Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Beni HarounAlgeriaANBT (Agence Nationale des Barrages et Transferts)I WEl Kebir96301/9310/9807/0012/0011871416901900V(1)0.80(1)*0.80(13)30030082143(F)
DaguChinaChina Huadian Group Co. Ltd.HYaluzangbu (Brahmaputra)55- /1603/1904/21- /231183859371442        93
60
93
100
 
Shin MaruyamaJapanKansai Electric PowerF HKiso131- /22- /25- /28- /30118341             

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Algeria

Owner: ANBT (Agence Nationale des Barrages et Transferts)

Type: Gravity

Purpose(s): Irrigation / Water Supply

River: El Kebir

Reservoir capacity: 963 m3x106

Construction Dates

Start of Project: 01/93

Start of RCC: 01/93

End of RCC: 07/00

End of Project: 12/00

Specifications

Height: 118 metres

Length: 714 metres

Volume of RCC: 1690 m3x103

Total volume: 1900 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Reinforced concrete cast against precast units or slip-formed facing elements

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
82
Pozzolan (kg/m3)Pozzolan Type
143Low-lime flyash (ASTM Class F)
  
Beni Haroun completed
Beni Haroun completed

Full Dam Information

Details

Country: China

Owner: China Huadian Group Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Yaluzangbu (Brahmaputra)

Reservoir capacity: 55 m3x106

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: 04/21

End of Project: -/23

Specifications

Height: 118 metres

Length: 385 metres

Volume of RCC: 937 m3x103

Total volume: 1442 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
93
60
Pozzolan (kg/m3)Pozzolan Type
93 
100 
Dagu completed
Dagu completed

Full Dam Information

Details

Country: Japan

Owner: Kansai Electric Power

Type: Gravity

Purpose(s): Flood Control / Hydropower

River: Kiso

Reservoir capacity: 131 m3x106

Construction Dates

Start of Project: -/22

Start of RCC: -/22

End of RCC: -/28

End of Project: -/30

Specifications

Height: 118 metres

Length: 341 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates