Type: Gravity

Purpose(s): Irrigation

River: Sharab Garod

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/12

Start of RCC: -/12

End of RCC: -/15

End of Project: -/16

Specifications

Height: 15 metres

Length: 75 metres

Volume of RCC: -

Total volume: 12 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Sharab Garod on Google Earth
Sharab Garod on Google Earth

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates