Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
ShuidongChinaFujian Shuikou Power Generation GroupH NYouxi10804/9111/9210/9312/9563197126184V(7)0.75(10)0.75(1)3003005090(F)
JucazinhoBrazilDNOCS (Departamento Nacional de Obras Contra a Secas)F I R WCapiibaribe28607/9611/9610/98- /9963442472500V(12)0.75(1)*0.75(1)*3003006416(N)
Dona FranciscaBrazilDona Francisca Energértica SAHJacuí33508/9806/9910/0012/0063670485503 (1) (3)* (1)*3003007218(N)
XiheChinaHanjiang Hydropower Development Ltd.F H NHanjiang22911/0302/0405/0506/0763346194631          (F)
YoushuiChinaChongqing Youshui River Hydropower Development Co. Ltd.HYoushui152- /05- /06- /07- /0863194             
BengohMalaysiaPublic Works DepartmentWSungai Bengoh14406/0706/0905/10- /1263267130172V(3')0.80(3')*0.80(3')*300300060120(F)
Valsamiotis
[H-F]
GreeceCrete Western Development OrganisationIValsamiotis 10/0505/0712/10- /14633356408200.80(13)0.80(3)0.80(1)*300300600(-) -
LonghuakouChinaLonghua30- /10- /11- /12- /1363353             
Lower Russei ChrumCambodiaMinistry of Mines and EnergyHRussei Chrum18- /11- /12- /13- /1463              
UludereTurkeyDSI - State Hydraulic WorksHOrtasu2009/08- /13- /14- /15634313924600.10(1)0.80(1)*0.80(12)3006001000(-) -

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: China

Owner: Fujian Shuikou Power Generation Group

Type: Gravity

Purpose(s): Hydropower / Navigation

River: Youxi

Reservoir capacity: 108 m3x106

Construction Dates

Start of Project: 04/91

Start of RCC: 04/91

End of RCC: 10/93

End of Project: 12/95

Specifications

Height: 63 metres

Length: 197 metres

Volume of RCC: 126 m3x103

Total volume: 184 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against precast concrete panels
Downstream
SlopeType
0.75RCC against precast concrete blocks
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
50
Pozzolan (kg/m3)Pozzolan Type
90Low-lime flyash (ASTM Class F)
  
Shuidong completed
Shuidong completed

Full Dam Information

Details

Country: Brazil

Owner: DNOCS (Departamento Nacional de Obras Contra a Secas)

Type: Gravity

Purpose(s): Flood Control / Irrigation / Recreation / Water Supply

River: Capiibaribe

Reservoir capacity: 286 m3x106

Construction Dates

Start of Project: 07/96

Start of RCC: 07/96

End of RCC: 10/98

End of Project: -/99

Specifications

Height: 63 metres

Length: 442 metres

Volume of RCC: 472 m3x103

Total volume: 500 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalReinforced conventional concrete cast after RCC placement
Downstream
SlopeType
0.75Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.75Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
64
Pozzolan (kg/m3)Pozzolan Type
16Natural pozzolan (ASTM Class N)
  
Jucazinho completed
Jucazinho completed

Full Dam Information

Details

Country: Brazil

Owner: Dona Francisca Energértica SA

Type: Gravity

Purpose(s): Hydropower

River: Jacuí

Reservoir capacity: 335 m3x106

Construction Dates

Start of Project: 08/98

Start of RCC: 08/98

End of RCC: 10/00

End of Project: 12/00

Specifications

Height: 63 metres

Length: 670 metres

Volume of RCC: 485 m3x103

Total volume: 503 m3x103

Construction Methods

Facings

Upstream
SlopeType
 Traditional concrete against formwork
Downstream
SlopeType
 RCC against formwork  [stepped face]
Spillway
SlopeType
 Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
72
Pozzolan (kg/m3)Pozzolan Type
18Natural pozzolan (ASTM Class N)
  
Dona Francisca completed
Dona Francisca completed

Full Dam Information

Details

Country: China

Owner: Hanjiang Hydropower Development Ltd.

Type: Gravity

Purpose(s): Flood Control / Hydropower / Navigation

River: Hanjiang

Reservoir capacity: 229 m3x106

Construction Dates

Start of Project: 11/03

Start of RCC: 11/03

End of RCC: 05/05

End of Project: 06/07

Specifications

Height: 63 metres

Length: 346 metres

Volume of RCC: 194 m3x103

Total volume: 631 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)
  
Photo coming soon

Full Dam Information

Details

Country: China

Owner: Chongqing Youshui River Hydropower Development Co. Ltd.

Type: Gravity

Purpose(s): Hydropower

River: Youshui

Reservoir capacity: 152 m3x106

Construction Dates

Start of Project: -/05

Start of RCC: -/05

End of RCC: -/07

End of Project: -/08

Specifications

Height: 63 metres

Length: 194 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Youshui completed
Youshui completed

Full Dam Information

Details

Country: Malaysia

Owner: Public Works Department

Type: Gravity

Purpose(s): Water Supply

River: Sungai Bengoh

Reservoir capacity: 144 m3x106

Construction Dates

Start of Project: 06/07

Start of RCC: 06/07

End of RCC: 05/10

End of Project: -/12

Specifications

Height: 63 metres

Length: 267 metres

Volume of RCC: 130 m3x103

Total volume: 172 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]
Spillway
SlopeType
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
120Low-lime flyash (ASTM Class F)
  
Bengoh completed
Bengoh completed

Full Dam Information

Details

Country: Greece

Owner: Crete Western Development Organisation

Type: Hardfill

Purpose(s): Irrigation

River: Valsamiotis

Reservoir capacity: -

Construction Dates

Start of Project: 10/05

Start of RCC: 10/05

End of RCC: 12/10

End of Project: -/14

Specifications

Height: 63 metres

Length: 335 metres

Volume of RCC: 640 m3x103

Total volume: 820 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.80Reinforced concrete cast against precast units or slip-formed facing elements
Downstream
SlopeType
0.80RCC against formwork
Spillway
SlopeType
0.80Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
Valsamiotis completed
Valsamiotis completed

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): unknown

River: Longhua

Reservoir capacity: 30 m3x106

Construction Dates

Start of Project: -/10

Start of RCC: -/10

End of RCC: -/12

End of Project: -/13

Specifications

Height: 63 metres

Length: 353 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Longhuakou completed
Longhuakou completed

Full Dam Information

Details

Country: Cambodia

Owner: Ministry of Mines and Energy

Type: Gravity

Purpose(s): Hydropower

River: Russei Chrum

Reservoir capacity: 18 m3x106

Construction Dates

Start of Project: -/11

Start of RCC: -/11

End of RCC: -/13

End of Project: -/14

Specifications

Height: 63 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Lower Russei Chrum on Google Earth
Lower Russei Chrum on Google Earth

Full Dam Information

Details

Country: Turkey

Owner: DSI - State Hydraulic Works

Type: Gravity

Purpose(s): Hydropower

River: Ortasu

Reservoir capacity: 20 m3x106

Construction Dates

Start of Project: 09/08

Start of RCC: 09/08

End of RCC: -/14

End of Project: -/15

Specifications

Height: 63 metres

Length: 431 metres

Volume of RCC: 392 m3x103

Total volume: 460 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork  [stepped face]
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300600

Cementitious material

Cement (kg/m3)
100
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
Photo coming soon

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates