Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
ShuangxiChinaDepartment of Electricity, Dapu County, Guangdong ProvinceF H I WMeixihe9101/9503/9610/9712/9760221113172V(9)0.80(1)0.78(1)30030090
55
110
105
(F)
DaxiaChinaChina Guodian CorporationH IQuan90- /05- /06- /08- /0994221             
Koris Gefiri (Maiden’s bridge)
[H-F]
GreeceMinistry of AgricultureI WPartheni311/0503/0707/10- /16422211701900.80(13)0.80(3)0.80(1)*300 -
450
300 -
450
5010(N)
LianhuataiChinaHDanjiang9502/09- /10- /11- /1170221             

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: China

Owner: Department of Electricity, Dapu County, Guangdong Province

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Meixihe

Reservoir capacity: 91 m3x106

Construction Dates

Start of Project: 01/95

Start of RCC: 01/95

End of RCC: 10/97

End of Project: 12/97

Specifications

Height: 60 metres

Length: 221 metres

Volume of RCC: 113 m3x103

Total volume: 172 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against precast concrete panels with hot poured membrane
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.78Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
90
55
Pozzolan (kg/m3)Pozzolan Type
110Low-lime flyash (ASTM Class F)
105 
Shuangxi completed
Shuangxi completed

Full Dam Information

Details

Country: China

Owner: China Guodian Corporation

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Quan

Reservoir capacity: 90 m3x106

Construction Dates

Start of Project: -/05

Start of RCC: -/05

End of RCC: -/08

End of Project: -/09

Specifications

Height: 94 metres

Length: 221 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Greece

Owner: Ministry of Agriculture

Type: Hardfill

Purpose(s): Irrigation / Water Supply

River: Partheni

Reservoir capacity: 3 m3x106

Construction Dates

Start of Project: 11/05

Start of RCC: 11/05

End of RCC: 07/10

End of Project: -/16

Specifications

Height: 42 metres

Length: 221 metres

Volume of RCC: 170 m3x103

Total volume: 190 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.80Reinforced concrete cast against precast units or slip-formed facing elements
Downstream
SlopeType
0.80RCC against formwork
Spillway
SlopeType
0.80Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300  -300  -
450450

Cementitious material

Cement (kg/m3)
50
Pozzolan (kg/m3)Pozzolan Type
10Natural pozzolan (ASTM Class N)
  
Koris Gefiri (Maiden’s bridge) under construction
Koris Gefiri (Maiden’s bridge) under construction

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Danjiang

Reservoir capacity: 95 m3x106

Construction Dates

Start of Project: 02/09

Start of RCC: 02/09

End of RCC: -/11

End of Project: -/11

Specifications

Height: 70 metres

Length: 221 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Lianhuatai completed
Lianhuatai completed

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates