Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
GuandiChinaYalong River Hydropower Development Co. Ltd.HYalong783- /09- /10- /12- /1316851629704710V
0.30
   0.70     (F)
Apporo
[H-F]
JapanHokkaido PrefectureF I WAtsuma10610/1406/1506/1603/18475163544800.80(1)0.80(1)0.80(1)250750800(-) -
Yukari (Upper) KaleköyTurkeyKalehan Energy Üretim ve Ticaret A.S.HMurat78406/1206/1409/1604/18150516222424140.25(7)0.80(1)  3003001300(M)

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: China

Owner: Yalong River Hydropower Development Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Yalong

Reservoir capacity: 783 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/12

End of Project: -/13

Specifications

Height: 168 metres

Length: 516 metres

Volume of RCC: 2970 m3x103

Total volume: 4710 m3x103

Construction Methods

Facings

Upstream
SlopeType
Vertical 
0.30 
Downstream
SlopeType
  
Spillway
SlopeType
0.70 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Guandi completed
Guandi completed

Full Dam Information

Details

Country: Japan

Owner: Hokkaido Prefecture

Type: Hardfill

Purpose(s): Flood Control / Irrigation / Water Supply

River: Atsuma

Reservoir capacity: 106 m3x106

Construction Dates

Start of Project: 10/14

Start of RCC: 10/14

End of RCC: 06/16

End of Project: 03/18

Specifications

Height: 47 metres

Length: 516 metres

Volume of RCC: 354 m3x103

Total volume: 480 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.80Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
250750

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
Apporo completed
Apporo completed

Full Dam Information

Details

Country: Turkey

Owner: Kalehan Energy Üretim ve Ticaret A.S.

Type: Gravity

Purpose(s): Hydropower

River: Murat

Reservoir capacity: 784 m3x106

Construction Dates

Start of Project: 06/12

Start of RCC: 06/12

End of RCC: 09/16

End of Project: 04/18

Specifications

Height: 150 metres

Length: 516 metres

Volume of RCC: 2224 m3x103

Total volume: 2414 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.25RCC against precast concrete panels
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
130
Pozzolan (kg/m3)Pozzolan Type
0Milled sand
  
Yukari (Upper) Kaleköy under construction
Yukari (Upper) Kaleköy under construction

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates