Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Rouidat Amont (formerly Rwedat)
[H-F]
MoroccoDirection des Aménagements HydrauliquesI WRouidat305/8709/8710/8812/882412525270.40(7)*0.40(7)*0.40(1)*40040010015(N)
Marathia
[H-F]
GreeceMinistry of AgricultureI WMarathia311/9112/9204/9306/932826531480.50(13)0.50(10)0.50(13)200 -
300
200 -
300
5515(N)
Ano Mera
[H-F]
GreeceMinistry of AgricultureI WAno Mera104/9303/95- /95- /973217049640.50(13)0.50(10)0.50(1)200 -
300
200 -
300
5515(N)
Contraembalse de Moncion
[H-F]
Dominican RepublicINDRHI (Instiuto Nacional de Recursos Hidráulicos de la República Dominicana)F H IMao807/9502/9603/9806/98282541301550.70(1)0.67(1)*0.80(1)*300300800(-)
Nagashima sediment dam
[H-F]
JapanMinistry of ConstructionOhi103/9704/9912/9908/003312723551.20(12)1.20(12)  250500
1000
4050(S)
Steno
[H-F]
GreeceMinistry of AgricultureI WSteno102/0007/0110/0206/033217069700.70(13)0.70(10)0.70(1)200 -
300
200 -
300
555(N)
Furquim
[H-F]
BrazilH  - /00- /01- /02- /0318              
La Rosilla II
[H-F]
MexicoCNA (Comisión Nacional del Agua)El Salto - /00- /01- /02- /0335250             
Rio Rejo
[H-F]
PeruYanacocha MineERejo1- /02- /03- /03- /043512530330.70(1)*0.70(1)*0.70(12)3003001000(-)
Taiho auxiliary dam
[H-F]
JapanNorth Dam Integrated Control OfficeETaiho - /02- /03- /04- /053011034 1.20(12)1.20(12)  250500
1000
  (S)
Jiemian Ataguia
[H-F]
China  - /00- /02- /04- /0616             (F)
Rio Grande
[H-F]
PeruYanacocha MineERio Grande1- /03- /04- /04- /05459872770.70(1)0.70(1)0.70(1)*3003001200(-)
Çindere
[H-F]
TurkeyDSI - State Hydraulic WorksH I WBuyuk Menderes8204/9407/0205/0511/07107280150016850.70(6)0.70(1)*0.89(12)3003005020(F)
Can Asujan
[H-F]
PhilippinesNational Irrigation AdministrationICan Asujan210/03- /04- /05- /054213575850.60(8)0.60(7)0.60(1)1701701000(-)
El Guapo spillway
[H-F]
VenezuelaMARN (Ministerio del Ambiente y los Recursos Naturales)F I WEl Guapo14108/0504/0612/0608/07501383203420.60(1)0.85(17)1.80(1)300300750(-)
El Mauro
[H-F]
ChileI 1088- /04- /05- /06- /0623380             
Hongkou Ataguia
[H-F]
China  - /04- /05- /06- /0736              
Ludesa
[H-F]
BrazilCPFL RenovaveisHChapecó142- /06- /06- /0704/0725300  1.50 1.50 0.75      
Beydag
[H-F]
TurkeyDSI - State Hydraulic WorksI WKucuk Menderes24804/9407/0604/0811/0895800235026500.25(6)0.80(1)*0.80(1)*3003006030(F)
Koudiat Acerdoune
[H-F]
AlgeriaANBT (Agence Nationale des Barrages et Transfert)I WWadi Isser80011/0205/0606/0809/08121492165018500.65(1)*0.65(1)*0.65(1)*300 to
400
300 to
400
7787(F)
Alto Irani
[H-F]
BrazilCPFL RenovaveisHIrani5- /07- /07- /08- /084524314202.50 2 2      
Saf-Saf
[H-F]
AlgeriaANBT (Agence Nationale des Barrages et Transfert)F I WSaf-Saf1803/06- /0810/0903/11362701201750.70(12)0.70(7)0.70(12)3003001200(-)
Taum Sauk
[H-F]
USAAmerenUEHWater source - East Fork of Black River602/0710/0711/0906/10492060244825000.60(1)0.60(1)*no
spillway
 3003005959(F)
Palomino
[H-F]
Dominican RepublicEGEHID (Empresa de Generación Hidroeléctrica Dominicana)HYaque del Sur and Blanco3- /05- /07- /09- /1365153             
Kasegawa auxiliary dam
[H-F]
JapanMinistry of Land, Infrastructure, Transport and TourismF H I WKase103/0810/0906/1009/102911652680.80(12)0.80(12)0.80(12)250750800(-)
Koris Gefiri (Maiden’s bridge)
[H-F]
GreeceMinistry of AgricultureI WPartheni311/0503/0707/10- /16422211701900.80(13)0.80(3)0.80(1)*300 -
450
300 -
450
5010(N)
Tobetsu
[H-F]
JapanHokkaido PrefectureF I WTobetsu7510/0806/0909/1010/12524326658030.80(5)0.80(5)0.80(1)250750100
80  60
0
0
(-)
Çamlica III
[H-F]
TurkeyAkfen EnergyF HZamanti104/0804/1012/1004/11521861601820.70(7)0.70(1)*0.70(12)3003008837(F)
Valsamiotis
[H-F]
GreeceCrete Development OrganisationIValsamiotis610/0505/0712/10- /14633356408200.80(13)0.80(3)0.80(1)*300300600(-)
Moula
[H-F]
TunisiaMinistère de l’AgricultureWBou Terfess2602/03- /08- /1011/1181324422450V(3') (3')* (3')*3003001200(-)
Çaltikoru
[H-F]
TurkeyDSI - State Hydraulic WorksIİlyasdere42- /95- /08- /1012/11654777438000.35(3')0.70(3')*0.70(12)3003006050(F)
Okukubi (Kin)
[H-F]
JapanOkinawa General Bureau, Cabinet Office, JapanF I WOkukubi7903/0911/1003/1107/11394613394300.80(5)0.80(5)0.80(5)300750800(-)
Çermikler
[H-F]
TurkeyDSI - State Hydraulic WorksHKizilirmak41- /08- /11- /12- /1342251160            
Cannelton
[H-F]
USAAmerican Municipal Partners (AMP)HOhio 05/0906/1208/1309/1635158113 0.80(10)0.80(10)separate 23023011864(F)
Captain Meldahl
[H-F]
USAAmerican Municipal Partners (AMP)HOhio 04/1106/1312/1304/16288456 0.80(10)0.80(10)separate 23023011662(F)
Beyhan-I
[H-F]
TurkeyKalehan Energy Üretim ve Ticaret A.S.HMurat369- /0903/1203/1403/1597361148016610.70(7)0.70(3')  3003009040(M)
Willow Island
[H-F]
USAAmerican Municipal Partners (AMP)HOhio 12/1111/1304/1402/16206649 0.80(10)0.80(10)separate 23023011662(F)
Wadi Umti
[H-F]
OmanMinistry of Rural Municipalities and Water ResourcesFWadi Umti104/1311/1307/1407/141614534580.70(12)0.70(12)0.70(12)300300600(-)
Smithland
[H-F]
USAAmerican Municipal Partners (AMP)HOhio 12/1103/1410/1407/1733153120 0.80(10)0.80(10)separate 23023011864(F)
Pembelik
[H-F]
TurkeyDarenhes A.S.HPeriSuyu35811/1003/1310/14- /15885007608380.70(3')*0.70(3')*0.70(12)30012001200(-)
Lithaios
[H-F]
GreeceTrikala PrefectureILithaios 06/0311/1112/1407/20325261602200.80(13)0.80(3)0.80(1)*3003005010(N)
Filiatrinos
[H-F]
GreeceMinistry of Rural Development and FoodIFiliatrinos8- /10- /11- /14- /16552463704300.80(2)0.80(10)0.80(10)3503505124(F)
Sarrath
[H-F]
TunisiaMinistre de l’AgricultureIOued Sarrath21- /08- /12- /1411/1536820 3350.70 0.70 0.70      
Gümüsören
[H-F]
TurkeyDSI - State Hydraulic WorksH I WZamanti195- /11- /13- /1406/1537842189019430.70(3')0.76(3')*0.76(12)30012008436(F)
Göktas 1
[H-F]
TurkeyBereket EnergyHZamanti10904/1103/1303/15- /161332007499000.30
1.00
(1)
(1)
0.60
1.00
(1)
(1)*
0.75(12)3003005050(F)
Mata Velha
[H-F]
BrazilCPFL RenovaveisHPreto38- /14- /14- /1504/163018045651.25 1.25 1.25      
Apporo
[H-F]
JapanHokkaido PrefectureF I WAtsuma10610/1406/1506/1603/18475163544900.80(1)0.80(1)0.80(1)250750800(-)
Karamürsel Tepeköy
[H-F]
TurkeyDSI - State Hydraulic WorksIUzundere1- /14- /15- /16- /1619170240 0.10(1)0.70(1)  3003008048(F)
Ambarau
[H-F]
DR CongoRandGoldHKibali611/1405/15- /16- /172125533400.75(4')*0.75(1)*0.75(1)3003001000(-)
Sanru
[H-F]
JapanMinistry of Land, Infrastructure, Transport and TourismF N WSanru5008/1409/1510/1703/19463503755000.80(1)0.80(1)0.80(1)250750800(-)
Tamalout
[H-F]
MoroccoDirection des Aménagements HydrauliquesF I WAnsegmir5010/10- /13- /17- /18613203804050.50(5)0.70(1)*0.70(1)*30030080
70  60
0
0
(-)
Ouljet Es Soltane
[H-F]
MoroccoDirection des Aménagements HydrauliquesF I WBeht51005/10- /14- /17- /18983839009300.50(1)0.70(1)*0.70(1)*3003005525(N)
Javeh
[H-F]
IranIran Water & Power Resources Development Company (IWPC)F IJaveh Roud9503/0907/11- /1807/19863016807500.90(3')1.20(3')*1.20(12)3003009431(N)
Timkit
[H-F]
MoroccoDirection des Aménagements HydrauliquesG IIfegh14- /10- /15- /18- /19561831241460.65(5)0.65(1)*0.65(1)*3003005624(N)
Shoukoubao
[H-F]
China 10- /14- /16- /18- /1962              
Asana
[H-F]
PeruAsana - /16- /17- /18- /1848214216 0.75 0.75 0.75      
Mellègue Amont
[H-F]
TunisiaMinistère de l’AgricultureH IOued Mellègue195- /16- /17- /19- /20684305005600.60 0.60 0.60   900(-)
Çetin
[H-F]
TurkeyDSI - State Hydraulic WorksHBotan614- /1209/1801/2003/20165492474148000.70(1)0.70(1)*0.70(1)*  900(-)
Sidi Abdellah
[H-F]
MoroccoDirection des Aménagements HydrauliquesF I WOuaar1004/10- /13- /20- /20683705806100.50(1)0.70(1)*0.70(1)*30030080
100
0
0
(-)
3 de Febrero (formerly El Chaparral)
[H-F]
El SalvadorComisión Ejecutiva Hidroeléctrica del Rio Lempa (CEL)HTorola - /09- /18- /2010/23883243754500.20(7')0.80(7')0.80(7')3003009463(N)
Jinjigou
[H-F]
ChinaShigaoqiao11- /19- /19- /20- /2033              
Xijiang
[H-F]
China 472- /16- /18- /21- /2250              
Tayabasan weir
[H-F]
PhilippinesWawa JV Co. Inc. (Prime Infrastructure Capital Inc and San Lorenzo Ruiz Builders and Developers Group)H I WTayabasan1- /20- /2105/2207/222411430 0.40(4')0.40
0.92
(3')0.92(1)*30030090120(F)
Kahir
[H-F]
IranSistan & Balouchestan Water AuthorityI WKahir31411/10- /1407/2208/25553835507300.80(12)0.80(12)0.80(12)     
Sorkun
[H-F]
TurkeyDSI - State Hydraulic WorksIDokuzsele Creek107/17- /20- /22- /242416042            
Naruse
[H-F]
JapanMinistry of Land, Infrastructure, Transport and TourismF H I WNaruse7905/1810/1908/2411/2611575544504850           
Hayghar (formerly Dehroud)
[H-F]
IranFars Water AuthorityF H I WFirooz Abad146- /09- /12- /24- /26882302602850.90(3')1.20(3')*1.20(12)300300   
Lengshuihe
[H-F]
China 10- /20- /22- /24- /2540              
Mikasabonbetsu
[H-F]
JapanMinistry of Land, Infrastructure, Transport and TourismFHonbetsu9- /85- /22- /24- /2653160 1800.80(1)0.80(1)0.80(1)     
Dongyang
[H-F]
ChinaDongyanggou505/22- /23- /24- /2567136             
Upper Wawa
[H-F]
PhilippinesWawa JV Co. Inc. (Prime Infrastructure Capital Inc and San Lorenzo Ruiz Builders and Developers Group)WMarikina12006/2101/23- /24- /2587439103510430.60(3')0.80(3')*0.80(3')*300360080
70
120
110
(F)
Agios Georgios
[H-F]
GreeceTerna EnergiakiHKapnitsorrema706/2304/2410/2512/2559475765795      400400   
Xiyin
[H-F]
ChinaQiuluxi2810/21- /23- /25- /2652395329386           
Beni Azimane
[H-F]
MoroccoDirection des Aménagements HydrauliquesF I WKert4401/2210/2201/2610/2670684800 0.50(1)*0.90(1)*0.90(1)*3003001000 
Heibaoshan
[H-F]
ChinaConstruction Headquarters of Heibaoshan Reservoir Project in Wanyuan CityI WDayan2- /22- /24- /26- /2760              
Cibeet
[H-F]
IndonesiaPUPR (Public Works and Public Housing Ministry)F H I WCibeet8309/23- /25- /27- /2847960371 0.90 0.90 0.90 2507501060(-)

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Morocco

Owner: Direction des Aménagements Hydrauliques

Type: Hardfill

Purpose(s): Irrigation / Water Supply

River: Rouidat

Reservoir capacity: 3 m3x106

Construction Dates

Start of Project: 05/87

Start of RCC: 05/87

End of RCC: 10/88

End of Project: 12/88

Specifications

Height: 24 metres

Length: 125 metres

Volume of RCC: 25 m3x103

Total volume: 27 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.40RCC against precast concrete panels  [stepped face]
Downstream
SlopeType
0.40RCC against precast concrete panels  [stepped face]
Spillway
SlopeType
0.40Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
400400

Cementitious material

Cement (kg/m3)
100
Pozzolan (kg/m3)Pozzolan Type
15Natural pozzolan (ASTM Class N)
  
Photo coming soon

Full Dam Information

Details

Country: Greece

Owner: Ministry of Agriculture

Type: Hardfill

Purpose(s): Irrigation / Water Supply

River: Marathia

Reservoir capacity: 3 m3x106

Construction Dates

Start of Project: 11/91

Start of RCC: 11/91

End of RCC: 04/93

End of Project: 06/93

Specifications

Height: 28 metres

Length: 265 metres

Volume of RCC: 31 m3x103

Total volume: 48 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.50Reinforced concrete cast against precast units or slip-formed facing elements
Downstream
SlopeType
0.50RCC against precast concrete blocks
Spillway
SlopeType
0.50Reinforced concrete cast against precast units or slip-formed facing elements

Placement

Layers (mm)Lifts (mm)
200  -200  -
300300

Cementitious material

Cement (kg/m3)
55
Pozzolan (kg/m3)Pozzolan Type
15Natural pozzolan (ASTM Class N)
  
Photo coming soon

Full Dam Information

Details

Country: Greece

Owner: Ministry of Agriculture

Type: Hardfill

Purpose(s): Irrigation / Water Supply

River: Ano Mera

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 04/93

Start of RCC: 04/93

End of RCC: -/95

End of Project: -/97

Specifications

Height: 32 metres

Length: 170 metres

Volume of RCC: 49 m3x103

Total volume: 64 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.50Reinforced concrete cast against precast units or slip-formed facing elements
Downstream
SlopeType
0.50RCC against precast concrete blocks
Spillway
SlopeType
0.50Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
200  -200  -
300300

Cementitious material

Cement (kg/m3)
55
Pozzolan (kg/m3)Pozzolan Type
15Natural pozzolan (ASTM Class N)
  
Photo coming soon

Full Dam Information

Details

Country: Dominican Republic

Owner: INDRHI (Instiuto Nacional de Recursos Hidráulicos de la República Dominicana)

Type: Hardfill

Purpose(s): Flood Control / Hydropower / Irrigation

River: Mao

Reservoir capacity: 8 m3x106

Construction Dates

Start of Project: 07/95

Start of RCC: 07/95

End of RCC: 03/98

End of Project: 06/98

Specifications

Height: 28 metres

Length: 254 metres

Volume of RCC: 130 m3x103

Total volume: 155 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.70Traditional concrete against formwork
Downstream
SlopeType
0.67Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
  
Photo coming soon

Full Dam Information

Details

Country: Japan

Owner: Ministry of Construction

Type: Hardfill

Purpose(s): unknown

River: Ohi

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 03/97

Start of RCC: 03/97

End of RCC: 12/99

End of Project: 08/00

Specifications

Height: 33 metres

Length: 127 metres

Volume of RCC: 23 m3x103

Total volume: 55 m3x103

Construction Methods

Facings

Upstream
SlopeType
1.20Reinforced conventional concrete cast after RCC placement
Downstream
SlopeType
1.20Reinforced conventional concrete cast after RCC placement
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
250500
 1000

Cementitious material

Cement (kg/m3)
40
Pozzolan (kg/m3)Pozzolan Type
50Ground-granulated blast-furnace slag
  
Nagashima sediment dam on Google Earth
Nagashima sediment dam on Google Earth

Full Dam Information

Details

Country: Greece

Owner: Ministry of Agriculture

Type: Hardfill

Purpose(s): Irrigation / Water Supply

River: Steno

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 02/00

Start of RCC: 02/00

End of RCC: 10/02

End of Project: 06/03

Specifications

Height: 32 metres

Length: 170 metres

Volume of RCC: 69 m3x103

Total volume: 70 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.70Reinforced concrete cast against precast units or slip-formed facing elements
Downstream
SlopeType
0.70RCC against precast concrete blocks
Spillway
SlopeType
0.70Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
200  -200  -
300300

Cementitious material

Cement (kg/m3)
55
Pozzolan (kg/m3)Pozzolan Type
5Natural pozzolan (ASTM Class N)
  
Photo coming soon

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Hardfill

Purpose(s): Hydropower

River: -

Reservoir capacity: -

Construction Dates

Start of Project: -/00

Start of RCC: -/00

End of RCC: -/02

End of Project: -/03

Specifications

Height: 18 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Furquim completed
Furquim completed

Full Dam Information

Details

Country: Mexico

Owner: CNA (Comisión Nacional del Agua)

Type: Hardfill

Purpose(s): unknown

River: El Salto

Reservoir capacity: -

Construction Dates

Start of Project: -/00

Start of RCC: -/00

End of RCC: -/02

End of Project: -/03

Specifications

Height: 35 metres

Length: 250 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Peru

Owner: Yanacocha Mine

Type: Hardfill

Purpose(s): Environmental

River: Rejo

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/02

Start of RCC: -/02

End of RCC: -/03

End of Project: -/04

Specifications

Height: 35 metres

Length: 125 metres

Volume of RCC: 30 m3x103

Total volume: 33 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.70Traditional concrete against formwork  [stepped face]
Downstream
SlopeType
0.70Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.70Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
100
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
  
Photo coming soon

Full Dam Information

Details

Country: Japan

Owner: North Dam Integrated Control Office

Type: Hardfill

Purpose(s): Environmental

River: Taiho

Reservoir capacity: -

Construction Dates

Start of Project: -/02

Start of RCC: -/02

End of RCC: -/04

End of Project: -/05

Specifications

Height: 30 metres

Length: 110 metres

Volume of RCC: 34 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
1.20Reinforced conventional concrete cast after RCC placement
Downstream
SlopeType
1.20Reinforced conventional concrete cast after RCC placement
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
250500
 1000

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Ground-granulated blast-furnace slag
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Hardfill

Purpose(s): unknown

River: -

Reservoir capacity: -

Construction Dates

Start of Project: -/00

Start of RCC: -/00

End of RCC: -/04

End of Project: -/06

Specifications

Height: 16 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: Peru

Owner: Yanacocha Mine

Type: Hardfill

Purpose(s): Environmental

River: Rio Grande

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/03

Start of RCC: -/03

End of RCC: -/04

End of Project: -/05

Specifications

Height: 45 metres

Length: 98 metres

Volume of RCC: 72 m3x103

Total volume: 77 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.70Traditional concrete against formwork
Downstream
SlopeType
0.70Traditional concrete against formwork
Spillway
SlopeType
0.70Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
120
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: DSI - State Hydraulic Works

Type: Hardfill

Purpose(s): Hydropower / Irrigation / Water Supply

River: Buyuk Menderes

Reservoir capacity: 82 m3x106

Construction Dates

Start of Project: 04/94

Start of RCC: 04/94

End of RCC: 05/05

End of Project: 11/07

Specifications

Height: 107 metres

Length: 280 metres

Volume of RCC: 1500 m3x103

Total volume: 1685 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.70Traditional concrete against precast concrete panels with geomembrane
Downstream
SlopeType
0.70Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.89Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
50
Pozzolan (kg/m3)Pozzolan Type
20Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: Philippines

Owner: National Irrigation Administration

Type: Hardfill

Purpose(s): Irrigation

River: Can Asujan

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: 10/03

Start of RCC: 10/03

End of RCC: -/05

End of Project: -/05

Specifications

Height: 42 metres

Length: 135 metres

Volume of RCC: 75 m3x103

Total volume: 85 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.60RCC against precast concrete panels with geomembrane
Downstream
SlopeType
0.60RCC against precast concrete panels
Spillway
SlopeType
0.60Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
170170

Cementitious material

Cement (kg/m3)
100
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
  
Can Asujan on Google Earth
Can Asujan on Google Earth

Full Dam Information

Details

Country: Venezuela

Owner: MARN (Ministerio del Ambiente y los Recursos Naturales)

Type: Hardfill

Purpose(s): Flood Control / Irrigation / Water Supply

River: El Guapo

Reservoir capacity: 141 m3x106

Construction Dates

Start of Project: 08/05

Start of RCC: 08/05

End of RCC: 12/06

End of Project: 08/07

Specifications

Height: 50 metres

Length: 138 metres

Volume of RCC: 320 m3x103

Total volume: 342 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.60Traditional concrete against formwork
Downstream
SlopeType
0.85Unformed face of RCC
Spillway
SlopeType
1.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
75
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
  
El Guapo spillway completed
El Guapo spillway completed

Full Dam Information

Details

Country: Chile

Owner: -

Type: Hardfill

Purpose(s): Irrigation

River: -

Reservoir capacity: 1088 m3x106

Construction Dates

Start of Project: -/04

Start of RCC: -/04

End of RCC: -/06

End of Project: -/06

Specifications

Height: 23 metres

Length: 380 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
El Mauro completed
El Mauro completed

Full Dam Information

Details

Country: China

Owner: -

Type: Hardfill

Purpose(s): unknown

River: -

Reservoir capacity: -

Construction Dates

Start of Project: -/04

Start of RCC: -/04

End of RCC: -/06

End of Project: -/07

Specifications

Height: 36 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Brazil

Owner: CPFL Renovaveis

Type: Hardfill

Purpose(s): Hydropower

River: Chapecó

Reservoir capacity: 142 m3x106

Construction Dates

Start of Project: -/06

Start of RCC: -/06

End of RCC: -/07

End of Project: 04/07

Specifications

Height: 25 metres

Length: 300 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
1.50 
Downstream
SlopeType
1.50 
Spillway
SlopeType
0.75 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Ludesa completed
Ludesa completed

Full Dam Information

Details

Country: Turkey

Owner: DSI - State Hydraulic Works

Type: Hardfill

Purpose(s): Irrigation / Water Supply

River: Kucuk Menderes

Reservoir capacity: 248 m3x106

Construction Dates

Start of Project: 04/94

Start of RCC: 04/94

End of RCC: 04/08

End of Project: 11/08

Specifications

Height: 95 metres

Length: 800 metres

Volume of RCC: 2350 m3x103

Total volume: 2650 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.25Traditional concrete against precast concrete panels with geomembrane
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
30Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: Algeria

Owner: ANBT (Agence Nationale des Barrages et Transfert)

Type: Hardfill

Purpose(s): Irrigation / Water Supply

River: Wadi Isser

Reservoir capacity: 800 m3x106

Construction Dates

Start of Project: 11/02

Start of RCC: 11/02

End of RCC: 06/08

End of Project: 09/08

Specifications

Height: 121 metres

Length: 492 metres

Volume of RCC: 1650 m3x103

Total volume: 1850 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.65Traditional concrete against formwork  [stepped face]
Downstream
SlopeType
0.65Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.65Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300  to300  to
400400

Cementitious material

Cement (kg/m3)
77
Pozzolan (kg/m3)Pozzolan Type
87Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: Brazil

Owner: CPFL Renovaveis

Type: Hardfill

Purpose(s): Hydropower

River: Irani

Reservoir capacity: 5 m3x106

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/08

End of Project: -/08

Specifications

Height: 45 metres

Length: 243 metres

Volume of RCC: 14 m3x103

Total volume: 20 m3x103

Construction Methods

Facings

Upstream
SlopeType
2.50 
Downstream
SlopeType
2 
Spillway
SlopeType
2 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Alto Irani on Google Earth
Alto Irani on Google Earth

Full Dam Information

Details

Country: Algeria

Owner: ANBT (Agence Nationale des Barrages et Transfert)

Type: Hardfill

Purpose(s): Flood Control / Irrigation / Water Supply

River: Saf-Saf

Reservoir capacity: 18 m3x106

Construction Dates

Start of Project: 03/06

Start of RCC: 03/06

End of RCC: 10/09

End of Project: 03/11

Specifications

Height: 36 metres

Length: 270 metres

Volume of RCC: 120 m3x103

Total volume: 175 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.70Reinforced conventional concrete cast after RCC placement
Downstream
SlopeType
0.70RCC against precast concrete panels
Spillway
SlopeType
0.70Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
120
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
  
Photo coming soon

Full Dam Information

Details

Country: USA

Owner: AmerenUE

Type: Hardfill

Purpose(s): Hydropower

River: Water source - East Fork of Black River

Reservoir capacity: 6 m3x106

Construction Dates

Start of Project: 02/07

Start of RCC: 02/07

End of RCC: 11/09

End of Project: 06/10

Specifications

Height: 49 metres

Length: 2060 metres

Volume of RCC: 2448 m3x103

Total volume: 2500 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.60Traditional concrete against formwork
Downstream
SlopeType
0.60Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
no 
spillway 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
59
Pozzolan (kg/m3)Pozzolan Type
59Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: Dominican Republic

Owner: EGEHID (Empresa de Generación Hidroeléctrica Dominicana)

Type: Hardfill

Purpose(s): Hydropower

River: Yaque del Sur and Blanco

Reservoir capacity: 3 m3x106

Construction Dates

Start of Project: -/05

Start of RCC: -/05

End of RCC: -/09

End of Project: -/13

Specifications

Height: 65 metres

Length: 153 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Palomino on Google Earth
Palomino on Google Earth

Full Dam Information

Details

Country: Japan

Owner: Ministry of Land, Infrastructure, Transport and Tourism

Type: Hardfill

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Kase

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 03/08

Start of RCC: 03/08

End of RCC: 06/10

End of Project: 09/10

Specifications

Height: 29 metres

Length: 116 metres

Volume of RCC: 52 m3x103

Total volume: 68 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.80Reinforced conventional concrete cast after RCC placement
Downstream
SlopeType
0.80Reinforced conventional concrete cast after RCC placement
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
250750

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
  
Kasegawa auxiliary dam on Google Earth
Kasegawa auxiliary dam on Google Earth

Full Dam Information

Details

Country: Greece

Owner: Ministry of Agriculture

Type: Hardfill

Purpose(s): Irrigation / Water Supply

River: Partheni

Reservoir capacity: 3 m3x106

Construction Dates

Start of Project: 11/05

Start of RCC: 11/05

End of RCC: 07/10

End of Project: -/16

Specifications

Height: 42 metres

Length: 221 metres

Volume of RCC: 170 m3x103

Total volume: 190 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.80Reinforced concrete cast against precast units or slip-formed facing elements
Downstream
SlopeType
0.80RCC against formwork
Spillway
SlopeType
0.80Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300  -300  -
450450

Cementitious material

Cement (kg/m3)
50
Pozzolan (kg/m3)Pozzolan Type
10Natural pozzolan (ASTM Class N)
  
Photo coming soon

Full Dam Information

Details

Country: Japan

Owner: Hokkaido Prefecture

Type: Hardfill

Purpose(s): Flood Control / Irrigation / Water Supply

River: Tobetsu

Reservoir capacity: 75 m3x106

Construction Dates

Start of Project: 10/08

Start of RCC: 10/08

End of RCC: 09/10

End of Project: 10/12

Specifications

Height: 52 metres

Length: 432 metres

Volume of RCC: 665 m3x103

Total volume: 803 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.80Traditional concrete against precast concrete panels
Downstream
SlopeType
0.80Traditional concrete against precast concrete panels
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
250750

Cementitious material

Cement (kg/m3)
100
80  60
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
0 
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: Akfen Energy

Type: Hardfill

Purpose(s): Flood Control / Hydropower

River: Zamanti

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 04/08

Start of RCC: 04/08

End of RCC: 12/10

End of Project: 04/11

Specifications

Height: 52 metres

Length: 186 metres

Volume of RCC: 160 m3x103

Total volume: 182 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.70RCC against precast concrete panels
Downstream
SlopeType
0.70Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.70Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
88
Pozzolan (kg/m3)Pozzolan Type
37Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: Greece

Owner: Crete Development Organisation

Type: Hardfill

Purpose(s): Irrigation

River: Valsamiotis

Reservoir capacity: 6 m3x106

Construction Dates

Start of Project: 10/05

Start of RCC: 10/05

End of RCC: 12/10

End of Project: -/14

Specifications

Height: 63 metres

Length: 335 metres

Volume of RCC: 640 m3x103

Total volume: 820 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.80Reinforced concrete cast against precast units or slip-formed facing elements
Downstream
SlopeType
0.80RCC against formwork
Spillway
SlopeType
0.80Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
  
Photo coming soon

Full Dam Information

Details

Country: Tunisia

Owner: Ministère de l’Agriculture

Type: Hardfill

Purpose(s): Water Supply

River: Bou Terfess

Reservoir capacity: 26 m3x106

Construction Dates

Start of Project: 02/03

Start of RCC: 02/03

End of RCC: -/10

End of Project: 11/11

Specifications

Height: 81 metres

Length: 324 metres

Volume of RCC: 422 m3x103

Total volume: 450 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
 RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
 RCC against formwork (GEVR/GE-RCC)  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
120
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: DSI - State Hydraulic Works

Type: Hardfill

Purpose(s): Irrigation

River: İlyasdere

Reservoir capacity: 42 m3x106

Construction Dates

Start of Project: -/95

Start of RCC: -/95

End of RCC: -/10

End of Project: 12/11

Specifications

Height: 65 metres

Length: 477 metres

Volume of RCC: 743 m3x103

Total volume: 800 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.35RCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.70RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.70Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
50Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: Japan

Owner: Okinawa General Bureau, Cabinet Office, Japan

Type: Hardfill

Purpose(s): Flood Control / Irrigation / Water Supply

River: Okukubi

Reservoir capacity: 79 m3x106

Construction Dates

Start of Project: 03/09

Start of RCC: 03/09

End of RCC: 03/11

End of Project: 07/11

Specifications

Height: 39 metres

Length: 461 metres

Volume of RCC: 339 m3x103

Total volume: 430 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.80Traditional concrete against precast concrete panels
Downstream
SlopeType
0.80Traditional concrete against precast concrete panels
Spillway
SlopeType
0.80Traditional concrete against precast concrete panels

Placement

Layers (mm)Lifts (mm)
300750

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: DSI - State Hydraulic Works

Type: Hardfill

Purpose(s): Hydropower

River: Kizilirmak

Reservoir capacity: 41 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/12

End of Project: -/13

Specifications

Height: 42 metres

Length: 251 metres

Volume of RCC: 160 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: USA

Owner: American Municipal Partners (AMP)

Type: Hardfill

Purpose(s): Hydropower

River: Ohio

Reservoir capacity: -

Construction Dates

Start of Project: 05/09

Start of RCC: 05/09

End of RCC: 08/13

End of Project: 09/16

Specifications

Height: 35 metres

Length: 158 metres

Volume of RCC: 113 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
0.80RCC against precast concrete blocks
Downstream
SlopeType
0.80RCC against precast concrete blocks
Spillway
SlopeType
separate 

Placement

Layers (mm)Lifts (mm)
230230

Cementitious material

Cement (kg/m3)
118
Pozzolan (kg/m3)Pozzolan Type
64Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: USA

Owner: American Municipal Partners (AMP)

Type: Hardfill

Purpose(s): Hydropower

River: Ohio

Reservoir capacity: -

Construction Dates

Start of Project: 04/11

Start of RCC: 04/11

End of RCC: 12/13

End of Project: 04/16

Specifications

Height: 28 metres

Length: 84 metres

Volume of RCC: 56 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
0.80RCC against precast concrete blocks
Downstream
SlopeType
0.80RCC against precast concrete blocks
Spillway
SlopeType
separate 

Placement

Layers (mm)Lifts (mm)
230230

Cementitious material

Cement (kg/m3)
116
Pozzolan (kg/m3)Pozzolan Type
62Low-lime flyash (ASTM Class F)
  
Captain Meldahl on Google Earth
Captain Meldahl on Google Earth

Full Dam Information

Details

Country: Turkey

Owner: Kalehan Energy Üretim ve Ticaret A.S.

Type: Hardfill

Purpose(s): Hydropower

River: Murat

Reservoir capacity: 369 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: 03/14

End of Project: 03/15

Specifications

Height: 97 metres

Length: 361 metres

Volume of RCC: 1480 m3x103

Total volume: 1661 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.70RCC against precast concrete panels
Downstream
SlopeType
0.70RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
40Milled sand
  
Photo coming soon

Full Dam Information

Details

Country: USA

Owner: American Municipal Partners (AMP)

Type: Hardfill

Purpose(s): Hydropower

River: Ohio

Reservoir capacity: -

Construction Dates

Start of Project: 12/11

Start of RCC: 12/11

End of RCC: 04/14

End of Project: 02/16

Specifications

Height: 20 metres

Length: 66 metres

Volume of RCC: 49 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
0.80RCC against precast concrete blocks
Downstream
SlopeType
0.80RCC against precast concrete blocks
Spillway
SlopeType
separate 

Placement

Layers (mm)Lifts (mm)
230230

Cementitious material

Cement (kg/m3)
116
Pozzolan (kg/m3)Pozzolan Type
62Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: Oman

Owner: Ministry of Rural Municipalities and Water Resources

Type: Hardfill

Purpose(s): Flood Control

River: Wadi Umti

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 04/13

Start of RCC: 04/13

End of RCC: 07/14

End of Project: 07/14

Specifications

Height: 16 metres

Length: 145 metres

Volume of RCC: 34 m3x103

Total volume: 58 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.70Reinforced conventional concrete cast after RCC placement
Downstream
SlopeType
0.70Reinforced conventional concrete cast after RCC placement
Spillway
SlopeType
0.70Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
  
Photo coming soon

Full Dam Information

Details

Country: USA

Owner: American Municipal Partners (AMP)

Type: Hardfill

Purpose(s): Hydropower

River: Ohio

Reservoir capacity: -

Construction Dates

Start of Project: 12/11

Start of RCC: 12/11

End of RCC: 10/14

End of Project: 07/17

Specifications

Height: 33 metres

Length: 153 metres

Volume of RCC: 120 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
0.80RCC against precast concrete blocks
Downstream
SlopeType
0.80RCC against precast concrete blocks
Spillway
SlopeType
separate 

Placement

Layers (mm)Lifts (mm)
230230

Cementitious material

Cement (kg/m3)
118
Pozzolan (kg/m3)Pozzolan Type
64Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: Darenhes A.S.

Type: Hardfill

Purpose(s): Hydropower

River: PeriSuyu

Reservoir capacity: 358 m3x106

Construction Dates

Start of Project: 11/10

Start of RCC: 11/10

End of RCC: 10/14

End of Project: -/15

Specifications

Height: 88 metres

Length: 500 metres

Volume of RCC: 760 m3x103

Total volume: 838 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.70RCC against formwork (GEVR/GE-RCC)  [stepped face]
Downstream
SlopeType
0.70RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.70Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
3001200

Cementitious material

Cement (kg/m3)
120
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
  
Photo coming soon

Full Dam Information

Details

Country: Greece

Owner: Trikala Prefecture

Type: Hardfill

Purpose(s): Irrigation

River: Lithaios

Reservoir capacity: -

Construction Dates

Start of Project: 06/03

Start of RCC: 06/03

End of RCC: 12/14

End of Project: 07/20

Specifications

Height: 32 metres

Length: 526 metres

Volume of RCC: 160 m3x103

Total volume: 220 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.80Reinforced concrete cast against precast units or slip-formed facing elements
Downstream
SlopeType
0.80RCC against formwork
Spillway
SlopeType
0.80Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
50
Pozzolan (kg/m3)Pozzolan Type
10Natural pozzolan (ASTM Class N)
  
Lithaios completed
Lithaios completed

Full Dam Information

Details

Country: Greece

Owner: Ministry of Rural Development and Food

Type: Hardfill

Purpose(s): Irrigation

River: Filiatrinos

Reservoir capacity: 8 m3x106

Construction Dates

Start of Project: -/10

Start of RCC: -/10

End of RCC: -/14

End of Project: -/16

Specifications

Height: 55 metres

Length: 246 metres

Volume of RCC: 370 m3x103

Total volume: 430 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.80Traditional concrete against formwork with external geomembrane
Downstream
SlopeType
0.80RCC against precast concrete blocks
Spillway
SlopeType
0.80RCC against precast concrete blocks

Placement

Layers (mm)Lifts (mm)
350350

Cementitious material

Cement (kg/m3)
51
Pozzolan (kg/m3)Pozzolan Type
24Low-lime flyash (ASTM Class F)
  
Filiatrinos on Google Earth
Filiatrinos on Google Earth

Full Dam Information

Details

Country: Tunisia

Owner: Ministre de l’Agriculture

Type: Hardfill

Purpose(s): Irrigation

River: Oued Sarrath

Reservoir capacity: 21 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/14

End of Project: 11/15

Specifications

Height: 36 metres

Length: 820 metres

Volume of RCC: -

Total volume: 335 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.70 
Downstream
SlopeType
0.70 
Spillway
SlopeType
0.70 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: DSI - State Hydraulic Works

Type: Hardfill

Purpose(s): Hydropower / Irrigation / Water Supply

River: Zamanti

Reservoir capacity: 195 m3x106

Construction Dates

Start of Project: -/11

Start of RCC: -/11

End of RCC: -/14

End of Project: 06/15

Specifications

Height: 37 metres

Length: 842 metres

Volume of RCC: 1890 m3x103

Total volume: 1943 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.70RCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.76RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.76Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
3001200

Cementitious material

Cement (kg/m3)
84
Pozzolan (kg/m3)Pozzolan Type
36Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: Bereket Energy

Type: Hardfill

Purpose(s): Hydropower

River: Zamanti

Reservoir capacity: 109 m3x106

Construction Dates

Start of Project: 04/11

Start of RCC: 04/11

End of RCC: 03/15

End of Project: -/16

Specifications

Height: 133 metres

Length: 200 metres

Volume of RCC: 749 m3x103

Total volume: 900 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.30Traditional concrete against formwork
1.00Traditional concrete against formwork
Downstream
SlopeType
0.60Traditional concrete against formwork
1.00Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.75Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
50
Pozzolan (kg/m3)Pozzolan Type
50Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: Brazil

Owner: CPFL Renovaveis

Type: Hardfill

Purpose(s): Hydropower

River: Preto

Reservoir capacity: 38 m3x106

Construction Dates

Start of Project: -/14

Start of RCC: -/14

End of RCC: -/15

End of Project: 04/16

Specifications

Height: 30 metres

Length: 180 metres

Volume of RCC: 45 m3x103

Total volume: 65 m3x103

Construction Methods

Facings

Upstream
SlopeType
1.25 
Downstream
SlopeType
1.25 
Spillway
SlopeType
1.25 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Mata Velha under construction
Mata Velha under construction

Full Dam Information

Details

Country: Japan

Owner: Hokkaido Prefecture

Type: Hardfill

Purpose(s): Flood Control / Irrigation / Water Supply

River: Atsuma

Reservoir capacity: 106 m3x106

Construction Dates

Start of Project: 10/14

Start of RCC: 10/14

End of RCC: 06/16

End of Project: 03/18

Specifications

Height: 47 metres

Length: 516 metres

Volume of RCC: 354 m3x103

Total volume: 490 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.80Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
250750

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
  
Apporo on Google Earth
Apporo on Google Earth

Full Dam Information

Details

Country: Turkey

Owner: DSI - State Hydraulic Works

Type: Hardfill

Purpose(s): Irrigation

River: Uzundere

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/14

Start of RCC: -/14

End of RCC: -/16

End of Project: -/16

Specifications

Height: 19 metres

Length: 170 metres

Volume of RCC: 240 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.70Traditional concrete against formwork
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
48Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: DR Congo

Owner: RandGold

Type: Hardfill

Purpose(s): Hydropower

River: Kibali

Reservoir capacity: 6 m3x106

Construction Dates

Start of Project: 11/14

Start of RCC: 11/14

End of RCC: -/16

End of Project: -/17

Specifications

Height: 21 metres

Length: 255 metres

Volume of RCC: 33 m3x103

Total volume: 40 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.75RCC against formwork with external geomembrane (GEVR/GE-RCC)  [stepped face]
Downstream
SlopeType
0.75Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
100
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
  
Photo coming soon

Full Dam Information

Details

Country: Japan

Owner: Ministry of Land, Infrastructure, Transport and Tourism

Type: Hardfill

Purpose(s): Flood Control / Navigation / Water Supply

River: Sanru

Reservoir capacity: 50 m3x106

Construction Dates

Start of Project: 08/14

Start of RCC: 08/14

End of RCC: 10/17

End of Project: 03/19

Specifications

Height: 46 metres

Length: 350 metres

Volume of RCC: 375 m3x103

Total volume: 500 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.80Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
250750

Cementitious material

Cement (kg/m3)
80
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
  
Photo coming soon

Full Dam Information

Details

Country: Morocco

Owner: Direction des Aménagements Hydrauliques

Type: Hardfill

Purpose(s): Flood Control / Irrigation / Water Supply

River: Ansegmir

Reservoir capacity: 50 m3x106

Construction Dates

Start of Project: 10/10

Start of RCC: 10/10

End of RCC: -/17

End of Project: -/18

Specifications

Height: 61 metres

Length: 320 metres

Volume of RCC: 380 m3x103

Total volume: 405 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.50Traditional concrete against precast concrete panels
Downstream
SlopeType
0.70Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.70Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
80
70  60
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
0 
Photo coming soon

Full Dam Information

Details

Country: Morocco

Owner: Direction des Aménagements Hydrauliques

Type: Hardfill

Purpose(s): Flood Control / Irrigation / Water Supply

River: Beht

Reservoir capacity: 510 m3x106

Construction Dates

Start of Project: 05/10

Start of RCC: 05/10

End of RCC: -/17

End of Project: -/18

Specifications

Height: 98 metres

Length: 383 metres

Volume of RCC: 900 m3x103

Total volume: 930 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.50Traditional concrete against formwork
Downstream
SlopeType
0.70Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.70Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
55
Pozzolan (kg/m3)Pozzolan Type
25Natural pozzolan (ASTM Class N)
  
Photo coming soon

Full Dam Information

Details

Country: Iran

Owner: Iran Water & Power Resources Development Company (IWPC)

Type: Hardfill

Purpose(s): Flood Control / Irrigation

River: Javeh Roud

Reservoir capacity: 95 m3x106

Construction Dates

Start of Project: 03/09

Start of RCC: 03/09

End of RCC: -/18

End of Project: 07/19

Specifications

Height: 86 metres

Length: 301 metres

Volume of RCC: 680 m3x103

Total volume: 750 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.90RCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
1.20RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
1.20Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
94
Pozzolan (kg/m3)Pozzolan Type
31Natural pozzolan (ASTM Class N)
  
Photo coming soon

Full Dam Information

Details

Country: Morocco

Owner: Direction des Aménagements Hydrauliques

Type: Hardfill

Purpose(s): Groundwater Recharge / Irrigation

River: Ifegh

Reservoir capacity: 14 m3x106

Construction Dates

Start of Project: -/10

Start of RCC: -/10

End of RCC: -/18

End of Project: -/19

Specifications

Height: 56 metres

Length: 183 metres

Volume of RCC: 124 m3x103

Total volume: 146 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.65Traditional concrete against precast concrete panels
Downstream
SlopeType
0.65Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.65Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
56
Pozzolan (kg/m3)Pozzolan Type
24Natural pozzolan (ASTM Class N)
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Hardfill

Purpose(s): unknown

River: -

Reservoir capacity: 10 m3x106

Construction Dates

Start of Project: -/14

Start of RCC: -/14

End of RCC: -/18

End of Project: -/19

Specifications

Height: 62 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Peru

Owner: -

Type: Hardfill

Purpose(s): unknown

River: Asana

Reservoir capacity: -

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/18

End of Project: -/18

Specifications

Height: 48 metres

Length: 214 metres

Volume of RCC: 216 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
0.75 
Downstream
SlopeType
0.75 
Spillway
SlopeType
0.75 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Asana completed
Asana completed

Full Dam Information

Details

Country: Tunisia

Owner: Ministère de l’Agriculture

Type: Hardfill

Purpose(s): Hydropower / Irrigation

River: Oued Mellègue

Reservoir capacity: 195 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/19

End of Project: -/20

Specifications

Height: 68 metres

Length: 430 metres

Volume of RCC: 500 m3x103

Total volume: 560 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.60 
Downstream
SlopeType
0.60 
Spillway
SlopeType
0.60 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: DSI - State Hydraulic Works

Type: Hardfill

Purpose(s): Hydropower

River: Botan

Reservoir capacity: 614 m3x106

Construction Dates

Start of Project: -/12

Start of RCC: -/12

End of RCC: 01/20

End of Project: 03/20

Specifications

Height: 165 metres

Length: 492 metres

Volume of RCC: 4741 m3x103

Total volume: 4800 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.70Traditional concrete against formwork
Downstream
SlopeType
0.70Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.70Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
  
Photo coming soon

Full Dam Information

Details

Country: Morocco

Owner: Direction des Aménagements Hydrauliques

Type: Hardfill

Purpose(s): Flood Control / Irrigation / Water Supply

River: Ouaar

Reservoir capacity: 10 m3x106

Construction Dates

Start of Project: 04/10

Start of RCC: 04/10

End of RCC: -/20

End of Project: -/20

Specifications

Height: 68 metres

Length: 370 metres

Volume of RCC: 580 m3x103

Total volume: 610 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.50Traditional concrete against formwork
Downstream
SlopeType
0.70Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.70Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
80
100
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
0 
Photo coming soon

Full Dam Information

Details

Country: El Salvador

Owner: Comisión Ejecutiva Hidroeléctrica del Rio Lempa (CEL)

Type: Hardfill

Purpose(s): Hydropower

River: Torola

Reservoir capacity: -

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/20

End of Project: 10/23

Specifications

Height: 88 metres

Length: 324 metres

Volume of RCC: 375 m3x103

Total volume: 450 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.20RCC against precast concrete panels (GEVR/GE-RCC)
Downstream
SlopeType
0.80RCC against precast concrete panels (GEVR/GE-RCC)
Spillway
SlopeType
0.80RCC against precast concrete panels (GEVR/GE-RCC)

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
94
Pozzolan (kg/m3)Pozzolan Type
63Natural pozzolan (ASTM Class N)
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Hardfill

Purpose(s): unknown

River: Shigaoqiao

Reservoir capacity: 11 m3x106

Construction Dates

Start of Project: -/19

Start of RCC: -/19

End of RCC: -/20

End of Project: -/20

Specifications

Height: 33 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Hardfill

Purpose(s): unknown

River: -

Reservoir capacity: 472 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/21

End of Project: -/22

Specifications

Height: 50 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Philippines

Owner: Wawa JV Co. Inc. (Prime Infrastructure Capital Inc and San Lorenzo Ruiz Builders and Developers Group)

Type: Hardfill

Purpose(s): Hydropower / Irrigation / Water Supply

River: Tayabasan

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: -/20

Start of RCC: -/20

End of RCC: 05/22

End of Project: 07/22

Specifications

Height: 24 metres

Length: 114 metres

Volume of RCC: 30 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
0.40RCC against formwork with external geomembrane (GEVR/GE-RCC)
Downstream
SlopeType
0.40RCC against formwork (GEVR/GE-RCC)
0.92 
Spillway
SlopeType
0.92Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
120Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: Iran

Owner: Sistan & Balouchestan Water Authority

Type: Hardfill

Purpose(s): Irrigation / Water Supply

River: Kahir

Reservoir capacity: 314 m3x106

Construction Dates

Start of Project: 11/10

Start of RCC: 11/10

End of RCC: 07/22

End of Project: 08/25

Specifications

Height: 55 metres

Length: 383 metres

Volume of RCC: 550 m3x103

Total volume: 730 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.80Reinforced conventional concrete cast after RCC placement
Downstream
SlopeType
0.80Reinforced conventional concrete cast after RCC placement
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Kahir on Google Earth
Kahir on Google Earth

Full Dam Information

Details

Country: Turkey

Owner: DSI - State Hydraulic Works

Type: Hardfill

Purpose(s): Irrigation

River: Dokuzsele Creek

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 07/17

Start of RCC: 07/17

End of RCC: -/22

End of Project: -/24

Specifications

Height: 24 metres

Length: 160 metres

Volume of RCC: 42 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Japan

Owner: Ministry of Land, Infrastructure, Transport and Tourism

Type: Hardfill

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Naruse

Reservoir capacity: 79 m3x106

Construction Dates

Start of Project: 05/18

Start of RCC: 05/18

End of RCC: 08/24

End of Project: 11/26

Specifications

Height: 115 metres

Length: 755 metres

Volume of RCC: 4450 m3x103

Total volume: 4850 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Naruse under construction
Naruse under construction

Full Dam Information

Details

Country: Iran

Owner: Fars Water Authority

Type: Hardfill

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Firooz Abad

Reservoir capacity: 146 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/24

End of Project: -/26

Specifications

Height: 88 metres

Length: 230 metres

Volume of RCC: 260 m3x103

Total volume: 285 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.90RCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
1.20RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
1.20Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Hayghar (formerly Dehroud) on Google Earth
Hayghar (formerly Dehroud) on Google Earth

Full Dam Information

Details

Country: China

Owner: -

Type: Hardfill

Purpose(s): unknown

River: -

Reservoir capacity: 10 m3x106

Construction Dates

Start of Project: -/20

Start of RCC: -/20

End of RCC: -/24

End of Project: -/25

Specifications

Height: 40 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Japan

Owner: Ministry of Land, Infrastructure, Transport and Tourism

Type: Hardfill

Purpose(s): Flood Control

River: Honbetsu

Reservoir capacity: 9 m3x106

Construction Dates

Start of Project: -/85

Start of RCC: -/85

End of RCC: -/24

End of Project: -/26

Specifications

Height: 53 metres

Length: 160 metres

Volume of RCC: -

Total volume: 180 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.80Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Hardfill

Purpose(s): unknown

River: Dongyanggou

Reservoir capacity: 5 m3x106

Construction Dates

Start of Project: 05/22

Start of RCC: 05/22

End of RCC: -/24

End of Project: -/25

Specifications

Height: 67 metres

Length: 136 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Philippines

Owner: Wawa JV Co. Inc. (Prime Infrastructure Capital Inc and San Lorenzo Ruiz Builders and Developers Group)

Type: Hardfill

Purpose(s): Water Supply

River: Marikina

Reservoir capacity: 120 m3x106

Construction Dates

Start of Project: 06/21

Start of RCC: 06/21

End of RCC: -/24

End of Project: -/25

Specifications

Height: 87 metres

Length: 439 metres

Volume of RCC: 1035 m3x103

Total volume: 1043 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.60RCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]

Placement

Layers (mm)Lifts (mm)
3003600

Cementitious material

Cement (kg/m3)
80
70
Pozzolan (kg/m3)Pozzolan Type
120Low-lime flyash (ASTM Class F)
110 
Photo coming soon

Full Dam Information

Details

Country: Greece

Owner: Terna Energiaki

Type: Hardfill

Purpose(s): Hydropower

River: Kapnitsorrema

Reservoir capacity: 7 m3x106

Construction Dates

Start of Project: 06/23

Start of RCC: 06/23

End of RCC: 10/25

End of Project: 12/25

Specifications

Height: 59 metres

Length: 475 metres

Volume of RCC: 765 m3x103

Total volume: 795 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
400400

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Agios Georgios under construction
Agios Georgios under construction

Full Dam Information

Details

Country: China

Owner: -

Type: Hardfill

Purpose(s): unknown

River: Qiuluxi

Reservoir capacity: 28 m3x106

Construction Dates

Start of Project: 10/21

Start of RCC: 10/21

End of RCC: -/25

End of Project: -/26

Specifications

Height: 52 metres

Length: 395 metres

Volume of RCC: 329 m3x103

Total volume: 386 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Morocco

Owner: Direction des Aménagements Hydrauliques

Type: Hardfill

Purpose(s): Flood Control / Irrigation / Water Supply

River: Kert

Reservoir capacity: 44 m3x106

Construction Dates

Start of Project: 01/22

Start of RCC: 01/22

End of RCC: 01/26

End of Project: 10/26

Specifications

Height: 70 metres

Length: 684 metres

Volume of RCC: 800 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
0.50Traditional concrete against formwork  [stepped face]
Downstream
SlopeType
0.90Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.90Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
100
Pozzolan (kg/m3)Pozzolan Type
0 
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Construction Headquarters of Heibaoshan Reservoir Project in Wanyuan City

Type: Hardfill

Purpose(s): Irrigation / Water Supply

River: Dayan

Reservoir capacity: 2 m3x106

Construction Dates

Start of Project: -/22

Start of RCC: -/22

End of RCC: -/26

End of Project: -/27

Specifications

Height: 60 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Indonesia

Owner: PUPR (Public Works and Public Housing Ministry)

Type: Hardfill

Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply

River: Cibeet

Reservoir capacity: 83 m3x106

Construction Dates

Start of Project: 09/23

Start of RCC: 09/23

End of RCC: -/27

End of Project: -/28

Specifications

Height: 47 metres

Length: 960 metres

Volume of RCC: 371 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
0.90 
Downstream
SlopeType
0.90 
Spillway
SlopeType
0.90 

Placement

Layers (mm)Lifts (mm)
250750

Cementitious material

Cement (kg/m3)
106
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used
  
Photo coming soon

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates