Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
CanoasBrazilSRH/CE (Secretaria de Rewrsos Hidricos-CE)WSaõ Gonçalo6907/9308/9405/95- /965111687930.10(1)0.80(10)*0.80(1)*3003006416(N)
JauruBrazilHJauru - /00- /01- /02- /0351              
BoussiabaAlgeriaANBT (Agence Nationale des Barrages et Transfert)WBoussiaba12012/0605/0811/0808/0951310160190V(2) (1) (1)30030011228(F)
HechuanChinaHJialingjiang11- /12- /14- /16- /1751              
Ouldjet MellegueAlgeriaI WMellegue155- /12- /13- /17- /1851              

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Brazil

Owner: SRH/CE (Secretaria de Rewrsos Hidricos-CE)

Type: Gravity

Purpose(s): Water Supply

River: Saõ Gonçalo

Reservoir capacity: 69 m3x106

Construction Dates

Start of Project: 07/93

Start of RCC: 07/93

End of RCC: 05/95

End of Project: -/96

Specifications

Height: 51 metres

Length: 116 metres

Volume of RCC: 87 m3x103

Total volume: 93 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80RCC against precast concrete blocks  [stepped face]
Spillway
SlopeType
0.80Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
64
Pozzolan (kg/m3)Pozzolan Type
16Natural pozzolan (ASTM Class N)
  
Canoas completed
Canoas completed

Full Dam Information

Details

Country: Brazil

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Jauru

Reservoir capacity: -

Construction Dates

Start of Project: -/00

Start of RCC: -/00

End of RCC: -/02

End of Project: -/03

Specifications

Height: 51 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Algeria

Owner: ANBT (Agence Nationale des Barrages et Transfert)

Type: Gravity

Purpose(s): Water Supply

River: Boussiaba

Reservoir capacity: 120 m3x106

Construction Dates

Start of Project: 12/06

Start of RCC: 12/06

End of RCC: 11/08

End of Project: 08/09

Specifications

Height: 51 metres

Length: 310 metres

Volume of RCC: 160 m3x103

Total volume: 190 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork with external geomembrane
Downstream
SlopeType
 Traditional concrete against formwork
Spillway
SlopeType
 Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
112
Pozzolan (kg/m3)Pozzolan Type
28Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: Jialingjiang

Reservoir capacity: 11 m3x106

Construction Dates

Start of Project: -/12

Start of RCC: -/12

End of RCC: -/16

End of Project: -/17

Specifications

Height: 51 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Algeria

Owner: -

Type: Gravity

Purpose(s): Irrigation / Water Supply

River: Mellegue

Reservoir capacity: 155 m3x106

Construction Dates

Start of Project: -/12

Start of RCC: -/12

End of RCC: -/17

End of Project: -/18

Specifications

Height: 51 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

 

Search again