Dam Search Results

Owner: Ministry of Land, Infrastructure, Transport and Tourism

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
KasegawaJapanMinistry of Land, Infrastructure, Transport and TourismF H I WKase7102/0510/0706/0903/1299456830948V
0.60
(1)
(1)
0.75(1)0.75(1)25010008436(F)
Kasegawa auxiliary dam
[H-F]
JapanMinistry of Land, Infrastructure, Transport and TourismF H I WKase103/0810/0906/1009/102911652680.80(12)0.80(12)0.80(12)250750800(-) -
YunishigawaJapanMinistry of Land, Infrastructure, Transport and TourismF I WYunishi7508/0809/0905/1109/121193209671053V
0.60
(1)0.78(1)0.78(1)25010009139(F)
TsugaruJapanMinistry of Land, Infrastructure, Transport and TourismF H IIwaki14110/0805/1008/1403/1697342500717V
1.00
(1)
(1)
0.74(1)0.74(1)25010009139(F)
Sanru
[H-F]
JapanMinistry of Land, Infrastructure, Transport and TourismF N WSanru5008/1409/1510/1703/19463503755000.80(1)0.80(1)0.80(1)250750800(-) -
YambaJapanMinistry of Land, Infrastructure, Transport and TourismF H I N WAzuma10808/1405/1705/1910/19116291 9110.15(1)0.80(1)0.08(1)25010008436(F)

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Japan

Owner: Ministry of Land, Infrastructure, Transport and Tourism

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Kase

Reservoir capacity: 71 m3x106

Construction Dates

Start of Project: 02/05

Start of RCC: 02/05

End of RCC: 06/09

End of Project: 03/12

Specifications

Height: 99 metres

Length: 456 metres

Volume of RCC: 830 m3x103

Total volume: 948 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.60Traditional concrete against formwork
Downstream
SlopeType
0.75Traditional concrete against formwork
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
2501000

Cementitious material

Cement (kg/m3)
84
Pozzolan (kg/m3)Pozzolan Type
36Low-lime flyash (ASTM Class F)
  
Kasegawa completed
Kasegawa completed

Full Dam Information

Details

Country: Japan

Owner: Ministry of Land, Infrastructure, Transport and Tourism

Type: Hardfill

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Kase

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 03/08

Start of RCC: 03/08

End of RCC: 06/10

End of Project: 09/10

Specifications

Height: 29 metres

Length: 116 metres

Volume of RCC: 52 m3x103

Total volume: 68 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.80Reinforced conventional concrete cast after RCC placement
Downstream
SlopeType
0.80Reinforced conventional concrete cast after RCC placement
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
250750

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
Kasegawa auxiliary dam completed
Kasegawa auxiliary dam completed

Full Dam Information

Details

Country: Japan

Owner: Ministry of Land, Infrastructure, Transport and Tourism

Type: Gravity

Purpose(s): Flood Control / Irrigation / Water Supply

River: Yunishi

Reservoir capacity: 75 m3x106

Construction Dates

Start of Project: 08/08

Start of RCC: 08/08

End of RCC: 05/11

End of Project: 09/12

Specifications

Height: 119 metres

Length: 320 metres

Volume of RCC: 967 m3x103

Total volume: 1053 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.60 
Downstream
SlopeType
0.78Traditional concrete against formwork
Spillway
SlopeType
0.78Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
2501000

Cementitious material

Cement (kg/m3)
91
Pozzolan (kg/m3)Pozzolan Type
39Low-lime flyash (ASTM Class F)
  
Yunishigawa completed
Yunishigawa completed

Full Dam Information

Details

Country: Japan

Owner: Ministry of Land, Infrastructure, Transport and Tourism

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation

River: Iwaki

Reservoir capacity: 141 m3x106

Construction Dates

Start of Project: 10/08

Start of RCC: 10/08

End of RCC: 08/14

End of Project: 03/16

Specifications

Height: 97 metres

Length: 342 metres

Volume of RCC: 500 m3x103

Total volume: 717 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
1.00Traditional concrete against formwork
Downstream
SlopeType
0.74Traditional concrete against formwork
Spillway
SlopeType
0.74Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
2501000

Cementitious material

Cement (kg/m3)
91
Pozzolan (kg/m3)Pozzolan Type
39Low-lime flyash (ASTM Class F)
  
Tsugaru completed
Tsugaru completed

Full Dam Information

Details

Country: Japan

Owner: Ministry of Land, Infrastructure, Transport and Tourism

Type: Hardfill

Purpose(s): Flood Control / Navigation / Water Supply

River: Sanru

Reservoir capacity: 50 m3x106

Construction Dates

Start of Project: 08/14

Start of RCC: 08/14

End of RCC: 10/17

End of Project: 03/19

Specifications

Height: 46 metres

Length: 350 metres

Volume of RCC: 375 m3x103

Total volume: 500 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.80Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
250750

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
Sanru completed
Sanru completed

Full Dam Information

Details

Country: Japan

Owner: Ministry of Land, Infrastructure, Transport and Tourism

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Navigation / Water Supply

River: Azuma

Reservoir capacity: 108 m3x106

Construction Dates

Start of Project: 08/14

Start of RCC: 08/14

End of RCC: 05/19

End of Project: 10/19

Specifications

Height: 116 metres

Length: 291 metres

Volume of RCC: -

Total volume: 911 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.15Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.08Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
2501000

Cementitious material

Cement (kg/m3)
84
Pozzolan (kg/m3)Pozzolan Type
36Low-lime flyash (ASTM Class F)
  
Yamba under construction
Yamba under construction

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates