Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Koudiat Acerdoune
[H-F]
AlgeriaANBT (Agence Nationale des Barrages et Transfert)I WWadi Isser80011/0205/0606/0809/08121492165018500.65(1)*0.65(1)*0.65(1)*300 to
400
300 to
400
7787(F)
AyvaliTurkeyOzdogan EnerjiHOltu30804/1102/1302/1510/1517740516501900V(3')0.75(3')*0.75(12)30030050
100
110
120
(F)

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Algeria

Owner: ANBT (Agence Nationale des Barrages et Transfert)

Type: Hardfill

Purpose(s): Irrigation / Water Supply

River: Wadi Isser

Reservoir capacity: 800 m3x106

Construction Dates

Start of Project: 11/02

Start of RCC: 11/02

End of RCC: 06/08

End of Project: 09/08

Specifications

Height: 121 metres

Length: 492 metres

Volume of RCC: 1650 m3x103

Total volume: 1850 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.65Traditional concrete against formwork  [stepped face]
Downstream
SlopeType
0.65Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.65Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300  to300  to
400400

Cementitious material

Cement (kg/m3)
77
Pozzolan (kg/m3)Pozzolan Type
87Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: Turkey

Owner: Ozdogan Enerji

Type: Gravity

Purpose(s): Hydropower

River: Oltu

Reservoir capacity: 308 m3x106

Construction Dates

Start of Project: 04/11

Start of RCC: 04/11

End of RCC: 02/15

End of Project: 10/15

Specifications

Height: 177 metres

Length: 405 metres

Volume of RCC: 1650 m3x103

Total volume: 1900 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.75Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
50
100
Pozzolan (kg/m3)Pozzolan Type
110Low-lime flyash (ASTM Class F)
120 
Ayvali completed
Ayvali completed

 

Search again