SEARCHING
... please wait

Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Xiao Yangxi (and saddle dam)ChinaGuizhou Province Electric Power Co.WXiaoyangxi1505/0101/0210/0212/02451184749V(3')0.75(3')*0.75(12)3503500138
60
113
90
(F)
GokkayaTurkeyMEM EnergyHGoksu1802/1007/1005/1207/1269118961220.067(3)0.80(3)0.80(11)3003005555(F)

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: China

Owner: Guizhou Province Electric Power Co.

Type: Gravity

Purpose(s): Water Supply

River: Xiaoyangxi

Reservoir capacity: 15 m3x106

Construction Dates

Start of Project: 05/01

Start of RCC: 05/01

End of RCC: 10/02

End of Project: 12/02

Specifications

Height: 45 metres

Length: 118 metres

Volume of RCC: 47 m3x103

Total volume: 49 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.75Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
3503500

Cementitious material

Cement (kg/m3)
138
60
Pozzolan (kg/m3)Pozzolan Type
113Low-lime flyash (ASTM Class F)
90 
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: MEM Energy

Type: Gravity

Purpose(s): Hydropower

River: Goksu

Reservoir capacity: 18 m3x106

Construction Dates

Start of Project: 02/10

Start of RCC: 02/10

End of RCC: 05/12

End of Project: 07/12

Specifications

Height: 69 metres

Length: 118 metres

Volume of RCC: 96 m3x103

Total volume: 122 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.067RCC against formwork
Downstream
SlopeType
0.80RCC against formwork
Spillway
SlopeType
0.80Reinforced conventional concrete cast before RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
55
Pozzolan (kg/m3)Pozzolan Type
55Low-lime flyash (ASTM Class F)
  
Gokkaya under construction
Gokkaya under construction

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates