SEARCHING
... please wait

Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
ZaaihoekSouth AfricaDepartment of Water & SanitationWSlang19005/8511/8503/8709/884752797134V(1)V
0.62
(1)*0.62(1)*2502503684(S)
ShangbanChinaHWenchuanxi10- /87- /88- /89- /8947122 74           
Wajin
[A]
ChinaFushan Power Station Management BureauH INanxi7- /94- /96- /98- /9947235 240           
Nandoni - formerly MutotiSouth AfricaDepartment of Water & SanitationI WLuvuvhu16404/9812/9908/0304/0447392150316V(1)0.75(1)0.75(1)*25025054129(F)
XiaoxiChinaYouxi Hydropower Development Corporation Ltd.HLongkouxi168- /04- /05- /06- /0747268             
MeanderAustraliaRivers and Water Supply Commission, TasmaniaI WMeander4301/0601/0708/0712/07471808585V(4)0.70(10)0.70(10)300300700(-) -
KotzianBrazilBME EnergiaHIvaí - /06- /07- /0804/09471070 405           
Apporo
[H-F]
JapanHookaido PrefectureF I WAtsuma10610/1406/1506/1603/18475163544800.80(1)0.80(1)0.80(1)250750800(-) -
Neelum-JhelumPakistanNeelum Jhelum Hydropower CompanyHNeelum8- /08- /1408/1611/1747125 156           
Ain KsobMoroccoDaliya17- /15- /17- /18- /1947              
NarliTurkeyAkkur Energy Production Trade and Industry Co. Inc.HGöksu27- /16- /17- /18- /19471534968 (14) (14)  3003006550(F)

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: South Africa

Owner: Department of Water & Sanitation

Type: Gravity

Purpose(s): Water Supply

River: Slang

Reservoir capacity: 190 m3x106

Construction Dates

Start of Project: 05/85

Start of RCC: 05/85

End of RCC: 03/87

End of Project: 09/88

Specifications

Height: 47 metres

Length: 527 metres

Volume of RCC: 97 m3x103

Total volume: 134 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
VerticalTraditional concrete against formwork  [stepped face]
0.62 
Spillway
SlopeType
0.62Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
250250

Cementitious material

Cement (kg/m3)
36
Pozzolan (kg/m3)Pozzolan Type
84Ground-granulated blast-furnace slag
  
Zaaihoek completed
Zaaihoek completed

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Wenchuanxi

Reservoir capacity: 10 m3x106

Construction Dates

Start of Project: -/87

Start of RCC: -/87

End of RCC: -/89

End of Project: -/89

Specifications

Height: 47 metres

Length: 122 metres

Volume of RCC: -

Total volume: 74 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Fushan Power Station Management Bureau

Type: Thin Arch

Purpose(s): Hydropower / Irrigation

River: Nanxi

Reservoir capacity: 7 m3x106

Construction Dates

Start of Project: -/94

Start of RCC: -/94

End of RCC: -/98

End of Project: -/99

Specifications

Height: 47 metres

Length: 235 metres

Volume of RCC: -

Total volume: 240 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: South Africa

Owner: Department of Water & Sanitation

Type: Gravity

Purpose(s): Irrigation / Water Supply

River: Luvuvhu

Reservoir capacity: 164 m3x106

Construction Dates

Start of Project: 04/98

Start of RCC: 04/98

End of RCC: 08/03

End of Project: 04/04

Specifications

Height: 47 metres

Length: 392 metres

Volume of RCC: 150 m3x103

Total volume: 316 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.75Traditional concrete against formwork
Spillway
SlopeType
0.75Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
250250

Cementitious material

Cement (kg/m3)
54
Pozzolan (kg/m3)Pozzolan Type
129Low-lime flyash (ASTM Class F)
  
Nandoni - formerly Mutoti completed
Nandoni - formerly Mutoti completed

Full Dam Information

Details

Country: China

Owner: Youxi Hydropower Development Corporation Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Longkouxi

Reservoir capacity: 168 m3x106

Construction Dates

Start of Project: -/04

Start of RCC: -/04

End of RCC: -/06

End of Project: -/07

Specifications

Height: 47 metres

Length: 268 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Australia

Owner: Rivers and Water Supply Commission, Tasmania

Type: Gravity

Purpose(s): Irrigation / Water Supply

River: Meander

Reservoir capacity: 43 m3x106

Construction Dates

Start of Project: 01/06

Start of RCC: 01/06

End of RCC: 08/07

End of Project: 12/07

Specifications

Height: 47 metres

Length: 180 metres

Volume of RCC: 85 m3x103

Total volume: 85 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork with external geomembrane
Downstream
SlopeType
0.70RCC against precast concrete blocks
Spillway
SlopeType
0.70RCC against precast concrete blocks

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
70
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
Meander completed
Meander completed

Full Dam Information

Details

Country: Brazil

Owner: BME Energia

Type: Gravity

Purpose(s): Hydropower

River: Ivaí

Reservoir capacity: -

Construction Dates

Start of Project: -/06

Start of RCC: -/06

End of RCC: -/08

End of Project: 04/09

Specifications

Height: 47 metres

Length: 1070 metres

Volume of RCC: -

Total volume: 405 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Japan

Owner: Hookaido Prefecture

Type: Hardfill

Purpose(s): Flood Control / Irrigation / Water Supply

River: Atsuma

Reservoir capacity: 106 m3x106

Construction Dates

Start of Project: 10/14

Start of RCC: 10/14

End of RCC: 06/16

End of Project: 03/18

Specifications

Height: 47 metres

Length: 516 metres

Volume of RCC: 354 m3x103

Total volume: 480 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.80Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
250750

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
Apporo completed
Apporo completed

Full Dam Information

Details

Country: Pakistan

Owner: Neelum Jhelum Hydropower Company

Type: Gravity

Purpose(s): Hydropower

River: Neelum

Reservoir capacity: 8 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: 08/16

End of Project: 11/17

Specifications

Height: 47 metres

Length: 125 metres

Volume of RCC: -

Total volume: 156 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Neelum-Jhelum under construction
Neelum-Jhelum under construction

Full Dam Information

Details

Country: Morocco

Owner: -

Type: Gravity

Purpose(s): unknown

River: Daliya

Reservoir capacity: 17 m3x106

Construction Dates

Start of Project: -/15

Start of RCC: -/15

End of RCC: -/18

End of Project: -/19

Specifications

Height: 47 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: Akkur Energy Production Trade and Industry Co. Inc.

Type: Gravity

Purpose(s): Hydropower

River: Göksu

Reservoir capacity: 27 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/18

End of Project: -/19

Specifications

Height: 47 metres

Length: 153 metres

Volume of RCC: 49 m3x103

Total volume: 68 m3x103

Construction Methods

Facings

Upstream
SlopeType
 Slip-formed/extruded facing elements
Downstream
SlopeType
 Slip-formed/extruded facing elements
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
65
Pozzolan (kg/m3)Pozzolan Type
50Low-lime flyash (ASTM Class F)
  
Photo coming soon

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates