Dam Search Results
- Dimensions
- Height: 24 metres
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
| Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
| Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
| Rouidat Amont (formerly Rwedat) [H-F] | Morocco | Direction des Aménagements Hydrauliques | I W | Rouidat | 3 | 05/87 | 09/87 | 10/88 | 12/88 | 24 | 125 | 25 | 27 | 0.40 | (7)* | 0.40 | (7)* | 0.40 | (1)* | 400 | 400 | 100 | 15 | (N) |
| Tirgu Jiu | Romania | Romanian Electricity Authority (RENAL) - Tirgu Jiu Branch | H | Jiu | 2 | 08/86 | 06/88 | 05/89 | 12/93 | 24 | 61 | 13 | 26 | (12) | (12) | ogee | (12) | 300 | 900 | 125 | 0 | (-) | ||
| Burguillos del Cerro | Spain | Junta de Extremadura | W | Ribera de los Montes | 3 | 12/90 | 05/91 | 09/91 | 12/91 | 24 | 167 | 25 | 33 | V | (14) | 0.13 0.60 | (14)* | 0.60 | (13)* | 300 | 300 | 80 | 135 | (F) |
| Zanja Honda | Colombia | I | Chenche | - /97 | - /98 | - /99 | - /00 | 24 | 75 | 75 | 0 | (-) | ||||||||||||
| Showkah | UAE | Ministry of Agriculture and Fisheries | G I | 1 | - /00 | 08/01 | 10/01 | - /01 | 24 | 105 | 18 | 20 | 0.10 | (11) | 0.80 | (1)* | 0.80 | (12) | 300 | 300 | 90 | 0 | (-) | |
| Pedras Altas | Brazil | CERB (Companhia de Engenharia Rural da Bahia) | F I R W | Itapicuru-mirim | - /00 | - /00 | - /01 | - /01 | 24 | 1090 | 42 | 60 | 300 | 300 | 34 | 41 | (S) | |||||||
| Chbika | Morocco | Direction des Arrenagements Hydrauliques | I | Chbika | 2 | - /04 | - /06 | - /08 | - /09 | 24 | ||||||||||||||
| Tayabasan weir [H-F] | Philippines | Wawa JV Co. Inc. (Prime Infrastructure Capital Inc and San Lorenzo Ruiz Builders and Developers Group) | H I W | Tayabasan | 1 | - /20 | - /21 | 05/22 | 07/22 | 24 | 114 | 30 | 0.40 | (4') | 0.40 0.92 | (3') | 0.92 | (1)* | 300 | 300 | 90 | 120 | (F) | |
| Sorkun [H-F] | Turkey | DSI - State Hydraulic Works | I | Dokuzsele Creek | 1 | 07/17 | - /20 | - /22 | - /24 | 24 | 160 | 42 | ||||||||||||
| Singrobo-Ahouaty | Ivory Coast | Ivoirian Hydro Energy | H | Bandama | 105 | 10/19 | - /21 | - /22 | 03/23 | 24 | ||||||||||||||
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: Morocco
Owner: Direction des Aménagements Hydrauliques
Type: Hardfill
Purpose(s): Irrigation / Water Supply
River: Rouidat
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 05/87
Start of RCC: 05/87
End of RCC: 10/88
End of Project: 12/88
Specifications
Height: 24 metres
Length: 125 metres
Volume of RCC: 25 m3x103
Total volume: 27 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.40 | RCC against precast concrete panels [stepped face] |
Downstream
| Slope | Type |
|---|---|
| 0.40 | RCC against precast concrete panels [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.40 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 400 | 400 |
Cementitious material
| Cement (kg/m3) |
|---|
| 100 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 15 | Natural pozzolan (ASTM Class N) |

Details
Country: Romania
Owner: Romanian Electricity Authority (RENAL) - Tirgu Jiu Branch
Type: Gravity
Purpose(s): Hydropower
River: Jiu
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: 08/86
Start of RCC: 08/86
End of RCC: 05/89
End of Project: 12/93
Specifications
Height: 24 metres
Length: 61 metres
Volume of RCC: 13 m3x103
Total volume: 26 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Downstream
| Slope | Type |
|---|---|
| Reinforced conventional concrete cast after RCC placement |
Spillway
| Slope | Type |
|---|---|
| ogee | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 900 |
Cementitious material
| Cement (kg/m3) |
|---|
| 125 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Spain
Owner: Junta de Extremadura
Type: Gravity
Purpose(s): Water Supply
River: Ribera de los Montes
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 12/90
Start of RCC: 12/90
End of RCC: 09/91
End of Project: 12/91
Specifications
Height: 24 metres
Length: 167 metres
Volume of RCC: 25 m3x103
Total volume: 33 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Slip-formed/extruded facing elements |
Downstream
| Slope | Type |
|---|---|
| 0.13 | Slip-formed/extruded facing elements [stepped face] |
| 0.60 |
Spillway
| Slope | Type |
|---|---|
| 0.60 | Reinforced concrete cast against precast units or slip-formed facing elements [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 135 | Low-lime flyash (ASTM Class F) |

Details
Country: Colombia
Owner: -
Type: Gravity
Purpose(s): Irrigation
River: Chenche
Reservoir capacity: -
Construction Dates
Start of Project: -/97
Start of RCC: -/97
End of RCC: -/99
End of Project: -/00
Specifications
Height: 24 metres
Length: -
Volume of RCC: 75 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 75 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: UAE
Owner: Ministry of Agriculture and Fisheries
Type: Gravity
Purpose(s): Groundwater Recharge / Irrigation
River: -
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: 10/01
End of Project: -/01
Specifications
Height: 24 metres
Length: 105 metres
Volume of RCC: 18 m3x103
Total volume: 20 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.10 | Reinforced conventional concrete cast before RCC placement |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |

Details
Country: Brazil
Owner: CERB (Companhia de Engenharia Rural da Bahia)
Type: Gravity
Purpose(s): Flood Control / Irrigation / Recreation / Water Supply
River: Itapicuru-mirim
Reservoir capacity: -
Construction Dates
Start of Project: -/00
Start of RCC: -/00
End of RCC: -/01
End of Project: -/01
Specifications
Height: 24 metres
Length: 1090 metres
Volume of RCC: 42 m3x103
Total volume: 60 m3x103
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 34 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 41 | Ground-granulated blast-furnace slag |

Details
Country: Morocco
Owner: Direction des Arrenagements Hydrauliques
Type: Gravity
Purpose(s): Irrigation
River: Chbika
Reservoir capacity: 2 m3x106
Construction Dates
Start of Project: -/04
Start of RCC: -/04
End of RCC: -/08
End of Project: -/09
Specifications
Height: 24 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Philippines
Owner: Wawa JV Co. Inc. (Prime Infrastructure Capital Inc and San Lorenzo Ruiz Builders and Developers Group)
Type: Hardfill
Purpose(s): Hydropower / Irrigation / Water Supply
River: Tayabasan
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: -/20
Start of RCC: -/20
End of RCC: 05/22
End of Project: 07/22
Specifications
Height: 24 metres
Length: 114 metres
Volume of RCC: 30 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
| 0.40 | RCC against formwork with external geomembrane (GEVR/GE-RCC) |
Downstream
| Slope | Type |
|---|---|
| 0.40 | RCC against formwork (GEVR/GE-RCC) |
| 0.92 |
Spillway
| Slope | Type |
|---|---|
| 0.92 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 120 | Low-lime flyash (ASTM Class F) |

Details
Country: Turkey
Owner: DSI - State Hydraulic Works
Type: Hardfill
Purpose(s): Irrigation
River: Dokuzsele Creek
Reservoir capacity: 1 m3x106
Construction Dates
Start of Project: 07/17
Start of RCC: 07/17
End of RCC: -/22
End of Project: -/24
Specifications
Height: 24 metres
Length: 160 metres
Volume of RCC: 42 m3x103
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Details
Country: Ivory Coast
Owner: Ivoirian Hydro Energy
Type: Gravity
Purpose(s): Hydropower
River: Bandama
Reservoir capacity: 105 m3x106
Construction Dates
Start of Project: 10/19
Start of RCC: 10/19
End of RCC: -/22
End of Project: 03/23
Specifications
Height: 24 metres
Length: -
Volume of RCC: -
Total volume: -
Construction Methods
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|

Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates