NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Longmentan Nº1ChinaDehua County, Fujian ProvinceH I WChanxi5312/8512/8708/8909/89581507193V
0.30
(12)
(12)
0.75(10)0.75(13)30030072
54
82
86
(F)
UrdalurSpainConfederación Hidrográfica del EbroWAlzania503/9008/9107/9210/9258396150240V(1)0.75(3)*0.75(3)*30030072108(F)
ArriaránSpainDiputacion Foral de GipuzkoaWArriarán310/9104/9209/9202/94582061101130.05(3)0.70(3)*0.70(3)*30030085135(F)
BoqueronSpainConfederación Hidrográfica del SeguraFRambla del Boqueron1310/9402/9608/9612/97582901371450.05(3')0.73(3')0.73(3')*30030055130(F)
Santa Cruz do ApodiBrazilSecretaria Estadual do Meio Ambiente e Recursos Hídricos do RNF I R WApodi600- /98- /99- /00- /0158166010231120      300300800(-) -
XiaotianlongChinaWTuochang1- /07- /09- /10- /1158168             
XunyangChinaHanjiang - /08- /10- /12- /1458              

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: China

Owner: Dehua County, Fujian Province

Type: Gravity

Purpose(s): Hydropower / Irrigation / Water Supply

River: Chanxi

Reservoir capacity: 53 m3x106

Construction Dates

Start of Project: 12/85

Start of RCC: 12/85

End of RCC: 08/89

End of Project: 09/89

Specifications

Height: 58 metres

Length: 150 metres

Volume of RCC: 71 m3x103

Total volume: 93 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalReinforced conventional concrete cast after RCC placement
0.30Reinforced conventional concrete cast after RCC placement
Downstream
SlopeType
0.75RCC against precast concrete blocks
Spillway
SlopeType
0.75Reinforced concrete cast against precast units or slip-formed facing elements

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
72
54
Pozzolan (kg/m3)Pozzolan Type
82Low-lime flyash (ASTM Class F)
86 
Longmentan Nº1 completed
Longmentan Nº1 completed

Full Dam Information

Details

Country: Spain

Owner: Confederación Hidrográfica del Ebro

Type: Gravity

Purpose(s): Water Supply

River: Alzania

Reservoir capacity: 5 m3x106

Construction Dates

Start of Project: 03/90

Start of RCC: 03/90

End of RCC: 07/92

End of Project: 10/92

Specifications

Height: 58 metres

Length: 396 metres

Volume of RCC: 150 m3x103

Total volume: 240 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.75RCC against formwork  [stepped face]
Spillway
SlopeType
0.75RCC against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
72
Pozzolan (kg/m3)Pozzolan Type
108Low-lime flyash (ASTM Class F)
  
Urdalur completed
Urdalur completed

Full Dam Information

Details

Country: Spain

Owner: Diputacion Foral de Gipuzkoa

Type: Gravity

Purpose(s): Water Supply

River: Arriarán

Reservoir capacity: 3 m3x106

Construction Dates

Start of Project: 10/91

Start of RCC: 10/91

End of RCC: 09/92

End of Project: 02/94

Specifications

Height: 58 metres

Length: 206 metres

Volume of RCC: 110 m3x103

Total volume: 113 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.05RCC against formwork
Downstream
SlopeType
0.70RCC against formwork  [stepped face]
Spillway
SlopeType
0.70RCC against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
85
Pozzolan (kg/m3)Pozzolan Type
135Low-lime flyash (ASTM Class F)
  
Arriarán completed
Arriarán completed

Full Dam Information

Details

Country: Spain

Owner: Confederación Hidrográfica del Segura

Type: Gravity

Purpose(s): Flood Control

River: Rambla del Boqueron

Reservoir capacity: 13 m3x106

Construction Dates

Start of Project: 10/94

Start of RCC: 10/94

End of RCC: 08/96

End of Project: 12/97

Specifications

Height: 58 metres

Length: 290 metres

Volume of RCC: 137 m3x103

Total volume: 145 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.05RCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.73RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
0.73RCC against formwork (GEVR/GE-RCC)  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
55
Pozzolan (kg/m3)Pozzolan Type
130Low-lime flyash (ASTM Class F)
  
Boqueron completed
Boqueron completed

Full Dam Information

Details

Country: Brazil

Owner: Secretaria Estadual do Meio Ambiente e Recursos Hídricos do RN

Type: Gravity

Purpose(s): Flood Control / Irrigation / Recreation / Water Supply

River: Apodi

Reservoir capacity: 600 m3x106

Construction Dates

Start of Project: -/98

Start of RCC: -/98

End of RCC: -/00

End of Project: -/01

Specifications

Height: 58 metres

Length: 1660 metres

Volume of RCC: 1023 m3x103

Total volume: 1120 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
Santa Cruz do Apodi completed
Santa Cruz do Apodi completed

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: Tuochang

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/10

End of Project: -/11

Specifications

Height: 58 metres

Length: 168 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Xiaotianlong completed
Xiaotianlong completed

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): unknown

River: Hanjiang

Reservoir capacity: -

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/12

End of Project: -/14

Specifications

Height: 58 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Xunyang completed
Xunyang completed

 