Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Gibe IIIEthiopiaEthiopian Electric Power (EEP)HOmo1469004/0812/1110/15- /16246630620064000.25(3')1.00(3')*1.00(3')*40040070 to  12045 to  60(S)
Koysha (Gibe IV)EthiopiaEthiopian Electric Power (EEP)HOmo690009/1306/2002/2705/282011020735077250.10
0.35
(3')0.70(3')*separate 300150013025(N)

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Ethiopia

Owner: Ethiopian Electric Power (EEP)

Type: Gravity

Purpose(s): Hydropower

River: Omo

Reservoir capacity: 14690 m3x106

Construction Dates

Start of Project: 04/08

Start of RCC: 04/08

End of RCC: 10/15

End of Project: -/16

Specifications

Height: 246 metres

Length: 630 metres

Volume of RCC: 6200 m3x103

Total volume: 6400 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.25RCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
1.00RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
1.00RCC against formwork (GEVR/GE-RCC)  [stepped face]

Placement

Layers (mm)Lifts (mm)
400400

Cementitious material

Cement (kg/m3)
70  to
Pozzolan (kg/m3)Pozzolan Type
45  toGround-granulated blast-furnace slag
  
Gibe III completed
Gibe III completed

Full Dam Information

Details

Country: Ethiopia

Owner: Ethiopian Electric Power (EEP)

Type: Gravity

Purpose(s): Hydropower

River: Omo

Reservoir capacity: 6900 m3x106

Construction Dates

Start of Project: 09/13

Start of RCC: 09/13

End of RCC: 02/27

End of Project: 05/28

Specifications

Height: 201 metres

Length: 1020 metres

Volume of RCC: 7350 m3x103

Total volume: 7725 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10RCC against formwork (GEVR/GE-RCC)
0.35 
Downstream
SlopeType
0.70RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
separate 

Placement

Layers (mm)Lifts (mm)
3001500

Cementitious material

Cement (kg/m3)
130
Pozzolan (kg/m3)Pozzolan Type
25Natural pozzolan (ASTM Class N)
  
Koysha (Gibe IV) on Google Earth
Koysha (Gibe IV) on Google Earth

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates