SEARCHING
... please wait

Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Yongxi Nº3ChinaYongxi Hydroelectric Co. Ltd.F H WDazhangxi6805/9610/9710/9809/9987198170255V(3')0.73(10)ogee
0.73
(1)
(1)
2803000115
80
95
90
(F)
ChangshunChinaDepartment of Water Resources, Hubei ProvinceH WYujiang68- /9103/9712/9806/0069279170200V(3')0.74(3)0.80(1)3005000134
72
89
48
(F)
Koris Gefiri (Maiden’s bridge)
[H-F]
GreeceMinistry of AgricultureI WPartheni311/0503/0707/10- /16422211701900.80(13)0.80(3)0.80(1)*300 -
450
300 -
450
5010(N)
Karaburun KarareisTurkeyDSI - State Hydraulic WorksW 10- /14- /15- /15- /1650 170            
Yeşil Vadi (Beyler Deresi) TurkeyDSI - State Hydraulic WorksI 5- /16- /17- /18- /1939 170            
Xe-Pian Xe-NamnoyLaosXe-Pian Xe Namnoy Power CompanyHXepian104310/1804/1910/19- /1956430170200V   none 300300  (F)

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: China

Owner: Yongxi Hydroelectric Co. Ltd.

Type: Gravity

Purpose(s): Flood Control / Hydropower / Water Supply

River: Dazhangxi

Reservoir capacity: 68 m3x106

Construction Dates

Start of Project: 05/96

Start of RCC: 05/96

End of RCC: 10/98

End of Project: 09/99

Specifications

Height: 87 metres

Length: 198 metres

Volume of RCC: 170 m3x103

Total volume: 255 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.73RCC against precast concrete blocks
Spillway
SlopeType
ogeeTraditional concrete against formwork
0.73Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
2803000

Cementitious material

Cement (kg/m3)
115
80
Pozzolan (kg/m3)Pozzolan Type
95Low-lime flyash (ASTM Class F)
90 
Yongxi Nº3 completed
Yongxi Nº3 completed

Full Dam Information

Details

Country: China

Owner: Department of Water Resources, Hubei Province

Type: Gravity

Purpose(s): Hydropower / Water Supply

River: Yujiang

Reservoir capacity: 68 m3x106

Construction Dates

Start of Project: -/91

Start of RCC: -/91

End of RCC: 12/98

End of Project: 06/00

Specifications

Height: 69 metres

Length: 279 metres

Volume of RCC: 170 m3x103

Total volume: 200 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.74RCC against formwork
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
3005000

Cementitious material

Cement (kg/m3)
134
72
Pozzolan (kg/m3)Pozzolan Type
89Low-lime flyash (ASTM Class F)
48 
Changshun completed
Changshun completed

Full Dam Information

Details

Country: Greece

Owner: Ministry of Agriculture

Type: Hardfill

Purpose(s): Irrigation / Water Supply

River: Partheni

Reservoir capacity: 3 m3x106

Construction Dates

Start of Project: 11/05

Start of RCC: 11/05

End of RCC: 07/10

End of Project: -/16

Specifications

Height: 42 metres

Length: 221 metres

Volume of RCC: 170 m3x103

Total volume: 190 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.80Reinforced concrete cast against precast units or slip-formed facing elements
Downstream
SlopeType
0.80RCC against formwork
Spillway
SlopeType
0.80Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300  -300  -
450450

Cementitious material

Cement (kg/m3)
50
Pozzolan (kg/m3)Pozzolan Type
10Natural pozzolan (ASTM Class N)
  
Koris Gefiri (Maiden’s bridge) under construction
Koris Gefiri (Maiden’s bridge) under construction

Full Dam Information

Details

Country: Turkey

Owner: DSI - State Hydraulic Works

Type: Gravity

Purpose(s): Water Supply

River: -

Reservoir capacity: 10 m3x106

Construction Dates

Start of Project: -/14

Start of RCC: -/14

End of RCC: -/15

End of Project: -/16

Specifications

Height: 50 metres

Length: -

Volume of RCC: 170 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: DSI - State Hydraulic Works

Type: Gravity

Purpose(s): Irrigation

River: -

Reservoir capacity: 5 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/18

End of Project: -/19

Specifications

Height: 39 metres

Length: -

Volume of RCC: 170 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Laos

Owner: Xe-Pian Xe Namnoy Power Company

Type: Gravity

Purpose(s): Hydropower

River: Xepian

Reservoir capacity: 1043 m3x106

Construction Dates

Start of Project: 10/18

Start of RCC: 10/18

End of RCC: 10/19

End of Project: -/19

Specifications

Height: 56 metres

Length: 430 metres

Volume of RCC: 170 m3x103

Total volume: 200 m3x103

Construction Methods

Facings

Upstream
SlopeType
Vertical 
Downstream
SlopeType
    [stepped face]
Spillway
SlopeType
none 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Photo coming soon

 