Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Dak Mi 4VietnamHVu Gia31304/0701/0808/1104/1290472720800V(3')0.48
0.80
(3')*
(3')*
0.80(1)30030095125(N)
Sanhekou
[A-G]
ChinaZiwuhe710- /1110/1612/1906/20142472             

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Vietnam

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Vu Gia

Reservoir capacity: 313 m3x106

Construction Dates

Start of Project: 04/07

Start of RCC: 04/07

End of RCC: 08/11

End of Project: 04/12

Specifications

Height: 90 metres

Length: 472 metres

Volume of RCC: 720 m3x103

Total volume: 800 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.48RCC against formwork (GEVR/GE-RCC)  [stepped face]
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
95
Pozzolan (kg/m3)Pozzolan Type
125Natural pozzolan (ASTM Class N)
  
Dak Mi 4 completed
Dak Mi 4 completed

Full Dam Information

Details

Country: China

Owner: -

Type: Arch-Gravity

Purpose(s): unknown

River: Ziwuhe

Reservoir capacity: 710 m3x106

Construction Dates

Start of Project: -/11

Start of RCC: -/11

End of RCC: 12/19

End of Project: 06/20

Specifications

Height: 142 metres

Length: 472 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates