NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
OlivenhainUSASan Diego County Water AuthorityWEscondido Creek3006/0102/0210/0207/039778810701140V(4')0.80(3)*0.80(1)*30030074121(F)
Linhekou
[A]
ChinaShaanxi Lan River Hydropower Development CorporationH ILinhe14701/0012/0106/0312/0397311229293curve(3')curve(3')ogee(1)300300074
66
111
111
(F)
Beyhan-I
[H-F]
TurkeyKalehan Energy Üretim ve Ticaret A.S.HMurat36901/1003/1203/1403/1597361148016610.70(7)0.70(1)  3003009040(M)
TsugaruJapanMinistry of Land, Infrastructure, Transport and TourismF H IIwaki14110/0805/1008/1403/1697342500717V
1.00
(1)
(1)
0.74(1)0.74(1)25010009139(F)
Kagong ChinaHLancangjiang1- /13- /15- /17- /1997              

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: USA

Owner: San Diego County Water Authority

Type: Gravity

Purpose(s): Water Supply

River: Escondido Creek

Reservoir capacity: 30 m3x106

Construction Dates

Start of Project: 06/01

Start of RCC: 06/01

End of RCC: 10/02

End of Project: 07/03

Specifications

Height: 97 metres

Length: 788 metres

Volume of RCC: 1070 m3x103

Total volume: 1140 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork with external geomembrane (GEVR/GE-RCC)
Downstream
SlopeType
0.80RCC against formwork  [stepped face]
Spillway
SlopeType
0.80Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
74
Pozzolan (kg/m3)Pozzolan Type
121Low-lime flyash (ASTM Class F)
  
Olivenhain completed
Olivenhain completed

Full Dam Information

Details

Country: China

Owner: Shaanxi Lan River Hydropower Development Corporation

Type: Thin Arch

Purpose(s): Hydropower / Irrigation

River: Linhe

Reservoir capacity: 147 m3x106

Construction Dates

Start of Project: 01/00

Start of RCC: 01/00

End of RCC: 06/03

End of Project: 12/03

Specifications

Height: 97 metres

Length: 311 metres

Volume of RCC: 229 m3x103

Total volume: 293 m3x103

Construction Methods

Facings

Upstream
SlopeType
curveRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
curveRCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
ogeeTraditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
74
66
Pozzolan (kg/m3)Pozzolan Type
111Low-lime flyash (ASTM Class F)
111 
Linhekou completed
Linhekou completed

Full Dam Information

Details

Country: Turkey

Owner: Kalehan Energy Üretim ve Ticaret A.S.

Type: Hardfill

Purpose(s): Hydropower

River: Murat

Reservoir capacity: 369 m3x106

Construction Dates

Start of Project: 01/10

Start of RCC: 01/10

End of RCC: 03/14

End of Project: 03/15

Specifications

Height: 97 metres

Length: 361 metres

Volume of RCC: 1480 m3x103

Total volume: 1661 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.70RCC against precast concrete panels
Downstream
SlopeType
0.70Traditional concrete against formwork
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
40Milled sand
  
Beyhan-I completed
Beyhan-I completed

Full Dam Information

Details

Country: Japan

Owner: Ministry of Land, Infrastructure, Transport and Tourism

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation

River: Iwaki

Reservoir capacity: 141 m3x106

Construction Dates

Start of Project: 10/08

Start of RCC: 10/08

End of RCC: 08/14

End of Project: 03/16

Specifications

Height: 97 metres

Length: 342 metres

Volume of RCC: 500 m3x103

Total volume: 717 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
1.00Traditional concrete against formwork
Downstream
SlopeType
0.74Traditional concrete against formwork
Spillway
SlopeType
0.74Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
2501000

Cementitious material

Cement (kg/m3)
91
Pozzolan (kg/m3)Pozzolan Type
39Low-lime flyash (ASTM Class F)
  
Tsugaru completed
Tsugaru completed

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Lancangjiang

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/13

Start of RCC: -/13

End of RCC: -/17

End of Project: -/19

Specifications

Height: 97 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates