Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Nam Leuk spillwayLaosEDL Generation Public Co. LtdHNam Leuk185- /98- /98- /99- /001560             
Nam Mang 3LaosEDL (Electricite du Laos)HNam Gnong49- /02- /03- /0401/0528151             
Nakai, part of Nam Theun 2 HPPLaosNam Theun Power Corporation (NTPC)/EdF (Electricitie de France)HNam Theun353004/0403/0610/0710/0939436150207V(1)0.35
0.75
(10)0.75(12)300300100100(F)
Nam Gnouang (Theun Hinboun Expansion)LaosTheun Hinboun Power CompanyHNam Gnouang245010/0803/1012/11- /1265480383 V(1)0.80(1)*1.00(12)30030090100(F)
Nam Ngum 5
[A]
LaosNam Ngum 5 Power Company Ltd. (15% Électricité du Laos - Generation Company Ltd., 85% Power)HNam Ting31410/0811/1112/1212/12101235298421           
Xekaman 1LaosXekaman Power Ltd.HXe Kaman312003/1205/1307/1512/161203358701065V(3')* (3')* (12)30030070130(F)
Nam Ou 5LaosEDL (Electricite du Laos)HNam Ou335- /11- /13- /1505/1674445             
Nam Khan 3LaosEDL (Electricite du Laos)F H WNam Khan24912/12- /14- /1506/1667154125145           
Nam Ngiep 1LaosNam Ngiep 1 Power CompanyHNam Ngiep119209/1404/1604/1808/191675402288 V(3') (3')* (12)3002400 -
3600
80
60
120
70
(F)
Xayaburi (Left bank closure section)LaosXPCL (Xayaburi Power Company Ltd.)HMekong 03/1201/1812/1810/19401098285V(1) (16)  30030060100(F)
Don SahongLaosDon Sahong Power Company (Mega First Corporation Berhad and Électricité du Laos)HMekong2410/15- /16- /1812/192668005666090.30(1)0.75(1)0.75(1)300240055103(F)
Saddle Dam D (Xe-Pian Xe-Namnoy)LaosXe-Pian Xe Namnoy Power CompanyHXepian104310/1804/1910/19- /1956430170200V   none 300300  (F)
Nam Kong 3LaosChaleun Sekong Energy Co Ltd (CSE)HNam Kong47111/1703/1902/2111/2165500347400V(3')0.75(3')*0.75(12)300300075113(F)
Nam Theun 1LaosNam Theun 1 Power CompanyHNam Kading, aka Nam Theun300908/1501/1901/2208/2218777241412134320   (3')*  3003000 &
9000
100
130
130
120
(F)
Houay LaNgeLaosHouay LaNge Power Co. Ltd. (JV of China-based Hebei Construction and Investment Group Co., Ltd (HCIG) and CS Energy (Laos))HHouaylange1402/18- /20- /2205/2359174  V(3') (3')* (12)     
Nam Ngum 4LaosEDL (Electricite du Laos)HNam Ngum11002/1803/1901/23- /2474252230    (3')*    82100 
Nam Sum 3LaosNam Sam 3 Power Co. Ltd. (part of Phongsubthavy Group)HNam Xam43510/1907/2104/2312/23122321907987V(3') (3')*    60140(F)

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Laos

Owner: EDL Generation Public Co. Ltd

Type: Gravity

Purpose(s): Hydropower

River: Nam Leuk

Reservoir capacity: 185 m3x106

Construction Dates

Start of Project: -/98

Start of RCC: -/98

End of RCC: -/99

End of Project: -/00

Specifications

Height: 15 metres

Length: 60 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Laos

Owner: EDL (Electricite du Laos)

Type: Gravity

Purpose(s): Hydropower

River: Nam Gnong

Reservoir capacity: 49 m3x106

Construction Dates

Start of Project: -/02

Start of RCC: -/02

End of RCC: -/04

End of Project: 01/05

Specifications

Height: 28 metres

Length: 151 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Laos

Owner: Nam Theun Power Corporation (NTPC)/EdF (Electricitie de France)

Type: Gravity

Purpose(s): Hydropower

River: Nam Theun

Reservoir capacity: 3530 m3x106

Construction Dates

Start of Project: 04/04

Start of RCC: 04/04

End of RCC: 10/07

End of Project: 10/09

Specifications

Height: 39 metres

Length: 436 metres

Volume of RCC: 150 m3x103

Total volume: 207 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.35RCC against precast concrete blocks
0.75 
Spillway
SlopeType
0.75Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
100
Pozzolan (kg/m3)Pozzolan Type
100Low-lime flyash (ASTM Class F)
  
Nakai, part of Nam Theun 2 HPP completed
Nakai, part of Nam Theun 2 HPP completed

Full Dam Information

Details

Country: Laos

Owner: Theun Hinboun Power Company

Type: Gravity

Purpose(s): Hydropower

River: Nam Gnouang

Reservoir capacity: 2450 m3x106

Construction Dates

Start of Project: 10/08

Start of RCC: 10/08

End of RCC: 12/11

End of Project: -/12

Specifications

Height: 65 metres

Length: 480 metres

Volume of RCC: 383 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
1.00Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
100Low-lime flyash (ASTM Class F)
  
Nam Gnouang (Theun Hinboun Expansion) completed
Nam Gnouang (Theun Hinboun Expansion) completed

Full Dam Information

Details

Country: Laos

Owner: Nam Ngum 5 Power Company Ltd. (15% Électricité du Laos - Generation Company Ltd., 85% Power)

Type: Thin Arch

Purpose(s): Hydropower

River: Nam Ting

Reservoir capacity: 314 m3x106

Construction Dates

Start of Project: 10/08

Start of RCC: 10/08

End of RCC: 12/12

End of Project: 12/12

Specifications

Height: 101 metres

Length: 235 metres

Volume of RCC: 298 m3x103

Total volume: 421 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Nam Ngum 5 completed
Nam Ngum 5 completed

Full Dam Information

Details

Country: Laos

Owner: Xekaman Power Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Xe Kaman

Reservoir capacity: 3120 m3x106

Construction Dates

Start of Project: 03/12

Start of RCC: 03/12

End of RCC: 07/15

End of Project: 12/16

Specifications

Height: 120 metres

Length: 335 metres

Volume of RCC: 870 m3x103

Total volume: 1065 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)  [stepped face]
Downstream
SlopeType
 RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
 Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
70
Pozzolan (kg/m3)Pozzolan Type
130Low-lime flyash (ASTM Class F)
  
Xekaman 1 completed
Xekaman 1 completed

Full Dam Information

Details

Country: Laos

Owner: EDL (Electricite du Laos)

Type: Gravity

Purpose(s): Hydropower

River: Nam Ou

Reservoir capacity: 335 m3x106

Construction Dates

Start of Project: -/11

Start of RCC: -/11

End of RCC: -/15

End of Project: 05/16

Specifications

Height: 74 metres

Length: 445 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Nam Ou 5 completed
Nam Ou 5 completed

Full Dam Information

Details

Country: Laos

Owner: EDL (Electricite du Laos)

Type: Gravity

Purpose(s): Flood Control / Hydropower / Water Supply

River: Nam Khan

Reservoir capacity: 249 m3x106

Construction Dates

Start of Project: 12/12

Start of RCC: 12/12

End of RCC: -/15

End of Project: 06/16

Specifications

Height: 67 metres

Length: 154 metres

Volume of RCC: 125 m3x103

Total volume: 145 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Laos

Owner: Nam Ngiep 1 Power Company

Type: Gravity

Purpose(s): Hydropower

River: Nam Ngiep

Reservoir capacity: 1192 m3x106

Construction Dates

Start of Project: 09/14

Start of RCC: 09/14

End of RCC: 04/18

End of Project: 08/19

Specifications

Height: 167 metres

Length: 540 metres

Volume of RCC: 2288 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
 RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
 Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
3002400  -
 3600

Cementitious material

Cement (kg/m3)
80
60
Pozzolan (kg/m3)Pozzolan Type
120Low-lime flyash (ASTM Class F)
70 
Nam Ngiep 1 completed
Nam Ngiep 1 completed

Full Dam Information

Details

Country: Laos

Owner: XPCL (Xayaburi Power Company Ltd.)

Type: Gravity

Purpose(s): Hydropower

River: Mekong

Reservoir capacity: -

Construction Dates

Start of Project: 03/12

Start of RCC: 03/12

End of RCC: 12/18

End of Project: 10/19

Specifications

Height: 40 metres

Length: 109 metres

Volume of RCC: 82 m3x103

Total volume: 85 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
 Mechanically compacted unformed face of RCC
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
100Low-lime flyash (ASTM Class F)
  
Xayaburi (Left bank closure section) under construction
Xayaburi (Left bank closure section) under construction

Full Dam Information

Details

Country: Laos

Owner: Don Sahong Power Company (Mega First Corporation Berhad and Électricité du Laos)

Type: Gravity

Purpose(s): Hydropower

River: Mekong

Reservoir capacity: 24 m3x106

Construction Dates

Start of Project: 10/15

Start of RCC: 10/15

End of RCC: -/18

End of Project: 12/19

Specifications

Height: 26 metres

Length: 6800 metres

Volume of RCC: 566 m3x103

Total volume: 609 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.30Traditional concrete against formwork
Downstream
SlopeType
0.75Traditional concrete against formwork
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
3002400

Cementitious material

Cement (kg/m3)
55
Pozzolan (kg/m3)Pozzolan Type
103Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: Laos

Owner: Xe-Pian Xe Namnoy Power Company

Type: Gravity

Purpose(s): Hydropower

River: Xepian

Reservoir capacity: 1043 m3x106

Construction Dates

Start of Project: 10/18

Start of RCC: 10/18

End of RCC: 10/19

End of Project: -/19

Specifications

Height: 56 metres

Length: 430 metres

Volume of RCC: 170 m3x103

Total volume: 200 m3x103

Construction Methods

Facings

Upstream
SlopeType
Vertical 
Downstream
SlopeType
    [stepped face]
Spillway
SlopeType
none 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: Laos

Owner: Chaleun Sekong Energy Co Ltd (CSE)

Type: Gravity

Purpose(s): Hydropower

River: Nam Kong

Reservoir capacity: 471 m3x106

Construction Dates

Start of Project: 11/17

Start of RCC: 11/17

End of RCC: 02/21

End of Project: 11/21

Specifications

Height: 65 metres

Length: 500 metres

Volume of RCC: 347 m3x103

Total volume: 400 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.75Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
75
Pozzolan (kg/m3)Pozzolan Type
113Low-lime flyash (ASTM Class F)
  
Nam Kong 3 on Google Earth
Nam Kong 3 on Google Earth

Full Dam Information

Details

Country: Laos

Owner: Nam Theun 1 Power Company

Type: Gravity

Purpose(s): Hydropower

River: Nam Kading, aka Nam Theun

Reservoir capacity: 3009 m3x106

Construction Dates

Start of Project: 08/15

Start of RCC: 08/15

End of RCC: 01/22

End of Project: 08/22

Specifications

Height: 187 metres

Length: 772 metres

Volume of RCC: 4141213 m3x103

Total volume: 4320 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
 RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
3003000  &
 9000

Cementitious material

Cement (kg/m3)
100
130
Pozzolan (kg/m3)Pozzolan Type
130Low-lime flyash (ASTM Class F)
120 
Nam Theun 1 under construction
Nam Theun 1 under construction

Full Dam Information

Details

Country: Laos

Owner: Houay LaNge Power Co. Ltd. (JV of China-based Hebei Construction and Investment Group Co., Ltd (HCIG) and CS Energy (Laos))

Type: Gravity

Purpose(s): Hydropower

River: Houaylange

Reservoir capacity: 14 m3x106

Construction Dates

Start of Project: 02/18

Start of RCC: 02/18

End of RCC: -/22

End of Project: 05/23

Specifications

Height: 59 metres

Length: 174 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
 RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
 Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Houay LaNge completed
Houay LaNge completed

Full Dam Information

Details

Country: Laos

Owner: EDL (Electricite du Laos)

Type: Gravity

Purpose(s): Hydropower

River: Nam Ngum

Reservoir capacity: 110 m3x106

Construction Dates

Start of Project: 02/18

Start of RCC: 02/18

End of RCC: 01/23

End of Project: -/24

Specifications

Height: 74 metres

Length: 252 metres

Volume of RCC: 230 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
 RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
82
Pozzolan (kg/m3)Pozzolan Type
100 
  
Nam Ngum 4 completed
Nam Ngum 4 completed

Full Dam Information

Details

Country: Laos

Owner: Nam Sam 3 Power Co. Ltd. (part of Phongsubthavy Group)

Type: Gravity

Purpose(s): Hydropower

River: Nam Xam

Reservoir capacity: 435 m3x106

Construction Dates

Start of Project: 10/19

Start of RCC: 10/19

End of RCC: 04/23

End of Project: 12/23

Specifications

Height: 122 metres

Length: 321 metres

Volume of RCC: 907 m3x103

Total volume: 987 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
 RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
140Low-lime flyash (ASTM Class F)
  
Nam Sum 3 completed
Nam Sum 3 completed

 