Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Hudson River Nº11USABanks CountyWMountain Creek 11/9204/9308/93- /93211682628V(6)0.80(1)*0.80(1)*30030011984(F)
New Peterson LakeUSACity of GreeleyWTributary of Cache La Poudre305/9509/9511/9512/95217078V(1)0.80(1)*0.80(1)*30030014548(F)
Juba IBrazilItamarati Norte S.A. (part of Brennand Energia)HJuba - /93- /94- /95- /962123896113        6015(N)
Juba IIBrazilItamarati Norte S.A. (part of Brennand Energia)HJuba - /93- /94- /95- /9621238105113        6015(N)
El EsparragalSpainConfederación Hidrográfica del GuadalquivirEViar5- /0205/0308/0303/042138362890.30(3')*0.90(3')*0.90(3')*30030068157(F)
São BernardoBrazilCJ Energética S/AHBernardo José2- /03- /04- /05- /0621120             
FazendaBrazilENEL Green Power Fazenda S.A.Hdos Apiacás2- /12- /14- /1509/1621503             
Jubinha IBrazilItamarati Norte S.A.HJubinha480- /15- /15- /15- /15211540             
Ambarau
[H-F]
DR CongoRandGoldHKibali611/1405/15- /16- /172125533400.75(4')*0.75(1)*0.75(1)3003001000(-)
ColoniaBrazilCERB (Companhia de Engenharia Ambienytal e Recursos Hídricos da Bahia)WColonia6209/15- /17- /1809/18211953034           
Bela VistaBrazilBela Vista Geracao de Energia S.A.HChapim7- /00- /00- /00- /0021393             

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: USA

Owner: Banks County

Type: Gravity

Purpose(s): Water Supply

River: Mountain Creek

Reservoir capacity: -

Construction Dates

Start of Project: 11/92

Start of RCC: 11/92

End of RCC: 08/93

End of Project: -/93

Specifications

Height: 21 metres

Length: 168 metres

Volume of RCC: 26 m3x103

Total volume: 28 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against precast concrete panels with geomembrane
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
119
Pozzolan (kg/m3)Pozzolan Type
84Low-lime flyash (ASTM Class F)
  
Hudson River Nº11 completed
Hudson River Nº11 completed

Full Dam Information

Details

Country: USA

Owner: City of Greeley

Type: Gravity

Purpose(s): Water Supply

River: Tributary of Cache La Poudre

Reservoir capacity: 3 m3x106

Construction Dates

Start of Project: 05/95

Start of RCC: 05/95

End of RCC: 11/95

End of Project: 12/95

Specifications

Height: 21 metres

Length: 70 metres

Volume of RCC: 7 m3x103

Total volume: 8 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
145
Pozzolan (kg/m3)Pozzolan Type
48Low-lime flyash (ASTM Class F)
  
New Peterson Lake completed
New Peterson Lake completed

Full Dam Information

Details

Country: Brazil

Owner: Itamarati Norte S.A. (part of Brennand Energia)

Type: Gravity

Purpose(s): Hydropower

River: Juba

Reservoir capacity: -

Construction Dates

Start of Project: -/93

Start of RCC: -/93

End of RCC: -/95

End of Project: -/96

Specifications

Height: 21 metres

Length: 238 metres

Volume of RCC: 96 m3x103

Total volume: 113 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
15Natural pozzolan (ASTM Class N)
  
Photo coming soon

Full Dam Information

Details

Country: Brazil

Owner: Itamarati Norte S.A. (part of Brennand Energia)

Type: Gravity

Purpose(s): Hydropower

River: Juba

Reservoir capacity: -

Construction Dates

Start of Project: -/93

Start of RCC: -/93

End of RCC: -/95

End of Project: -/96

Specifications

Height: 21 metres

Length: 238 metres

Volume of RCC: 105 m3x103

Total volume: 113 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
15Natural pozzolan (ASTM Class N)
  
Photo coming soon

Full Dam Information

Details

Country: Spain

Owner: Confederación Hidrográfica del Guadalquivir

Type: Gravity

Purpose(s): Environmental

River: Viar

Reservoir capacity: 5 m3x106

Construction Dates

Start of Project: -/02

Start of RCC: -/02

End of RCC: 08/03

End of Project: 03/04

Specifications

Height: 21 metres

Length: 383 metres

Volume of RCC: 62 m3x103

Total volume: 89 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.30RCC against formwork (GEVR/GE-RCC)  [stepped face]
Downstream
SlopeType
0.90RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.90RCC against formwork (GEVR/GE-RCC)  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
68
Pozzolan (kg/m3)Pozzolan Type
157Low-lime flyash (ASTM Class F)
  
El Esparragal completed
El Esparragal completed

Full Dam Information

Details

Country: Brazil

Owner: CJ Energética S/A

Type: Gravity

Purpose(s): Hydropower

River: Bernardo José

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: -/03

Start of RCC: -/03

End of RCC: -/05

End of Project: -/06

Specifications

Height: 21 metres

Length: 120 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
São Bernardo completed
São Bernardo completed

Full Dam Information

Details

Country: Brazil

Owner: ENEL Green Power Fazenda S.A.

Type: Gravity

Purpose(s): Hydropower

River: dos Apiacás

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: -/12

Start of RCC: -/12

End of RCC: -/15

End of Project: 09/16

Specifications

Height: 21 metres

Length: 503 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Fazenda completed
Fazenda completed

Full Dam Information

Details

Country: Brazil

Owner: Itamarati Norte S.A.

Type: Gravity

Purpose(s): Hydropower

River: Jubinha

Reservoir capacity: 480 m3x106

Construction Dates

Start of Project: -/15

Start of RCC: -/15

End of RCC: -/15

End of Project: -/15

Specifications

Height: 21 metres

Length: 1540 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: DR Congo

Owner: RandGold

Type: Hardfill

Purpose(s): Hydropower

River: Kibali

Reservoir capacity: 6 m3x106

Construction Dates

Start of Project: 11/14

Start of RCC: 11/14

End of RCC: -/16

End of Project: -/17

Specifications

Height: 21 metres

Length: 255 metres

Volume of RCC: 33 m3x103

Total volume: 40 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.75RCC against formwork with external geomembrane (GEVR/GE-RCC)  [stepped face]
Downstream
SlopeType
0.75Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
100
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
  
Photo coming soon

Full Dam Information

Details

Country: Brazil

Owner: CERB (Companhia de Engenharia Ambienytal e Recursos Hídricos da Bahia)

Type: Gravity

Purpose(s): Water Supply

River: Colonia

Reservoir capacity: 62 m3x106

Construction Dates

Start of Project: 09/15

Start of RCC: 09/15

End of RCC: -/18

End of Project: 09/18

Specifications

Height: 21 metres

Length: 195 metres

Volume of RCC: 30 m3x103

Total volume: 34 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Brazil

Owner: Bela Vista Geracao de Energia S.A.

Type: Gravity

Purpose(s): Hydropower

River: Chapim

Reservoir capacity: 7 m3x106

Construction Dates

Start of Project: -/00

Start of RCC: -/00

End of RCC: -/00

End of Project: -/00

Specifications

Height: 21 metres

Length: 393 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Bela Vista completed
Bela Vista completed

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates